Sunshine Act Meetings, 87762-87764 [2023-27886]

Download as PDF 87762 Federal Register / Vol. 88, No. 242 / Tuesday, December 19, 2023 / Notices POLICIES AND PRACTICES FOR STORAGE OF RECORDS: Records in this system are on paper or in digital or other electronic form. Digital and other electronic images are stored on a storage area network in a secured environment. Records, whether paper or electronic, may be stored in a separate, secure location at the Department of Energy Headquarters or at the Department field sites. POLICIES AND PRACTICES FOR RETRIEVAL OF RECORDS: Records may be retrieved by the name of the grievant or the employing organizational element, type of grievance/matter being grieved, or other unique identifier, such as employee identification number. POLICIES AND PRACTICES FOR RETENTION AND DISPOSAL OF RECORDS: Retention and disposition of these records is in accordance with the National Archives and Records Administration and DOE-approved records disposition schedule with a retention of 4 years. requirements as determined by NIST and DOE directives and guidance. • Physical: Computer servers on which electronic records are stored are located in secured Department facilities, which are protected by security guards, identification badges, and cameras. Paper copies of all records are locked in file cabinets, file rooms, or offices and are under the control of authorized personnel. Access to these facilities is granted only to authorized personnel and each person granted access to the system must be an individual authorized to use and/or administer the system. RECORD ACCESS PROCEDURES: The Department follows the procedures outlined in 10 CFR 1008.4. Valid identification of the individual making the request is required before information will be processed, given, access granted, or a correction considered, to ensure that information is given, corrected, or records disclosed or corrected only at the request of the proper person. CONTESTING RECORD PROCEDURES: lotter on DSK11XQN23PROD with NOTICES1 ADMINISTRATIVE, TECHNICAL, AND PHYSICAL SAFEGUARDS: Electronic records may be secured and maintained on a cloud-based software server and operating system that resides in Federal Risk and Authorization Management Program (FedRAMP) and Federal Information Security Modernization Act (FISMA) hosting environment. Data located in the cloud-based server is firewalled and encrypted at rest and in transit. The security mechanisms for handling data at rest and in transit are in accordance with DOE encryption standards. Records are protected from unauthorized access through the following appropriate safeguards: • Administrative: Access to all records is limited to lawful government purposes only, with access to electronic records based on role and either twofactor authentication or password protection. The system requires passwords to be complex and to be changed frequently. Users accessing system records undergo frequent training in Privacy Act and information security requirements. Security and privacy controls are reviewed on an ongoing basis. • Technical: Computerized records systems are safeguarded on Departmental networks configured for role-based access based on job responsibilities and organizational affiliation. Privacy and security controls are in place for this system and are updated in accordance with applicable VerDate Sep<11>2014 17:33 Dec 18, 2023 Jkt 262001 Any individual may submit a request to the System Manager and request a copy of any records relating to them. In accordance with 10 CFR 1008.11, any individual may appeal the denial of a request made by him or her for information about or for access to or correction or amendment of records. An appeal shall be filed within 90 calendar days after receipt of the denial. When an appeal is filed by mail, the postmark is conclusive as to timeliness. The appeal shall be in writing and must be signed by the individual. The words ‘‘PRIVACY ACT APPEAL’’ should appear in capital letters on the envelope and the letter. Appeals of denials relating