Notice of Availability of Revised Final Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 11-Arch Dams, 87420 [2023-27751]
Download as PDF
87420
Federal Register / Vol. 88, No. 241 / Monday, December 18, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER24–619–000]
khammond on DSKJM1Z7X2PROD with NOTICES
MS Solar 5, LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of MS
Solar 5, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 2,
2024.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
VerDate Sep<11>2014
17:41 Dec 15, 2023
Jkt 262001
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 12, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–27749 Filed 12–15–23; 8:45 am]
BILLING CODE 6717–01–P
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number, excluding the last three
digits in the Docket Number field (i.e.,
AD18–6). Be sure you have selected an
appropriate date range. The Commission
also offers a free service called
eSubscription which allows you to keep
track of all formal issuances and
submittals in specific dockets. This can
reduce the amount of time you spend
researching proceedings by
automatically providing you with
electronic notification of these filings
and direct links to the documents. Go to
the Commission’s website
(www.ferc.gov), select the FERC Online
option from the left-hand column, and
click on eSubscription. Users must be
registered in order to use eSubscription.
The revised version of Chapter 11 is
also available on the Commission’s
Division of Dam Safety and Inspections
website at: Engineering Guidelines for
the Evaluation of Hydropower Projects |
Federal Energy Regulatory Commission
(ferc.gov).
For assistance with any of the
Commission’s online systems, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8258.
Dated: December 12, 2023.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2023–27751 Filed 12–15–23; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. AD18–6–000]
DEPARTMENT OF ENERGY
Notice of Availability of Revised Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 11—Arch Dams
Federal Energy Regulatory
Commission
On March 14, 2018, the Federal
Energy Regulatory Commission issued a
Notice of Availability of Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 11—Arch Dams. Appendix 11A
provides an approach to estimate
erosion of rock downstream of arch
dams and is applicable to similar
evaluations at other types of dams.
Commission staff recently became aware
of errors in several equations and one
table in Appendix 11A; this notice
provides a revised version of Chapter 11
correcting those errors.
All information related to ‘‘Chapter
11—Arch Dams,’’ including the draft
chapter, all submitted comments, the
final chapter, and the revised final
chapter incorporating the revisions to
Appendix A, can be found on the FERC
website (www.ferc.gov) using the
Brown Bear II Hydro, Inc.; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
[Project No. 3428–205]
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 3428–2050.
c. Date Filed: November 29, 2023.
d. Applicant: Brown Bear II Hydro,
Inc.
e. Name of Project: Worumbo
Hydroelectric Project.
f. Location: On the Androscoggin
River, in Androscoggin County, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 88, Number 241 (Monday, December 18, 2023)]
[Notices]
[Page 87420]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-27751]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD18-6-000]
Notice of Availability of Revised Final Engineering Guidelines
for the Evaluation of Hydropower Projects: Chapter 11--Arch Dams
On March 14, 2018, the Federal Energy Regulatory Commission issued
a Notice of Availability of Final Engineering Guidelines for the
Evaluation of Hydropower Projects: Chapter 11--Arch Dams. Appendix 11A
provides an approach to estimate erosion of rock downstream of arch
dams and is applicable to similar evaluations at other types of dams.
Commission staff recently became aware of errors in several equations
and one table in Appendix 11A; this notice provides a revised version
of Chapter 11 correcting those errors.
All information related to ``Chapter 11--Arch Dams,'' including the
draft chapter, all submitted comments, the final chapter, and the
revised final chapter incorporating the revisions to Appendix A, can be
found on the FERC website (www.ferc.gov) using the eLibrary link. Click
on the eLibrary link, click on ``General Search'' and enter the docket
number, excluding the last three digits in the Docket Number field
(i.e., AD18-6). Be sure you have selected an appropriate date range.
The Commission also offers a free service called eSubscription which
allows you to keep track of all formal issuances and submittals in
specific dockets. This can reduce the amount of time you spend
researching proceedings by automatically providing you with electronic
notification of these filings and direct links to the documents. Go to
the Commission's website (www.ferc.gov), select the FERC Online option
from the left-hand column, and click on eSubscription. Users must be
registered in order to use eSubscription.
The revised version of Chapter 11 is also available on the
Commission's Division of Dam Safety and Inspections website at:
Engineering Guidelines for the Evaluation of Hydropower Projects
[verbar] Federal Energy Regulatory Commission (ferc.gov).
For assistance with any of the Commission's online systems, please
contact FERC Online Support at ferc.gov">FercOnlineSupport@ferc.gov or toll free
at (866) 208-3676, or for TTY, contact (202) 502-8258.
Dated: December 12, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-27751 Filed 12-15-23; 8:45 am]
BILLING CODE 6717-01-P