Combined Notice of Filings #1, 83114-83116 [2023-26168]
Download as PDF
83114
Federal Register / Vol. 88, No. 227 / Tuesday, November 28, 2023 / Notices
Respondents/Affected Public:
Individuals or households.
Total Estimated Number of Annual
Responses: 130.
Total Estimated Number of Annual
Burden Hours: 65.
Abstract: The collection is necessary
under 5 U.S.C. 552a(b) to collect
information from individuals requesting
information under the Privacy Act (PA).
The Department will use the
information to provide documents that
are responsive to a Privacy Act or FOIA/
Privacy Act request under the Freedom
of Information Act.
Dated: November 22, 2023.
Stephanie Valentine,
PRA Coordinator, Strategic Collections and
Clearance, Governance and Strategy Division,
Office of Chief Data Officer, Office of
Planning, Evaluation and Policy
Development.
[FR Doc. 2023–26172 Filed 11–27–23; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Portsmouth
Office of Environmental
Management, Department of Energy.
ACTION: Notice of open meeting.
AGENCY:
This notice announces a
meeting of the Environmental
Management Site-Specific Advisory
Board (EM SSAB), Portsmouth. The
Federal Advisory Committee Act
requires that public notice of this
meeting be announced in the Federal
Register.
SUMMARY:
Thursday, January 4, 2024; 6
p.m.–8 p.m. EST.
ADDRESSES: The Ohio State University,
Endeavor Center, 1862 Shyville Road,
Room 165, Piketon, OH 45661.
FOR FURTHER INFORMATION CONTACT: Greg
Simonton, Federal Coordinator, by
phone: (740) 897–3737 or email:
greg.simonton@pppo.gov.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to provide advice and
recommendations concerning the
following EM site-specific issues: cleanup activities and environmental
restoration; waste and nuclear materials
management and disposition; excess
facilities; future land use and long-term
stewardship. The Board may also be
asked to provide advice and
recommendations on any EM program
components.
Tentative Agenda:
• Presentation
• Administrative Activities
lotter on DSK11XQN23PROD with NOTICES1
DATES:
VerDate Sep<11>2014
17:19 Nov 27, 2023
Jkt 262001
• Public Comments
Public Participation: The meeting is
open to the public. The EM SSAB,
Portsmouth, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Greg
Simonton as soon as possible in
advance of the meeting at the telephone
number listed above. Written statements
may be filed with the Board either
before or after the meeting. Comments
received by no later than 5 p.m. EST on
Friday, December 29, 2023, will be read
aloud during the meeting. Comments
will also be accepted after the meeting,
by no later than 5 p.m. EST on Friday,
January 12, 2024. Please submit
comments to Greg Simonton at the
aforementioned email address. Please
put ‘‘Public Comment’’ in the subject
line. Individuals who wish to make oral
statements pertaining to agenda items
should contact Greg Simonton at the
telephone number listed above.
Requests must be received as soon as
possible prior to the meeting and
reasonable provision will be made to
include the presentation in the agenda.
The Deputy Designated Federal Officer
is empowered to conduct the meeting in
a fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments. The EM
SSAB, Portsmouth, will hear public
comments pertaining to its scope (cleanup standards and environmental
restoration; waste management and
disposition; stabilization and
disposition of non-stockpile nuclear
materials; excess facilities; future land
use and long-term stewardship; risk
assessment and management; and cleanup science and technology activities).
Comments outside of the scope may be
submitted via written statement as
directed above.
Minutes: Minutes will be available by
writing or calling Greg Simonton,
Federal Coordinator, U.S. Department of
Energy, Portsmouth/Paducah Project
Office, P.O. Box 700, Piketon, OH
45661, Email: greg.simonton@pppo.gov
or by Phone: (740) 897–3737, Minutes
will also be available at the following
website: https://www.energy.gov/pppo/
ports-ssab/listings/meeting-materials.
Signed in Washington, DC, on November
21, 2023.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2023–26142 Filed 11–27–23; 8:45 am]
BILLING CODE 6450–01–P
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG24–33–000.
Applicants: Pleasant Valley Solar
LLC.
Description: Pleasant Valley Solar
LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121–5011.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: EG24–34–000.
Applicants: Flat Ridge 4 Wind, LLC.
Description: Flat Ridge 4 Wind, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121–5118.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: EG24–35–000.
Applicants: Flat Ridge 4 Wind
Holdings LLC.
Description: Flat Ridge 4 Wind
Holdings LLC submits Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121–5119.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: EG24–36–000.
Applicants: Flat Ridge 5 Wind Energy
LLC.
