WBI Energy Transmission, Inc.; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed South Spearfish Project, 72052-72054 [2023-23107]
Download as PDF
72052
Federal Register / Vol. 88, No. 201 / Thursday, October 19, 2023 / Notices
Defense for Privacy, Civil Liberties, and
Transparency, 4800 Mark Center Drive,
Mailbox #24, Suite 08D09, Alexandria,
VA 22350–1700.
• JSC Portal: https://jsc.defense.gov/
Contact. Follow the instructions for
submitting comments.
Instructions: All submissions received
must include the agency name and
docket number for this Federal Register
document. The general policy for
comments and other submissions from
members of the public is to make these
submissions available for public
viewing on the internet at https://
www.regulations.gov as they are
received without change, including any
personal identifiers or contact
information.
Dated: October 16, 2023.
Aaron T. Siegel,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
FOR FURTHER INFORMATION CONTACT:
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document, that will
discuss the environmental impacts of
the South Spearfish Project involving
construction, operation, and
abandonment of facilities by WBI
Energy Transmission, Inc. (WBI Energy)
in Lawrence County, South Dakota. The
Commission will use this environmental
document in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of a Certificate of Public
Convenience and Necessity and
authorization for abandonment of
facilities. This gathering of public input
is referred to as ‘‘scoping.’’ The main
goal of the scoping process is to focus
the analysis in the environmental
document on the important
environmental issues. Additional
information about the Commission’s
NEPA process is described below in the
NEPA Process and Environmental
Document section of this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on
Commander Anthony M. DeStefano,
U.S. Coast Guard, Executive Secretary,
JSC, (202) 372–3807,
anthony.m.destefano@uscg.mil. The JSC
website is located at https://
jsc.defense.gov.
The
proposed changes to the MCM are being
made available on the internet at https://
www.regulations.gov, Docket ID: DoD–
2023–OS–0099 rather than being
printed in the Federal Register.
These proposed changes have not
been coordinated within the DoD under
DoD Directive 5500.01, ‘‘Preparing,
Processing and Coordinating
Legislation, Executive Orders,
Proclamations, Views Letters, and
Testimony,’’ June 15, 2007, and do not
constitute the official position of the
DoD, the Military Departments, or any
other Government agency.
This notice is provided in accordance
with DoD Instruction 5500.17, ‘‘Role
and Responsibilities of the Joint Service
Committee on Military Justice (JSC),’’
February 21, 2018.
The JSC invites members of the public
to comment on the proposed changes;
such comments should address specific
recommended changes and provide
supporting rationale.
This notice also sets forth the date,
time, and location for a public meeting
of the JSC to discuss the proposed
changes.
This notice is intended only to
improve the internal management of the
Federal Government. It is not intended
to create any right or benefit,
substantive or procedural, enforceable at
law by any party against the United
States, its agencies, its officers, or any
person.
lotter on DSK11XQN23PROD with NOTICES1
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
17:48 Oct 18, 2023
Jkt 262001
[FR Doc. 2023–23115 Filed 10–18–23; 8:45 am]
BILLING CODE 6001– FR–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–535–000]
WBI Energy Transmission, Inc.; Notice
of Scoping Period Requesting
Comments on Environmental Issues
for the Proposed South Spearfish
Project
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
November 13, 2023. Comments may be
submitted in written form. Further
details on how to submit comments are
provided in the Public Participation
section of this notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written comments during
the preparation of the environmental
document.
If you submitted comments on this
project to the Commission before the
opening of this docket on August 28,
2023, you will need to file those
comments in Docket No. CP23–535–000
to ensure they are considered as part of
this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, the Natural Gas Act conveys
the right of eminent domain to the
company. Therefore, if you and the
company do not reach an easement
agreement, the pipeline company could
initiate condemnation proceedings in
court. In such instances, compensation
would be determined by a judge in
accordance with state law. The
Commission does not subsequently
grant, exercise, or oversee the exercise
of that eminent domain authority. The
courts have exclusive authority to
handle eminent domain cases; the
Commission has no jurisdiction over
these matters.
WBI Energy provided landowners
with a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ which addresses typically
asked questions, including the use of
eminent domain and how to participate
in the Commission’s proceedings. This
fact sheet along with other landowner
topics of interest are available for
viewing on the FERC website
(www.ferc.gov) under the Natural Gas,
Landowner Topics link.
