Revision To Power Marketing Policy Cumberland System of Projects, 76207-76208 [2023-24456]
Download as PDF
Federal Register / Vol. 88, No. 213 / Monday, November 6, 2023 / Notices
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on November 21, 2023.
Dated: October 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–24463 Filed 11–3–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Southeastern Power Administration
Revision To Power Marketing Policy
Cumberland System of Projects
Southeastern Power
Administration, DOE.
ACTION: Notice of revision to power
marketing policy.
ddrumheller on DSK120RN23PROD with NOTICES1
AGENCY:
Southeastern Power
Administration (Southeastern or SEPA)
announces revision to the power
marketing policy for the Cumberland
System of Projects to include a
procedure for distribution of renewable
SUMMARY:
11 18
CFR 385.214(b)(3) and (d).
VerDate Sep<11>2014
17:53 Nov 03, 2023
Jkt 262001
energy certificates (RECs). The
Cumberland System power marketing
policy was published on August 5,
1993, and is reflected in contracts for
the sale of system power, which are
maintained in Southeastern’s
headquarters office. Pursuant to the
Procedure for Public Participation in the
Formulation of Marketing Policy,
published in the Federal Register on
July 6, 1978, Southeastern published on
October 21, 2021, a notice of intent to
revise the power marketing policy to
include provisions regarding RECs from
the Cumberland System. The proposed
revision to the Cumberland System
Power Marketing Policy was published
in the Federal Register on April 25,
2023. A virtual web based public
information and comment forum was
held on June 29, 2023, with written
comments due on or before July 14,
2023.
DATES: The power marketing policy
revision will become effective December
6, 2023.
FOR FURTHER INFORMATION CONTACT: Mr.
Douglas Spencer, Engineer,
Southeastern Power Administration,
1166 Athens Tech Road, Elberton, GA
30635, (706) 213–3855, Email:
douglas.spencer@sepa.doe.gov.
SUPPLEMENTARY INFORMATION:
Background
Southeastern published a ‘‘Notice of
Issuance of Final Power Marketing
Policy Cumberland System of Projects’’
in the Federal Register on August 5,
1993 (58 FR 41762). The policy
establishes the marketing area for
system power and addresses the
utilization of area utility systems for
essential purposes. The policy also
addresses wholesale rates, resale rates,
and conservation measures, but does not
address RECs.
Under Section 5 of the Flood Control
Act of 1944 (16 U.S.C. 825s),
Southeastern, through delegated
authority, is responsible for the
transmission and disposition of electric
power and energy from reservoir
projects operated by the U.S. Army
Corps of Engineers. Furthermore,
Southeastern must transmit and dispose
of power and energy in such a manner
as to encourage the most widespread
use at the lowest possible rates to
consumers consistent with sound
business principles. Rate schedules are
developed with regard to the recovery of
the cost of producing and transmitting
such electric energy.
Southeastern’s authority to formulate
the policy and perform the functions are
derived from section 302(a) of the
Department of Energy Organization Act,
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
76207
42 U.S.C. 7152. By Delegation Order No.
S1–DEL–RATES–2016, effective
November 19, 2016, the Secretary of
Energy delegated: (1) the authority to
develop power and transmission rates to
the SEPA Administrator; (2) the
authority to confirm, approve, and place
such rates into effect on an interim basis
to the Deputy Secretary of Energy; and
(3) the authority to confirm, approve,
and place into effect on a final basis, or
to remand or disapprove such rates, to
FERC. By Delegation Order No. S1–
DEL–S3–2023, effective April 10, 2023,
the Secretary of Energy also delegated
the authority to confirm, approve, and
place such rates into effect on an
interim basis to the Under Secretary for
Infrastructure. By Redelegation Order
No. S3–DEL–SEPA1–2023, effective
April 10, 2023, the Under Secretary for
Infrastructure further redelegated the
authority to confirm, approve, and place
such rates into effect on an interim basis
to SEPA’s Administrator.