to records maintained in government-wide System of Records reported by Office of Personnel Management (OPM), shall be filed, as appropriate, with the Assistant Director for Agency Compliance and Evaluation, OPM, 1900 E Street NW, Washington, DC 20415. All other appeals relating to DOE records shall be directed to the Director, Office of Hearings and Appeals (OHA), 1000 Independence Ave. SW, Washington, DC 20585. NOTIFICATION PROCEDURES: In accordance with the DOE regulation implementing the Privacy Act, 10 CFR part 1008, a request by an individual to determine if a System of Records contains information about themselves should be directed to the U.S. Department of Energy, Headquarters, Privacy Act Officer. The PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 request should include the requester’s complete name and the time period for which records are sought. EXEMPTIONS PROMULGATED FOR THE SYSTEM: None. HISTORY: This SORN was last published in the Federal Register (FR), 74 FR 998–999, on January 9, 2009. Signing Authority This document of the Department of Energy was signed on December 13, 2023, by Ann Dunkin, Senior Agency Official for Privacy, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC, on December 14, 2023. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. [FR Doc. 2023–27847 Filed 12–18–23; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meetings The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: December 19, 2023, 10:00 a.m. PLACE: Room 2C, 888 First Street NE, Washington, DC 20426. STATUS: Open to the public. MATTERS TO BE CONSIDERED: Agenda. * NOTE—Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items stricken from or added to the meeting, call (202) 502–8627. E:\FR\FM\19DEN1.SGM 19DEN1 Federal Register / Vol. 88, No. 242 / Tuesday, December 19, 2023 / Notices This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed online at the Commission’s 87763 website at https://elibrary.ferc.gov/ eLibrary/search using the eLibrary link. 1107TH—MEETING OPEN MEETING [December 19, 2023 10:00 a.m.] Item No. Docket No. Company ADMINISTRATIVE A–1 ....... A–2 ....... A–3 ....... AD24–1–000 ............................................. AD24–2–000 ............................................. AD24–5–000 ............................................. Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. FERC–NERC-Regional Entity Joint Blackstart Availability Study in Texas. ELECTRIC E–1 ....... E–2 ....... E–3 ....... E–4 ....... lotter on DSK11XQN23PROD with NOTICES1 E–5 ....... E–6 ....... AD24–6–000 ............................................. ER23–2657–001, ER23–2658–001, ER23–2659–001, ER23–2660–001, ER23–2661–001. EL02–60–007, EL02–60–013, EL02–62– 006, EL02–62–012, (Consolidated). ER09–1256–000, ER09–1256–003, ER09–1256–005, ER09–1256–007, ER12–2708–000, ER12–2708–007, ER12–2708–009, ER12–2708–010. ER22–2339–001 ....................................... EL24–4–000 .............................................. E–7 ....... E–8 ....... ER24–163–000 ......................................... ER21–2818–000, EL22–4–000, (Consolidated), EL21–75–000, EL21–53–000, (Unconsolidated). E–9 ....... E–10 ..... E–11 ..... ER23–2183–000 ....................................... ER22–1846–004 ....................................... EL23–28–001, ER23–1195–002 .............. E–12 E–13 E–14 E–15 EL23–106–000 .......................................... ER22–2931–000, EL24–26–000 .............. EL23–63–000 ............................................ ER23–2975–000, EL23–53–000, EL23– 53–002, EL23–54–000, EL23–54–002, EL23–55–000, EL23–55–002, EL23– 56–000, EL23–56–002, EL23–57–000, EL23–57–001, EL23–57–004, EL23– 57–006, EL23–58–000, EL23–58–002, EL23–59–000, EL23–59–002, EL23– 60–000, EL23–60–002, EL23–61–000, EL23–61–002, EL23–63–000, EL23– 63–002, EL23–66–000, EL23–66–002, EL23–67–000, EL23–67–002, EL23– 74–000, EL23–74–002, EL23–75–000, EL23–75–002, EL23–77–000, EL23– 77–002. ..... ..... ..... ..... VerDate Sep<11>2014 17:33 Dec 18, 2023 Jkt 262001 PO 00000 Federal Power Act Section 203 Blanket Authorizations for Investment Companies. Emera Energy LNG, LLC, Emera Energy Services Subsidiary No. 11 LLC, Emera Energy Services Subsidiary No. 12 LLC, Emera Energy Services Subsidiary No. 13 LLC, Emera Energy Services Subsidiary No. 15 LLC Public Utilities Commission of the State of California v. Sellers of Long-Term Contracts to the California Department of Water Resources, California Electricity Oversight Board v. Sellers of Long-Term Contracts to the California Department of Water Resources Potomac-Appalachian Transmission Highline, LLC and PJM Interconnection, L.L.C. Southwest Power Pool, Inc. Greenbacker Renewable Energy Company LLC, Greenbacker Renewable Energy Company II, LLC. PJM Interconnection, L.L.C. Tri-State Generation and Transmission Association, Inc., Wheat Belt Public Power District, La Plata Electric Association, Inc., Northwest Rural Public Power District, San Isabel Electric Association, Inc., San Miguel Power Association, Springer Electric Cooperative, Inc., and United Power Inc. v. Tri-State Generation and Transmission Association, Inc. Southwest Power Pool, Inc. Southwest Power Pool, Inc. Solar Energy Industries Association v. Midcontinent Independent System Operator, Inc., Midcontinent Independent System Operator, Inc. Summit Ridge Energy, LLC and Osaka Gas USA Corporation. PJM Interconnection L.L.C. Energy Harbor LLC v. PJM Interconnection, L.L.C. PJM Interconnection L.L.C., Essential Power OPP, LLC, Essential Power Rock Springs, LLC and Lakewood Cogeneration, L.P. v. PJM Interconnection, L.L.C., Aurora Generation, LLC, LSP University Park, LLC, Rockford Power, LLC, Rockford Power II, LLC, University Park Energy, LLC, Elwood Energy LLC, Jackson Generation, LLC, Lee County Generating Station, LLC, and Lincoln Generating Facility, LLC v. PJM Interconnection. L.L.C., Coalition of PJM Capacity Resources v. PJM Interconnection, L.L.C., Talen Energy Marketing LLC v. PJM Interconnection, L.L.C., Lee County Generating Station, LLC v. PJM Interconnection, L.L.C., SunEnergy 1, LLC v. PJM Interconnection, L.L.C., Lincoln Generating Facility, LLC v. PJM Interconnection, Parkway Generation Keys Energy Center LLC v. PJM Interconnection, L.L.C., Old Dominion Electric Cooperative v. PJM Interconnection, L.L.C., Energy Harbor LLC v. PJM Interconnection, L.L.C., Calpine Corporation v. PJM Interconnection, L.L.C., Invenergy Nelson LLC v. PJM Interconnection, L.L.C., East Kentucky Power Cooperative, Inc. v. PJM Interconnection, L.L.C., CPV Maryland, LLC and Competitive Power Ventures Holding, LP v. PJM Interconnection, L.L.C., Parkway Generation Operating LLC and Parkway Generation Sewaren Urban Renewal Entity LLC v. PJM Interconnection, L.L.C. Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\19DEN1.SGM 19DEN1 87764 Federal Register / Vol. 88, No. 242 / Tuesday, December 19, 2023 / Notices 1107TH—MEETING OPEN MEETING—Continued [December 19, 2023 10:00 a.m.] Item No. Docket No. Company E–16 ..... EL23–53–000, EL23–53–003, EL23–54– 000, EL23–54–003, EL23–55–000, EL23–55–003, EL23–56–000, EL23– 56–003, EL23–57–000, EL23–57–005, EL23–58–000, EL23–58–003, EL23– 59–000, EL23–59–003, EL23–60–000, EL23–60–003, EL23–61–000, EL23– 61–003, EL23–63–000, EL23–63–003, EL23–66–000, EL23–66–003, EL23– 67–000, EL23–67–003, EL23–74–000, EL23–74–003, EL23–75–000, EL23– 75–003, EL23–77–000, EL23–77–003, (not consolidated).. Essential Power OPP, LLC, Essential Power Rock Springs, LLC, and Lakewood Cogeneration, L.P. v. PJM Interconnection, L.L.C., Aurora Generation, LLC, LSP University Park, LLC, Rockford Power, LLC, Rockford Power II, LLC, University Park Energy, LLC, Elwood Energy LLC, Jackson Generation, LLC, Lee County Generating Station, LLC, and Lincoln Generating Facility, LLC v. PJM Interconnection, L.L.C., Coalition of PJM Capacity Resources v. PJM Interconnection, L.L.C., Talen Energy Marketing, LLC v. PJM Interconnection, L.L.C., Lee County Generating Station, LLC v. PJM Interconnection, L.L.C., SunEnergy1, LLC v. PJM Interconnection, L.L.C., Lincoln Generating Facility, LLC