Projects Approved for Consumptive Uses of Water, 1623-1624 [2024-00356]
Download as PDF
Federal Register / Vol. 89, No. 7 / Wednesday, January 10, 2024 / Notices
lotter on DSK11XQN23PROD with NOTICES1
abandonment shall be protected under
Oregon Short Line Railroad—
Abandonment Portion Goshen Branch
Between Firth & Ammon, in Bingham &
Bonneville Counties, Idaho, 360 I.C.C.
91 (1979). To address whether this
condition adequately protects affected
employees, a petition for partial
revocation under 49 U.S.C. 10502(d)
must be filed.
Provided no formal expression of
intent to file an offer of financial
assistance (OFA) has been received,2
this exemption will be effective on
February 9, 2024, unless stayed pending
reconsideration. Petitions to stay that do
not involve environmental issues 3 must
be filed by January 19, 2024. Formal
expressions of intent to file an OFA
under 49 CFR 1152.27(c)(2) and interim
trail use/rail banking requests under 49
CFR 1152.29 must be filed by January
22, 2024.4 Petitions to reopen and
requests for public use conditions under
49 CFR 1152.28 must be filed by January
30, 2024.
All pleadings, referring to Docket No.
AB 1311 (Sub-No. 1X), must be filed
with the Surface Transportation Board
either via e-filing on the Board’s website
or in writing addressed to 395 E Street,
SW, Washington, DC 20423–0001. In
addition, a copy of each pleading must
be served on MNR’s representative,
Charles A. Spitulnik, Kaplan, Kirsch &
Rockwell, LLP, 1634 I (Eye) Street NW,
Suite 300, Washington, DC 20006.
If the verified notice contains false or
misleading information, the exemption
is void ab initio.
Public use or trail use/rail banking
conditions will be imposed, where
appropriate, in a subsequent decision.
2 Persons interested in submitting an OFA must
first file a formal expression of intent to file an
offer, indicating the type of financial assistance they
wish to provide (i.e., subsidy or purchase) and
demonstrating that they are preliminarily
financially responsible. See 49 CFR 1152.27(c)(2)(i).
3 Typically, an abandonment requires
environmental review. However, on September 9,
2022, the Board’s Office of Environmental Analysis
(OEA) issued a Final Environmental Assessment
(Final EA) covering the Line in a related
proceeding: Metro-North Commuter Railroad—
Adverse Discontinuance of Trackage Rights—
Housatonic Railroad, Docket No. AB 1311. No
environmental or historic preservation issues were
raised by any party or identified by OEA in that
Final EA. MNR states that no significant changes
affecting the Line have taken place since the Final
EA was issued. Accordingly, because OEA has
recently conducted an appropriate environmental
review concerning the Line at issue, a finding of no
significant impact under 49 CFR 1105.10(g) will be
made pursuant to 49 CFR 1011.7(a)(2)(ix). See
Housatonic R.R.—Discontinuance of Serv.—in
Dutchess & Putnam Cntys., N.Y., AB 733 (Sub-no.
1X) et al., slip op. at 4 n.10 (STB served July 13,
2023).
4 Filing fees for OFAs and trail use requests can
be found at 49 CFR 1002.2(f)(25) and (27),
respectively.
VerDate Sep<11>2014
16:40 Jan 09, 2024
Jkt 262001
Pursuant to the provisions of 49 CFR
1152.29(e)(2), MNR shall file a notice of
consummation with the Board to signify
that it has exercised the authority
granted and fully abandoned the Line. If
consummation has not been effected by
MNR’s filing of a notice of
consummation by January 10, 2025, and
there are no legal or regulatory barriers
to consummation, the authority to
abandon will automatically expire.
Board decisions and notices are
available at www.stb.gov.
Decided: January 5, 2024.
By the Board, Mai T. Dinh, Director, Office
of Proceedings.
Stefan Rice,
Clearance Clerk.
[FR Doc. 2024–00338 Filed 1–9–24; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Approved for Consumptive
Uses of Water
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists Approvals by
Rule for projects by the Susquehanna
River Basin Commission during the
period set forth in DATES.
DATES: December 1–31, 2023.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.gov.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists the projects, described
below, receiving approval for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22 (e)
and (f) for the time period specified
above.
