Information Collection: Notices of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (NRC Enforcement Policy), 73880-73881 [2023-23792]
Download as PDF
73880
Federal Register / Vol. 88, No. 207 / Friday, October 27, 2023 / Notices
NUCLEAR REGULATORY
COMMISSION
[NRC–2023–0001]
Sunshine Act Meetings
Weeks of October 30,
November 6, 13, 20, 27, December 4,
2023. The schedule for Commission
meetings is subject to change on short
notice. The NRC Commission Meeting
Schedule can be found on the internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
PLACE: The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify Anne
Silk, NRC Disability Program Specialist,
at 301–287–0745, by videophone at
240–428–3217, or by email at
Anne.Silk@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
STATUS: Public.
Members of the public may request to
receive the information in these notices
electronically. If you would like to be
added to the distribution, please contact
the Nuclear Regulatory Commission,
Office of the Secretary, Washington, DC
20555, at 301–415–1969, or by email at
Betty.Thweatt@nrc.gov.
MATTERS TO BE CONSIDERED:
TIME AND DATE:
Week of October 30, 2023
Thursday, November 2, 2023
9:00 a.m. Strategic Programmatic
Overview of the Operating Reactors
and New Reactors Business Lines
(Public Meeting); (Contact: Jennie
Rankin: 301–415–1530)
Additional Information: The meeting
will be held in the Commissioners’
Conference Room, 11555 Rockville Pike,
Rockville, Maryland. The public is
invited to attend the Commission’s
meeting in person or watch live via
webcast at the Web address—https://
video.nrc.gov/
ddrumheller on DSK120RN23PROD with NOTICES1
Week of November 6, 2023—Tentative
There are no meetings scheduled for
the week of November 6, 2023.
Week of November 13, 2023—Tentative
Thursday, November 16, 2023
9:00 a.m. Briefing on Region I
Activities and External Engagement
(Public Meeting); (Contact: Wesley
Held: 301–287–3591)
VerDate Sep<11>2014
17:44 Oct 26, 2023
Jkt 262001
Additional Information: The meeting
will be held at the Market and Broad
Conference Room, 475 Allendale Rd.,
Suite 102, King of Prussia,
Pennsylvania. The public is invited to
attend the Commission’s meeting in
person or watch live via webcast at the
Web address—https://video.nrc.gov/.
Week of November 20, 2023—Tentative
There are no meetings scheduled for
the week of November 20, 2023.
Week of November 27, 2023—Tentative
There are no meetings scheduled for
the week of November 27, 2023.
Week of December 4, 2023—Tentative
There are no meetings scheduled for
the week of December 4, 2023.
CONTACT PERSON FOR MORE INFORMATION:
For more information or to verify the
status of meetings, contact Wesley Held
at 301–287–3591 or via email at
Wesley.Held@nrc.gov.
The NRC is holding the meetings
under the authority of the Government
in the Sunshine Act, 5 U.S.C. 552b.
Dated: October 25, 2023.
For the Nuclear Regulatory Commission.
Wesley W. Held,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2023–23923 Filed 10–25–23; 4:15 pm]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2023–0033]
Information Collection: Notices of
Enforcement Discretion (NOEDs) for
Operating Power Reactors and
Gaseous Diffusion Plants (NRC
Enforcement Policy)
Nuclear Regulatory
Commission.
ACTION: Notice of submission to the
Office of Management and Budget;
request for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has recently
submitted a request for renewal of an
existing collection of information to the
Office of Management and Budget
(OMB) for review. The information
collection is entitled, ‘‘Notices of
Enforcement Discretion (NOEDs) for
Operating Power Reactors and Gaseous
Diffusion Plants (NRC Enforcement
Policy).’’
SUMMARY:
Submit comments by November
27, 2023. Comments received after this
date will be considered if it is practical
to do so, but the Commission is able to
DATES:
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
ensure consideration only for comments
received on or before this date.
ADDRESSES: Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to https://www.reginfo.gov/
public/do/PRAMain. Find this
particular information collection by
selecting ‘‘Currently under Review—
Open for Public Comments’’ or by using
the search function.
FOR FURTHER INFORMATION CONTACT:
David Cullison, NRC Clearance Officer,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–2084; email:
Infocollects.Resource@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2023–
0033 when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2023–0033.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, at
301–415–4737, or by email to
PDR.Resource@nrc.gov. A copy of the
collection of information and related
instructions may be obtained without
charge by accessing ADAMS Accession
Nos. ML22056A177 and ML19193A023.
The supporting statement is available in
ADAMS under Accession No.
ML23177A253.
• NRC’s PDR: The PDR, where you
may examine and order copies of
publicly available documents, is open
by appointment. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8 a.m. and 4 p.m. eastern
time (ET), Monday through Friday,
except Federal holidays.
• NRC’s Clearance Officer: A copy of
the collection of information and related
instructions may be obtained without
charge by contacting the NRC’s
Clearance Officer, David C. Cullison,
Office of the Chief Information Officer,
E:\FR\FM\27OCN1.SGM
27OCN1
Federal Register / Vol. 88, No. 207 / Friday, October 27, 2023 / Notices
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–2084; email:
Infocollects.Resource@nrc.gov.
