Combined Notice of Filings, 77299 [2023-24833]
Download as PDF
Federal Register / Vol. 88, No. 216 / Thursday, November 9, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas and
Oil Pipeline Rate and Refund Report
filings:
ddrumheller on DSK120RN23PROD with NOTICES1
Filings Instituting Proceedings
Docket Numbers: PR24–6–000.
Applicants: Hope Gas, Inc.
Description: § 284.123(g) Rate Filing:
HGI—2023 PREP Filing to be effective
11/1/2023.
Filed Date: 11/3/23.
Accession Number: 20231103–5025.
Comment Date: 5 p.m. ET 11/24/23.
Protest Date: 5 p.m. ET 1/02/24.
Docket Numbers: RP24–142–000.
Applicants: NEXUS Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—DTE Gas contract
860003 eff 11–1–23 to be effective 11/
1/2023.
Filed Date: 11/3/23.
Accession Number: 20231103–5013.
Comment Date: 5 p.m. ET 11/15/23.
Docket Numbers: RP24–143–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: Compliance filing: Rate
Schedule S–2 OFO Refund Report
November 2023 to be effective N/A.
Filed Date: 11/3/23.
Accession Number: 20231103–5044.
Comment Date: 5 p.m. ET 11/15/23.
Docket Numbers: RP24–144–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: TCOVitol NR Agmts 289490 and 289491, Eff.
11.3.23 to be effective 11/3/2023.
Filed Date: 11/3/23.
Accession Number: 20231103–5092.
Comment Date: 5 p.m. ET 11/15/23.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
VerDate Sep<11>2014
18:22 Nov 08, 2023
Jkt 262001
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: November 3, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–24833 Filed 11–8–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15318–000]
Cabin Run Pumped Storage, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On July 12, 2023, Cabin Run Pumped
Storage, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Cabin Run Pumped Storage Project to be
located near the Stony River and
unincorporated community of Bismarck
in Tucker and Grant Counties, West
Virginia. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) a 8,700-foot-long, 80foot-high rock-fill embankment dike
creating an upper reservoir with a 60acre surface area and a 4,800-acre-foot
storage capacity at a normal maximum
water surface elevation of 4,030 feet
above mean sea level (msl); (2) a 7,200foot-long, 80-foot-high rock-fill
embankment dike enclosing a lower
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
77299
reservoir with a 60-acre surface area and
a 4,800-acre-foot storage capacity at a
normal maximum water surface
elevation of 3,530 feet msl; (3) a 400foot-long, 24-foot-diameter vertical
power tunnel/shaft connecting a 4,650foot-long, 24-foot-diameter horizontal
power tunnel to the powerhouse; (4) a
550-foot-long, 120-foot-wide, 100-foothigh powerhouse housing four 57.5megawatt (MW) reversible Francis
pumping-generating units with a total
installed capacity of 230 MW; (5) a 4.5mile-long, 230-kilovolt transmission
line from a proposed substation near the
powerhouse to an interconnection
point; (6) a substation including two 120
megavolt amperes generator step-up
units; (7) a 20-foot-long, 20-foot-wide,
15-foot-high concrete pump station on
the south bank of the Stony River (upper
end of Mount Storm Lake), capable of
conveying water at 50 cubic feet per
second through a 3,400-foot-long, 2-footdiamenter steel conduit to the lower
reservoir for fill or refill purposes; and
(8) appurtenant facilities. The proposed
project would have an annual
generation of 671,000 megawatt-hours.
Applicant Contact: Nate Sandvig, Rye
Development, LLC, 830 NE Holladay St.,
Portland, OR 97232; email: nathan@
ryedevelopment.com; phone: (503) 309–
2496.
FERC Contact: Woohee Choi; email:
woohee.choi@ferc.gov; phone: (202)
502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/eFiling.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support. In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
E:\FR\FM\09NON1.SGM
09NON1
Agencies
[Federal Register Volume 88, Number 216 (Thursday, November 9, 2023)]
[Notices]
[Page 77299]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-24833]
[[Page 77299]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas and Oil Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR24-6-000.
Applicants: Hope Gas, Inc.
Description: Sec. 284.123(g) Rate Filing: HGI--2023 PREP Filing to
be effective 11/1/2023.
Filed Date: 11/3/23.
Accession Number: 20231103-5025.
Comment Date: 5 p.m. ET 11/24/23.
Protest Date: 5 p.m. ET 1/02/24.
Docket Numbers: RP24-142-000.
Applicants: NEXUS Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rates--DTE Gas
contract 860003 eff 11-1-23 to be effective 11/1/2023.
Filed Date: 11/3/23.
Accession Number: 20231103-5013.
Comment Date: 5 p.m. ET 11/15/23.
Docket Numbers: RP24-143-000.
Applicants: Transcontinental Gas Pipe Line Company, LLC.
Description: Compliance filing: Rate Schedule S-2 OFO Refund Report
November 2023 to be effective N/A.
Filed Date: 11/3/23.
Accession Number: 20231103-5044.
Comment Date: 5 p.m. ET 11/15/23.
Docket Numbers: RP24-144-000.
Applicants: Columbia Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: TCO-Vitol NR Agmts 289490 and
289491, Eff. 11.3.23 to be effective 11/3/2023.
Filed Date: 11/3/23.
Accession Number: 20231103-5092.
Comment Date: 5 p.m. ET 11/15/23.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: November 3, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-24833 Filed 11-8-23; 8:45 am]