Additionally, on April 20, 2022, the
Council on Environmental Quality
(CEQ) issued a final rule for
implementing CEQ’s NEPA regulations,
including the definition of
environmental ‘‘effects.’’ 26 DOE has
determined that, consistent with E.O.
14008 and its obligations under NEPA,
it is appropriate to evaluate the
potential environmental impacts—
including the greenhouse gas
emissions—of exporting (or reexporting) U.S.-sourced LNG from the
proposed MPL Facility to non-FTA
countries. Therefore, on October 23,
2023, DOE issued a ‘‘Notice of
Environmental Assessment’’
announcing that it is undertaking an
environmental assessment (EA) under
NEPA to analyze MPL’s requested
exports of U.S.-sourced LNG to nonFTA countries.27
The Draft EA examined the potential
environmental impacts associated with
unconventional natural gas exploration
and production activities in the lower48 states; the utilization of the crossborder pipelines that interconnect the
United States and Mexico and that MPL
may utilize for its U.S. natural gas
supply; descriptions of Mexico’s
environmental review process for the
construction and operation of
liquefaction terminals and related
facilities; marine transport of LNG
exported from the proposed MPL
Facility; and the global nature of GHG
emissions associated with re-exporting
U.S.-sourced LNG from Mexico from a
life cycle perspective.
khammond on DSKJM1Z7X2PROD with NOTICES
NEPA Process and Public Involvement
DOE prepared the Draft EA in
accordance with the CEQ regulations at
Title 40, Code of Federal Regulations,
parts 1500–1508 (40 CFR 1500–1508)
and DOE’s NEPA implementing
procedures at 10 CFR part 1021. DOE
published a Notice of Environmental
Assessment to Docket No. 22–167–LNG
on October 23, 2023, announcing its
intent to prepare an EA. DOE is
providing opportunities for public
review and comments on this Draft EA
capacity of [Federal] agencies to combat the climate
crisis.’’ Exec. Order No. 14008 of Jan. 27, 2021,
Tackling the Climate Crisis at Home and Abroad,
86 FR 7619 (Feb. 1, 2021), www.federalregister.gov/
documents/2021/02/01/2021–02177/tackling-theclimate-crisisat-home-and-abroad. E.O. 14008
further requires the ‘‘Federal Government [to] drive
assessment, disclosure, and mitigation of climate
pollution and climate-related risks in every sector’’
of the U.S. economy. Id.
26 See Council on Envtl. Quality, National
Environmental Policy Act Implementing
Regulations Revisions; Final Rule, 87 FR 23453
(Apr. 20, 2022).
27 Mexico Pac. Ltd. LLC, Notice of Environmental
Assessment, Docket No. 22–167–LNG (Oct. 23,
2023).
VerDate Sep<11>2014
17:43 Nov 24, 2023
Jkt 262001
View PV Solar Two LLC, Hancock
Wind, LLC, Comanche Solar PV, LLC,
Pio Pico Energy Center, LLC, Greeley
Signed in Washington, DC, on November
Energy Facility, LLC, Maricopa West
21, 2023.
Solar PV, LLC, Pavant Solar LLC,
Amy Sweeney,
Evergreen Wind Power II, LLC, Blue Sky
Director, Office of Regulation, Analysis, and
West, LLC, Cottonwood Solar, LLC, CID
Engagement, Office of Resource
Solar, LLC, Imperial Valley Solar
Sustainability.
Company (IVSC) 2, LLC, RE Camelot
[FR Doc. 2023–26060 Filed 11–24–23; 8:45 am]
LLC, RE Columbia Two LLC, Selmer
BILLING CODE 6450–01–P
Farm, LLC, Mulberry Farm, LLC, KMC
Thermo, LLC, SWG Arapahoe, LLC,
EnergyMark, LLC, Palouse Wind, LLC,
DEPARTMENT OF ENERGY
Fountain Valley Power, L.L.C., El Paso
Electric Company, Marina Energy, LLC,
Federal Energy Regulatory
Broad River Energy LLC, Mankato
Commission
Energy Center, LLC, AZ Solar 1, LLC.
Combined Notice of Filings #1
Description: Notice of Non-Material
Change in Status of AZ Solar 1, LLC, et
Take notice that the Commission
al.
received the following exempt
Filed Date: 11/20/23.
wholesale generator filings:
Accession Number: 20231120–5075.
Docket Numbers: EG24–32–000.
Comment Date: 5 p.m. ET 12/11/23.
Applicants: Jade Meadow LLC.
