Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Alabama Georgia Connector Project, 83935-83936 [2023-26463]

Download as PDF Federal Register / Vol. 88, No. 230 / Friday, December 1, 2023 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–194–000] lotter on DSK11XQN23PROD with NOTICES1 Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Alabama Georgia Connector Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Alabama Georgia Connector Project, proposed by Transcontinental Gas Pipe Line Company, LLC (Transco) in the above-referenced docket. Transco requests authorization from the Commission to provide customers with firm access to 63,800 dekatherms per day of incremental natural gas supply, increase overall system reliability, and add natural gas infrastructure to meet growing demand in Georgia. To accomplish this, Transco would construct and operate various modifications at five existing compressor stations in Marengo and Randolph Counties, Alabama, and Coweta, Henry, and Walton Counties, Georgia. The EA assesses the potential environmental effects of the construction and operation of the Alabama Georgia Connector Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major Federal action significantly affecting the quality of the human environment. The proposed Alabama Georgia Connector Projector includes the following facilities: • re-wheel two compressors at existing Compressor Station 90 (Marengo County, Alabama); • upgrade two natural gas-fired turbines to add 3,685 horsepower (hp) at existing Compressor Station 110 (Randolph County, Alabama); • re-wheel three compressors at existing Compressor Station 115 (Coweta County, Georgia); • replace a 12,000 hp electric compressor unit with a 22,500 hp electric compressor unit at existing Compressor Station 120 (Henry County, Georgia); and • re-wheel one compressor and increase the certificated hp of a 9,000 hp electric compressor unit to 15,000 hp at existing Compressor Station 125 (Walton County, Georgia). VerDate Sep<11>2014 18:47 Nov 30, 2023 Jkt 262001 Transco would also modify station piping within the compressor stations listed above. The Commission mailed a copy of the Notice of Availability to Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. The EA is only available in electronic format. It may be viewed and downloaded from the FERC’s website (www.ferc.gov), on the natural gas environmental documents page (https:// www.ferc.gov/industries-data/naturalgas/environment/environmentaldocuments). In addition, the EA may be accessed by using the eLibrary link on the FERC’s website. Click on the eLibrary link (https://elibrary.ferc.gov/ eLibrary/search), select ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field, excluding the last three digits (i.e. CP23–194). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The EA is not a decision document. It presents Commission staff’s independent analysis of the environmental issues for the Commission to consider when addressing the merits of all issues in this proceeding. Any person wishing to comment on the EA may do so. Your comments should focus on the EA’s disclosure and discussion of potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before 5:00 p.m. Eastern Time on December 27, 2023. For your convenience, there are three methods you can use to file your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to FERC PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 83935 Online. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP23–194–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. At this point in this proceeding, the timeframe for filing timely intervention requests has expired. Any person seeking to become a party to the proceeding must file a motion to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the Commission’s Rules of Practice and Procedures (18 CFR 385.214(b)(3) and (d)) and show good cause why the time limitation should be waived. Motions to intervene are more fully described at https://www.ferc.gov/how-intervene. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission E:\FR\FM\01DEN1.SGM 01DEN1 83936 Federal Register / Vol. 88, No. 230 / Friday, December 1, 2023 / Notices processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202)502–6595 or OPP@ ferc.gov. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: November 27, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–26463 Filed 11–30–23; 8:45 am] BILLING CODE 6717–01–P Dated: November 24, 2023. Debbie-Anne A. Reese, Deputy Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission lotter on DSK11XQN23PROD with NOTICES1 Dated: November 27, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–26464 Filed 11–30–23; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Take notice that the Commission received the following electric rate filings: Docket Numbers: ER24–475–000. Applicants: Nevada Power Company. Description: § 205(d) Rate Filing: NPC—Amendments to Attachments N and P to be effective 1/21/2024. Filed Date: 11/22/23. Accession Number: 20231122–5171. Comment Date: 5 p.m. ET 12/13/23. Docket Numbers: ER24–476–000. Applicants: ISO New England Inc. Description: ISO New England Inc. submits confidential and public versions of its informational filing for Forward Capacity Auction 18, which is associated with the 2027–2028 Capacity Commitment Period. Filed Date: 11/22/23. Accession Number: 20231122–5206. Comment Date: 5 p.m. ET 12/7/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is 18:47 Nov 30, 2023 eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. [FR Doc. 2023–26388 Filed 11–30–23; 8:45 am] Combined Notice of Filings #1 VerDate Sep<11>2014 necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Jkt 262001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Combined Notice of Filings Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP24–170–000. Applicants: Viking Gas Transmission Company. Description: § 4(d) Rate Filing: Negotiated Rate Agreement AF0554 to be effective 12/1/2023. Filed Date: 11/27/23. Accession Number: 20231127–5030. Comment Date: 5 p.m. ET 12/11/23. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP24–168–000. Applicants: Southern Star Central Gas Pipeline, Inc. Description: Compliance filing: Annual Cash-Out Activity Report 2023 to be effective N/A. Filed Date: 11/22/23. Accession Number: 20231122–5100. Comment Date: 5 p.m. ET 12/4/23. Docket Numbers: RP24–169–000. Applicants: Crescent Point Energy Corp., Crescent Point Resources Partnership. Description: Joint Petition for Limited Waiver of Capacity Release Regulations, et al. of Crescent Point Energy Corp., et al. Filed Date: 11/22/23. Accession Number: 20231122–5218. Comment Date: 5 p.m. ET 12/4/23. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the E:\FR\FM\01DEN1.SGM 01DEN1