v. PJM Interconnection, L.L.C., Parkway Generation Keys Energy Center LLC, v. PJM Interconnection, L.L.C., Old Dominion Electric Cooperative v. PJM Interconnection, L.L.C., Energy Harbor LLC, v.PJM Interconnection, L.L.C., Calpine Corporation, v. PJM Interconnection, L.L.C., Invenergy Nelson LLC v. PJM Interconnection, L.L.C., East Kentucky Power Cooperative, Inc. v. PJM Interconnection, L.L.C., CPV Maryland, LLC and Competitive, Power Ventures Holdings, LP v. PJM Interconnection, L.L.C., Parkway Generation Operating LLC and Parkway Generation Sewaren Urban Renewal Entity LLC v. PJM Interconnection, L.L.C. GAS G–1 ...... OR14–6–003 ............................................. BP Pipelines (Alaska) Inc., ConocoPhillips Transportation Alaska, Inc., and ExxonMobil Pipeline Company. HYDRO H–1 ....... H–2 ....... P–15287–000 ............................................ P–2082–071 .............................................. HGE Energy Storage 3 LLC. PacifiCorp. CERTIFICATES lotter on DSK11XQN23PROD with NOTICES1 C–1 C–2 C–3 C–4 C–5 ....... ....... ....... ....... ....... CP23–15–000 CP16–10–012 CP19–14–002 CP20–55–001 CP22–16–000 ........................................... ........................................... ........................................... ........................................... ........................................... A free webcast of this event is available through the Commission’s website. Anyone with internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The Federal Energy Regulatory Commission provides technical support for the free webcasts. Please call (202) 502–8680 or email customer@ferc.gov if you have any questions. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters but will not be telecast. Issued: December 12, 2023 Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–27886 Filed 12–15–23; 11:15 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:33 Dec 18, 2023 Jkt 262001 ANR Pipeline Company. Mountain Valley Pipeline, LLC. Mountain Valley Pipeline, LLC. Port Arthur LNG Phase II, LLC, and PALNG Common Facilities Company, LLC. Georgia-Pacific Consumer Operations LLC. any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is [EPA–HQ–OPP–2023–0070; FRL–10841–11– restricted by statute. Additional OCSPP] instructions on commenting and visiting the docket, along with more information Pesticide Product Registration; Receipt of Applications for New Active about dockets generally, is available at https://www.epa.gov/dockets. Ingredients November 2023 FOR FURTHER INFORMATION CONTACT: AGENCY: Environmental Protection Anne Overstreet, Biopesticides and Agency (EPA). Pollution Prevention Division (BPPD) ACTION: Notice. (7511M), main telephone number: (202) 566–2425, email address: SUMMARY: EPA has received applications to register pesticide products containing BPPDFRNotices@epa.gov. The mailing address for each contact person is Office active ingredients not included in any of Pesticide Programs, Environmental currently registered pesticide products. Protection Agency, 1200 Pennsylvania Pursuant to the Federal Insecticide, Ave. NW, Washington, DC 20460–0001. Fungicide, and Rodenticide Act (FIFRA), EPA is hereby providing notice As part of the mailing address, include the contact person’s name, division, and of receipt and opportunity to comment mail code. The division to contact is on these applications. listed at the end of each application DATES: Comments must be received on summary. or before January 18, 2024. SUPPLEMENTARY INFORMATION: ADDRESSES: Submit your comments, identified by docket identification (ID) I. General Information number EPA–HQ–OPP–2023–0070, through the Federal eRulemaking Portal A. Does this Action apply to me? You may be potentially affected by at https://www.regulations.gov. Follow this action if you are an agricultural the online instructions for submitting comments. Do not submit electronically producer, food manufacturer, or ENVIRONMENTAL PROTECTION AGENCY PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\19DEN1.SGM 19DEN1

