Notice of Availability for the Final Site-Wide Environmental Impact Statement for Continued Operation of the Lawrence Livermore National Laboratory, 75566-75567 [2023-24141]
Download as PDF
75566
Federal Register / Vol. 88, No. 212 / Friday, November 3, 2023 / Notices
Dated: October 18, 2023.
Pamela M. Bush,
Commission Secretary.
[FR Doc. 2023–24279 Filed 11–2–23; 8:45 am]
BILLING CODE P
DEPARTMENT OF ENERGY
National Nuclear Security
Administration
Notice of Availability for the Final SiteWide Environmental Impact Statement
for Continued Operation of the
Lawrence Livermore National
Laboratory
National Nuclear Security
Administration, Department of Energy.
ACTION: Notice of availability.
AGENCY:
The National Nuclear
Security Administration (NNSA), a
semi-autonomous agency within the
United States (U.S.) Department of
Energy (DOE), announces the
availability of a Final Site-Wide
Environmental Impact Statement for
Continued Operation of the Lawrence
Livermore National Laboratory (Final
LLNL SWEIS) (DOE/EIS–0547) in
compliance with the National
Environmental Policy Act of 1969
(NEPA). NNSA prepared the Final LLNL
SWEIS to analyze the potential
environmental impacts associated with
continuing LLNL operations and
foreseeable new and/or modified
operations and facilities for
approximately the next 15 years.
Volume 3 of the Final LLNL SWEIS is
a comment response document (CRD),
which includes all comments received
during the public comment period on
the Draft LLNL SWEIS, as well as
NNSA’s responses to those comments.
DATES: NNSA will not issue any Record
of Decision (ROD) on the proposal for a
minimum of 30 days after the date that
the U.S. Environmental Protection
Agency (EPA) publishes its Notice of
Availability (NOA) in the Federal
Register.
SUMMARY:
Requests for additional
information related to the Final LLNL
SWEIS should be sent to Mr. Tom Grim,
NEPA Document Manager, National
Nuclear Security Administration, 1000
Independence Ave. SW, Washington,
DC 20585; or sent by email to:
LLNLSWEIS@nnsa.doe.gov.
The Final LLNL SWEIS is available
for viewing and downloading on the
NNSA NEPA Reading Room website
(www.energy.gov/nnsa/nnsa-nepareading-room) and the DOE NEPA
website (https://energy.gov/nepa/nepa-
lotter on DSK11XQN23PROD with NOTICES1
ADDRESSES:
VerDate Sep<11>2014
17:02 Nov 02, 2023
Jkt 262001
documents). Copies of the Final LLNL
SWEIS will also be available at the
Livermore Public Library, 1188 South
Livermore Avenue, Livermore,
California, and the Tracy Public Library,
20 East Eaton Avenue, Tracy, California.
FOR FURTHER INFORMATION CONTACT: For
further information about this notice,
please contact Mr. Tom Grim, NEPA
Document Manager, National Nuclear
Security Administration, 1000
Independence Ave. SW, Washington,
DC 20585; call 833–778–0508 to leave a
message; or email at: LLNLSWEIS@
nnsa.doe.gov.
SUPPLEMENTARY INFORMATION: NNSA is
responsible for meeting the national
security requirements established by the
President and Congress to maintain and
enhance the safety, reliability, and
performance of the U.S. nuclear
weapons stockpile. The continued
operation of LLNL is critical to NNSA’s
Stockpile Stewardship and Management
Program, preventing the spread and use
of nuclear weapons worldwide, and
many other areas that may impact
national security and global stability.
The Final LLNL SWEIS analyzes two
alternatives: (1) the No-Action
Alternative and (2) the Proposed Action.
The Final LLNL SWEIS also analyzes
the new hybrid work environment
under both alternatives due to increases
in remote work at LLNL. Under the NoAction Alternative, NNSA would
continue current facility operations
throughout LLNL in support of assigned
missions. The No-Action Alternative
includes previously approved
construction of new facilities;
modernization, upgrade, and utility
projects; and decontamination,
decommissioning, and demolition of
excess and aging facilities through 2022.
The Proposed Action includes the
scope of the No-Action Alternative and
an increase in current facility operations
or enhanced operations that may require
new or modified facilities and that are
reasonably foreseeable over the next 15
years. Continued re-investment in site
infrastructure would allow LLNL to
meet mission deliverables and sustain
science, technology, and engineering
excellence to respond to future national
security challenges. The Proposed
Action includes 75 new projects,
totaling 3.3 million square feet, between
2023 and 2035. This comprises 61
proposed projects, totaling 2.9 million
square feet, at LLNL’s main site in
Livermore, California and 14 proposed
projects, totaling 385,000 square feet, at
LLNL’s remote testing site, Site 300,
near Tracy, California. In addition,
NNSA proposes 20 types of
modernization, upgrade, and utility
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
projects, each involving several
facilities. Under the Proposed Action,
NNSA would also decontaminate,
decommission, and demolish 150
facilities, totaling 1,170,000 square feet.