The Cumberland System consist of
nine projects: Barkley, Center Hill,
Cheatham, Cordell Hull, Dale Hollow,
Laurel, Old Hickory, J. Percy Priest, and
Wolf Creek. The power from the projects
is currently marketed to Preference
Customers located in the service areas of
Tennessee Valley Authority, Big Rivers
Electric Corporation, Duke Energy
Progress, East Kentucky Power
Cooperative, Kentucky Utilities,
Municipal Electric Agency of
Mississippi, Mississippi Delta Energy
Agency, the seven-member Cooperative
Energy currently receiving Cumberland
power, and Southern Illinois Power
Cooperative.
Southeastern has been using the
Generation Attribute Tracking System
(GATS) provided through the PJM
Interconnection, LLC, for the KerrPhilpott System of Projects. The
attributes are unbundled from the
megawatt-hour of energy produced and
recorded onto a certificate. These
certificates may be used by electricity
suppliers and other energy market
participants to comply with relevant
state policies and regulatory programs
and to support voluntary ‘‘green’’
electricity markets. Southeastern will
use the similar M–RETS product for
distributing certificates to current
Preference Customers with allocations
of power from the Cumberland System.
Through this RECs tracking system
Southeastern is capable of tracking
environmental attributes used for
voluntary claims in all state, provinces,
and territories in North America. Under
the following revision of the 1994 power
marketing policy, Southeastern will
distribute the M–RETS created
certificates to current Preference
E:\FR\FM\06NON1.SGM
06NON1
76208
Federal Register / Vol. 88, No. 213 / Monday, November 6, 2023 / Notices
Customers with allocations of power
from the Cumberland System.
ddrumheller on DSK120RN23PROD with NOTICES1
Public Notice and Comment
Southeastern published a proposed
revision in the Federal Register, 88 FR
24981, dated April 25, 2023.
Southeastern held a web-based
information and comment forum on
June 29, 2023. Southeastern received no
comments.
Revision to the Power Marketing Policy
Southeastern revises the Power
Marketing Policy for the System to
include the following additional
provisions for RECs associated with
hydroelectric generation:
Renewable Energy Certificates: The
M–RETS Tracking System creates and
tracks certificates reporting generation
attributes, by generating unit, for each
megawatt-hour (MWh) of energy
produced by registered generators. The
System projects are registered generators
within M–RETS. The RECs potentially
satisfy Renewable Portfolio Standards,
state policies, and other regulatory or
voluntary clean energy standards in a
number of states. Southeastern has
subscribed to M–RETS and has an
account in which RECs are collected
and tracked for each MWh of energy
produced from the System. Within M–
RETS, certificates can be transferred to
other M–RETS subscribers or to a thirdparty tracking system.
M–RETS creates a REC for every MWh
of renewable energy produced by
registered generators, tracks the life
cycle of each REC created, and ensures
against any double-counting or doubleuse of each REC. These RECs may be
used by electricity suppliers and other
energy market participants to comply
with relevant state policies and
regulatory programs and to support
voluntary ‘‘green’’ electricity markets.
Southeastern will distribute M–RETScreated RECs to Preference Customers
with allocations of power from the
System.
REC Distribution: M–RETS (or a
successor application) will be the
transfer mechanism for all RECs related
to the System. Southeastern shall
maintain an account with M–RETS and
collect RECs from the generation at the
System projects. Southeastern will
verify the total amount of RECs each
month. Preference Customers with an
allocation of power from the System are
eligible to receive RECs by transfer from
Southeastern’s M–RETS account to their
M–RETS account or that of their agent.
M–RETS (or a successor application)
will be the transfer mechanism for all
RECs related to the Kerr-Philpott
System. Any further transfer, sale use,
VerDate Sep<11>2014
17:53 Nov 03, 2023
Jkt 262001
or trade transaction would be the sole
responsibility of a Preference Customer.
Transfers to each customer will be based
on the customer’s monthly invoices
during the same three-month period
(quarter). Where applicable, RECs will
be project-specific based on the
customer’s contractual arrangements.
Customers receiving energy under the
TVA/TVPPA contract will receive their
distributions pursuant to the
percentages in TVA Area Preference
Customer 1978 Load document (revised
March 2022).