E:\FR\FM\19OCN1.SGM
19OCN1
Federal Register / Vol. 88, No. 201 / Thursday, October 19, 2023 / Notices
lotter on DSK11XQN23PROD with NOTICES1
Public Participation
There are three methods you can use
to submit your comments to the
Commission. Please carefully follow
these instructions so that your
comments are properly recorded. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature, which is on the Commission’s
website (www.ferc.gov) under the link to
FERC Online. Using eComment is an
easy method for submitting brief, textonly comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is also on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP23–535–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Additionally, the Commission offers a
free service called eSubscription which
makes it easy to stay informed of all
issuances and submittals regarding the
dockets/projects to which you
subscribe. These instant email
notifications are the fastest way to
receive notification and provide a link
to the document files which can reduce
the amount of time you spend
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
VerDate Sep<11>2014
17:48 Oct 18, 2023
Jkt 262001
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Summary of the Proposed Project
The proposed project would allow for
incremental firm transportation capacity
from WBI Energy’s existing Line Section
15 in western South Dakota to the
community of Spearfish, South Dakota
for Montana-Dakota Utilities, Company.
Specifically, WBI Energy proposes the
following in Lawrence County, South
Dakota:
• modify the Deadwood-Central City
Lateral Takeoff Valve Setting adjacent to
the Deadwood Mainline Transfer
Station on WBI Energy’s Line Section
15;
• increase the maximum allowable
operating pressure of the 8-inchdiameter Deadwood-Central City Lateral
from the Deadwood Mainline Transfer
Station to the proposed South Spearfish
Station;
• install two pig launcher/receivers,1
one at each end of the uprated
Deadwood-Central City Lateral;
• construct the new South Spearfish
Station adjacent to the existing South
Spearfish Lateral Takeoff Valve Setting.
The new station would contain the
relocated South Spearfish Town Border
Station and the new Deadwood Lateral
Transfer Station;
• relocate approximately 500 feet of
the South Spearfish Lateral adjacent to
the South Spearfish Town Border
Station and the existing South Spearfish
Lateral Takeoff Valve Setting; and
• abandon by sale the existing 5.5mile-long 4-inch-diameter South
Spearfish Lateral and certain town
border station equipment, at the existing
South Spearfish Town Border Station to
Montana-Dakota upon the
commissioning of the new South
Spearfish Town Border Station.
The general location of the project
facilities is shown in appendix 1.2
1 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes. A pig launcher/
receiver are facilities where pigs are inserted/
retrieved from the pipeline.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’. For instructions on
connecting to eLibrary, refer to the last page of this
notice. At this time, the Commission has suspended
access to the Commission’s Public Reference Room.
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll free, (886)
208–3676 or TTY (202) 502–8659.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
72053
Land Requirements for Construction
Construction of the Project will affect
approximately 8.1 acres of land,
including temporary workspace needed
for construction of pipeline and
aboveground facilities, staging area, and
access roads. Following construction,
approximately 4.7 acres would revert to
pre-construction conditions and uses.
The remaining approximately 3.4 acres,
including the permanent pipeline
easement and aboveground facility sites,
would be retained for permanent
operation of the Project.
NEPA Process and the Environmental
Document
Any environmental document issued
by the Commission will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under the relevant
general resource areas:
• geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• environmental justice;
• air quality and noise; and
• reliability and safety.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project and
make recommendations on how to
lessen or avoid impacts on the various
resource areas. Your comments will
help Commission staff identify and
focus on the issues that might have an
effect on the human environment and
potentially eliminate others from further
study and discussion in the
environmental document.
Following this scoping period,
Commission staff will determine
whether to prepare an Environmental
Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the
EIS will present Commission staff’s
independent analysis of the issues. If
Commission staff prepares an EA, a
Notice of Schedule for the Preparation
of an Environmental Assessment will be
issued. The EA may be issued for an
allotted public comment period. The
Commission would consider timely
comments on the EA before making its
decision regarding the proposed project.
If Commission staff prepares an EIS, a
Notice of Intent to Prepare an EIS/
Notice of Schedule will be issued,
which will open up an additional
comment period. Staff will then prepare
a draft EIS which will be issued for
public comment. Commission staff will
consider all timely comments received
during the comment period on the draft
E:\FR\FM\19OCN1.SGM
19OCN1
72054
Federal Register / Vol. 88, No. 201 / Thursday, October 19, 2023 / Notices
EIS and revise the document, as
necessary, before issuing a final EIS.
Any EA or draft and final EIS will be
available in electronic format in the
public record through eLibrary 3 and the
Commission’s natural gas
environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
email notification when the
environmental document is issued.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the environmental document.4
Agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office, and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.5 The
environmental document for this project
will document findings on the impacts
on historic properties and summarize
the status of consultations under section
106.
lotter on DSK11XQN23PROD with NOTICES1
Environmental Mailing List
The environmental mailing list
includes: federal, state, and local
government representatives and
agencies; elected officials; public
interest groups; Native American Tribes;
other interested parties; and local
libraries. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
3 For instructions on connecting to eLibrary, refer
to the last page of this notice.
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at title 40, Code of Federal
Regulations, section 1501.8.
