Notice of Extension of Segregation of Public Lands for the Rough Hat Clark County Solar Project, Clark County, NV, 72103 [2023-23057]
Download as PDF
Federal Register / Vol. 88, No. 201 / Thursday, October 19, 2023 / Notices
lotter on DSK11XQN23PROD with NOTICES1
end of the season (early September), all
permit holders must submit the
completed Kodiak Roaded Area InSeason Harvest Report (Form 3–2381–7)
indicating whether they harvested birds
and eggs, and if so, the kinds and
amounts of birds and eggs harvested.
Permit holders submit the completed
form by mail to the ADF&G for data
analysis (the form includes the return
address and is postage-paid). To ensure
a more complete harvest reporting, the
ADF&G will mail a post-season harvest
survey to permit holders who did not
submit a completed in-season harvest
log. The post-season mail survey
includes two reminders. Reported
harvests will be extrapolated to
represent all permit holders, based on
statistical methods. Forms 3–2381–6
and 3–2381–7 are only completed twice
per year (spring and summer seasons).
Title of Collection: Alaska Migratory
Bird Subsistence Harvest Household
Survey.
OMB Control Number: 1018–0124.
Form Numbers: Forms 3–2380, and 3–
2381–1 through 3–2381–7.
Type of Review: Extension of a
currently approved collection.
Respondents/Affected Public:
Households within subsistence-eligible
areas of Alaska.
Total Estimated Number of Annual
Respondents: 2,271.
Total Estimated Number of Annual
Responses: 4,371.
Estimated Completion Time per
Response: 5 minutes.
Total Estimated Number of Annual
Burden Hours: 364.
Respondent’s Obligation: Required to
obtain or retain a benefit.
Frequency of Collection: Annually.
Total Estimated Annual Nonhour
Burden Cost: None.
An agency may not conduct or
sponsor and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number.
The authority for this action is the
Paperwork Reduction Act of 1995 (44
U.S.C. 3501 et seq.).
Madonna Baucum,
Information Collection Clearance Officer, U.S.
Fish and Wildlife Service.
[FR Doc. 2023–23028 Filed 10–18–23; 8:45 am]
BILLING CODE 4333–15–P
VerDate Sep<11>2014
17:48 Oct 18, 2023
Jkt 262001
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[BLM_NV_FRN_MO4500175288]
Notice of Extension of Segregation of
Public Lands for the Rough Hat Clark
County Solar Project, Clark County, NV
Bureau of Land Management,
Interior.
ACTION: Notice of segregation extension.
AGENCY:
The Bureau of Land
Management (BLM) segregated public
lands included in the right-of-way
application (N–099406) for the Rough
Hat Clark County Solar Project from
appropriation under the public land
laws, including the Mining Law, but not
the mineral leasing or material sales
acts, for a period of 2 years on October
20, 2021, subject to valid existing rights.
This 2-year extension of the segregation
is necessary to allow the BLM to
complete review of the Rough Hat Clark
County Solar Project application and
reach a decision on the application.
DATES: This segregation extension for
the lands identified in this notice is
effective on October 20, 2023.
FOR FURTHER INFORMATION CONTACT: For
further information and/or to have your
name added to the project mailing list,
send requests to: Whitney Wirthlin,
Southern Nevada District Energy and
Infrastructure Team, at telephone (702)
515–5084; address 4701 North Torrey
Pines Drive, Las Vegas, NV 89130–2301;
or email BLM_NV_SND_
EnergyProjects@blm.gov. Individuals in
the United States who are deaf,
deafblind, hard of hearing, or have a
speech disability may dial 711 (TTY,
TDD, or TeleBraille) to access
telecommunications relay services for
contacting Whitney Wirthlin.
Individuals outside the United States
should use the relay services offered
within their country to make
international calls to the point-of
contact in the United States.
SUPPLEMENTARY INFORMATION: This
notice extends the segregation
published in the Federal Register on
October 20, 2021 (86 FR 58301) for an
additional 2 years. Candela Renewables,
LLC, submitted a right-of-way
application to the BLM Las Vegas Field
Office for the Rough Hat Clark County
Solar Project requesting authorization to
construct, operate, maintain, and
eventually decommission a 400megawatt photovoltaic solar electric
generating facility, battery storage
facilities, associated generation tie-line,
and access road facilities. The BLM has
made substantial progress in the review
SUMMARY:
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
72103
of the Rough Hat Clark County Solar
Project right-of-way application;
however, the BLM needs additional
time to complete its review and make a
decision on the application.
