Notice of Extension of Segregation of Public Lands for the Rough Hat Clark County Solar Project, Clark County, NV, 72103 [2023-23057]

Download as PDF Federal Register / Vol. 88, No. 201 / Thursday, October 19, 2023 / Notices lotter on DSK11XQN23PROD with NOTICES1 end of the season (early September), all permit holders must submit the completed Kodiak Roaded Area InSeason Harvest Report (Form 3–2381–7) indicating whether they harvested birds and eggs, and if so, the kinds and amounts of birds and eggs harvested. Permit holders submit the completed form by mail to the ADF&G for data analysis (the form includes the return address and is postage-paid). To ensure a more complete harvest reporting, the ADF&G will mail a post-season harvest survey to permit holders who did not submit a completed in-season harvest log. The post-season mail survey includes two reminders. Reported harvests will be extrapolated to represent all permit holders, based on statistical methods. Forms 3–2381–6 and 3–2381–7 are only completed twice per year (spring and summer seasons). Title of Collection: Alaska Migratory Bird Subsistence Harvest Household Survey. OMB Control Number: 1018–0124. Form Numbers: Forms 3–2380, and 3– 2381–1 through 3–2381–7. Type of Review: Extension of a currently approved collection. Respondents/Affected Public: Households within subsistence-eligible areas of Alaska. Total Estimated Number of Annual Respondents: 2,271. Total Estimated Number of Annual Responses: 4,371. Estimated Completion Time per Response: 5 minutes. Total Estimated Number of Annual Burden Hours: 364. Respondent’s Obligation: Required to obtain or retain a benefit. Frequency of Collection: Annually. Total Estimated Annual Nonhour Burden Cost: None. An agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. The authority for this action is the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Madonna Baucum, Information Collection Clearance Officer, U.S. Fish and Wildlife Service. [FR Doc. 2023–23028 Filed 10–18–23; 8:45 am] BILLING CODE 4333–15–P VerDate Sep<11>2014 17:48 Oct 18, 2023 Jkt 262001 DEPARTMENT OF THE INTERIOR Bureau of Land Management [BLM_NV_FRN_MO4500175288] Notice of Extension of Segregation of Public Lands for the Rough Hat Clark County Solar Project, Clark County, NV Bureau of Land Management, Interior. ACTION: Notice of segregation extension. AGENCY: The Bureau of Land Management (BLM) segregated public lands included in the right-of-way application (N–099406) for the Rough Hat Clark County Solar Project from appropriation under the public land laws, including the Mining Law, but not the mineral leasing or material sales acts, for a period of 2 years on October 20, 2021, subject to valid existing rights. This 2-year extension of the segregation is necessary to allow the BLM to complete review of the Rough Hat Clark County Solar Project application and reach a decision on the application. DATES: This segregation extension for the lands identified in this notice is effective on October 20, 2023. FOR FURTHER INFORMATION CONTACT: For further information and/or to have your name added to the project mailing list, send requests to: Whitney Wirthlin, Southern Nevada District Energy and Infrastructure Team, at telephone (702) 515–5084; address 4701 North Torrey Pines Drive, Las Vegas, NV 89130–2301; or email BLM_NV_SND_ EnergyProjects@blm.gov. Individuals in the United States who are deaf, deafblind, hard of hearing, or have a speech disability may dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay services for contacting Whitney Wirthlin. Individuals outside the United States should use the relay services offered within their country to make international calls to the point-of contact in the United States. SUPPLEMENTARY INFORMATION: This notice extends the segregation published in the Federal Register on October 20, 2021 (86 FR 58301) for an additional 2 years. Candela Renewables, LLC, submitted a right-of-way application to the BLM Las Vegas Field Office for the Rough Hat Clark County Solar Project requesting authorization to construct, operate, maintain, and eventually decommission a 400megawatt photovoltaic solar electric generating facility, battery storage facilities, associated generation tie-line, and access road facilities. The BLM has made substantial progress in the review SUMMARY: PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 72103 of the Rough Hat Clark County Solar Project right-of-way application; however, the BLM needs additional time to complete its review and make a decision on the application. The BLM completed the variance process required by the solar programmatic environmental impact statement and determined it was appropriate to continue processing the application. On October 21, 2022, the BLM published in the Federal Register (87 FR 68187) a Notice of Intent to amend the Las Vegas Resource Management Plan (RMP) and prepare an environmental impact statement (EIS) for the proposed Rough Hat Clark County Solar Project in Clark County, Nevada. The BLM is currently preparing the draft RMP amendment/EIS. Authority: 43 CFR 2091.3–1(e) and 43 CFR 2804.25(f). Jon K. Raby, Nevada State Director. [FR Doc. 2023–23057 Filed 10–18–23; 8:45 am] BILLING CODE 4331–21–P DEPARTMENT OF THE INTERIOR Bureau of Land Management [BLM_AZ_FRN_MO4500175809] Notice of Filing of Plats of Survey; Arizona Bureau of Land Management, Interior. ACTION: Notice of official filing. AGENCY: The plats of survey of the following described land were officially filed in the Bureau of Land Management (BLM), Arizona State Office, Phoenix, Arizona on the dates indicated. The surveys announced in this notice are necessary for the management of lands administered by the agency indicated. ADDRESSES: These plats will be available for inspection in the Arizona State Office, Bureau of Land Management, One North Central Avenue, Suite 800, Phoenix, Arizona 85004–4427. Protests of any of these surveys should be sent to the Arizona State Director at the above address. FOR FURTHER INFORMATION CONTACT: Geoffrey A. Graham, Chief Cadastral Surveyor of Arizona; (602) 417–9558; ggraham@blm.gov. Individuals in the United States who are deaf, deafblind, hard of hearing, or have a speech disability may dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay services. Individuals outside the United States should use the relay services offered within their country to make SUMMARY: E:\FR\FM\19OCN1.SGM 19OCN1