5 The Advisory Council on Historic Preservation’s
regulations are at title 36, Code of Federal
Regulations, part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
17:48 Oct 18, 2023
Jkt 262001
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP23–535–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: October 13, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–23107 Filed 10–18–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas and
Oil Pipeline Rate and Refund Report
filings:
Filings Instituting Proceedings
Docket Numbers: RP24–39–000.
Applicants: Fayetteville Express
Pipeline LLC.
Description: § 4(d) Rate Filing:
Housekeeping Filing on 10–12–23 to be
effective 11/12/2023.
Filed Date: 10/12/23.
Accession Number: 20231012–5033.
Comment Date: 5 p.m. ET 10/24/23.
Docket Numbers: RP24–40–000.
Applicants: Southwest Gas Storage
Company.
Description: § 4(d) Rate Filing:
Housekeeping Filing on 10–12–23 to be
effective 11/12/2023.
Filed Date: 10/12/23.
Accession Number: 20231012–5064.
Comment Date: 5 p.m. ET 10/24/23.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: PR23–69–001.
Applicants: Dow Intrastate Gas
Company.
Description: Amendment Filing:
Amended Statement of Operating
Conditions to be effective 9/1/2023.
Filed Date: 10/12/23.
Accession Number: 20231012–5002.
Comment Date: 5 p.m. ET 11/2/23.
Protest Date: 5 p.m. ET 11/2/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
E:\FR\FM\19OCN1.SGM
19OCN1
Agencies
[Federal Register Volume 88, Number 201 (Thursday, October 19, 2023)]
[Notices]
[Pages 72052-72054]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-23107]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-535-000]
WBI Energy Transmission, Inc.; Notice of Scoping Period
Requesting Comments on Environmental Issues for the Proposed South
Spearfish Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document, that will discuss
the environmental impacts of the South Spearfish Project involving
construction, operation, and abandonment of facilities by WBI Energy
Transmission, Inc. (WBI Energy) in Lawrence County, South Dakota. The
Commission will use this environmental document in its decision-making
process to determine whether the project is in the public convenience
and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. As part of the National Environmental
Policy Act (NEPA) review process, the Commission takes into account
concerns the public may have about proposals and the environmental
impacts that could result from its action whenever it considers the
issuance of a Certificate of Public Convenience and Necessity and
authorization for abandonment of facilities. This gathering of public
input is referred to as ``scoping.'' The main goal of the scoping
process is to focus the analysis in the environmental document on the
important environmental issues. Additional information about the
Commission's NEPA process is described below in the NEPA Process and
Environmental Document section of this notice.
By this notice, the Commission requests public comments on the
scope of issues to address in the environmental document. To ensure
that your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on November 13, 2023. Comments may be
submitted in written form. Further details on how to submit comments
are provided in the Public Participation section of this notice.
Your comments should focus on the potential environmental effects,
reasonable alternatives, and measures to avoid or lessen environmental
impacts. Your input will help the Commission staff determine what
issues they need to evaluate in the environmental document. Commission
staff will consider all written comments during the preparation of the
environmental document.
If you submitted comments on this project to the Commission before
the opening of this docket on August 28, 2023, you will need to file
those comments in Docket No. CP23-535-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, the Natural Gas Act conveys the right of eminent
domain to the company. Therefore, if you and the company do not reach
an easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law. The Commission does
not subsequently grant, exercise, or oversee the exercise of that
eminent domain authority. The courts have exclusive authority to handle
eminent domain cases; the Commission has no jurisdiction over these
matters.
WBI Energy provided landowners with a fact sheet prepared by the
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?'' which addresses typically asked questions, including
the use of eminent domain and how to participate in the Commission's
proceedings. This fact sheet along with other landowner topics of
interest are available for viewing on the FERC website (www.ferc.gov)
under the Natural Gas, Landowner Topics link.
[[Page 72053]]
Public Participation
There are three methods you can use to submit your comments to the
Commission. Please carefully follow these instructions so that your
comments are properly recorded. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
(1) You can file your comments electronically using the eComment
feature, which is on the Commission's website (www.ferc.gov) under the
link to FERC Online. Using eComment is an easy method for submitting
brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is also on the Commission's website (www.ferc.gov) under
the link to FERC Online. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; a comment on a particular project is considered a ``Comment on
a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP23-
535-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Additionally, the Commission offers a free service called
eSubscription which makes it easy to stay informed of all issuances and
submittals regarding the dockets/projects to which you subscribe. These
instant email notifications are the fastest way to receive notification
and provide a link to the document files which can reduce the amount of
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Summary of the Proposed Project
The proposed project would allow for incremental firm
transportation capacity from WBI Energy's existing Line Section 15 in
western South Dakota to the community of Spearfish, South Dakota for
Montana-Dakota Utilities, Company. Specifically, WBI Energy proposes
the following in Lawrence County, South Dakota:
modify the Deadwood-Central City Lateral Takeoff Valve
Setting adjacent to the Deadwood Mainline Transfer Station on WBI
Energy's Line Section 15;
increase the maximum allowable operating pressure of the
8-inch-diameter Deadwood-Central City Lateral from the Deadwood
Mainline Transfer Station to the proposed South Spearfish Station;
install two pig launcher/receivers,\1\ one at each end of
the uprated Deadwood-Central City Lateral;
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes. A pig launcher/
receiver are facilities where pigs are inserted/retrieved from the
pipeline.