Water Source Approval—Issued
Under 18 CFR 806.22(e):
1. Plainville Brands, LLC—Plainville
Farms, ABR–202312005; New Oxford
Borough, Adams County, Pa.;
Consumptive Use of Up to 0.380 mgd;
Approval Date: December 6, 2023.
2. Penn State Health Hampden
Medical Center—Hampden Medical
Center; ABR–202312006; Hampden
Township, Cumberland County, Pa.;
Consumptive Use of Up to 0.1620 mgd;
Approval Date: December 7, 2023.
SUMMARY:
PO 00000
Frm 00115
Fmt 4703
Sfmt 4703
1623
Water Source Approval—Issued
Under 18 CFR 806.22(f):
1. Coterra Energy Inc.; Pad ID:
DobrosielskiJ P1; ABR–202312003;
Auburn & Dimock Townships,
Susquehanna County, Pa.; Consumptive
Use of Up to 5.0000 mgd; Approval
Date: December 7, 2023.
2. RENEWAL—Chesapeake
Appalachia, L.L.C.; Pad ID: Amcor;
ABR–201211018.R2; Meshoppen
Township, Wyoming County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: December 8, 2023.
3. RENEWAL—Chesapeake
Appalachia, L.L.C.; Pad ID: Joeguswa;
ABR–201211019.R2; Cherry Township,
Sullivan County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date:
December 8, 2023.
4. RENEWAL—Chesapeake
Appalachia, L.L.C.; Pad ID: Lucarino
Drilling Pad #1; ABR–201112010.R2;
Wilmot Township, Bradford County,
Pa.; Consumptive Use of Up to 7.5000
mgd; Approval Date: December 8, 2023.
5. RENEWAL—Range Resources—
Appalachia, LLC; Pad ID: State Game
Lands 075A—East Pad; ABR–
201311005.R2; Pine Township,
Lycoming County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval
Date: December 8, 2023.
6. RENEWAL—Seneca Resources
Company, LLC; Pad ID: Sherman 492W;
ABR–201310001.R2; Sullivan
Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: December 8, 2023.
7. RENEWAL—SWN Production
Company, LLC; Pad ID: TNT 1 LIMITED
PARTNERSHIP; ABR–201112006.R2;
New Milford Township, Susquehanna
County, Pa.; Consumptive Use of Up to
4.9990 mgd; Approval Date: December
8, 2023.
8. Coterra Energy Inc.; Pad ID:
ConboyT P1; ABR–202312002;
Middletown Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: December
10, 2023.
9. Greylock Production, LLC; Pad ID:
Ron Well Pad; ABR–202312001; Hector
Township, Potter County, Pa.;
Consumptive Use of Up to 6.0000 mgd;
Approval Date: December 10, 2023.
10. RENEWAL—Chesapeake
Appalachia, L.L.C.; Pad ID: Edger; ABR–
201112020.R2; Smithfield Township,
Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date:
December 18, 2023.
11. RENEWAL—Chesapeake
Appalachia, L.L.C.; Pad ID: RGB; ABR–
201112021.R2; Smithfield Township,
Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date:
December 18, 2023.
E:\FR\FM\10JAN1.SGM
10JAN1
lotter on DSK11XQN23PROD with NOTICES1
1624
Federal Register / Vol. 89, No. 7 / Wednesday, January 10, 2024 / Notices
12. RENEWAL—Chesapeake
Appalachia, L.L.C.; Pad ID: Wildonger;
ABR–201112026.R2; Wyalusing
Township, Bradford County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: December 18, 2023.
13. RENEWAL—Chesapeake
Appalachia, L.L.C.; Pad ID: Yost; ABR–
201112022.R2; Franklin Township,
Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date:
December 18, 2023.
14. RENEWAL—Coterra Energy Inc.;
Pad ID: CareyR P1; ABR–201112023.R2;
Harford Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: December
18, 2023.
15. RENEWAL—Seneca Resources
Company, LLC; Pad ID: DCNR 007 Pad
K; ABR–201112018.R2; Delmar
Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: December 18, 2023.
16. RENEWAL—SWN Production
Company, LLC; Pad ID: NR–11–
DAYTON–PAD; ABR–201312002.R2;
Great Bend Township, Susquehanna
County, Pa.; Consumptive Use of Up to
4.9990 mgd; Approval Date: December
18, 2023.
