City of Homer, Alaska; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 74993-74994 [2023-24093]

Download as PDF Federal Register / Vol. 88, No. 210 / Wednesday, November 1, 2023 / Notices 74993 FERC–725R—Continued Function Number & type of respondents Number of annual responses per respondent Total number of annual responses Average burden hours & cost ($) per response Total annual burden hours & total annual cost ($) (1) (2) (1) × (2) = (3) (4) (3) × (4) = (5) BA Recordkeeping Requirements ................. 98 1 98 1 hr.; $56.14 .......... 98 hrs.; $5,501.72. SUB-TOTAL FOR REPORTING REQUIREMENTS. ........................ .............................. ........................ ................................ 23,906 hrs.; $1,847,694.74. SUB-TOTAL FOR RECORDKEEPING REQUIREMENTS. ........................ .............................. ........................ ................................ 1,112 hrs.; $62,427.68. TOTAL FOR FERC–725R (rounded). ........................ .............................. ........................ ................................ 25,018 hrs.; $1,910,122.42. Comments: Comments are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: October 26, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–24097 Filed 10–31–23; 8:45 am] The conference will be held via teleconference beginning at 1:00 p.m. Eastern Standard Time. Discussion topics for the technical conference include: (1) Engineering analysis of project-related flooding impacts (AIR number 2), and (2) Stability analysis and revised Supporting Design Report (AIR number 3). All local, state, and federal agencies, Indian tribes, and other interested parties are invited to participate. There will be no transcript of the conference, but a summary of the meeting will be prepared for the project record. If you are interested in participating in the meeting you must contact Jody Callihan at (202) 502–8278 or jody.callihan@ ferc.gov by November 6, 2023 to receive specific instructions on how to participate. Dated: October 25, 2023. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P [FR Doc. 2023–24038 Filed 10–31–23; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Project No. 4679–050] ddrumheller on DSK120RN23PROD with NOTICES1 New York Power Authority; Notice of Technical Conference On Wednesday, November 8, 2023, Commission staff will hold a technical conference to provide clarification to New York Power Authority regarding Commission staff’s additional information request (AIR) issued August 7, 2023, for the Vischer Ferry Hydroelectric Project No. 4679.1 1 Commission staff’s letter requesting additional information is available at: https://elibrary.ferc.gov/ VerDate Sep<11>2014 19:48 Oct 31, 2023 Jkt 262001 Federal Energy Regulatory Commission to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA). The proposed Homer Hydroelectric Energy Recovery Project would have an installed capacity of 10 kilowatts (kW), and would be located within the applicant’s municipal water supply system in Homer, Kenai Peninsula Borough, Alaska. Applicant Contact: Gregg Semler, InPipe Energy, 920 SW 6th Ave., 12th Floor, Portland, OR 97204, 503–341– 0004, gregg@inpipeenergy.com. FERC Contact: Christopher Chaney, 202–502–6778, christopher.chaney@ ferc.gov. Qualifying Conduit Hydropower Facility Description: The project would consist of: (1) one 10-kW centrifugal pump as turbine generating unit and (2) appurtenant facilities. The proposed project would have an estimated annual generation of approximately 42 megawatt-hours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all the criteria shown in the table below. [Docket No. CD24–1–000] City of Homer, Alaska; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On October 23, 2023, the City of Homer, Alaska, filed a notice of intent eLibrary/filelist?accession_number=202308073020&optimized=false. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\01NON1.SGM 01NON1 74994 Federal Register / Vol. 88, No. 210 / Wednesday, November 1, 2023 / Notices TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A) ........................................ The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 40 megawatts ................ On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y FPA 30(a)(3)(C)(i) ..................................... ddrumheller on DSK120RN23PROD with NOTICES1 FPA 30(a)(3)(C)(ii) .................................... FPA 30(a)(3)(C)(iii) ................................... Preliminary Determination: The proposed Homer Hydroelectric Energy Recovery Project will not alter the primary purpose of the conduit, which is for municipal water supply. Therefore, based upon the above criteria, Commission staff preliminarily determines that the operation of the project described above satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 30 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// 1 18 CFR 385.2001–2005 (2022). VerDate Sep<11>2014 19:48 Oct 31, 2023 Jkt 262001 www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may send a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Locations of Notice of Intent: The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (i.e., CD24–1) in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. Copies of the notice of intent can be obtained directly from the applicant. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Y Y Y members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: October 26, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–24093 Filed 10–31–23; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2023–0445; FRL–11370–02– OCSPP] Pesticides; Concept for a Framework To Assess the Risk to the Effectiveness of Human and Animal Drugs Posed by Certain Antibacterial or Antifungal Pesticides; Notice of Availability and Request for Comment; Extension of Comment Period Environmental Protection Agency (EPA). ACTION: Notice; extension of comment period. AGENCY: In the Federal Register of September 26, 2023, EPA announced the availability of and solicited public comment on the concept for developing a framework to improve assessments of potential risks to human and animal health where the use of certain pesticides could potentially result in antimicrobial resistance (AMR) that compromises the effectiveness of medically important antibacterial and antifungal drugs; and sought feedback on research gaps and other information to help inform the risk assessment and mitigation processes. This document extends the comment period, which was SUMMARY: E:\FR\FM\01NON1.SGM 01NON1

Agencies

[Federal Register Volume 88, Number 210 (Wednesday, November 1, 2023)]
[Notices]
[Pages 74993-74994]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-24093]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD24-1-000]


City of Homer, Alaska; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On October 23, 2023, the City of Homer, Alaska, filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA). The proposed Homer 
Hydroelectric Energy Recovery Project would have an installed capacity 
of 10 kilowatts (kW), and would be located within the applicant's 
municipal water supply system in Homer, Kenai Peninsula Borough, 
Alaska.
    Applicant Contact: Gregg Semler, InPipe Energy, 920 SW 6th Ave., 
12th Floor, Portland, OR 97204, 503-341-0004, [email protected].
    FERC Contact: Christopher Chaney, 202-502-6778, 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The project 
would consist of: (1) one 10-kW centrifugal pump as turbine generating 
unit and (2) appurtenant facilities. The proposed project would have an 
estimated annual generation of approximately 42 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all the criteria shown in the table below.

[[Page 74994]]



      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................  The conduit the                      Y
                                  facility uses is a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i).............  The facility is                      Y
                                  constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii)............  The facility has an                  Y
                                  installed capacity
                                  that does not exceed
                                  40 megawatts.
FPA 30(a)(3)(C)(iii)...........  On or before August 9,               Y
                                  2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed Homer Hydroelectric Energy 
Recovery Project will not alter the primary purpose of the conduit, 
which is for municipal water supply. Therefore, based upon the above 
criteria, Commission staff preliminarily determines that the operation 
of the project described above satisfies the requirements for a 
qualifying conduit hydropower facility, which is not required to be 
licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 30 
days from the issuance date of this notice. Deadline for filing motions 
to intervene is 30 days from the issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2022).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a 
paper copy. Submissions sent via the U.S. Postal Service must be 
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, MD 20852. A copy of all other filings in reference 
to this application must be accompanied by proof of service on all 
persons listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 385.2010.
    Locations of Notice of Intent: The Commission provides all 
interested persons an opportunity to view and/or print the contents of 
this document via the internet through the Commission's website at 
https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number 
(i.e., CD24-1) in the docket number field to access the document. You 
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. Copies of the notice of 
intent can be obtained directly from the applicant. For assistance, 
call toll-free 1-866-208-3676 or email [email protected]. For 
TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: October 26, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-24093 Filed 10-31-23; 8:45 am]
BILLING CODE 6717-01-P