---------------------------------------------------------------------------
construct the new South Spearfish Station adjacent to the
existing South Spearfish Lateral Takeoff Valve Setting. The new station
would contain the relocated South Spearfish Town Border Station and the
new Deadwood Lateral Transfer Station;
relocate approximately 500 feet of the South Spearfish
Lateral adjacent to the South Spearfish Town Border Station and the
existing South Spearfish Lateral Takeoff Valve Setting; and
abandon by sale the existing 5.5-mile-long 4-inch-diameter
South Spearfish Lateral and certain town border station equipment, at
the existing South Spearfish Town Border Station to Montana-Dakota upon
the commissioning of the new South Spearfish Town Border Station.
The general location of the project facilities is shown in appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary''. For instructions on
connecting to eLibrary, refer to the last page of this notice. At
this time, the Commission has suspended access to the Commission's
Public Reference Room. For assistance, contact FERC at
[email protected] or call toll free, (886) 208-3676 or TTY
(202) 502-8659.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the Project will affect approximately 8.1 acres of
land, including temporary workspace needed for construction of pipeline
and aboveground facilities, staging area, and access roads. Following
construction, approximately 4.7 acres would revert to pre-construction
conditions and uses. The remaining approximately 3.4 acres, including
the permanent pipeline easement and aboveground facility sites, would
be retained for permanent operation of the Project.
NEPA Process and the Environmental Document
Any environmental document issued by the Commission will discuss
impacts that could occur as a result of the construction and operation
of the proposed project under the relevant general resource areas:
geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
environmental justice;
air quality and noise; and
reliability and safety.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project and make recommendations on
how to lessen or avoid impacts on the various resource areas. Your
comments will help Commission staff identify and focus on the issues
that might have an effect on the human environment and potentially
eliminate others from further study and discussion in the environmental
document.
Following this scoping period, Commission staff will determine
whether to prepare an Environmental Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the EIS will present Commission
staff's independent analysis of the issues. If Commission staff
prepares an EA, a Notice of Schedule for the Preparation of an
Environmental Assessment will be issued. The EA may be issued for an
allotted public comment period. The Commission would consider timely
comments on the EA before making its decision regarding the proposed
project. If Commission staff prepares an EIS, a Notice of Intent to
Prepare an EIS/Notice of Schedule will be issued, which will open up an
additional comment period. Staff will then prepare a draft EIS which
will be issued for public comment. Commission staff will consider all
timely comments received during the comment period on the draft
[[Page 72054]]
EIS and revise the document, as necessary, before issuing a final EIS.
Any EA or draft and final EIS will be available in electronic format in
the public record through eLibrary \3\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you
will receive instant email notification when the environmental document
is issued.
---------------------------------------------------------------------------
\3\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the environmental document.\4\ Agencies that would like
to request cooperating agency status should follow the instructions for
filing comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at title 40, Code of Federal
Regulations, section 1501.8.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office,
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\5\ The environmental document for this
project will document findings on the impacts on historic properties
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation's regulations
are at title 36, Code of Federal Regulations, part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes: federal, state, and local
government representatives and agencies; elected officials; public
interest groups; Native American Tribes; other interested parties; and
local libraries. This list also includes all affected landowners (as
defined in the Commission's regulations) who are potential right-of-way
grantors, whose property may be used temporarily for project purposes,
or who own homes within certain distances of aboveground facilities,
and anyone who submits comments on the project and includes a mailing
address with their comments. Commission staff will update the
environmental mailing list as the analysis proceeds to ensure that
Commission notices related to this environmental review are sent to all
individuals, organizations, and government entities interested in and/
or potentially affected by the proposed project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please complete one of
the following steps:
(1) Send an email to [email protected] stating your
request. You must include the docket number CP23-535-000 in your
request. If you are requesting a change to your address, please be sure
to include your name and the correct address. If you are requesting to
delete your address from the mailing list, please include your name and
address as it appeared on this notice. This email address is unable to
accept comments. OR
(2) Return the attached ``Mailing List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/news-events/events along with
other related information.
Dated: October 13, 2023.
Kimberly D. Bose,
Secretary.