Yellow Pine Solar Interconnect, LLC; Supplemental Notice That Filing Includes Request for Blanket Section 204 Authorization, 86128-86129 [2023-27232]

Download as PDF 86128 Federal Register / Vol. 88, No. 237 / Tuesday, December 12, 2023 / Notices [Project No. 11426–000] issued for a period ending October 31, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 11426 is issued to T.A. Keck III and H.S. Keck for a period effective November 1, 2023, through October 31, 2024, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before October 31, 2024, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that T.A. Keck III and H.S. Keck is authorized to continue operation of the Blackstone Mill Hydroelectric Project under the terms and conditions of the prior license until the issuance of a subsequent license for the project or other disposition under the FPA, whichever comes first. T.A. Keck III and H.S. Keck; Notice of Authorization for Continued Project Operation Dated: December 5, 2023. Kimberly D. Bose, Secretary. The license for the Blackstone Mill Hydroelectric Project No. 11426 was [FR Doc. 2023–27227 Filed 12–11–23; 8:45 am] Accession Number: 20231205–5135. Comment Date: 5 pm ET 12/26/23. Docket Numbers: ER24–553–000. Applicants: Martin County Solar Project, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 2/4/2024. Filed Date: 12/5/23. Accession Number: 20231205–5136. Comment Date: 5 pm ET 12/26/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: December 5, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–27230 Filed 12–11–23; 8:45 am] BILLING CODE 6717–01–P ddrumheller on DSK120RN23PROD with NOTICES1 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission VerDate Sep<11>2014 18:03 Dec 11, 2023 Jkt 262001 BILLING CODE 6717–01–P PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER24–373–000] Yellow Pine Solar Interconnect, LLC; Supplemental Notice That Filing Includes Request for Blanket Section 204 Authorization This supplemental notice in the above-referenced proceeding of Yellow Pine Solar Interconnect, LLC’s filing includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is December 26, 2023. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended E:\FR\FM\12DEN1.SGM 12DEN1 Federal Register / Vol. 88, No. 237 / Tuesday, December 12, 2023 / Notices access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: December 5, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–27232 Filed 12–11–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL24–16–000] ddrumheller on DSK120RN23PROD with NOTICES1 Wabash Valley Power Association, Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date On December 5, 2023, the Commission issued an order in Docket No. EL24–16–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, instituting an investigation to determine whether Wabash Valley Power Association, Inc.’s Formulary Rate Tariff is unjust, unreasonable, unduly discriminatory or preferential, or otherwise unlawful. Wabash Valley Power Ass’n, 185 FERC ¶ 61,082 (2023). The refund effective date in Docket No. EL24–16–000, established pursuant to section 206(b) of the FPA, 16 U.S.C. 824e(b), will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket No. EL24–16–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214 (2022), within 21 days of the date of issuance of the order. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. VerDate Sep<11>2014 18:03 Dec 11, 2023 Jkt 262001 Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFile’’ link at https://www.ferc.gov. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: December 6, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–27225 Filed 12–11–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98–1–000] Records Governing Off-the-Record Communications This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 86129 of prohibited and exempt off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who make or receive a prohibited or exempt off-the-record communication relevant to the merits of a contested proceeding, to deliver to the Secretary of the Commission, a copy of the communication, if written, or a summary of the substance of any oral communication. Prohibited communications are included in a public, non-decisional file associated with, but not a part of, the decisional record of the proceeding. Unless the Commission determines that the prohibited communication and any responses thereto should become a part of the decisional record, the prohibited off-the-record communication will not be considered by the Commission in reaching its decision. Parties to a proceeding may seek the opportunity to respond to any facts or contentions made in a prohibited off-the-record communication and may request that the Commission place the prohibited communication and responses thereto in the decisional record. The Commission will grant such a request only when it determines that fairness so requires. Any person identified below as having made a prohibited off-the-record communication shall serve the document on all parties listed on the official service list for the applicable proceeding in accordance with Rule 2010, 18 CFR 385.2010. Exempt off-the-record communications are included in the decisional record of the proceeding, unless the communication was with a cooperating agency as described by 40 CFR 1501.6, made under 18 CFR 385.2201(e) (1) (v). The following is a list of off-therecord communications recently received by the Secretary of the Commission. This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the eLibrary link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. E:\FR\FM\12DEN1.SGM 12DEN1

Agencies

[Federal Register Volume 88, Number 237 (Tuesday, December 12, 2023)]
[Notices]
[Pages 86128-86129]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-27232]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER24-373-000]


Yellow Pine Solar Interconnect, LLC; Supplemental Notice That 
Filing Includes Request for Blanket Section 204 Authorization

    This supplemental notice in the above-referenced proceeding of 
Yellow Pine Solar Interconnect, LLC's filing includes a request for 
blanket authorization, under 18 CFR part 34, of future issuances of 
securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is December 26, 2023.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically may mail similar pleadings to 
the Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. Hand delivered submissions in docketed 
proceedings should be delivered to Health and Human Services, 12225 
Wilkins Avenue, Rockville, Maryland 20852.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended

[[Page 86129]]

access to the Commission's Public Reference Room, due to the 
proclamation declaring a National Emergency concerning the Novel 
Coronavirus Disease (COVID-19), issued by the President on March 13, 
2020. For assistance, contact the Federal Energy Regulatory Commission 
at [email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.

    Dated: December 5, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-27232 Filed 12-11-23; 8:45 am]
BILLING CODE 6717-01-P