Federal Register / Vol. 88, No. 247 / Wednesday, December 27, 2023 / Notices
authorized to sell wholesale electric
energy, capacity and ancillary services
outside of the Electric Reliability
Council of Texas at market-based rates
pursuant to authority granted by the
Federal Energy Regulatory Commission
(FERC) under a wholesale power sales
tariff currently on file with FERC. Id. at
2. BETM states that as a power marketer,
it ‘‘does not own any electric generation
or transmission facilities and does not
hold a franchise or service territory or
native load obligation.’’ Id. at 4. Further,
BETM represents that ‘‘none of BETM’s
U.S.-based affiliates or subsidiaries own
any electric transmission facilities other
than generating facility interconnection
facilities necessary to connect
individual generating facilities to the
grid[,] and BETM is not affiliated with
an entity that holds a franchise or
service territory in the U.S.’’ Id. BETM
represents that because it neither owns,
operates nor controls an electric power
supply transmission and/or distribution
system, ‘‘its exports cannot have any
adverse impact on the reliability,
stability, or sufficiency of supply on a
franchised electric supply system or the
electric power supply within the U.S.’’
Id. at 5.
The existing international
transmission facilities to be utilized by
the Applicant have been previously
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties. See App. at Exhibit C.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of FERC’s
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at
Electricity.Exports@hq.doe.gov in
accordance with FERC Rule 214 (18 CFR
385.214).
Comments and other filings
concerning BETM’s Application should
be clearly marked with GDO Docket No.
EA–463–A. Additional copies are to be
provided directly to BETM Contract
Administrator, Boston Energy Trading
and Marketing LLC, One International
Place, 9th Floor, Boston, MA 02110,
BETMContractAdmin@betm.com, and
Catherine McCarthy, Partner, Bracewell
LLP, 2001 M Street NW, Suite 900,
Washington DC 20036, cathy.mccarthy@
bracewell.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
VerDate Sep<11>2014
19:00 Dec 26, 2023
Jkt 262001
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
Copies of this Application will be
made available, upon request, by
accessing the program website at
https://www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority: This document of
the Department of Energy was signed on
December 19, 2023, by Maria Robinson,
Director, Grid Deployment Office,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC on December
20, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–28475 Filed 12–26–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Isotope Research & Development and
Production Advisory Committee
Department of Energy, Office of
Science.
ACTION: Notice of establishment.
AGENCY:
The CHIPS and Science Act of
2022 requires the Secretary of Energy to
establish an advisory committee in
alignment with the Department of
Energy (DOE) Isotope Program. Pursuant
to the Federal Advisory Committee Act,
and in accordance with title 41 of the
Code of Federal Regulations, and
following consultation with the
Committee Management Secretariat,
General Services Administration, notice
is hereby given that the Isotope
Research & Development and
Production Advisory Committee will be
established for a two-year period. The
Committee will provide advice,
information, and recommendations to
the Director, Office of Science, DOE, on
SUMMARY:
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
89429
a continuing basis on the DOE Isotope
Program.
SUPPLEMENTARY INFORMATION:
Committee members will be carefully
considered to be balanced in terms of
views represented and functions to be
performed, in accord with FACA, and to
obtain diversity, equity, and inclusion
with a balance of disciplines,
experiences, points of view, and
geography. Members shall be experts in
their respective fields from entities,
including, but not limited to, research
facilities, industry, and academic
institutions. Membership and
representation of all interests will be
determined in accordance with the
requirements of the Federal Advisory
Committee Act, and implementing
regulation.
The Committee will operate in
accordance with the provisions of the
Federal Advisory Committee Act, and
the rules and regulations in
implementation of that Act.
FOR FURTHER INFORMATION CONTACT:
Jehanne Gillo at (301) 903–3400, or
email at jehanne.gillo@science.doe.gov.
Signing Authority
This document of the Department of
Energy was signed on December 20,
2023, by Sarah E. Butler, Committee
Management Officer, pursuant to
delegated authority from the Secretary
of Energy. The document with the
original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on December
20, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–28432 Filed 12–26–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[GDO Docket No. EA–393–B]
Application for Renewal of
Authorization To Export Electric
Energy; Emera Energy Services
Subsidiary No. 8 LLC
Grid Deployment Office,
Department of Energy.
AGENCY:
E:\FR\FM\27DEN1.SGM
27DEN1
89430
ACTION:
Federal Register / Vol. 88, No. 247 / Wednesday, December 27, 2023 / Notices
Notice of application.
Emera Energy Services
Subsidiary No. 8 LLC (the Applicant or
EES No. 8) has applied for renewed
authorization to transmit electric energy
from the United States to Canada
pursuant to the Federal Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before January 26, 2024.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
by electronic mail to
Electricity.Exports@hq.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Christina Gomer, (240) 474–2403,
Electricity.Exports@hq.doe.gov.