Agencies

[Federal Register Volume 88, Number 201 (Thursday, October 19, 2023)]
[Notices]
[Page 72103]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-23057]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

[BLM_NV_FRN_MO4500175288]


Notice of Extension of Segregation of Public Lands for the Rough 
Hat Clark County Solar Project, Clark County, NV

AGENCY: Bureau of Land Management, Interior.

ACTION: Notice of segregation extension.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Land Management (BLM) segregated public lands 
included in the right-of-way application (N-099406) for the Rough Hat 
Clark County Solar Project from appropriation under the public land 
laws, including the Mining Law, but not the mineral leasing or material 
sales acts, for a period of 2 years on October 20, 2021, subject to 
valid existing rights. This 2-year extension of the segregation is 
necessary to allow the BLM to complete review of the Rough Hat Clark 
County Solar Project application and reach a decision on the 
application.

DATES: This segregation extension for the lands identified in this 
notice is effective on October 20, 2023.

FOR FURTHER INFORMATION CONTACT: For further information and/or to have 
your name added to the project mailing list, send requests to: Whitney 
Wirthlin, Southern Nevada District Energy and Infrastructure Team, at 
telephone (702) 515-5084; address 4701 North Torrey Pines Drive, Las 
Vegas, NV 89130-2301; or email [email protected]. 
Individuals in the United States who are deaf, deafblind, hard of 
hearing, or have a speech disability may dial 711 (TTY, TDD, or 
TeleBraille) to access telecommunications relay services for contacting 
Whitney Wirthlin. Individuals outside the United States should use the 
relay services offered within their country to make international calls 
to the point-of contact in the United States.

SUPPLEMENTARY INFORMATION: This notice extends the segregation 
published in the Federal Register on October 20, 2021 (86 FR 58301) for 
an additional 2 years. Candela Renewables, LLC, submitted a right-of-
way application to the BLM Las Vegas Field Office for the Rough Hat 
Clark County Solar Project requesting authorization to construct, 
operate, maintain, and eventually decommission a 400-megawatt 
photovoltaic solar electric generating facility, battery storage 
facilities, associated generation tie-line, and access road facilities. 
The BLM has made substantial progress in the review of the Rough Hat 
Clark County Solar Project right-of-way application; however, the BLM 
needs additional time to complete its review and make a decision on the 
application.
    The BLM completed the variance process required by the solar 
programmatic environmental impact statement and determined it was 
appropriate to continue processing the application. On October 21, 
2022, the BLM published in the Federal Register (87 FR 68187) a Notice 
of Intent to amend the Las Vegas Resource Management Plan (RMP) and 
prepare an environmental impact statement (EIS) for the proposed Rough 
Hat Clark County Solar Project in Clark County, Nevada. The BLM is 
currently preparing the draft RMP amendment/EIS.
    Authority: 43 CFR 2091.3-1(e) and 43 CFR 2804.25(f).

Jon K. Raby,
Nevada State Director.
[FR Doc. 2023-23057 Filed 10-18-23; 8:45 am]
BILLING CODE 4331-21-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.