NNSA is also proposing operational
changes that would increase the tritium
emissions limits in the National Ignition
Facility (Building 581) and the Tritium
Facility (Building 331), decrease the
administrative limit for fuels-gradeequivalent plutonium in the Superblock
(Building 332), increase the
administrative limits for plutonium-239
at Building 235, and revise the National
Ignition Facility radioactive materials
administrative limits to be consistent
with DOE’s Facility Hazard
Categorization Standard. The Proposed
Action also includes several projects to
enhance the resilience of the energy
infrastructure and demonstrate
renewable power solutions.
This Final LLNL SWEIS contains
revisions and new information based in
part on comments received on the Draft
LLNL SWEIS. These revisions and new
information are indicated by sidebars in
the margins. Volume 3 of the Final
LLNL SWEIS contains summaries of the
comments received, images of the
comment documents, and NNSA’s
responses to the comments. NNSA
considered all comments received on
the Draft LLNL SWEIS in preparing the
Final LLNL SWEIS.
NNSA will consider the
environmental impact analysis
presented in the Final LLNL SWEIS,
along with other information, in making
decisions regarding how operations will
be conducted at LLNL, including
construction and operation of new
facilities, modification and upgrade of
existing facilities and utilities,
operational changes, and/or
decontamination, decommission and
demolition of excess and aging facilities.
NNSA will not issue any ROD on the
proposal for a minimum of 30 days after
the date that EPA publishes its NOA in
the Federal Register. NNSA will
publish any ROD in the Federal
Register.
Signing Authority
This document of the Department of
Energy was signed on October 13, 2023,
by Jill Hruby, Under Secretary for
Nuclear Security and Administrator,
National Nuclear Security
Administration, pursuant to delegated
authority from the Secretary of Energy.
That document with the original
signature and date is maintained by
DOE. For administrative purposes only,
and in compliance with requirements of
the Office of the Federal Register, the
undersigned DOE Federal Register
E:\FR\FM\03NON1.SGM
03NON1
Federal Register / Vol. 88, No. 212 / Friday, November 3, 2023 / Notices
Liaison Officer has been authorized to
sign and submit the document in
electronic format for publication, as an
official document of the Department of
Energy. This administrative process in
no way alters the legal effect of this
document upon publication in the
Federal Register.
Signed in Washington, DC, on October 27,
2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–24141 Filed 11–2–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSK11XQN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG24–21–000.
Applicants: Black Walnut Energy
Storage, LLC.
Description: Black Walnut Energy
Storage, LLC submits Notice of Self–
Certification of Exempt Wholesale
Generator Status.
Filed Date: 10/26/23.
Accession Number: 20231026–5150.
Comment Date: 5 p.m. ET 11/16/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–1946–002;
ER16–1947–002; ER16–1948–002.
Applicants: Atlantic Energy MA LLC,
Atlantic Energy MD, LLC, Atlantic
Energy LLC.
Description: Notice of Non-Material
Change in Status of Atlantic Energy
LLC, et al.
Filed Date: 10/27/23.
Accession Number: 20231027–5062.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–1851–003.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Original & Amended ISA–CSA, SA Nos.
6917–6918; Queue No. AD1–031 (Part I
of II) to be effective 7/8/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5143.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–1851–004.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Original & Amended ISA–CSA, SA Nos.
6917–6918; Queue No. AD1–031 (Part II
of II) to be effective 10/26/2023.
VerDate Sep<11>2014
17:02 Nov 02, 2023
Jkt 262001
Filed Date: 10/27/23.
Accession Number: 20231027–5157.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–1973–001.
Applicants: BE-Pine 1 LLC.
Description: Notice of Non-Material
Change in Status of BE-Pine 1 LLC.
Filed Date: 10/25/23.
Accession Number: 20231025–5286.
Comment Date: 5 p.m. ET 11/15/23.
Docket Numbers: ER23–2520–001.
Applicants: SR Litchfield, LLC.
Description: Tariff Amendment:
Response to Deficiency Notice to be
effective 9/27/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5180.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2522–001.
Applicants: SR Georgetown, LLC.
Description: Tariff Amendment:
Response to Deficiency Notice to be
effective 9/27/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5172.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2523–001.
Applicants: SR Lambert I, LLC.