All RECs distributed by Southeastern
shall be transferred within forty-five
days of the end of a quarter. Each
customer must submit to Southeastern,
by the tenth business day after the
quarter, any notice of change to M–
RETS account or agent. Any REC
transfers that were not claimed or if a
transfer account was not provided to
Southeastern will be forfeited if they
become nontransferable as described in
the M–RETS terms of service,
procedures, policies, or definitions of
reporting and trading periods, or any
subsequent rules and procedures for
transfers as established.
The initial transfer process in M–
RETS will be accomplished by the
sixtieth day after the end of the first
completed quarter subsequent to
publication of the final policy revision.
Any balance of RECs that exist in
Southeastern’s M–RETS account, other
than the first quarter after policy
revision publication, may also be
transferred to Preference Customers
according to the customer’s invoiced
energy at the time of the REC creation.
Rates: No rates shall be established by
Southeastern for RECs transferred to
Preference Customers. Any cost to
Southeastern, such as the M–RETS
subscription, will be incorporated into
marketing costs and included in
recovery through the energy and
capacity rates of the System.
Determination Under Executive Order
12866
Southeastern is exempted from
centralized regulatory review under
Executive Order 12866; accordingly, no
clearance of this notice by the Office of
Management and Budget is required.
Environmental Compliance
SEPA has determined this action fits
within the following categorical
exclusions listed in appendix B to
subpart D of 10 CFR part 1021: B4.1
(Contracts, policies, and marketing and
allocation plans for electric power).
Categorically excluded projects and
activities do not require preparation of
either an environmental impact
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
statement or an environmental
assessment.
Signing Authority
This document of the Department of
Energy was signed on October 23, 2023,
by Virgil G. Hobbs III, Administrator,
Southeastern Power Administration,
pursuant to the delegated authority from
the Secretary of Energy. That document,
with the original signature and date, is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on November 1,
2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–24456 Filed 11–3–23; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–10082–02–OMS]
Privacy Act of 1974; System of
Records
Security Management Division,
Environmental Protection Agency
(EPA).
ACTION: Notice of a modified system of
records.
AGENCY:
The U.S. Environmental
Protection Agency’s (EPA or Agency)
Personnel Security Branch (PSB) is
giving notice that it proposes to modify
a system of records pursuant to the
provisions of the Privacy Act of 1974.
The Personnel Security System (PSS)
2.0 is being modified to include a new
module, which the Agency will use to
administer its Insider Threat Program.
The new module will collect records
about individuals to assist the Agency
with insider threat inquiry management
and coordination. The module will
retain insider threat inquiry-related data
and help EPA personnel coordinate
responses to those inquiries. Collecting
this data ensures the effective and
timely processing of records.
DATES: Persons wishing to comment on
this system of records notice must do so
by December 6, 2023.
SUMMARY:
E:\FR\FM\06NON1.SGM
06NON1
Agencies
[Federal Register Volume 88, Number 213 (Monday, November 6, 2023)]
[Notices]
[Pages 76207-76208]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-24456]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Southeastern Power Administration
Revision To Power Marketing Policy Cumberland System of Projects
AGENCY: Southeastern Power Administration, DOE.
ACTION: Notice of revision to power marketing policy.
-----------------------------------------------------------------------
SUMMARY: Southeastern Power Administration (Southeastern or SEPA)
announces revision to the power marketing policy for the Cumberland
System of Projects to include a procedure for distribution of renewable
energy certificates (RECs). The Cumberland System power marketing
policy was published on August 5, 1993, and is reflected in contracts
for the sale of system power, which are maintained in Southeastern's
headquarters office. Pursuant to the Procedure for Public Participation
in the Formulation of Marketing Policy, published in the Federal
Register on July 6, 1978, Southeastern published on October 21, 2021, a
notice of intent to revise the power marketing policy to include
provisions regarding RECs from the Cumberland System. The proposed
revision to the Cumberland System Power Marketing Policy was published
in the Federal Register on April 25, 2023. A virtual web based public
information and comment forum was held on June 29, 2023, with written
comments due on or before July 14, 2023.