17. RENEWAL—SWN Production
Company, LLC; Pad ID: NR–14–
BRANT–PAD; ABR–201312001.R2;
Great Bend Township, Susquehanna
County, Pa.; Consumptive Use of Up to
4.9990 mgd; Approval Date: December
18, 2023.
18. RENEWAL—SWN Production
Company, LLC; Pad ID: RU–40–
BREESE–PAD; ABR–201312003.R2;
New Milford Township, Susquehanna
County, Pa.; Consumptive Use of Up to
4.9990 mgd; Approval Date: December
18, 2023.
19. RENEWAL—Seneca Resources
Company, LLC; Pad ID: Cotton Hanlon
595; ABR–201612001.R1; Sullivan
Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: December 20, 2023.
20. RENEWAL—EQT ARO LLC; Pad
ID: Kurt Haufler Pad A; ABR–
201312005.R2; Cogan House Township,
Lycoming County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval
Date: December 26, 2023.
21. RENEWAL—Repsol Oil & Gas
USA, LLC; Pad ID: STICKNEY (07 087)
A; ABR–201312004.R2; Choconut
Township, Susquehanna County, Pa.;
Consumptive Use of Up to 6.0000 mgd;
Approval Date: December 26, 2023.
22. RENEWAL—Seneca Resources
Company, LLC; Pad ID: Scheible 898;
ABR–201112039.R2; Deerfield
Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: December 26, 2023.
VerDate Sep<11>2014
16:40 Jan 09, 2024
Jkt 262001
23. RENEWAL—SWN Production
Company, LLC; Pad ID: LOCH; ABR–
201112031.R2; Cogan House Township,
Lycoming County, Pa.; Consumptive
Use of Up to 4.9990 mgd; Approval
Date: December 26, 2023.
24. Inflection Energy (PA) LLC; Pad
ID: Easton Well Site; ABR–202312004;
Upper Fairfield Township, Lycoming
County, Pa.; Consumptive Use of Up to
4.0000 mgd; Approval Date: December
29, 2023.
25. RENEWAL—Coterra Energy Inc.;
Pad ID: Jeffers Farms P1; ABR–
201112003.R2; Harford Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 5.0000 mgd; Approval
Date: December 29, 2023.
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806 and
808.
Dated: January 5, 2024.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2024–00356 Filed 1–9–24; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on February 1, 2024. The Commission
will hold this hearing in person and
telephonically. At this public hearing,
the Commission will hear testimony on
the projects listed in the Supplementary
Information section of this notice and
testimony on the General Permit GP–3,
Cooperative Fish Nursery. Such projects
and actions are intended to be
scheduled for Commission action at its
next business meeting, tentatively
scheduled for March 14, 2024, which
will be noticed separately. The public
should note that this public hearing will
be the only opportunity to offer oral
comments to the Commission for the
listed projects and actions. The deadline
for the submission of written comments
is February 12, 2024.
DATES: The public hearing will convene
on February 1, 2024, at 6:30 p.m. The
public hearing will end at 9 p.m. or at
the conclusion of public testimony,
whichever is earlier. The deadline for
submitting written comments is
Monday, February 12, 2024.
ADDRESSES: This public hearing will be
conducted in person and virtually. You
may attend in person at Susquehanna
SUMMARY:
PO 00000
Frm 00116
Fmt 4703
Sfmt 4703
River Basin Commission, 4423 N. Front
St., Harrisburg, Pennsylvania, or join by
telephone at Toll-Free Number 1–877–
304–9269 and then enter the guest
passcode 2619070 followed by #.
FOR FURTHER INFORMATION CONTACT:
Jason Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423 or joyler@srbc.gov.
The draft General Permit GP–3,
Cooperative Fish Nursery, and related
Fact Sheet may be viewed on the
Commissions website at https://
www.srbc.gov/regulatory/publicparticipation/.
Information concerning the project
applications is available at the
Commission’s Water Application and
Approval Viewer at https://
www.srbc.net/waav. Additional
supporting documents are available to
inspect and copy in accordance with the
Commission’s Access to Records Policy
at www.srbc.gov/regulatory/policiesguidance/docs/access-to-records-policy2009–02.pdf.
