Combined Notice of Filings #1, 86127-86128 [2023-27230]
Download as PDF
Federal Register / Vol. 88, No. 237 / Tuesday, December 12, 2023 / Notices
contact FERC Online Support at
FERCOnlineSupport@ferc.gov.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
n. Scoping Process.
Pursuant to the National
Environmental Policy Act (NEPA),
Commission staff intends to prepare
either an environmental assessment
(EA) or an environmental impact
statement (EIS) (collectively referred to
as the ‘‘NEPA document’’) that describes
and evaluates the probable effects,
including an assessment of the sitespecific and cumulative effects, if any,
of the proposed action and alternatives.
The Commission’s scoping process will
help determine the required level of
analysis and satisfy the NEPA scoping
requirements, irrespective of whether
the Commission issues an EA or an EIS.
At this time, we do not anticipate
holding on-site scoping meetings.
Instead, we are soliciting written
comments and suggestions on the
preliminary list of issues and
alternatives to be addressed in the
NEPA document, as described in
scoping document 1 (SD1), issued
December 6, 2023.
Copies of the SD1 outlining the
proposed project and subject areas to be
addressed in the NEPA document were
distributed to the parties on the
Commission’s mailing list and the
applicant’s distribution list. Copies of
SD1 may be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link (see item m above).
Dated: December 6, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–27226 Filed 12–11–23; 8:45 am]
ddrumheller on DSK120RN23PROD with NOTICES1
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
VerDate Sep<11>2014
18:03 Dec 11, 2023
Jkt 262001
Docket Numbers: EC24–21–000.
Applicants: TotalEnergies Flexible
Power USA, LLC, TexGen Power, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of TotalEnergies
Flexible Power USA, LLC, et. al.
Filed Date: 12/4/23.
Accession Number: 20231204–5280.
Comment Date: 5 p.m. ET 12/26/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER24–86–000.
Applicants: EFS Parlin Holdings, LLC.
Description: Supplement to October
12, 2023 EFS Parlin Holdings, LLC tariff
filing.
Filed Date: 11/30/23.
Accession Number: 20231130–5353.
Comment Date: 5 p.m. ET 12/21/23.
Docket Numbers: ER24–228–002.
Applicants: South Cheyenne Solar,
LLC.
Description: Tariff Amendment:
Revision of Proposed Market-Based Rate
Tariff to be effective 12/1/2023.
Filed Date: 12/1/23.
Accession Number: 20231201–5248.
Comment Date: 5 pm ET 12/11/23.
Docket Numbers: ER24–537–000.
Applicants: Southwestern Public
Service Company
Description: Petition for Limited
Waiver of Southwestern Public Service
Company.
Filed Date: 12/4/23.
Accession Number: 20231204–5142.
Comment Date: 5 pm ET 12/18/23.
Docket Numbers: ER24–543–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to 10 Service Agreements
re: FirstEnergy Reorganization to be
effective 12/31/9998.
Filed Date: 12/4/23.
Accession Number: 20231204–5212.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–544–000.
Applicants: Robin Hollow Solar
Lessee, LLC.
Description: Tariff Amendment:
Notice of MBR Cancellation to be
effective 12/5/2023.
Filed Date: 12/4/23.
Accession Number: 20231204–5223.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–545–000.
Applicants: American Electric Power
Service Corporation, Appalachian
Power Company.
Description: Petition for Limited
Waiver of Appalachian Power
Company.
Filed Date: 12/4/23.
Accession Number: 20231204–5283.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
86127
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–546–000.
Applicants: Virginia Electric and
Power Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Virginia Electric and Power Company
submits tariff filing per 35.13(a)(2)(iii:
VEPCO submits One WDSA, SA No.
7136 to be effective 11/6/2023.
Filed Date: 12/5/23.
Accession Number: 20231205–5045.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–547–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Modify Operating
Tolerances for Uninstructued Resource
Deviation to be effective 12/31/9998.
Filed Date: 12/5/23.
Accession Number: 20231205–5071.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–548–000.
Applicants: Dow Hydrocarbons and
Resources LLC.
Description: Baseline eTariff Filing:
Petition for Approval of Initial MarketBased Rate Tariff to be effective 2/4/
2024.
Filed Date: 12/5/23.
Accession Number: 20231205–5078.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–549–000.
Applicants: Santa Rosa Energy Center,
LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 12/6/2023.
Filed Date: 12/5/23.
Accession Number: 20231205–5102.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–550–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 292, Amendment No. 1 to
be effective 2/4/2024.
Filed Date: 12/5/23.
Accession Number: 20231205–5125.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–551–000.
Applicants: Elkhart County Solar
Project, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 2/4/2024.
Filed Date: 12/5/23.
Accession Number: 20231205–5133.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–552–000.
Applicants: Martin County II Solar
Project, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 2/4/2024.
Filed Date: 12/5/23.
E:\FR\FM\12DEN1.SGM
12DEN1
86128
Federal Register / Vol. 88, No. 237 / Tuesday, December 12, 2023 / Notices
[Project No. 11426–000]
issued for a period ending October 31,
2023.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 11426
is issued to T.A. Keck III and H.S. Keck
for a period effective November 1, 2023,
through October 31, 2024, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before October 31,
2024, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that T.A. Keck III and H.S. Keck is
authorized to continue operation of the
Blackstone Mill Hydroelectric Project
under the terms and conditions of the
prior license until the issuance of a
subsequent license for the project or
other disposition under the FPA,
whichever comes first.