Description: Tariff Amendment:
Response to Deficiency Notice to be
effective 9/27/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5174.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2524–001.
Applicants: SR Lambert II, LLC.
Description: Tariff Amendment:
Response to Deficiency Notice to be
effective 9/27/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5178.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2582–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Amended Filing in ER23–2582—
Application of Emergency Limits to be
effective 11/1/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5077.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2657–001.
Applicants: Emera Energy LNG, LLC.
Description: Tariff Amendment: Per
Deficiency Letter—Indicative Screen
Studies’ AA Serial No’s (ER23–2657–) to
be effective 10/18/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5041.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2658–001.
Applicants: Emera Energy Services
Subsidiary No. 11 LLC.
Description: Tariff Amendment: Per
Deficiency Letter- Indicative Screen
Studies’ AA Serial No’s. (ER23–2658–)
to be effective 10/18/2023.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
75567
Filed Date: 10/27/23.
Accession Number: 20231027–5068.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2659–001.
Applicants: Emera Energy Services
Subsidiary No. 12 LLC.
Description: Tariff Amendment: Per
Deficiency Letter—Indicative Screen
Studies’ AA Serial No’s.s (ER23–2659–
) to be effective 10/18/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5073.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2660–001.
Applicants: Emera Energy Services
Subsidiary No. 13 LLC.
Description: Tariff Amendment: Per
Deficiency Letter—Indicative Screen
Studies’ AA Serial No’s. (ER23–2660–)
to be effective 10/18/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5079.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2661–001.
Applicants: Emera Energy Services
Subsidiary No. 15 LLC.
Description: Tariff Amendment: Per
Deficiency Letter—Indicative Screen
Studies’ AA Serial No’s. (ER23–2661–)
to be effective 10/18/2023.
Filed Date: 10/27/23.
Accession Number: 20231027–5084.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER23–2917–000.
Applicants: California Independent
System Operator Corporation.
Description: Motion for Leave to
Answer and Answer of SunZia
Transmission, LLC to the October 13,
2023, Limited Protest of Southern
California Edison, et al.
Filed Date: 10/27/23.
Accession Number: 20231027–5221.
Comment Date: 5 p.m. ET 11/17/23.
Docket Numbers: ER24–216–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX—AP Sunray 3rd A&R System
Upgrade Agreement to be effective 10/
9/2023.
Filed Date: 10/26/23.
Accession Number: 20231026–5153.
Comment Date: 5 p.m. ET 11/16/23.
Docket Numbers: ER24–217–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: RS
331 Certificate of Concurrence to PGE
Dynamic Transfer BA to be effective 10/
31/2023.
Filed Date: 10/26/23.
Accession Number: 20231026–5154.
Comment Date: 5 p.m. ET 11/16/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
E:\FR\FM\03NON1.SGM
03NON1
Agencies
[Federal Register Volume 88, Number 212 (Friday, November 3, 2023)]
[Notices]
[Pages 75566-75567]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-24141]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
National Nuclear Security Administration
Notice of Availability for the Final Site-Wide Environmental
Impact Statement for Continued Operation of the Lawrence Livermore
National Laboratory
AGENCY: National Nuclear Security Administration, Department of Energy.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The National Nuclear Security Administration (NNSA), a semi-
autonomous agency within the United States (U.S.) Department of Energy
(DOE), announces the availability of a Final Site-Wide Environmental
Impact Statement for Continued Operation of the Lawrence Livermore
National Laboratory (Final LLNL SWEIS) (DOE/EIS-0547) in compliance
with the National Environmental Policy Act of 1969 (NEPA). NNSA
prepared the Final LLNL SWEIS to analyze the potential environmental
impacts associated with continuing LLNL operations and foreseeable new
and/or modified operations and facilities for approximately the next 15
years. Volume 3 of the Final LLNL SWEIS is a comment response document
(CRD), which includes all comments received during the public comment
period on the Draft LLNL SWEIS, as well as NNSA's responses to those
comments.
DATES: NNSA will not issue any Record of Decision (ROD) on the proposal
for a minimum of 30 days after the date that the U.S. Environmental
Protection Agency (EPA) publishes its Notice of Availability (NOA) in
the Federal Register.
ADDRESSES: Requests for additional information related to the Final
LLNL SWEIS should be sent to Mr. Tom Grim, NEPA Document Manager,
National Nuclear Security Administration, 1000 Independence Ave. SW,
Washington, DC 20585; or sent by email to: [email protected].