SUPPLEMENTARY INFORMATION: In
addition to hearing testimony on
General Permit GP–3, the public hearing
will cover the following projects:
Projects Scheduled for Action:
1. Project Sponsor and Facility:
ADLIB Resources, Inc. (Meshoppen
Creek), Springville Township,
Susquehanna County, Pa. Application
for renewal of surface water withdrawal
of up to 0.499 mgd (peak day) (Docket
No. 20190301).
2. Project Sponsor and Facility: Beech
Resources, LLC (Lycoming Creek),
Lycoming Township, Lycoming County,
Pa. Application for surface water
withdrawal of up to 1.500 mgd (peak
day).
3. Project Sponsor and Facility:
Cherokee Pharmaceuticals, LLC
(Susquehanna River), Riverside
Borough, Northumberland County, Pa.
Modification to extend the approval
terms of the consumptive use and
surface water withdrawal approvals
(Docket Nos. 20090310 and 20090311)
while the facility begins to
decommission operations through 2028,
and a phased reduction in the surface
water withdrawal from 34.392 mgd to
5.100 mgd (peak day) and consumptive
use from 0.999 mgd to 0.200 mgd (peak
day).
4. Project Sponsor and Facility:
Chesapeake Appalachia, L.L.C.
(Susquehanna River), Braintrim
Township, Wyoming County, Pa.
Application for renewal of surface water
withdrawal of up to 3.000 mgd (peak
day) (Docket No. 20190303).
5. Project Sponsor and Facility:
Chesapeake Appalachia, L.L.C.
E:\FR\FM\10JAN1.SGM
10JAN1
Agencies
[Federal Register Volume 89, Number 7 (Wednesday, January 10, 2024)]
[Notices]
[Pages 1623-1624]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-00356]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Projects Approved for Consumptive Uses of Water
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice lists Approvals by Rule for projects by the
Susquehanna River Basin Commission during the period set forth in
DATES.
DATES: December 1-31, 2023.
ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423, ext. 1312; fax:
(717) 238-2436; email: [email protected]. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This notice lists the projects, described
below, receiving approval for the consumptive use of water pursuant to
the Commission's approval by rule process set forth in 18 CFR 806.22
(e) and (f) for the time period specified above.
Water Source Approval--Issued Under 18 CFR 806.22(e):
1. Plainville Brands, LLC--Plainville Farms, ABR-202312005; New
Oxford Borough, Adams County, Pa.; Consumptive Use of Up to 0.380 mgd;
Approval Date: December 6, 2023.
2. Penn State Health Hampden Medical Center--Hampden Medical
Center; ABR-202312006; Hampden Township, Cumberland County, Pa.;
Consumptive Use of Up to 0.1620 mgd; Approval Date: December 7, 2023.
Water Source Approval--Issued Under 18 CFR 806.22(f):
1. Coterra Energy Inc.; Pad ID: DobrosielskiJ P1; ABR-202312003;
Auburn & Dimock Townships, Susquehanna County, Pa.; Consumptive Use of
Up to 5.0000 mgd; Approval Date: December 7, 2023.
2. RENEWAL--Chesapeake Appalachia, L.L.C.; Pad ID: Amcor; ABR-
201211018.R2; Meshoppen Township, Wyoming County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date: December 8, 2023.
3. RENEWAL--Chesapeake Appalachia, L.L.C.; Pad ID: Joeguswa; ABR-
201211019.R2; Cherry Township, Sullivan County, Pa.; Consumptive Use of
Up to 7.5000 mgd; Approval Date: December 8, 2023.
4. RENEWAL--Chesapeake Appalachia, L.L.C.; Pad ID: Lucarino
Drilling Pad #1; ABR-201112010.R2; Wilmot Township, Bradford County,
Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: December 8,
2023.
5. RENEWAL--Range Resources--Appalachia, LLC; Pad ID: State Game
Lands 075A--East Pad; ABR-201311005.R2; Pine Township, Lycoming County,
Pa.; Consumptive Use of Up to 4.0000 mgd; Approval Date: December 8,
2023.
6. RENEWAL--Seneca Resources Company, LLC; Pad ID: Sherman 492W;
ABR-201310001.R2; Sullivan Township, Tioga County, Pa.; Consumptive Use
of Up to 4.0000 mgd; Approval Date: December 8, 2023.