T.A. Keck III and H.S. Keck; Notice of
Authorization for Continued Project
Operation
Dated: December 5, 2023.
Kimberly D. Bose,
Secretary.
The license for the Blackstone Mill
Hydroelectric Project No. 11426 was
[FR Doc. 2023–27227 Filed 12–11–23; 8:45 am]
Accession Number: 20231205–5135.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24–553–000.
Applicants: Martin County Solar
Project, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 2/4/2024.
Filed Date: 12/5/23.
Accession Number: 20231205–5136.
Comment Date: 5 pm ET 12/26/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 5, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–27230 Filed 12–11–23; 8:45 am]
BILLING CODE 6717–01–P
ddrumheller on DSK120RN23PROD with NOTICES1
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
VerDate Sep<11>2014
18:03 Dec 11, 2023
Jkt 262001
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER24–373–000]
Yellow Pine Solar Interconnect, LLC;
Supplemental Notice That Filing
Includes Request for Blanket Section
204 Authorization
This supplemental notice in the
above-referenced proceeding of Yellow
Pine Solar Interconnect, LLC’s filing
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 26,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
E:\FR\FM\12DEN1.SGM
12DEN1
Agencies
[Federal Register Volume 88, Number 237 (Tuesday, December 12, 2023)]
[Notices]
[Pages 86127-86128]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-27230]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC24-21-000.
Applicants: TotalEnergies Flexible Power USA, LLC, TexGen Power,
LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of TotalEnergies Flexible Power USA, LLC, et.
al.
Filed Date: 12/4/23.
Accession Number: 20231204-5280.
Comment Date: 5 p.m. ET 12/26/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER24-86-000.
Applicants: EFS Parlin Holdings, LLC.
Description: Supplement to October 12, 2023 EFS Parlin Holdings,
LLC tariff filing.
Filed Date: 11/30/23.
Accession Number: 20231130-5353.
Comment Date: 5 p.m. ET 12/21/23.
Docket Numbers: ER24-228-002.
Applicants: South Cheyenne Solar, LLC.
Description: Tariff Amendment: Revision of Proposed Market-Based
Rate Tariff to be effective 12/1/2023.
Filed Date: 12/1/23.
Accession Number: 20231201-5248.
Comment Date: 5 pm ET 12/11/23.
Docket Numbers: ER24-537-000.
Applicants: Southwestern Public Service Company
Description: Petition for Limited Waiver of Southwestern Public
Service Company.
Filed Date: 12/4/23.
Accession Number: 20231204-5142.
Comment Date: 5 pm ET 12/18/23.
Docket Numbers: ER24-543-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to 10 Service
Agreements re: FirstEnergy Reorganization to be effective 12/31/9998.
Filed Date: 12/4/23.
Accession Number: 20231204-5212.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-544-000.
Applicants: Robin Hollow Solar Lessee, LLC.
Description: Tariff Amendment: Notice of MBR Cancellation to be
effective 12/5/2023.
Filed Date: 12/4/23.
Accession Number: 20231204-5223.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-545-000.
Applicants: American Electric Power Service Corporation,
Appalachian Power Company.
Description: Petition for Limited Waiver of Appalachian Power
Company.
Filed Date: 12/4/23.
Accession Number: 20231204-5283.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-546-000.
Applicants: Virginia Electric and Power Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Virginia Electric and Power
Company submits tariff filing per 35.13(a)(2)(iii: VEPCO submits One
WDSA, SA No. 7136 to be effective 11/6/2023.
Filed Date: 12/5/23.
Accession Number: 20231205-5045.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-547-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Modify
Operating Tolerances for Uninstructued Resource Deviation to be
effective 12/31/9998.
Filed Date: 12/5/23.
Accession Number: 20231205-5071.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-548-000.
Applicants: Dow Hydrocarbons and Resources LLC.
Description: Baseline eTariff Filing: Petition for Approval of
Initial Market-Based Rate Tariff to be effective 2/4/2024.
Filed Date: 12/5/23.
Accession Number: 20231205-5078.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-549-000.
Applicants: Santa Rosa Energy Center, LLC.
Description: Sec. 205(d) Rate Filing: Market-Based Rate Tariff
Revisions to be effective 12/6/2023.
Filed Date: 12/5/23.
Accession Number: 20231205-5102.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-550-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 292,
Amendment No. 1 to be effective 2/4/2024.
Filed Date: 12/5/23.
Accession Number: 20231205-5125.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-551-000.
Applicants: Elkhart County Solar Project, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 2/4/2024.
Filed Date: 12/5/23.
Accession Number: 20231205-5133.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-552-000.
Applicants: Martin County II Solar Project, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 2/4/2024.
Filed Date: 12/5/23.
[[Page 86128]]
Accession Number: 20231205-5135.
Comment Date: 5 pm ET 12/26/23.
Docket Numbers: ER24-553-000.
Applicants: Martin County Solar Project, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 2/4/2024.
Filed Date: 12/5/23.
Accession Number: 20231205-5136.
Comment Date: 5 pm ET 12/26/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5 p.m. Eastern time on the specified
comment date. Protests may be considered, but intervention is necessary
to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: December 5, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-27230 Filed 12-11-23; 8:45 am]
BILLING CODE 6717-01-P