The Final LLNL SWEIS is available for viewing and downloading on
the NNSA NEPA Reading Room website (www.energy.gov/nnsa/nnsa-nepa-reading-room) and the DOE NEPA website (https://energy.gov/nepa/nepa-documents). Copies of the Final LLNL SWEIS will also be available at
the Livermore Public Library, 1188 South Livermore Avenue, Livermore,
California, and the Tracy Public Library, 20 East Eaton Avenue, Tracy,
California.
FOR FURTHER INFORMATION CONTACT: For further information about this
notice, please contact Mr. Tom Grim, NEPA Document Manager, National
Nuclear Security Administration, 1000 Independence Ave. SW, Washington,
DC 20585; call 833-778-0508 to leave a message; or email at:
[email protected].
SUPPLEMENTARY INFORMATION: NNSA is responsible for meeting the national
security requirements established by the President and Congress to
maintain and enhance the safety, reliability, and performance of the
U.S. nuclear weapons stockpile. The continued operation of LLNL is
critical to NNSA's Stockpile Stewardship and Management Program,
preventing the spread and use of nuclear weapons worldwide, and many
other areas that may impact national security and global stability. The
Final LLNL SWEIS analyzes two alternatives: (1) the No-Action
Alternative and (2) the Proposed Action. The Final LLNL SWEIS also
analyzes the new hybrid work environment under both alternatives due to
increases in remote work at LLNL. Under the No-Action Alternative, NNSA
would continue current facility operations throughout LLNL in support
of assigned missions. The No-Action Alternative includes previously
approved construction of new facilities; modernization, upgrade, and
utility projects; and decontamination, decommissioning, and demolition
of excess and aging facilities through 2022.
The Proposed Action includes the scope of the No-Action Alternative
and an increase in current facility operations or enhanced operations
that may require new or modified facilities and that are reasonably
foreseeable over the next 15 years. Continued re-investment in site
infrastructure would allow LLNL to meet mission deliverables and
sustain science, technology, and engineering excellence to respond to
future national security challenges. The Proposed Action includes 75
new projects, totaling 3.3 million square feet, between 2023 and 2035.
This comprises 61 proposed projects, totaling 2.9 million square feet,
at LLNL's main site in Livermore, California and 14 proposed projects,
totaling 385,000 square feet, at LLNL's remote testing site, Site 300,
near Tracy, California. In addition, NNSA proposes 20 types of
modernization, upgrade, and utility projects, each involving several
facilities. Under the Proposed Action, NNSA would also decontaminate,
decommission, and demolish 150 facilities, totaling 1,170,000 square
feet. NNSA is also proposing operational changes that would increase
the tritium emissions limits in the National Ignition Facility
(Building 581) and the Tritium Facility (Building 331), decrease the
administrative limit for fuels-grade-equivalent plutonium in the
Superblock (Building 332), increase the administrative limits for
plutonium-239 at Building 235, and revise the National Ignition
Facility radioactive materials administrative limits to be consistent
with DOE's Facility Hazard Categorization Standard. The Proposed Action
also includes several projects to enhance the resilience of the energy
infrastructure and demonstrate renewable power solutions.
This Final LLNL SWEIS contains revisions and new information based
in part on comments received on the Draft LLNL SWEIS. These revisions
and new information are indicated by sidebars in the margins. Volume 3
of the Final LLNL SWEIS contains summaries of the comments received,
images of the comment documents, and NNSA's responses to the comments.
NNSA considered all comments received on the Draft LLNL SWEIS in
preparing the Final LLNL SWEIS.
NNSA will consider the environmental impact analysis presented in
the Final LLNL SWEIS, along with other information, in making decisions
regarding how operations will be conducted at LLNL, including
construction and operation of new facilities, modification and upgrade
of existing facilities and utilities, operational changes, and/or
decontamination, decommission and demolition of excess and aging
facilities. NNSA will not issue any ROD on the proposal for a minimum
of 30 days after the date that EPA publishes its NOA in the Federal
Register. NNSA will publish any ROD in the Federal Register.
Signing Authority
This document of the Department of Energy was signed on October 13,
2023, by Jill Hruby, Under Secretary for Nuclear Security and
Administrator, National Nuclear Security Administration, pursuant to
delegated authority from the Secretary of Energy. That document with
the original signature and date is maintained by DOE. For
administrative purposes only, and in compliance with requirements of
the Office of the Federal Register, the undersigned DOE Federal
Register
[[Page 75567]]
Liaison Officer has been authorized to sign and submit the document in
electronic format for publication, as an official document of the
Department of Energy. This administrative process in no way alters the
legal effect of this document upon publication in the Federal Register.
Signed in Washington, DC, on October 27, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-24141 Filed 11-2-23; 8:45 am]
BILLING CODE 6450-01-P