Federal Register / Vol. 88, No. 212 / Friday, November 3, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–535–000]
WBI Energy Transmission, Inc.; Notice
of Schedule for the Preparation of an
Environmental Assessment for the
South Spearfish Project
On August 28, 2023, WBI Energy
Transmission, Inc. (WBI Energy) filed an
application in Docket No. CP23–535–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
section 7(c) and Authorization pursuant
to section 7(b) of the Natural Gas Act to
construct, operate, and abandon certain
natural gas pipeline facilities. The
proposed project is known as the South
Spearfish Project (Project) and would
allow for incremental firm
transportation capacity from WBI
Energy’s existing Line Section 15 in
western South Dakota to the community
of Spearfish, South Dakota for MontanaDakota Utilities, Company.
On September 11, 2023, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing Federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a Federal authorization
within 90 days of the date of issuance
of the Commission staff’s environmental
document for the Project.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for the
completion of the environmental
review.1
Schedule for Environmental Review
Issuance of EA—February 26, 2024
90-day Federal Authorization Decision
Deadline 2—May 26, 2024
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
WBI Energy proposes the following in
Lawrence County, South Dakota:
lotter on DSK11XQN23PROD with NOTICES1
1 40
CFR 1501.10 (2020)
2 The Commission’s deadline applies to the
decisions of other Federal agencies, and State
agencies acting under federally delegated authority,
that are responsible for Federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by Federal law.
VerDate Sep<11>2014
17:27 Nov 02, 2023
Jkt 262001
• modify the Deadwood-Central City
Lateral Takeoff Valve Setting adjacent to
the Deadwood Mainline Transfer
Station on WBI Energy’s Line Section
15;
• increase the maximum allowable
operating pressure of the 8-inchdiameter Deadwood-Central City Lateral
from the Deadwood Mainline Transfer
Station to the proposed South Spearfish
Town Border Station;
• install two pig launcher/receivers,3
one at each end of the uprated
Deadwood-Central City Lateral;
• construct the new South Spearfish
Town Border Station adjacent to the
existing South Spearfish Lateral Takeoff
Valve Setting. The new station would
contain the relocated South Spearfish
Town Border Station and the new
Deadwood Lateral Transfer Station;
• relocate approximately 500 feet of
the South Spearfish Lateral adjacent to
the South Spearfish Town Border
Station and the existing South Spearfish
Lateral Takeoff Valve Setting; and
• abandon by sale the existing 5.5mile-long 4-inch-diameter South
Spearfish Lateral and certain town
border station equipment, at the existing
South Spearfish Town Border Station to
Montana-Dakota Utilities, Company
upon the commissioning of the new
South Spearfish Town Border Station.
Background
On October 13, 2023, the Commission
issued a Notice of Scoping Period
Requesting Comments on
Environmental Issues for the Proposed
South Spearfish Project (Notice of
Scoping). The Notice of Scoping was
sent to affected landowners; Federal,
State, and local government agencies;
elected officials; environmental and
public interest groups; Native American
Tribes; other interested parties; and
local libraries. All substantive
comments will be addressed in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
75577
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP23–535), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: October 27, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–24259 Filed 11–2–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Change In Date for the December
Commission Open Meeting
Take notice that the Commission has
changed the date for its December 2023
open meeting. The meeting will now
take place on Tuesday, December 19,
2023. The open meeting had been
initially scheduled for Thursday,
December 21, 2023.1
Dated: October 26, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–24274 Filed 11–2–23; 8:45 am]
3A
‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes. A pig launcher/
receiver are facilities where pigs are inserted/
retrieved from the pipeline.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
1 The start time of the meeting remains 10:00 a.m.
Eastern Time.
E:\FR\FM\03NON1.SGM
03NON1
Agencies
[Federal Register Volume 88, Number 212 (Friday, November 3, 2023)]
[Notices]
[Page 75577]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-24274]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Change In Date for the December Commission Open Meeting
Take notice that the Commission has changed the date for its
December 2023 open meeting. The meeting will now take place on Tuesday,
December 19, 2023. The open meeting had been initially scheduled for
Thursday, December 21, 2023.\1\
---------------------------------------------------------------------------
\1\ The start time of the meeting remains 10:00 a.m. Eastern
Time.
Dated: October 26, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-24274 Filed 11-2-23; 8:45 am]
BILLING CODE 6717-01-P