Agencies

[Federal Register Volume 88, Number 242 (Tuesday, December 19, 2023)]
[Notices]
[Pages 87762-87764]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-27886]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meetings

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

Agency Holding Meeting:  Federal Energy Regulatory Commission.

DATE AND TIME:  December 19, 2023, 10:00 a.m.

PLACE: Room 2C, 888 First Street NE, Washington, DC 20426.

STATUS: Open to the public.

MATTERS TO BE CONSIDERED: Agenda.
    * NOTE--Items listed on the agenda may be deleted without further 
notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items stricken from or added to the 
meeting, call (202) 502-8627.

[[Page 87763]]

    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed online at the 
Commission's website at https://elibrary.ferc.gov/eLibrary/search using 
the eLibrary link.

                                          1107th--Meeting Open Meeting
                                         [December 19, 2023 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
    Item No.                             Docket No.                                        Company
----------------------------------------------------------------------------------------------------------------
                                                 ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1.............  AD24-1-000..............................................  Agency Administrative Matters.
A-2.............  AD24-2-000..............................................  Customer Matters, Reliability,
                                                                             Security and Market Operations.
A-3.............  AD24-5-000..............................................  FERC-NERC-Regional Entity Joint
                                                                             Blackstart Availability Study in
                                                                             Texas.
----------------------------------------------------------------------------------------------------------------
                                                    ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1.............  AD24-6-000..............................................  Federal Power Act Section 203
                                                                             Blanket Authorizations for
                                                                             Investment Companies.
E-2.............  ER23-2657-001, ER23-2658-001, ER23-2659-001, ER23-2660-   Emera Energy LNG, LLC, Emera Energy
                   001, ER23-2661-001.                                       Services Subsidiary No. 11 LLC,
                                                                             Emera Energy Services Subsidiary
                                                                             No. 12 LLC, Emera Energy Services
                                                                             Subsidiary No. 13 LLC, Emera Energy
                                                                             Services Subsidiary No. 15 LLC
E-3.............  EL02-60-007, EL02-60-013, EL02-62-006, EL02-62-012,       Public Utilities Commission of the
                   (Consolidated).                                           State of California v. Sellers of
                                                                             Long-Term Contracts to the
                                                                             California Department of Water
                                                                             Resources, California Electricity
                                                                             Oversight Board v. Sellers of Long-
                                                                             Term Contracts to the California
                                                                             Department of Water Resources
E-4.............  ER09-1256-000, ER09-1256-003, ER09-1256-005, ER09-1256-   Potomac-Appalachian Transmission
                   007, ER12-2708-000, ER12-2708-007, ER12-2708-009, ER12-   Highline, LLC and PJM
                   2708-010.                                                 Interconnection, L.L.C.
E-5.............  ER22-2339-001...........................................  Southwest Power Pool, Inc.
E-6.............  EL24-4-000..............................................  Greenbacker Renewable Energy Company
                                                                             LLC, Greenbacker Renewable Energy
                                                                             Company II, LLC.
E-7.............  ER24-163-000............................................  PJM Interconnection, L.L.C.
E-8.............  ER21-2818-000, EL22-4-000, (Consolidated), EL21-75-000,   Tri-State Generation and
                   EL21-53-000, (Unconsolidated).                            Transmission Association, Inc.,
                                                                             Wheat Belt Public Power District,
                                                                             La Plata Electric Association,
                                                                             Inc., Northwest Rural Public Power
                                                                             District, San Isabel Electric
                                                                             Association, Inc., San Miguel Power
                                                                             Association, Springer Electric
                                                                             Cooperative, Inc., and United Power