Description: Flat Ridge 5 Wind Energy
LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121–5121.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: EG24–37–000.
Applicants: Flat Ridge 5 Wind Energy
Holdings LLC.
Description: Flat Ridge 5 Wind Energy
Holdings LLC submits Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121–5124.
Comment Date: 5 p.m. ET 12/12/23.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL23–57–006.
Applicants: Lee County Generating
Station, LLC v. PJM Interconnection,
L.L.C.
Description: Joint Request of PJM &
Lee County Generating Station, LLC for
Further Waiver of Tariff Provisions.
Filed Date: 11/17/23.
Accession Number: 20231117–5263.
E:\FR\FM\28NON1.SGM
28NON1
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 88, No. 227 / Tuesday, November 28, 2023 / Notices
Comment Date: 5 p.m. ET 12/8/23.
Docket Numbers: EL24–25–000.
Applicants: City of Tacoma,
Department of Public Utilities, Light
Division v. California Independent
System Operator Corporation.
Description: Complaint of the City of
Tacoma, Department of Public Utilities,
Light Division v. California Independent
System Operator Corporation.
Filed Date: 11/21/23.
Accession Number: 20231121–5116.
Comment Date: 5 p.m. ET 12/11/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–2584–000.
Applicants: Greeley Energy Facility,
LLC.
Description: Supplement to August 1,
2022, Greeley Energy Facility, LLC
submits tariff filing, Notice of Change in
Status.
Filed Date: 11/20/23.
Accession Number: 20231120–5226.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER23–1783–002.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
NYISO Compliance Filing re: Order
676–J NAESB/WEQ Standards to be
effective 2/1/2024.
Filed Date: 11/21/23.
Accession Number: 20231121–5161.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER23–2947–001.
Applicants: Midcontinent
Independent System Operator, Inc.,
Montana-Dakota Utilities Co.
Description: Tariff Amendment:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.17(b): 2023–11–21_Amendment
MDU Depreciation Rates related to
Retail Rates to be effective 12/31/9998.
Filed Date: 11/21/23.
Accession Number: 20231121–5040.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–26–001.
Applicants: East Point Energy Center,
LLC.
Description: Tariff Amendment:
Amendment to Market-Based Rate
Authorization Request (ER24–26) to be
effective 1/18/2024.
Filed Date: 11/21/23.
Accession Number: 20231121–5134.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–451–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 4082; Queue No. AD2–112 to be
effective 1/22/2024.
Filed Date: 11/21/23.
VerDate Sep<11>2014
17:19 Nov 27, 2023
Jkt 262001
Accession Number: 20231121–5001.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–452–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2825R11 KMEA and Evergy Kansas
Central Meter Agent Agreement to be
effective 12/1/2023.
Filed Date: 11/21/23.
Accession Number: 20231121–5009.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–453–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of ISA, SA No.
6225; Queue Nos. AA1–111/AB1–092 et
al to be effective 1/22/2024.
Filed Date: 11/21/23.
Accession Number: 20231121–5026.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–454–000.
Applicants: Mountain Top Energy
LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Tariff Application to
be effective 11/22/2023.
Filed Date: 11/21/23.
Accession Number: 20231121–5055.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–455–000.
Applicants: Electree LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Tariff Application to
be effective 11/22/2023.
Filed Date: 11/21/23.
Accession Number: 20231121–5057.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–456–000.
Applicants: Navajo Tribal Utility
Authority.
Description: Petition for Waiver of
Navajo Tribal Utility Authority.
Filed Date: 11/20/23.
Accession Number: 20231120–5219.
Comment Date: 5 p.m. ET 11/27/23.
Docket Numbers: ER24–457–000.
Applicants: Georgia Power Company.
Description: § 205(d) Rate Filing:
GPCo 2023 PBOP Filing to be effective
1/1/2023.
Filed Date: 11/21/23.
Accession Number: 20231121–5123.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–458–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 5159; Queue No. AB2–040 to be
effective 1/22/2024.
Filed Date: 11/21/23.
Accession Number: 20231121–5125.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–459–000.
Applicants: Mississippi Power
Company.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
83115
Description: § 205(d) Rate Filing:
MPCo PBOP 2023 Filing to be effective
1/1/2023.
Filed Date: 11/21/23.
Accession Number: 20231121–5127.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–460–000.
Applicants: Southern Electric
Generating Company.
Description: § 205(d) Rate Filing:
SEGCo 2023 PBOP Filing to be effective
1/1/2023.
Filed Date: 11/21/23.
Accession Number: 20231121–5129.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–461–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: Peak
Market Activity Credit Requirement
Enhancements to be effective 1/22/2024.
