Federal Register / Vol. 88, No. 247 / Wednesday, December 27, 2023 / Notices
Montgomery counties, Maryland. The
project does not occupy any Federal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Jonathan
DiCesare, Regulatory Manager, 10
Roberts Lane, Suite 201, Ridgefield, CT
06877, 518–657–9012.
i. FERC Contact: Diana Shannon,
(202) 502–6136, diana.shannon@
ferc.gov.
j. Cooperating agencies: With this
notice, the Commission is inviting
Federal, State, local, and Tribal agencies
with jurisdiction and/or special
expertise with respect to environmental
issues affected by the proposal, that
wish to cooperate in the preparation of
any environmental document, if
applicable, to follow the instructions for
filing such requests described in item m
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of any environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. Deadline for filing comments,
motions to intervene, and protests:
January 19, 2024.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–3633–044. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
VerDate Sep<11>2014
19:00 Dec 26, 2023
Jkt 262001
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
l. Description of Request: During
relicensing consultation with interested
parties which began in 2020, the
licensee determined that the cost of
relicensing the project, as well as
anticipated mitigation measures, would
render the project uneconomic. Thus,
the licensee proposes to surrender its
license. The licensee proposes to
remove all generating equipment,
including the equipment diverging from
the main penstocks including the
turbine, generator, gate valve, and elbow
for each unit. The electrical conduit in
the powerhouse, the motor controllers,
and the generation cables up to the
interconnection point would also be
removed. Surrender activities would be
confined to the powerhouse. No changes
to the dam, which is owned by
Washington Suburban Sanitary
Commission (WSSC), are proposed. The
primary use of WSSC’s dam and
reservoir is to provide a water source to
surrounding counties. No changes to
this water supply are proposed as part
of surrender. The licensee is not
proposing any ground disturbing
activities or any changes to the
environment in the project area.
m. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
p. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
q. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 20, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–28539 Filed 12–26–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER24–181–000.
Applicants: Frankland Road Solar,
LLC.
Description: Supplement to October
23, 2023 Frankland Road Solar, LLC
tariff filing.
Filed Date: 12/15/23.
Accession Number: 20231215–5230.
E:\FR\FM\27DEN1.SGM
27DEN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 247 / Wednesday, December 27, 2023 / Notices
Comment Date: 5 p.m. ET 12/26/23.
Docket Numbers: ER24–706–000.
Applicants: Northern Orchard Solar
PV, LLC.
Description: Baseline eTariff Filing:
Market Based Rate to be effective 12/19/
2023.
Filed Date: 12/19/23.
Accession Number: 20231219–5223.
Comment Date: 5 p.m. ET 1/9/24.
Docket Numbers: ER24–707–000.
Applicants: Quartz Solar, LLC.
Description: Baseline eTariff Filing:
Market Based Rate to be effective 2/19/
2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5000.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–708–000.
Applicants: Transource Oklahoma,
LLC, Southwest Power Pool, Inc.
Description: Compliance filing:
Transource Oklahoma, LLC submits
tariff filing per 35: AEP on behalf of
affilate Transource Oklahoma Order 864
Compliance Filing to be effective 2/20/
2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5069.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–709–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing: Joint
OATT Ministerial Clean-up Filing
(2023) to be effective 11/17/2021.
Filed Date: 12/20/23.
Accession Number: 20231220–5115.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–710–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
NYISO 205: NYISO Ravenswood Fuel
Oil Implementation Agreement, SA2827
to be effective 1/1/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5117.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–711–000.
Applicants: Valley Electric
Association, Inc.
Description: § 205(d) Rate Filing:
Annual TRBAA Filing for 2024 to be
effective 1/1/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5145.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–712–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 5979; Queue No. AD2–085/AE2–
247/AF1–017 to be effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5161.
VerDate Sep<11>2014
19:00 Dec 26, 2023
Jkt 262001
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–713–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Pinewood Solar
LGIA Filing to be effective 12/9/2023.
Filed Date: 12/20/23.
Accession Number: 20231220–5166.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–714–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Zurisol
(Rockdale Storage) LGIA Filing to be
effective 12/8/2023.
Filed Date: 12/20/23.