Docket Numbers: ER23–426–004.
Description: Jade Meadow LLC
Applicants: California Independent
submits Notice of Self–Certification of
System Operator Corporation.
Exempt Wholesale Generator Status.
Description: Compliance filing: 2023–
Filed Date: 11/17/23.
11–20 NAESB Compliance Filing—
Accession Number: 20231117–5247.
Version 003.3 to be effective 2/1/2024.
Comment Date: 5 p.m. ET 12/8/23.
Filed Date: 11/20/23.
Take notice that the Commission
Accession Number: 20231120–5164.
received the following electric rate
Comment Date: 5 p.m. ET 12/11/23.
filings:
Docket Numbers: ER23–2663–001.
Docket Numbers: ER17–1329–001.
Applicants: PJM Interconnection,
Applicants: J.P. Morgan Ventures
L.L.C.
Energy Corporation.
Description: Tariff Amendment:
Description: Compliance filing:
Submission of Response to Deficiency
JPMVEC Q3 2023 Notice of Change in
Letter, Original ISA, SA No. 7038 to be
Status Compliance Filing to be effective effective 12/31/9998.
Filed Date: 11/20/23.
11/20/2023.
Accession Number: 20231120–5143.
Filed Date: 11/20/23.
Comment Date: 5 p.m. ET 12/11/23.
Accession Number: 20231120–5169.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–154–000.
Applicants: BCE Los Alamitos, LLC.
Docket Numbers: ER20–59–006;
Description: Supplement to October
ER10–1874–018; ER10–1946–018;
19, 2023, BCE Los Alamitos, LLC Notice
ER10–2201–006; ER10–2721–017;
of Change in Status and Request for Cat
ER10–2861–014; ER12–1308–017;
ER13–291–005; ER13–1504–015; ER14– 1 Seller Status in the SW Region to be
1468–016; ER14–2140–015; ER14–2141– effective 10/20/2023.
Filed Date: 11/17/23.
015; ER14–2465–017; ER14–2466–017;
Accession Number: 20231117–5260.
ER14–2939–014; ER15–632–016; ER15–
Comment Date: 5 p.m. ET 11/27/23.
634–016; ER15–1471–016; ER15–1672–
Docket Numbers: ER24–438–000.
015; ER15–1952–015; ER15–2728–016;
Applicants: Jade Meadow LLC.
ER16–612–003; ER16–711–013; ER16–
Description: Baseline eTariff Filing:
915–009; ER16–2010–010; ER16–2520–
Market-Based Rate Application to be
007; ER16–2561–009; ER17–318–007;
effective 11/18/2023.
ER18–97–005; ER19–8–007; ER19–9–
Filed Date: 11/17/23.
012; ER19–2287–007; ER19–2294–007;
Accession Number: 20231117–5218.
ER19–2305–007; ER20–57–005; ER20–
Comment Date: 5 p.m. ET 12/8/23
58–005; ER20–339–005; ER20–422–005.
Applicants: FL Solar 1, LLC, Twiggs
Docket Numbers: ER24–440–000.
County Solar, LLC, FL Solar 4, LLC, GA
Applicants: PJM Interconnection,
Solar 3, LLC, Valencia Power, LLC,
L.L.C.
Mesquite Power, LLC, Goal Line L.P.,
Description: § 205(d) Rate Filing:
Mankato Energy Center II, LLC,
Amendment to WMPA, Service
Sweetwater Solar, LLC, MS Solar 3,
Agreement No. 6129; Queue No. AF1–
LLC, Three Peaks Power, LLC,
287 to be effective 1/22/2024.
Sunflower Wind Project, LLC, Grand
Filed Date: 11/20/23.
(see DATES and ADDRESSES sections of
this notice).
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
E:\FR\FM\27NON1.SGM
27NON1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 88, No. 226 / Monday, November 27, 2023 / Notices
Accession Number: 20231120–5044.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–442–000.
Applicants: Innovative Solar 42, LLC.
Description: Compliance filing: Notice
of Non-Material Change in Status and
Revised Market-Based Rate Tariff to be
effective 11/21/2023.
Filed Date: 11/20/23.
Accession Number: 20231120–5061.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–443–000.
Applicants: Deriva Energy Services,
LLC.
Description: Compliance filing: Notice
of Succession and Revised MarketBased Rate Tariff to be effective 11/21/
2023.
Filed Date: 11/20/23.
Accession Number: 20231120–5067.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–444–000.
Applicants: Deriva Energy Beckjord
Storage LLC.