Filed Date: 11/21/23.
Accession Number: 20231121–5135.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24–462–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Proposal to Establish a Fifth Cost of
New Entry Area to be effective 1/22/
2024.
Filed Date: 11/21/23.
Accession Number: 20231121–5144.
Comment Date: 5 p.m. ET 12/12/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
E:\FR\FM\28NON1.SGM
28NON1
83116
Federal Register / Vol. 88, No. 227 / Tuesday, November 28, 2023 / Notices
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: November 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–26168 Filed 11–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP24–164–000.
Applicants: Carolina Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: CGT–
2023 Section 4 General Rate Case to be
effective 1/1/2024.
Filed Date: 11/21/23.
Accession Number: 20231121–5002.
Comment Date: 5 p.m. ET 12/4/23.
Docket Numbers: RP24–165–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing: NonConforming—Carolina Market Link—
PEG to be effective 1/1/2024.
Filed Date: 11/21/23.
Accession Number: 20231121–5072.
Comment Date: 5 p.m. ET 12/4/23.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
lotter on DSK11XQN23PROD with NOTICES1
Filings in Existing Proceedings
Docket Numbers: RP24–142–001.
Applicants: NEXUS Gas
Transmission, LLC.
Description: Tariff Amendment:
Negotiated Rates—DTE Gas 860003
Amendment eff 12–1–23 to be effective
12/1/2023.
Filed Date: 11/21/23.
Accession Number: 20231121–5064.
Comment Date: 5 p.m. ET 12/4/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
VerDate Sep<11>2014
17:19 Nov 27, 2023
Jkt 262001
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: November 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–26167 Filed 11–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3442–029]
City of Nashua, New Hampshire;
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following license
application has been filed with the
Commission and is available for public
inspection.
a. Type of Application: New License.
b. Project No.: P–3442–029.
c. Date filed: July 30, 2021.
d. Applicant: City of Nashua
(Nashua).
e. Name of Project: Mine Falls
Hydroelectric Project.
f. Location: The existing project is
located on the Nashua River in
Hillsborough County, New Hampshire.
The project does not affect federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: James W.
Donchess, Mayor, City of Nashua, 229
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
Main Street, P.O. Box 2019, Nashua, NH
03060; (603) 589–3260; or email at
NasuaMayor@nashuanh.gov.
i. FERC Contact: Khatoon Melick,
(202) 502–8433, or email at
khatoon.melick@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERC.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
Quick.aspx. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
must clearly identify the project name
and docket number on the first page:
Mine Falls Hydroelectric Project (P–
3442–029).
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is ready for environmental analysis
at this time.
l. The existing project consists of: (1)
A 242-acre impoundment with a normal
storage volume of 1,970 acre-feet and a
normal headpond elevation of 158.76
feet (NAVD 88); (2) a rock filled
concrete cap, variable in height dam
with an approximately 132-foot-long
spillway at a permanent crest elevation
of 154.66 feet, and nominal 4.0-foothigh wooden flashboards maintaining a
E:\FR\FM\28NON1.SGM
28NON1
Agencies
[Federal Register Volume 88, Number 227 (Tuesday, November 28, 2023)]
[Notices]
[Pages 83114-83116]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-26168]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG24-33-000.
Applicants: Pleasant Valley Solar LLC.
Description: Pleasant Valley Solar LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121-5011.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: EG24-34-000.
Applicants: Flat Ridge 4 Wind, LLC.
Description: Flat Ridge 4 Wind, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121-5118.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: EG24-35-000.
Applicants: Flat Ridge 4 Wind Holdings LLC.
Description: Flat Ridge 4 Wind Holdings LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121-5119.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: EG24-36-000.
Applicants: Flat Ridge 5 Wind Energy LLC.
Description: Flat Ridge 5 Wind Energy LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121-5121.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: EG24-37-000.
Applicants: Flat Ridge 5 Wind Energy Holdings LLC.
Description: Flat Ridge 5 Wind Energy Holdings LLC submits Notice
of Self-Certification of Exempt Wholesale Generator Status.
Filed Date: 11/21/23.
Accession Number: 20231121-5124.
Comment Date: 5 p.m. ET 12/12/23.
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL23-57-006.
Applicants: Lee County Generating Station, LLC v. PJM
Interconnection, L.L.C.
Description: Joint Request of PJM & Lee County Generating Station,
LLC for Further Waiver of Tariff Provisions.
Filed Date: 11/17/23.
Accession Number: 20231117-5263.
[[Page 83115]]
Comment Date: 5 p.m. ET 12/8/23.