DATES: The power marketing policy revision will become effective
December 6, 2023.
FOR FURTHER INFORMATION CONTACT: Mr. Douglas Spencer, Engineer,
Southeastern Power Administration, 1166 Athens Tech Road, Elberton, GA
30635, (706) 213-3855, Email: [email protected].
SUPPLEMENTARY INFORMATION:
Background
Southeastern published a ``Notice of Issuance of Final Power
Marketing Policy Cumberland System of Projects'' in the Federal
Register on August 5, 1993 (58 FR 41762). The policy establishes the
marketing area for system power and addresses the utilization of area
utility systems for essential purposes. The policy also addresses
wholesale rates, resale rates, and conservation measures, but does not
address RECs.
Under Section 5 of the Flood Control Act of 1944 (16 U.S.C. 825s),
Southeastern, through delegated authority, is responsible for the
transmission and disposition of electric power and energy from
reservoir projects operated by the U.S. Army Corps of Engineers.
Furthermore, Southeastern must transmit and dispose of power and energy
in such a manner as to encourage the most widespread use at the lowest
possible rates to consumers consistent with sound business principles.
Rate schedules are developed with regard to the recovery of the cost of
producing and transmitting such electric energy.
Southeastern's authority to formulate the policy and perform the
functions are derived from section 302(a) of the Department of Energy
Organization Act, 42 U.S.C. 7152. By Delegation Order No. S1-DEL-RATES-
2016, effective November 19, 2016, the Secretary of Energy delegated:
(1) the authority to develop power and transmission rates to the SEPA
Administrator; (2) the authority to confirm, approve, and place such
rates into effect on an interim basis to the Deputy Secretary of
Energy; and (3) the authority to confirm, approve, and place into
effect on a final basis, or to remand or disapprove such rates, to
FERC. By Delegation Order No. S1-DEL-S3-2023, effective April 10, 2023,
the Secretary of Energy also delegated the authority to confirm,
approve, and place such rates into effect on an interim basis to the
Under Secretary for Infrastructure. By Redelegation Order No. S3-DEL-
SEPA1-2023, effective April 10, 2023, the Under Secretary for
Infrastructure further redelegated the authority to confirm, approve,
and place such rates into effect on an interim basis to SEPA's
Administrator.
The Cumberland System consist of nine projects: Barkley, Center
Hill, Cheatham, Cordell Hull, Dale Hollow, Laurel, Old Hickory, J.
Percy Priest, and Wolf Creek. The power from the projects is currently
marketed to Preference Customers located in the service areas of
Tennessee Valley Authority, Big Rivers Electric Corporation, Duke
Energy Progress, East Kentucky Power Cooperative, Kentucky Utilities,
Municipal Electric Agency of Mississippi, Mississippi Delta Energy
Agency, the seven-member Cooperative Energy currently receiving
Cumberland power, and Southern Illinois Power Cooperative.
Southeastern has been using the Generation Attribute Tracking
System (GATS) provided through the PJM Interconnection, LLC, for the
Kerr-Philpott System of Projects. The attributes are unbundled from the
megawatt-hour of energy produced and recorded onto a certificate. These
certificates may be used by electricity suppliers and other energy
market participants to comply with relevant state policies and
regulatory programs and to support voluntary ``green'' electricity
markets. Southeastern will use the similar M-RETS product for
distributing certificates to current Preference Customers with
allocations of power from the Cumberland System.
Through this RECs tracking system Southeastern is capable of
tracking environmental attributes used for voluntary claims in all
state, provinces, and territories in North America. Under the following
revision of the 1994 power marketing policy, Southeastern will
distribute the M-RETS created certificates to current Preference
[[Page 76208]]
Customers with allocations of power from the Cumberland System.
Public Notice and Comment
Southeastern published a proposed revision in the Federal Register,
88 FR 24981, dated April 25, 2023. Southeastern held a web-based
information and comment forum on June 29, 2023. Southeastern received
no comments.