Description: Compliance filing: Notice
of Succession and Revised MarketBased Rate Tariff to be effective 11/21/
2023.
Filed Date: 11/20/23.
Accession Number: 20231120–5069.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–445–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment:
Alabama Power Company submits tariff
filing per 35.15: Photosol US Renewable
Energy (Bayou Solar) LGIA Termination
Filing to be effective 11/20/2023.
Filed Date: 11/20/23.
Accession Number: 20231120–5070.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–446–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment:
Alabama Power Company submits tariff
filing per 35.15: Photosol US Renewable
Energy (Mobile River Solar 1) LGIA
Termination Filing to be effective 11/20/
2023.
Filed Date: 11/20/23.
Accession Number: 20231120–5071.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–447–000.
Applicants: Santa Paula Energy
Storage, LLC.
Description: § 205(d) Rate Filing:
Santa Paula Energy Storage, LLC CoTenancy and Shared Facilities
Agreement to be effective 11/21/2023.
Filed Date: 11/20/23.
Accession Number: 20231120–5076.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–448–000.
VerDate Sep<11>2014
17:43 Nov 24, 2023
Jkt 262001
Applicants: ITC Midwest LLC.
Description: Baseline eTariff Filing:
Filing of Contribution in Aid and
Construction Agreement_ITC Midwest
RS 231 to be effective 1/20/2024.
Filed Date: 11/20/23.
Accession Number: 20231120–5129.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–449–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, SA No. 7131; Queue No.
W1–108 to be effective 1/20/2024.
Filed Date: 11/20/23.
Accession Number: 20231120–5151.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24–450–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OA, Sch. 12 and RAA, Sch
17 re: 3Q 2023 Membership Lists to be
effective 9/30/2023.
Filed Date: 11/20/23.
Accession Number: 20231120–5156.
Comment Date: 5 p.m. ET 12/11/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
82879
Dated: November 20, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–26071 Filed 11–24–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER24–421–000]
JGT2 Energy LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of JGT2
Energy LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 11,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
E:\FR\FM\27NON1.SGM
27NON1
Agencies
[Federal Register Volume 88, Number 226 (Monday, November 27, 2023)]
[Notices]
[Pages 82878-82879]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-26071]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG24-32-000.
Applicants: Jade Meadow LLC.
Description: Jade Meadow LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 11/17/23.
Accession Number: 20231117-5247.
Comment Date: 5 p.m. ET 12/8/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER17-1329-001.
Applicants: J.P. Morgan Ventures Energy Corporation.
Description: Compliance filing: JPMVEC Q3 2023 Notice of Change in
Status Compliance Filing to be effective 11/20/2023.
Filed Date: 11/20/23.
Accession Number: 20231120-5169.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER20-59-006; ER10-1874-018; ER10-1946-018; ER10-
2201-006; ER10-2721-017; ER10-2861-014; ER12-1308-017; ER13-291-005;
ER13-1504-015; ER14-1468-016; ER14-2140-015; ER14-2141-015; ER14-2465-
017; ER14-2466-017; ER14-2939-014; ER15-632-016; ER15-634-016; ER15-
1471-016; ER15-1672-015; ER15-1952-015; ER15-2728-016; ER16-612-003;
ER16-711-013; ER16-915-009; ER16-2010-010; ER16-2520-007; ER16-2561-
009; ER17-318-007; ER18-97-005; ER19-8-007; ER19-9-012; ER19-2287-007;
ER19-2294-007; ER19-2305-007; ER20-57-005; ER20-58-005; ER20-339-005;
ER20-422-005.
Applicants: FL Solar 1, LLC, Twiggs County Solar, LLC, FL Solar 4,
LLC, GA Solar 3, LLC, Valencia Power, LLC, Mesquite Power, LLC, Goal
Line L.P., Mankato Energy Center II, LLC, Sweetwater Solar, LLC, MS
Solar 3, LLC, Three Peaks Power, LLC, Sunflower Wind Project, LLC,
Grand View PV Solar Two LLC, Hancock Wind, LLC, Comanche Solar PV, LLC,
Pio Pico Energy Center, LLC, Greeley Energy Facility, LLC, Maricopa
West Solar PV, LLC, Pavant Solar LLC, Evergreen Wind Power II, LLC,
Blue Sky West, LLC, Cottonwood Solar, LLC, CID Solar, LLC, Imperial
Valley Solar Company (IVSC) 2, LLC, RE Camelot LLC, RE Columbia Two
LLC, Selmer Farm, LLC, Mulberry Farm, LLC, KMC Thermo, LLC, SWG
Arapahoe, LLC, EnergyMark, LLC, Palouse Wind, LLC, Fountain Valley
Power, L.L.C., El Paso Electric Company, Marina Energy, LLC, Broad
River Energy LLC, Mankato Energy Center, LLC, AZ Solar 1, LLC.