                                                                             Inc. v. Tri-State Generation and
                                                                             Transmission Association, Inc.
E-9.............  ER23-2183-000...........................................  Southwest Power Pool, Inc.
E-10............  ER22-1846-004...........................................  Southwest Power Pool, Inc.
E-11............  EL23-28-001, ER23-1195-002..............................  Solar Energy Industries Association
                                                                             v. Midcontinent Independent System
                                                                             Operator, Inc., Midcontinent
                                                                             Independent System Operator, Inc.
E-12............  EL23-106-000............................................  Summit Ridge Energy, LLC and Osaka
                                                                             Gas USA Corporation.
E-13............  ER22-2931-000, EL24-26-000..............................  PJM Interconnection L.L.C.
E-14............  EL23-63-000.............................................  Energy Harbor LLC v. PJM
                                                                             Interconnection, L.L.C.
E-15............  ER23-2975-000, EL23-53-000, EL23-53-002, EL23-54-000,     PJM Interconnection L.L.C.,
                   EL23-54-002, EL23-55-000, EL23-55-002, EL23-56-000,       Essential Power OPP, LLC, Essential
                   EL23-56-002, EL23-57-000, EL23-57-001, EL23-57-004,       Power Rock Springs, LLC and
                   EL23-57-006, EL23-58-000, EL23-58-002, EL23-59-000,       Lakewood Cogeneration, L.P. v. PJM
                   EL23-59-002, EL23-60-000, EL23-60-002, EL23-61-000,       Interconnection, L.L.C., Aurora
                   EL23-61-002, EL23-63-000, EL23-63-002, EL23-66-000,       Generation, LLC, LSP University
                   EL23-66-002, EL23-67-000, EL23-67-002, EL23-74-000,       Park, LLC, Rockford Power, LLC,
                   EL23-74-002, EL23-75-000, EL23-75-002, EL23-77-000,       Rockford Power II, LLC, University
                   EL23-77-002.                                              Park Energy, LLC, Elwood Energy
                                                                             LLC, Jackson Generation, LLC, Lee
                                                                             County Generating Station, LLC, and
                                                                             Lincoln Generating Facility, LLC v.
                                                                             PJM Interconnection. L.L.C.,
                                                                             Coalition of PJM Capacity Resources
                                                                             v. PJM Interconnection, L.L.C.,
                                                                             Talen Energy Marketing LLC v. PJM
                                                                             Interconnection, L.L.C., Lee County
                                                                             Generating Station, LLC v. PJM
                                                                             Interconnection, L.L.C., SunEnergy
                                                                             1, LLC v. PJM Interconnection,
                                                                             L.L.C., Lincoln Generating
                                                                             Facility, LLC v. PJM
                                                                             Interconnection, Parkway Generation
                                                                             Keys Energy Center LLC v. PJM
                                                                             Interconnection, L.L.C., Old
                                                                             Dominion Electric Cooperative v.
                                                                             PJM Interconnection, L.L.C., Energy
                                                                             Harbor LLC v. PJM Interconnection,
                                                                             L.L.C., Calpine Corporation v. PJM
                                                                             Interconnection, L.L.C., Invenergy
                                                                             Nelson LLC v. PJM Interconnection,
                                                                             L.L.C., East Kentucky Power
                                                                             Cooperative, Inc. v. PJM
                                                                             Interconnection, L.L.C., CPV
                                                                             Maryland, LLC and Competitive Power
                                                                             Ventures Holding, LP v. PJM
                                                                             Interconnection, L.L.C., Parkway
                                                                             Generation Operating LLC and
                                                                             Parkway Generation Sewaren Urban
                                                                             Renewal Entity LLC v. PJM
                                                                             Interconnection, L.L.C.

[[Page 87764]]