Agencies

[Federal Register Volume 88, Number 230 (Friday, December 1, 2023)]
[Notices]
[Pages 83935-83936]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-26463]



[[Page 83935]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-194-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of 
Availability of the Environmental Assessment for the Proposed Alabama 
Georgia Connector Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the 
Alabama Georgia Connector Project, proposed by Transcontinental Gas 
Pipe Line Company, LLC (Transco) in the above-referenced docket. 
Transco requests authorization from the Commission to provide customers 
with firm access to 63,800 dekatherms per day of incremental natural 
gas supply, increase overall system reliability, and add natural gas 
infrastructure to meet growing demand in Georgia. To accomplish this, 
Transco would construct and operate various modifications at five 
existing compressor stations in Marengo and Randolph Counties, Alabama, 
and Coweta, Henry, and Walton Counties, Georgia.
    The EA assesses the potential environmental effects of the 
construction and operation of the Alabama Georgia Connector Project in 
accordance with the requirements of the National Environmental Policy 
Act (NEPA). The FERC staff concludes that approval of the proposed 
project, with appropriate mitigating measures, would not constitute a 
major Federal action significantly affecting the quality of the human 
environment.
    The proposed Alabama Georgia Connector Projector includes the 
following facilities:
     re-wheel two compressors at existing Compressor Station 90 
(Marengo County, Alabama);
     upgrade two natural gas-fired turbines to add 3,685 
horsepower (hp) at existing Compressor Station 110 (Randolph County, 
Alabama);
     re-wheel three compressors at existing Compressor Station 
115 (Coweta County, Georgia);
     replace a 12,000 hp electric compressor unit with a 22,500 
hp electric compressor unit at existing Compressor Station 120 (Henry 
County, Georgia); and
     re-wheel one compressor and increase the certificated hp 
of a 9,000 hp electric compressor unit to 15,000 hp at existing 
Compressor Station 125 (Walton County, Georgia).
    Transco would also modify station piping within the compressor 
stations listed above.
    The Commission mailed a copy of the Notice of Availability to 
Federal, State, and local government representatives and agencies; 
elected officials; environmental and public interest groups; Native 
American Tribes; potentially affected landowners and other interested 
individuals and groups; and newspapers and libraries in the project 
area. The EA is only available in electronic format. It may be viewed 
and downloaded from the FERC's website (www.ferc.gov), on the natural 
gas environmental documents page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In addition, the EA 
may be accessed by using the eLibrary link on the FERC's website. Click 
on the eLibrary link (https://elibrary.ferc.gov/eLibrary/search), 
select ``General Search'' and enter the docket number in the ``Docket 
Number'' field, excluding the last three digits (i.e. CP23-194). Be 
sure you have selected an appropriate date range. For assistance, 
please contact FERC Online Support at [email protected] or 
toll free at (866) 208-3676, or for TTY, contact (202) 502-8659.
    The EA is not a decision document. It presents Commission staff's 
independent analysis of the environmental issues for the Commission to 
consider when addressing the merits of all issues in this proceeding. 
Any person wishing to comment on the EA may do so. Your comments should 
focus on the EA's disclosure and discussion of potential environmental 
effects, reasonable alternatives, and measures to avoid or lessen 
environmental impacts. The more specific your comments, the more useful 
they will be. To ensure that the Commission has the opportunity to 
consider your comments prior to making its decision on this project, it 
is important that we receive your comments in Washington, DC on or 
before 5:00 p.m. Eastern Time on December 27, 2023.
    For your convenience, there are three methods you can use to file 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
FERC Online. This is an easy method for submitting brief, text-only 
comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's website (www.ferc.gov) under the 
link to FERC Online. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (CP23-
194-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.
    Filing environmental comments will not give you intervenor status, 
but you do not need intervenor status to have your comments considered. 
Only intervenors have the right to seek rehearing or judicial review of 
the Commission's decision. At this point in this proceeding, the 
timeframe for filing timely intervention requests has expired. Any 
person seeking to become a party to the proceeding must file a motion 
to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the 
Commission's Rules of Practice and Procedures (18 CFR 385.214(b)(3) and 
(d)) and show good cause why the time limitation should be waived. 
Motions to intervene are more fully described at https://www.ferc.gov/how-intervene.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link 
also provides access to the texts of all formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission

[[Page 83936]]

processes. For public inquiries and assistance with making filings such 
as interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202)502-6595 or [email protected].
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to https://www.ferc.gov/ferc-online/overview to 
register for eSubscription.

    Dated: November 27, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-26463 Filed 11-30-23; 8:45 am]
BILLING CODE 6717-01-P