SUPPLEMENTARY INFORMATION: The
United States Department of Energy
(DOE) regulates electricity exports from
the United States to foreign countries in
accordance with section 202(e) of the
Federal Power Act (FPA) (16 U.S.C.
824a(e)) and regulations thereunder (10
CFR 205.300 et seq.). Sections 301(b)
and 402(f) of the DOE Organization Act
(42 U.S.C. 7151(b) and 7172(f))
transferred this regulatory authority,
previously exercised by the nowdefunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides
that an entity which seeks to export
electricity must obtain an order from
DOE authorizing that export. (16 U.S.C.
824a(e)). On April 10, 2023, the
authority to issue such orders was
delegated to the DOE’s Grid Deployment
Office (GDO) by Delegation Order No.
S1–DEL–S3–2023 and Redelegation
Order No. S3–DEL–GD1–2023.
In May 2014, DOE issued Order No.
EA–393, authorizing EES No. 8 to
transmit electric energy from the United
States to Canada as a power marketer for
a five-year term. This authority was
renewed in 2019 (Order No. EA–393–A).
On November 9, 2023, EES No. 8 filed
an application with DOE (Application
or App.) for renewal of their export
authority for another five-year term.
App. at 1.
In its Application, EES No. 8 states
that it is a ‘‘wholly-owned subsidiary of
Emera Incorporated (‘Emera’), a Nova
Scotia company that is a publicly-traded
diversified energy and services
company.’’ Id. at 1. EES No. 8 states that
it ‘‘is currently authorized to export
electric energy from the United States to
Canada and has also received marketbased rate authority from the Federal
Energy Regulatory Commission
(‘FERC’). Id. at 1–2. According to the
Application, the Applicant’s parent
company, Emera, ‘‘owns other energy
ddrumheller on DSK120RN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
19:00 Dec 26, 2023
Jkt 262001
concerns.’’ Id. at 2. However, the
Applicant states EES No. 8 itself ‘‘does
not own or control any electric power
generation or transmission facilities and
does not have a franchised electric
power service area.’’ Id. at 6.
The existing international
transmission facilities to be utilized by
the Applicant have been previously
authorized by Presidential permits
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties. See App. at Exhibit C.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of FERC’s
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at
Electricity.Exports@hq.doe.gov in
accordance with FERC Rule 214 (18 CFR
385.214).
Comments and other filings
concerning EES No. 8’s Application
should be clearly marked with GDO
Docket No. EA–393–B. Additional
copies are to be provided directly to
Keith Sutherland, Vice President, Legal
& Regulatory Affairs, Emera Energy,
Inc., 5151 Terminal Road, Halifax, NS
B3J 1A1, Canada, keith.sutherland@
emeraenergy.com, Jeffrey Jakubiak,
Vinson & Elkins LLP, 1114 Avenue of
the Americas, 32nd Floor, New York,
NY 10036, JJakubiak@velaw.com, and
Jennifer Mansh, Vinson & Elkins LLP,
2200 Pennsylvania Avenue NW, Suite
500 West, Washington, DC 20037,
JMansh@velaw.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
Copies of this Application will be
made available, upon request, by
accessing the program website at
https://www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority: This document of
the Department of Energy was signed on
December 19, 2023, by Maria Robinson,
Director, Grid Deployment Office,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC on December
20, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–28462 Filed 12–26–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[GDO Docket No. EA–458–A]
Application for Renewal of
Authorization To Export Electric
Energy; Sempra Gas & Power
Marketing, LLC
Grid Deployment Office,
Department of Energy.
ACTION: Notice of application.
AGENCY:
Sempra Gas & Power
Marketing, LLC (the Applicant) has
applied for renewed authorization to
transmit electric energy from the United
States to Mexico pursuant to the Federal
Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before January 26, 2024.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
by electronic mail to
Electricity.Exports@hq.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Christina Gomer, (240) 474–2403,
Electricity.Exports@hq.doe.gov.
SUPPLEMENTARY INFORMATION: The
United States Department of Energy
(DOE) regulates electricity exports from
the United States to foreign countries in
accordance with section 202(e) of the
Federal Power Act (FPA) (16 U.S.C.
824a(e)) and regulations thereunder (10
CFR 205.300 et seq.). Sections 301(b)
and 402(f) of the DOE Organization Act
(42 U.S.C. 7151(b) and 7172(f))
transferred this regulatory authority,
previously exercised by the nowdefunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides
that an entity which seeks to export
electricity must obtain an order from
DOE authorizing that export. (16 U.S.C.