B. Submitting Comments
Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to https://www.reginfo.gov/
public/do/PRAMain. Find this
particular information collection by
selecting ‘‘Currently under Review—
Open for Public Comments’’ or by using
the search function.
The NRC cautions you not to include
identifying or contact information in
comment submissions that you do not
want to be publicly disclosed in your
comment submission. All comment
submissions are posted at https://
www.regulations.gov and entered into
ADAMS. Comment submissions are not
routinely edited to remove identifying
or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the OMB, then you
should inform those persons not to
include identifying or contact
information that they do not want to be
publicly disclosed in their comment
submission. Your request should state
that comment submissions are not
routinely edited to remove such
information before making the comment
submissions available to the public or
entering the comment into ADAMS.
ddrumheller on DSK120RN23PROD with NOTICES1
II. Background
Under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. chapter 35), the NRC recently
submitted a request for renewal of an
existing collection of information to
OMB for review entitled, ‘‘Notices of
Enforcement Discretion (NOEDs) for
Operating Power Reactors and Gaseous
Diffusion Plants (NRC Enforcement
Policy).’’ The NRC hereby informs
potential respondents that an agency
may not conduct or sponsor, and that a
person is not required to respond to, a
collection of information unless it
displays a currently valid OMB control
number.
The NRC published a Federal
Register notice with a 60-day comment
period on this information collection on
June 12, 2023, 88 FR 38106.
1. The title of the information
collection: Notices of Enforcement
Discretion (NOEDs) for Operating Power
Reactors and Gaseous Diffusion Plants
(NRC Enforcement Policy).
2. OMB approval number: 3150–0136.
3. Type of submission: Extension.
VerDate Sep<11>2014
17:44 Oct 26, 2023
Jkt 262001
4. The form number, if applicable:
Not applicable.
5. How often the collection is required
or requested: On occasion.
6. Who will be required or asked to
respond: Those licensees that
voluntarily request enforcement
discretion through the NOED process.
7. The estimated number of annual
responses: 8 (4 reporting responses + 4
recordkeepers).
8. The estimated number of annual
respondents: 4.
9. The estimated number of hours
needed annually to comply with the
information collection requirement or
request: 680 (600 reporting + 80
recordkeeping).
10. Abstract: The NRC’s Enforcement
Policy includes the circumstances in
which the NRC may grant a NOED. On
occasion, circumstances arise when a
power plant licensee’s compliance with
a Technical Specification (TS) Limiting
Condition for Operation or any other
license condition would involve an
unnecessary plant shutdown or
transient. Similarly, for a gaseous
diffusion plant, circumstances may arise
where compliance with a Technical
Safety Requirement (TSR) or other
condition would unnecessarily call for a
total plant shutdown, or compliance
would unnecessarily place the plant in
a condition where safety, safeguards, or
security features were degraded or
inoperable. In these circumstances, a
licensee or certificate holder may
request that the NRC exercise
enforcement discretion, and the NRC
staff may choose to not enforce the
applicable TS, TSR, or other license or
certificate condition. This enforcement
discretion is designated as a NOED. A
licensee or certificate holder seeking the
issuance of a NOED must justify, in
accordance with NRC Enforcement
Manual (ADAMS Accession No.
ML22056A177), the safety basis for the
request, including an evaluation of the
safety significance and potential
consequences of the proposed request, a
description of proposed compensatory
measures, a justification for the duration
of the request, the basis for the
licensee’s or certificate holder’s
conclusion that the request does not
have a potential adverse impact on the
public health and safety, and does not
involve adverse consequences to the
environment, and any other information
the NRC staff deems necessary before
making a decision to exercise discretion.
Dated: October 24, 2023.
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
73881
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief
Information Officer.
[FR Doc. 2023–23792 Filed 10–26–23; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2023–0101]
Information Collection: NRC Form 483,
Registration Certificate—In Vitro
Testing With Byproduct Material Under
General License
Nuclear Regulatory
Commission.
ACTION: Renewal of existing information
collection; request for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) invites public
comment on the renewal of Office of
Management and Budget (OMB)
approval for an existing collection of
information. The information collection
is entitled, NRC Form 483, ‘‘Registration
Certificate—In Vitro Testing with
Byproduct Material Under General
License.’’
SUMMARY:
Submit comments by December
26, 2023. Comments received after this
date will be considered if it is practical
to do so, but the Commission is able to
ensure consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal rulemaking website:
• Federal rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2023–0101. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail comments to: David C.
Cullison, Office of the Chief Information
Officer, Mail Stop: T–6 A10M, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
David C. Cullison, Office of the Chief
Information Officer, U.S. Nuclear
Regulatory Commission, Washington,
DATES:
E:\FR\FM\27OCN1.SGM
27OCN1
Agencies
[Federal Register Volume 88, Number 207 (Friday, October 27, 2023)]
[Notices]
[Pages 73880-73881]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-23792]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2023-0033]
Information Collection: Notices of Enforcement Discretion (NOEDs)
for Operating Power Reactors and Gaseous Diffusion Plants (NRC
Enforcement Policy)
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of submission to the Office of Management and Budget;
request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has recently
submitted a request for renewal of an existing collection of
information to the Office of Management and Budget (OMB) for review.