 
E-16............  EL23-53-000, EL23-53-003, EL23-54-000, EL23-54-003, EL23- Essential Power OPP, LLC, Essential
                   55-000, EL23-55-003, EL23-56-000, EL23-56-003, EL23-57-   Power Rock Springs, LLC, and
                   000, EL23-57-005, EL23-58-000, EL23-58-003, EL23-59-      Lakewood Cogeneration, L.P. v. PJM
                   000, EL23-59-003, EL23-60-000, EL23-60-003, EL23-61-      Interconnection, L.L.C., Aurora
                   000, EL23-61-003, EL23-63-000, EL23-63-003, EL23-66-      Generation, LLC, LSP University
                   000, EL23-66-003, EL23-67-000, EL23-67-003, EL23-74-      Park, LLC, Rockford Power, LLC,
                   000, EL23-74-003, EL23-75-000, EL23-75-003, EL23-77-      Rockford Power II, LLC, University
                   000, EL23-77-003, (not consolidated)..                    Park Energy, LLC, Elwood Energy
                                                                             LLC, Jackson Generation, LLC, Lee
                                                                             County Generating Station, LLC, and
                                                                             Lincoln Generating Facility, LLC v.
                                                                             PJM Interconnection, L.L.C.,
                                                                             Coalition of PJM Capacity Resources
                                                                             v. PJM Interconnection, L.L.C.,
                                                                             Talen Energy Marketing, LLC v. PJM
                                                                             Interconnection, L.L.C., Lee County
                                                                             Generating Station, LLC v. PJM
                                                                             Interconnection, L.L.C.,
                                                                             SunEnergy1, LLC v. PJM
                                                                             Interconnection, L.L.C., Lincoln
                                                                             Generating Facility, LLC v. PJM
                                                                             Interconnection, L.L.C., Parkway
                                                                             Generation Keys Energy Center LLC,
                                                                             v. PJM Interconnection, L.L.C., Old
                                                                             Dominion Electric Cooperative v.
                                                                             PJM Interconnection, L.L.C., Energy
                                                                             Harbor LLC, v.PJM Interconnection,
                                                                             L.L.C., Calpine Corporation, v. PJM
                                                                             Interconnection, L.L.C., Invenergy
                                                                             Nelson LLC v. PJM Interconnection,
                                                                             L.L.C., East Kentucky Power
                                                                             Cooperative, Inc. v. PJM
                                                                             Interconnection, L.L.C., CPV
                                                                             Maryland, LLC and Competitive,
                                                                             Power Ventures Holdings, LP v. PJM
                                                                             Interconnection, L.L.C., Parkway
                                                                             Generation Operating LLC and
                                                                             Parkway Generation Sewaren Urban
                                                                             Renewal Entity LLC v. PJM
                                                                             Interconnection, L.L.C.
----------------------------------------------------------------------------------------------------------------
                                                       GAS
----------------------------------------------------------------------------------------------------------------
G-1.............  OR14-6-003..............................................  BP Pipelines (Alaska) Inc.,
                                                                             ConocoPhillips Transportation
                                                                             Alaska, Inc., and ExxonMobil
                                                                             Pipeline Company.
----------------------------------------------------------------------------------------------------------------
                                                      HYDRO
----------------------------------------------------------------------------------------------------------------
H-1.............  P-15287-000.............................................  HGE Energy Storage 3 LLC.
H-2.............  P-2082-071..............................................  PacifiCorp.
----------------------------------------------------------------------------------------------------------------
                                                  CERTIFICATES
----------------------------------------------------------------------------------------------------------------
C-1.............  CP23-15-000.............................................  ANR Pipeline Company.
C-2.............  CP16-10-012.............................................  Mountain Valley Pipeline, LLC.
C-3.............  CP19-14-002.............................................  Mountain Valley Pipeline, LLC.
C-4.............  CP20-55-001.............................................  Port Arthur LNG Phase II, LLC, and
                                                                             PALNG Common Facilities Company,
                                                                             LLC.
C-5.............  CP22-16-000.............................................  Georgia-Pacific Consumer Operations
                                                                             LLC.
----------------------------------------------------------------------------------------------------------------

    A free webcast of this event is available through the Commission's 
website. Anyone with internet access who desires to view this event can 
do so by navigating to www.ferc.gov's Calendar of Events and locating 
this event in the Calendar. The Federal Energy Regulatory Commission 
provides technical support for the free webcasts. Please call (202) 
502-8680 or email [email protected] if you have any questions.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters but will not be telecast.

     Issued: December 12, 2023
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-27886 Filed 12-15-23; 11:15 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.