Revision to the Power Marketing Policy
Southeastern revises the Power Marketing Policy for the System to
include the following additional provisions for RECs associated with
hydroelectric generation:
Renewable Energy Certificates: The M-RETS Tracking System creates
and tracks certificates reporting generation attributes, by generating
unit, for each megawatt-hour (MWh) of energy produced by registered
generators. The System projects are registered generators within M-
RETS. The RECs potentially satisfy Renewable Portfolio Standards, state
policies, and other regulatory or voluntary clean energy standards in a
number of states. Southeastern has subscribed to M-RETS and has an
account in which RECs are collected and tracked for each MWh of energy
produced from the System. Within M-RETS, certificates can be
transferred to other M-RETS subscribers or to a third-party tracking
system.
M-RETS creates a REC for every MWh of renewable energy produced by
registered generators, tracks the life cycle of each REC created, and
ensures against any double-counting or double-use of each REC. These
RECs may be used by electricity suppliers and other energy market
participants to comply with relevant state policies and regulatory
programs and to support voluntary ``green'' electricity markets.
Southeastern will distribute M-RETS-created RECs to Preference
Customers with allocations of power from the System.
REC Distribution: M-RETS (or a successor application) will be the
transfer mechanism for all RECs related to the System. Southeastern
shall maintain an account with M-RETS and collect RECs from the
generation at the System projects. Southeastern will verify the total
amount of RECs each month. Preference Customers with an allocation of
power from the System are eligible to receive RECs by transfer from
Southeastern's M-RETS account to their M-RETS account or that of their
agent. M-RETS (or a successor application) will be the transfer
mechanism for all RECs related to the Kerr-Philpott System. Any further
transfer, sale use, or trade transaction would be the sole
responsibility of a Preference Customer. Transfers to each customer
will be based on the customer's monthly invoices during the same three-
month period (quarter). Where applicable, RECs will be project-specific
based on the customer's contractual arrangements. Customers receiving
energy under the TVA/TVPPA contract will receive their distributions
pursuant to the percentages in TVA Area Preference Customer 1978 Load
document (revised March 2022).
All RECs distributed by Southeastern shall be transferred within
forty-five days of the end of a quarter. Each customer must submit to
Southeastern, by the tenth business day after the quarter, any notice
of change to M-RETS account or agent. Any REC transfers that were not
claimed or if a transfer account was not provided to Southeastern will
be forfeited if they become nontransferable as described in the M-RETS
terms of service, procedures, policies, or definitions of reporting and
trading periods, or any subsequent rules and procedures for transfers
as established.
The initial transfer process in M-RETS will be accomplished by the
sixtieth day after the end of the first completed quarter subsequent to
publication of the final policy revision. Any balance of RECs that
exist in Southeastern's M-RETS account, other than the first quarter
after policy revision publication, may also be transferred to
Preference Customers according to the customer's invoiced energy at the
time of the REC creation.
Rates: No rates shall be established by Southeastern for RECs
transferred to Preference Customers. Any cost to Southeastern, such as
the M-RETS subscription, will be incorporated into marketing costs and
included in recovery through the energy and capacity rates of the
System.
Determination Under Executive Order 12866
Southeastern is exempted from centralized regulatory review under
Executive Order 12866; accordingly, no clearance of this notice by the
Office of Management and Budget is required.
Environmental Compliance
SEPA has determined this action fits within the following
categorical exclusions listed in appendix B to subpart D of 10 CFR part
1021: B4.1 (Contracts, policies, and marketing and allocation plans for
electric power). Categorically excluded projects and activities do not
require preparation of either an environmental impact statement or an
environmental assessment.
Signing Authority
This document of the Department of Energy was signed on October 23,
2023, by Virgil G. Hobbs III, Administrator, Southeastern Power
Administration, pursuant to the delegated authority from the Secretary
of Energy. That document, with the original signature and date, is
maintained by DOE. For administrative purposes only, and in compliance
with requirements of the Office of the Federal Register, the
undersigned DOE Federal Register Liaison Officer has been authorized to
sign and submit the document in electronic format for publication, as
an official document of the Department of Energy. This administrative
process in no way alters the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on November 1, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-24456 Filed 11-3-23; 8:45 am]