The information collection is entitled, ``Notices of Enforcement
Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion
Plants (NRC Enforcement Policy).''
DATES: Submit comments by November 27, 2023. Comments received after
this date will be considered if it is practical to do so, but the
Commission is able to ensure consideration only for comments received
on or before this date.
ADDRESSES: Written comments and recommendations for the proposed
information collection should be sent within 30 days of publication of
this notice to https://www.reginfo.gov/public/do/PRAMain. Find this
particular information collection by selecting ``Currently under
Review--Open for Public Comments'' or by using the search function.
FOR FURTHER INFORMATION CONTACT: David Cullison, NRC Clearance Officer,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-2084; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2023-0033 when contacting the NRC
about the availability of information for this action. You may obtain
publicly available information related to this action by any of the
following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0033.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737,
or by email to [email protected]. A copy of the collection of
information and related instructions may be obtained without charge by
accessing ADAMS Accession Nos. ML22056A177 and ML19193A023. The
supporting statement is available in ADAMS under Accession No.
ML23177A253.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
NRC's Clearance Officer: A copy of the collection of
information and related instructions may be obtained without charge by
contacting the NRC's Clearance Officer, David C. Cullison, Office of
the Chief Information Officer,
[[Page 73881]]
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-2084; email: [email protected].
B. Submitting Comments
Written comments and recommendations for the proposed information
collection should be sent within 30 days of publication of this notice
to https://www.reginfo.gov/public/do/PRAMain. Find this particular
information collection by selecting ``Currently under Review--Open for
Public Comments'' or by using the search function.
The NRC cautions you not to include identifying or contact
information in comment submissions that you do not want to be publicly
disclosed in your comment submission. All comment submissions are
posted at https://www.regulations.gov and entered into ADAMS. Comment
submissions are not routinely edited to remove identifying or contact
information.
If you are requesting or aggregating comments from other persons
for submission to the OMB, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that comment submissions are not routinely edited to remove such
information before making the comment submissions available to the
public or entering the comment into ADAMS.
II. Background
Under the provisions of the Paperwork Reduction Act of 1995 (44
U.S.C. chapter 35), the NRC recently submitted a request for renewal of
an existing collection of information to OMB for review entitled,
``Notices of Enforcement Discretion (NOEDs) for Operating Power
Reactors and Gaseous Diffusion Plants (NRC Enforcement Policy).'' The
NRC hereby informs potential respondents that an agency may not conduct
or sponsor, and that a person is not required to respond to, a
collection of information unless it displays a currently valid OMB
control number.
The NRC published a Federal Register notice with a 60-day comment
period on this information collection on June 12, 2023, 88 FR 38106.
1. The title of the information collection: Notices of Enforcement
Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion
Plants (NRC Enforcement Policy).
2. OMB approval number: 3150-0136.
3. Type of submission: Extension.
4. The form number, if applicable: Not applicable.
5. How often the collection is required or requested: On occasion.
6. Who will be required or asked to respond: Those licensees that
voluntarily request enforcement discretion through the NOED process.
7. The estimated number of annual responses: 8 (4 reporting
responses + 4 recordkeepers).
8. The estimated number of annual respondents: 4.
9. The estimated number of hours needed annually to comply with the
information collection requirement or request: 680 (600 reporting + 80
recordkeeping).
10. Abstract: The NRC's Enforcement Policy includes the
circumstances in which the NRC may grant a NOED. On occasion,
circumstances arise when a power plant licensee's compliance with a
Technical Specification (TS) Limiting Condition for Operation or any
other license condition would involve an unnecessary plant shutdown or
transient. Similarly, for a gaseous diffusion plant, circumstances may
arise where compliance with a Technical Safety Requirement (TSR) or
other condition would unnecessarily call for a total plant shutdown, or
compliance would unnecessarily place the plant in a condition where
safety, safeguards, or security features were degraded or inoperable.
In these circumstances, a licensee or certificate holder may request
that the NRC exercise enforcement discretion, and the NRC staff may
choose to not enforce the applicable TS, TSR, or other license or
certificate condition. This enforcement discretion is designated as a
NOED. A licensee or certificate holder seeking the issuance of a NOED
must justify, in accordance with NRC Enforcement Manual (ADAMS
Accession No. ML22056A177), the safety basis for the request, including
an evaluation of the safety significance and potential consequences of
the proposed request, a description of proposed compensatory measures,
a justification for the duration of the request, the basis for the
licensee's or certificate holder's conclusion that the request does not
have a potential adverse impact on the public health and safety, and
does not involve adverse consequences to the environment, and any other
information the NRC staff deems necessary before making a decision to
exercise discretion.
Dated: October 24, 2023.
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 2023-23792 Filed 10-26-23; 8:45 am]
BILLING CODE 7590-01-P