Accession Number: 20231220–5167.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–715–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–12–20_SA 4218 Union ElectricGrain Belt TCA (H104 H105) to be
effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5202.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–716–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 6232; Queue No. AE1–071 to be
effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5207.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–717–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 6220; Queue No. AB2–037 to be
effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5238.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–718–000.
Applicants: Oklahoma Gas and
Electric Company.
Description: § 205(d) Rate Filing:
Normal filing 2023 Dec to be effective
11/12/2010.
Filed Date: 12/20/23.
Accession Number: 20231220–5245.
Comment Date: 5 p.m. ET 1/10/24.pm
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
89443
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 20, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–28544 Filed 12–26–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2197–144]
Cube Yadkin Generation, LLC; Notice
of Application for a Non-Capacity
Amendment of License Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Capacity
Amendment of License.
b. Project No.: 2197–144.
c. Date Filed: June 20, 2023, and
supplemented on August 18, 2023, and
December 1, 2023.
d. Applicant: Cube Yadkin
Generation, LLC.
e. Name of Project: Yadkin
Hydroelectric Project.
f. Location: The project is located on
the Yadkin River in Davie, Davidson,
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 88, Number 247 (Wednesday, December 27, 2023)]
[Notices]
[Pages 89442-89443]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-28544]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER24-181-000.
Applicants: Frankland Road Solar, LLC.
Description: Supplement to October 23, 2023 Frankland Road Solar,
LLC tariff filing.
Filed Date: 12/15/23.
Accession Number: 20231215-5230.
[[Page 89443]]
Comment Date: 5 p.m. ET 12/26/23.
Docket Numbers: ER24-706-000.
Applicants: Northern Orchard Solar PV, LLC.
Description: Baseline eTariff Filing: Market Based Rate to be
effective 12/19/2023.
Filed Date: 12/19/23.
Accession Number: 20231219-5223.
Comment Date: 5 p.m. ET 1/9/24.
Docket Numbers: ER24-707-000.
Applicants: Quartz Solar, LLC.
Description: Baseline eTariff Filing: Market Based Rate to be
effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220-5000.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-708-000.
Applicants: Transource Oklahoma, LLC, Southwest Power Pool, Inc.
Description: Compliance filing: Transource Oklahoma, LLC submits
tariff filing per 35: AEP on behalf of affilate Transource Oklahoma
Order 864 Compliance Filing to be effective 2/20/2024.
Filed Date: 12/20/23.
Accession Number: 20231220-5069.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-709-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Sec. 205(d) Rate Filing: Joint OATT Ministerial
Clean-up Filing (2023) to be effective 11/17/2021.
Filed Date: 12/20/23.
Accession Number: 20231220-5115.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-710-000.
Applicants: New York Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: NYISO 205: NYISO Ravenswood
Fuel Oil Implementation Agreement, SA2827 to be effective 1/1/2024.
Filed Date: 12/20/23.
Accession Number: 20231220-5117.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-711-000.
Applicants: Valley Electric Association, Inc.
Description: Sec. 205(d) Rate Filing: Annual TRBAA Filing for 2024
to be effective 1/1/2024.
Filed Date: 12/20/23.
Accession Number: 20231220-5145.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-712-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, Service
Agreement No. 5979; Queue No. AD2-085/AE2-247/AF1-017 to be effective
2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220-5161.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-713-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Pinewood Solar LGIA Filing
to be effective 12/9/2023.
Filed Date: 12/20/23.
Accession Number: 20231220-5166.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-714-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Zurisol (Rockdale Storage)
LGIA Filing to be effective 12/8/2023.
Filed Date: 12/20/23.
Accession Number: 20231220-5167.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-715-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2023-12-20_SA 4218 Union
Electric-Grain Belt TCA (H104 H105) to be effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220-5202.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-716-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, Service
Agreement No. 6232; Queue No. AE1-071 to be effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220-5207.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-717-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, Service
Agreement No. 6220; Queue No. AB2-037 to be effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220-5238.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24-718-000.
Applicants: Oklahoma Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: Normal filing 2023 Dec to be
effective 11/12/2010.
Filed Date: 12/20/23.
Accession Number: 20231220-5245.
Comment Date: 5 p.m. ET 1/10/24.pm
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: December 20, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-28544 Filed 12-26-23; 8:45 am]