The BLM completed the variance
process required by the solar
programmatic environmental impact
statement and determined it was
appropriate to continue processing the
application. On October 21, 2022, the
BLM published in the Federal Register
(87 FR 68187) a Notice of Intent to
amend the Las Vegas Resource
Management Plan (RMP) and prepare an
environmental impact statement (EIS)
for the proposed Rough Hat Clark
County Solar Project in Clark County,
Nevada. The BLM is currently preparing
the draft RMP amendment/EIS.
Authority: 43 CFR 2091.3–1(e) and 43
CFR 2804.25(f).
Jon K. Raby,
Nevada State Director.
[FR Doc. 2023–23057 Filed 10–18–23; 8:45 am]
BILLING CODE 4331–21–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[BLM_AZ_FRN_MO4500175809]
Notice of Filing of Plats of Survey;
Arizona
Bureau of Land Management,
Interior.
ACTION: Notice of official filing.
AGENCY:
The plats of survey of the
following described land were officially
filed in the Bureau of Land Management
(BLM), Arizona State Office, Phoenix,
Arizona on the dates indicated. The
surveys announced in this notice are
necessary for the management of lands
administered by the agency indicated.
ADDRESSES: These plats will be available
for inspection in the Arizona State
Office, Bureau of Land Management,
One North Central Avenue, Suite 800,
Phoenix, Arizona 85004–4427. Protests
of any of these surveys should be sent
to the Arizona State Director at the
above address.
FOR FURTHER INFORMATION CONTACT:
Geoffrey A. Graham, Chief Cadastral
Surveyor of Arizona; (602) 417–9558;
ggraham@blm.gov. Individuals in the
United States who are deaf, deafblind,
hard of hearing, or have a speech
disability may dial 711 (TTY, TDD, or
TeleBraille) to access
telecommunications relay services.
Individuals outside the United States
should use the relay services offered
within their country to make
SUMMARY:
E:\FR\FM\19OCN1.SGM
19OCN1
Agencies
[Federal Register Volume 88, Number 201 (Thursday, October 19, 2023)]
[Notices]
[Page 72103]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-23057]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[BLM_NV_FRN_MO4500175288]
Notice of Extension of Segregation of Public Lands for the Rough
Hat Clark County Solar Project, Clark County, NV
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of segregation extension.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) segregated public lands
included in the right-of-way application (N-099406) for the Rough Hat
Clark County Solar Project from appropriation under the public land
laws, including the Mining Law, but not the mineral leasing or material
sales acts, for a period of 2 years on October 20, 2021, subject to
valid existing rights. This 2-year extension of the segregation is
necessary to allow the BLM to complete review of the Rough Hat Clark
County Solar Project application and reach a decision on the
application.
DATES: This segregation extension for the lands identified in this
notice is effective on October 20, 2023.
FOR FURTHER INFORMATION CONTACT: For further information and/or to have
your name added to the project mailing list, send requests to: Whitney
Wirthlin, Southern Nevada District Energy and Infrastructure Team, at
telephone (702) 515-5084; address 4701 North Torrey Pines Drive, Las
Vegas, NV 89130-2301; or email [email protected].
Individuals in the United States who are deaf, deafblind, hard of
hearing, or have a speech disability may dial 711 (TTY, TDD, or
TeleBraille) to access telecommunications relay services for contacting
Whitney Wirthlin. Individuals outside the United States should use the
relay services offered within their country to make international calls
to the point-of contact in the United States.
SUPPLEMENTARY INFORMATION: This notice extends the segregation
published in the Federal Register on October 20, 2021 (86 FR 58301) for
an additional 2 years. Candela Renewables, LLC, submitted a right-of-
way application to the BLM Las Vegas Field Office for the Rough Hat
Clark County Solar Project requesting authorization to construct,
operate, maintain, and eventually decommission a 400-megawatt
photovoltaic solar electric generating facility, battery storage
facilities, associated generation tie-line, and access road facilities.
The BLM has made substantial progress in the review of the Rough Hat
Clark County Solar Project right-of-way application; however, the BLM
needs additional time to complete its review and make a decision on the
application.
The BLM completed the variance process required by the solar
programmatic environmental impact statement and determined it was
appropriate to continue processing the application. On October 21,
2022, the BLM published in the Federal Register (87 FR 68187) a Notice
of Intent to amend the Las Vegas Resource Management Plan (RMP) and
prepare an environmental impact statement (EIS) for the proposed Rough
Hat Clark County Solar Project in Clark County, Nevada. The BLM is
currently preparing the draft RMP amendment/EIS.
Authority: 43 CFR 2091.3-1(e) and 43 CFR 2804.25(f).
Jon K. Raby,
Nevada State Director.
[FR Doc. 2023-23057 Filed 10-18-23; 8:45 am]
BILLING CODE 4331-21-P