7. RENEWAL--SWN Production Company, LLC; Pad ID: TNT 1 LIMITED
PARTNERSHIP; ABR-201112006.R2; New Milford Township, Susquehanna
County, Pa.; Consumptive Use of Up to 4.9990 mgd; Approval Date:
December 8, 2023.
8. Coterra Energy Inc.; Pad ID: ConboyT P1; ABR-202312002;
Middletown Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: December 10, 2023.
9. Greylock Production, LLC; Pad ID: Ron Well Pad; ABR-202312001;
Hector Township, Potter County, Pa.; Consumptive Use of Up to 6.0000
mgd; Approval Date: December 10, 2023.
10. RENEWAL--Chesapeake Appalachia, L.L.C.; Pad ID: Edger; ABR-
201112020.R2; Smithfield Township, Bradford County, Pa.; Consumptive
Use of Up to 7.5000 mgd; Approval Date: December 18, 2023.
11. RENEWAL--Chesapeake Appalachia, L.L.C.; Pad ID: RGB; ABR-
201112021.R2; Smithfield Township, Bradford County, Pa.; Consumptive
Use of Up to 7.5000 mgd; Approval Date: December 18, 2023.
[[Page 1624]]
12. RENEWAL--Chesapeake Appalachia, L.L.C.; Pad ID: Wildonger; ABR-
201112026.R2; Wyalusing Township, Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date: December 18, 2023.
13. RENEWAL--Chesapeake Appalachia, L.L.C.; Pad ID: Yost; ABR-
201112022.R2; Franklin Township, Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date: December 18, 2023.
14. RENEWAL--Coterra Energy Inc.; Pad ID: CareyR P1; ABR-
201112023.R2; Harford Township, Susquehanna County, Pa.; Consumptive
Use of Up to 5.0000 mgd; Approval Date: December 18, 2023.
15. RENEWAL--Seneca Resources Company, LLC; Pad ID: DCNR 007 Pad K;
ABR-201112018.R2; Delmar Township, Tioga County, Pa.; Consumptive Use
of Up to 4.0000 mgd; Approval Date: December 18, 2023.
16. RENEWAL--SWN Production Company, LLC; Pad ID: NR-11-DAYTON-PAD;
ABR-201312002.R2; Great Bend Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd; Approval Date: December 18, 2023.
17. RENEWAL--SWN Production Company, LLC; Pad ID: NR-14-BRANT-PAD;
ABR-201312001.R2; Great Bend Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd; Approval Date: December 18, 2023.
18. RENEWAL--SWN Production Company, LLC; Pad ID: RU-40-BREESE-PAD;
ABR-201312003.R2; New Milford Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd; Approval Date: December 18, 2023.
19. RENEWAL--Seneca Resources Company, LLC; Pad ID: Cotton Hanlon
595; ABR-201612001.R1; Sullivan Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd; Approval Date: December 20, 2023.
20. RENEWAL--EQT ARO LLC; Pad ID: Kurt Haufler Pad A; ABR-
201312005.R2; Cogan House Township, Lycoming County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval Date: December 26, 2023.
21. RENEWAL--Repsol Oil & Gas USA, LLC; Pad ID: STICKNEY (07 087)
A; ABR-201312004.R2; Choconut Township, Susquehanna County, Pa.;
Consumptive Use of Up to 6.0000 mgd; Approval Date: December 26, 2023.
22. RENEWAL--Seneca Resources Company, LLC; Pad ID: Scheible 898;
ABR-201112039.R2; Deerfield Township, Tioga County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval Date: December 26, 2023.
23. RENEWAL--SWN Production Company, LLC; Pad ID: LOCH; ABR-
201112031.R2; Cogan House Township, Lycoming County, Pa.; Consumptive
Use of Up to 4.9990 mgd; Approval Date: December 26, 2023.
24. Inflection Energy (PA) LLC; Pad ID: Easton Well Site; ABR-
202312004; Upper Fairfield Township, Lycoming County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval Date: December 29, 2023.
25. RENEWAL--Coterra Energy Inc.; Pad ID: Jeffers Farms P1; ABR-
201112003.R2; Harford Township, Susquehanna County, Pa.; Consumptive
Use of Up to 5.0000 mgd; Approval Date: December 29, 2023.
Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806 and 808.
Dated: January 5, 2024.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2024-00356 Filed 1-9-24; 8:45 am]
BILLING CODE 7040-01-P