Description: Notice of Non-Material Change in Status of AZ Solar 1,
LLC, et al.
Filed Date: 11/20/23.
Accession Number: 20231120-5075.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER23-426-004.
Applicants: California Independent System Operator Corporation.
Description: Compliance filing: 2023-11-20 NAESB Compliance
Filing--Version 003.3 to be effective 2/1/2024.
Filed Date: 11/20/23.
Accession Number: 20231120-5164.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER23-2663-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Submission of Response to Deficiency
Letter, Original ISA, SA No. 7038 to be effective 12/31/9998.
Filed Date: 11/20/23.
Accession Number: 20231120-5143.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-154-000.
Applicants: BCE Los Alamitos, LLC.
Description: Supplement to October 19, 2023, BCE Los Alamitos, LLC
Notice of Change in Status and Request for Cat 1 Seller Status in the
SW Region to be effective 10/20/2023.
Filed Date: 11/17/23.
Accession Number: 20231117-5260.
Comment Date: 5 p.m. ET 11/27/23.
Docket Numbers: ER24-438-000.
Applicants: Jade Meadow LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 11/18/2023.
Filed Date: 11/17/23.
Accession Number: 20231117-5218.
Comment Date: 5 p.m. ET 12/8/23
Docket Numbers: ER24-440-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to WMPA, Service
Agreement No. 6129; Queue No. AF1-287 to be effective 1/22/2024.
Filed Date: 11/20/23.
[[Page 82879]]
Accession Number: 20231120-5044.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-442-000.
Applicants: Innovative Solar 42, LLC.
Description: Compliance filing: Notice of Non-Material Change in
Status and Revised Market-Based Rate Tariff to be effective 11/21/2023.
Filed Date: 11/20/23.
Accession Number: 20231120-5061.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-443-000.
Applicants: Deriva Energy Services, LLC.
Description: Compliance filing: Notice of Succession and Revised
Market-Based Rate Tariff to be effective 11/21/2023.
Filed Date: 11/20/23.
Accession Number: 20231120-5067.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-444-000.
Applicants: Deriva Energy Beckjord Storage LLC.
Description: Compliance filing: Notice of Succession and Revised
Market-Based Rate Tariff to be effective 11/21/2023.
Filed Date: 11/20/23.
Accession Number: 20231120-5069.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-445-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment: Alabama Power Company submits tariff
filing per 35.15: Photosol US Renewable Energy (Bayou Solar) LGIA
Termination Filing to be effective 11/20/2023.
Filed Date: 11/20/23.
Accession Number: 20231120-5070.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-446-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment: Alabama Power Company submits tariff
filing per 35.15: Photosol US Renewable Energy (Mobile River Solar 1)
LGIA Termination Filing to be effective 11/20/2023.
Filed Date: 11/20/23.
Accession Number: 20231120-5071.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-447-000.
Applicants: Santa Paula Energy Storage, LLC.
Description: Sec. 205(d) Rate Filing: Santa Paula Energy Storage,
LLC Co-Tenancy and Shared Facilities Agreement to be effective 11/21/
2023.
Filed Date: 11/20/23.
Accession Number: 20231120-5076.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-448-000.
Applicants: ITC Midwest LLC.
Description: Baseline eTariff Filing: Filing of Contribution in Aid
and Construction Agreement_ITC Midwest RS 231 to be effective 1/20/
2024.
Filed Date: 11/20/23.
Accession Number: 20231120-5129.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-449-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original NSA, SA No. 7131;
Queue No. W1-108 to be effective 1/20/2024.
Filed Date: 11/20/23.
Accession Number: 20231120-5151.
Comment Date: 5 p.m. ET 12/11/23.
Docket Numbers: ER24-450-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to OA, Sch. 12 and
RAA, Sch 17 re: 3Q 2023 Membership Lists to be effective 9/30/2023.
Filed Date: 11/20/23.
Accession Number: 20231120-5156.
Comment Date: 5 p.m. ET 12/11/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: November 20, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-26071 Filed 11-24-23; 8:45 am]
BILLING CODE 6717-01-P