Docket Numbers: EL24-25-000.
Applicants: City of Tacoma, Department of Public Utilities, Light
Division v. California Independent System Operator Corporation.
Description: Complaint of the City of Tacoma, Department of Public
Utilities, Light Division v. California Independent System Operator
Corporation.
Filed Date: 11/21/23.
Accession Number: 20231121-5116.
Comment Date: 5 p.m. ET 12/11/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER22-2584-000.
Applicants: Greeley Energy Facility, LLC.
Description: Supplement to August 1, 2022, Greeley Energy Facility,
LLC submits tariff filing, Notice of Change in Status.
Filed Date: 11/20/23.
Accession Number: 20231120-5226.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER23-1783-002.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: NYISO Compliance Filing re: Order
676-J NAESB/WEQ Standards to be effective 2/1/2024.
Filed Date: 11/21/23.
Accession Number: 20231121-5161.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER23-2947-001.
Applicants: Midcontinent Independent System Operator, Inc.,
Montana-Dakota Utilities Co.
Description: Tariff Amendment: Midcontinent Independent System
Operator, Inc. submits tariff filing per 35.17(b): 2023-11-21_Amendment
MDU Depreciation Rates related to Retail Rates to be effective 12/31/
9998.
Filed Date: 11/21/23.
Accession Number: 20231121-5040.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-26-001.
Applicants: East Point Energy Center, LLC.
Description: Tariff Amendment: Amendment to Market-Based Rate
Authorization Request (ER24-26) to be effective 1/18/2024.
Filed Date: 11/21/23.
Accession Number: 20231121-5134.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-451-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, Service
Agreement No. 4082; Queue No. AD2-112 to be effective 1/22/2024.
Filed Date: 11/21/23.
Accession Number: 20231121-5001.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-452-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2825R11 KMEA and Evergy
Kansas Central Meter Agent Agreement to be effective 12/1/2023.
Filed Date: 11/21/23.
Accession Number: 20231121-5009.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-453-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of ISA, SA
No. 6225; Queue Nos. AA1-111/AB1-092 et al to be effective 1/22/2024.
Filed Date: 11/21/23.
Accession Number: 20231121-5026.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-454-000.
Applicants: Mountain Top Energy LLC.
Description: Baseline eTariff Filing: Market-Based Rate Tariff
Application to be effective 11/22/2023.
Filed Date: 11/21/23.
Accession Number: 20231121-5055.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-455-000.
Applicants: Electree LLC.
Description: Baseline eTariff Filing: Market-Based Rate Tariff
Application to be effective 11/22/2023.
Filed Date: 11/21/23.
Accession Number: 20231121-5057.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-456-000.
Applicants: Navajo Tribal Utility Authority.
Description: Petition for Waiver of Navajo Tribal Utility
Authority.
Filed Date: 11/20/23.
Accession Number: 20231120-5219.
Comment Date: 5 p.m. ET 11/27/23.
Docket Numbers: ER24-457-000.
Applicants: Georgia Power Company.
Description: Sec. 205(d) Rate Filing: GPCo 2023 PBOP Filing to be
effective 1/1/2023.
Filed Date: 11/21/23.
Accession Number: 20231121-5123.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-458-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, Service
Agreement No. 5159; Queue No. AB2-040 to be effective 1/22/2024.
Filed Date: 11/21/23.
Accession Number: 20231121-5125.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-459-000.
Applicants: Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: MPCo PBOP 2023 Filing to be
effective 1/1/2023.
Filed Date: 11/21/23.
Accession Number: 20231121-5127.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-460-000.
Applicants: Southern Electric Generating Company.
Description: Sec. 205(d) Rate Filing: SEGCo 2023 PBOP Filing to be
effective 1/1/2023.
Filed Date: 11/21/23.
Accession Number: 20231121-5129.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-461-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Peak Market Activity Credit
Requirement Enhancements to be effective 1/22/2024.
Filed Date: 11/21/23.
Accession Number: 20231121-5135.
Comment Date: 5 p.m. ET 12/12/23.
Docket Numbers: ER24-462-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Proposal to Establish a
Fifth Cost of New Entry Area to be effective 1/22/2024.
Filed Date: 11/21/23.
Accession Number: 20231121-5144.
Comment Date: 5 p.m. ET 12/12/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and
[[Page 83116]]
assistance with making filings such as interventions, comments, or
requests for rehearing, the public is encouraged to contact OPP at
(202) 502-6595 or [email protected].
Dated: November 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-26168 Filed 11-27-23; 8:45 am]
BILLING CODE 6717-01-P