824a(e)). On April 10, 2023, the
SUMMARY:
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 88, Number 247 (Wednesday, December 27, 2023)]
[Notices]
[Pages 89429-89430]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-28462]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[GDO Docket No. EA-393-B]
Application for Renewal of Authorization To Export Electric
Energy; Emera Energy Services Subsidiary No. 8 LLC
AGENCY: Grid Deployment Office, Department of Energy.
[[Page 89430]]
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Emera Energy Services Subsidiary No. 8 LLC (the Applicant or
EES No. 8) has applied for renewed authorization to transmit electric
energy from the United States to Canada pursuant to the Federal Power
Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before January 26, 2024.
ADDRESSES: Comments, protests, motions to intervene, or requests for
more information should be addressed by electronic mail to
[email protected].
FOR FURTHER INFORMATION CONTACT: Christina Gomer, (240) 474-2403,
[email protected].
SUPPLEMENTARY INFORMATION: The United States Department of Energy (DOE)
regulates electricity exports from the United States to foreign
countries in accordance with section 202(e) of the Federal Power Act
(FPA) (16 U.S.C. 824a(e)) and regulations thereunder (10 CFR 205.300 et
seq.). Sections 301(b) and 402(f) of the DOE Organization Act (42
U.S.C. 7151(b) and 7172(f)) transferred this regulatory authority,
previously exercised by the now-defunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides that an entity which seeks to
export electricity must obtain an order from DOE authorizing that
export. (16 U.S.C. 824a(e)). On April 10, 2023, the authority to issue
such orders was delegated to the DOE's Grid Deployment Office (GDO) by
Delegation Order No. S1-DEL-S3-2023 and Redelegation Order No. S3-DEL-
GD1-2023.
In May 2014, DOE issued Order No. EA-393, authorizing EES No. 8 to
transmit electric energy from the United States to Canada as a power
marketer for a five-year term. This authority was renewed in 2019
(Order No. EA-393-A). On November 9, 2023, EES No. 8 filed an
application with DOE (Application or App.) for renewal of their export
authority for another five-year term. App. at 1.
In its Application, EES No. 8 states that it is a ``wholly-owned
subsidiary of Emera Incorporated (`Emera'), a Nova Scotia company that
is a publicly-traded diversified energy and services company.'' Id. at
1. EES No. 8 states that it ``is currently authorized to export
electric energy from the United States to Canada and has also received
market-based rate authority from the Federal Energy Regulatory
Commission (`FERC'). Id. at 1-2. According to the Application, the
Applicant's parent company, Emera, ``owns other energy concerns.'' Id.
at 2. However, the Applicant states EES No. 8 itself ``does not own or
control any electric power generation or transmission facilities and
does not have a franchised electric power service area.'' Id. at 6.
The existing international transmission facilities to be utilized
by the Applicant have been previously authorized by Presidential
permits issued pursuant to Executive Order 10485, as amended, and are
appropriate for open access transmission by third parties. See App. at
Exhibit C.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the Application at
[email protected]. Protests should be filed in accordance
with Rule 211 of FERC's Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to become a party to this proceeding
should file a motion to intervene at [email protected] in
accordance with FERC Rule 214 (18 CFR 385.214).
Comments and other filings concerning EES No. 8's Application
should be clearly marked with GDO Docket No. EA-393-B. Additional
copies are to be provided directly to Keith Sutherland, Vice President,
Legal & Regulatory Affairs, Emera Energy, Inc., 5151 Terminal Road,
Halifax, NS B3J 1A1, Canada, [email protected], Jeffrey
Jakubiak, Vinson & Elkins LLP, 1114 Avenue of the Americas, 32nd Floor,
New York, NY 10036, [email protected], and Jennifer Mansh, Vinson &
Elkins LLP, 2200 Pennsylvania Avenue NW, Suite 500 West, Washington, DC
20037, [email protected].
A final decision will be made on the requested authorization after
the environmental impacts have been evaluated pursuant to DOE's
National Environmental Policy Act Implementing Procedures (10 CFR part
1021) and after DOE evaluates whether the proposed action will have an
adverse impact on the sufficiency of supply or reliability of the
United States electric power supply system.
Copies of this Application will be made available, upon request, by
accessing the program website at https://www.energy.gov/gdo/pending-applications-0 or by emailing [email protected].
Signing Authority: This document of the Department of Energy was
signed on December 19, 2023, by Maria Robinson, Director, Grid
Deployment Office, pursuant to delegated authority from the Secretary
of Energy. That document with the original signature and date is
maintained by DOE. For administrative purposes only, and in compliance
with requirements of the Office of the Federal Register, the
undersigned DOE Federal Register Liaison Officer has been authorized to
sign and submit the document in electronic format for publication, as
an official document of the Department of Energy. This administrative
process in no way alters the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC on December 20, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-28462 Filed 12-26-23; 8:45 am]
BILLING CODE 6450-01-P