Combined Notice of Filings, 88062 [2023-27988]

Download as PDF 88062 Federal Register / Vol. 88, No. 243 / Wednesday, December 20, 2023 / Notices new license to continue to operate and maintain the 2.1-megawatt Alice Falls Hydroelectric Project No. 5867 (Alice Falls Project). On April 24, 2023, Commission staff issued a notice of intent to prepare an Environmental Assessment (EA) to evaluate the effects of relicensing the Alice Falls Project. The notice of intent included a schedule for preparing a single EA. By this notice, Commission staff is updating the procedural schedule for completing the EA. The revised schedule is shown below. Further revisions to the schedule may be made as appropriate. Milestone Issue EA .................... Target date March 2024. Any questions regarding this notice may be directed to Kelly Wolcott at (202) 502–6480, or by email at kelly.wolcott@ferc.gov. Dated: December 13, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–27878 Filed 12–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: ddrumheller on DSK120RN23PROD with NOTICES1 Filings Instituting Proceedings Docket Numbers: RP24–243–000. Applicants: Southern Star Central Gas Pipeline, Inc. Description: § 4(d) Rate Filing: Correction to Tariff Sheet No. 241 to be effective 4/1/2023. Filed Date: 12/13/23. Accession Number: 20231213–5146. Comment Date: 5 p.m. ET 12/26/23. Docket Numbers: RP24–244–000. Applicants: Bear Creek Storage Company, L.L.C. Description: Compliance filing: Annual Fuel Summary 2023 to be effective N/A. Filed Date: 12/14/23. Accession Number: 20231214–5063. Comment Date: 5 p.m. ET 12/26/23. Docket Numbers: RP24–245–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: REX 2023–12–14 Negotiated Rate Agreement Amendments to be effective 12/15/2023. Filed Date: 12/14/23. VerDate Sep<11>2014 18:02 Dec 19, 2023 Jkt 262001 Accession Number: 20231214–5125. Comment Date: 5 p.m. ET 12/26/23. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: PR24–4–001. Applicants: The Peoples Gas Light and Coke Company. Description: Amendment Filing: Limited Supplement to Petition for Rate Approval to be effective 11/1/2023. Filed Date: 12/13/23. Accession Number: 20231213–5134. Comment Date: 5 p.m. ET 1/3/24. § 284.123(g) Protest: 5 p.m. ET 1/17/ 24. Docket Numbers: RP24–203–001. Applicants: Gulf South Pipeline Company, LLC. Description: Tariff Amendment: Amendment Filing in Docket No. RP24– 203–000 to be effective 11/30/2023. Filed Date: 12/13/23. Accession Number: 20231213–5144. Comment Date: 5 p.m. ET 12/20/23. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Dated: December 14, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–27988 Filed 12–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 8051–012] Willimantic Power Corporation; Notice Soliciting Applications On August 31, 2020, Willimantic Power Corporation (licensee), a subsidiary of Enel Green Power North America filed a Notice of Intent (NOI) to file an application for a subsequent license for its Willimantic #1 Hydroelectric Project No. 8051, pursuant to section 16.19(b)(3) of the Commission’s regulations.1 On October 23, 2020, Commission staff noticed the NOI and approved the use of the traditional licensing process (TLP) to develop the license application. The existing license for the project expires on November 30, 2025. The 684-kilowatt (kW) Willimantic #1 Project is located on the Willimantic River, in Windham County, Connecticut. The principal project works consist of: (1) a 16-foot-high and 225-foot-long granite block dam with a spillway crest elevation of 182.39 feet mean sea level (msl); (2) a reservoir with a surface area of 3 acres; (3) an intake structure at the north side of the dam; (4) trashracks with a 2-inch clear bar spacing; (5) a head gate with a 120-foot-long, 9-footdiameter penstock; (6) a powerhouse containing a Kaplan turbine-generator unit with an installed capacity of 684 kilowatts (kW); (7) a 347-foot-long tailrace channel with a tailwater elevation of 159.80 feet msl; (8) a 4,160Volt (V) generator lead, and a 1500-kVA 600/2,400–V transformer bank; (9) a 520-foot-long, 23,500–V transmission line; and (10) appurtenant facilities. The project operates run-of-river and generates and an estimated average of 1,201,000 kW hours a year. Pursuant to section 16.20(c) of the Commission’s regulations, an existing licensee with a minor license not subject to sections 14 and 15 of the Federal Power Act must file an application for a subsequent license at least 24 months prior to the expiration 1 On March 22, 2021, Hydroland Omega, LLC, notified the Commission that the Willimantic Power Corporation is a wholly owned subsidiary of Hydroland Omega, LLC and replaced Enel Green Power North America, Inc. as the parent company. E:\FR\FM\20DEN1.SGM 20DEN1

Agencies

[Federal Register Volume 88, Number 243 (Wednesday, December 20, 2023)]
[Notices]
[Page 88062]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-27988]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP24-243-000.
    Applicants: Southern Star Central Gas Pipeline, Inc.
    Description: Sec.  4(d) Rate Filing: Correction to Tariff Sheet No. 
241 to be effective 4/1/2023.
    Filed Date: 12/13/23.
    Accession Number: 20231213-5146.
    Comment Date: 5 p.m. ET 12/26/23.

    Docket Numbers: RP24-244-000.
    Applicants: Bear Creek Storage Company, L.L.C.
    Description: Compliance filing: Annual Fuel Summary 2023 to be 
effective N/A.
    Filed Date: 12/14/23.
    Accession Number: 20231214-5063.
    Comment Date: 5 p.m. ET 12/26/23.

    Docket Numbers: RP24-245-000.
    Applicants: Rockies Express Pipeline LLC.
    Description: Sec.  4(d) Rate Filing: REX 2023-12-14 Negotiated Rate 
Agreement Amendments to be effective 12/15/2023.
    Filed Date: 12/14/23.
    Accession Number: 20231214-5125.
    Comment Date: 5 p.m. ET 12/26/23.

    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.

Filings in Existing Proceedings

    Docket Numbers: PR24-4-001.
    Applicants: The Peoples Gas Light and Coke Company.
    Description: Amendment Filing: Limited Supplement to Petition for 
Rate Approval to be effective 11/1/2023.
    Filed Date: 12/13/23.
    Accession Number: 20231213-5134.
    Comment Date: 5 p.m. ET 1/3/24.
    Sec.  284.123(g) Protest: 5 p.m. ET 1/17/24.

    Docket Numbers: RP24-203-001.
    Applicants: Gulf South Pipeline Company, LLC.
    Description: Tariff Amendment: Amendment Filing in Docket No. RP24-
203-000 to be effective 11/30/2023.
    Filed Date: 12/13/23.
    Accession Number: 20231213-5144.
    Comment Date: 5 p.m. ET 12/20/23.

    Any person desiring to protest in any the above proceedings must 
file in accordance with Rule 211 of the Commission's Regulations (18 
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified 
comment date.
    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: December 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-27988 Filed 12-19-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.