Briar Hydro Associates, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 71848-71849 [2023-22979]

Download as PDF ddrumheller on DSK120RN23PROD with NOTICES1 71848 Federal Register / Vol. 88, No. 200 / Wednesday, October 18, 2023 / Notices Description: § 205(d) Rate Filing: IROL–CIP Rate Schedule to be effective 12/11/2023. Filed Date: 10/12/23. Accession Number: 20231012–5085. Comment Date: 5 p.m. ET 11/2/23. Docket Numbers: ER24–81–000. Applicants: Shady Oaks Wind 2, LLC. Description: § 205(d) Rate Filing: Rate Schedule FERC No. 2—Reactive Supply Service—Expedited to be effective 10/ 13/2023. Filed Date: 10/12/23. Accession Number: 20231012–5102. Comment Date: 5 p.m. ET 11/2/23. Docket Numbers: ER24–82–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Tariff Clean-up of Tri-State—Effective 20210202, 20210601, 20210615 to be effective 2/2/2021. Filed Date: 10/12/23. Accession Number: 20231012–5109. Comment Date: 5 p.m. ET 11/2/23. Docket Numbers: ER24–83–000. Applicants: Robison Energy (Commercial) LLC. Description: Tariff Amendment: Notice of Cancellation of Market Based Rate Tariff to be effective 10/13/2023. Filed Date: 10/12/23. Accession Number: 20231012–5116. Comment Date: 5 p.m. ET 11/2/23. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES24–6–000; ES24– 7–000; ES24–8–000. Applicants: AEP Texas Inc., Southwestern Electric Power Company, Wheeling Power Company, AEP Texas Inc., Southwestern Electric Power Company, Wheeling Power Company, AEP Texas Inc., Southwestern Electric Power Company, Wheeling Power Company. Description: Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of AEP Texas Inc., et al. Filed Date: 10/10/23. Accession Number: 20231010–5400. Comment Date: 5 p.m. ET 10/31/23. Take notice that the Commission received the following foreign utility company status filings: Docket Numbers: FC24–1–000. Applicants: Windpark Duben Su¨d GmbH & Co. KG, Windpark Karche Zwei GmbH & Co. KG. Description: Windpark Duben Su¨d GmbH & Co. KG, et al. submits Notice of Self-Certification of Foreign Utility Company Status. Filed Date: 10/12/23. Accession Number: 20231012–5054. VerDate Sep<11>2014 18:01 Oct 17, 2023 Jkt 262001 Comment Date: 5 p.m. ET 11/2/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: October 12, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–22990 Filed 10–17–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3240–040] Briar Hydro Associates, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New License. b. Project No.: 3240–040. c. Date Filed: November 30, 2022. d. Applicant: Briar Hydro Associates, LLC. e. Name of Project: Rolfe Canal Hydroelectric Project. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 f. Location: On the Contoocook River, in the City of Concord, Merrimack County New Hampshire. No federal lands are located within the project boundary. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Andrew J. Locke, Essex Hydro Associates, LLC, 55 Union Street, Boston, MA 02108; (617) 357–0032; email: alocke@ essexhydro.com. i. FERC Contact: Jeanne Edwards at (202) 502–6181; or jeanne.edwards@ ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Rolfe Canal Hydroelectric Project (P– 3240–040). The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted but is not ready for environmental analysis. l. The Rolfe Canal Project diverts water from the York Dam into the Rolfe Canal and consists of the following existing facilities: (1) York impoundment with a surface area of 50acres, at elevation of 342.5 feet National Geodetic Vertical Datum 1929 (NGVD29); (2) a 300-foot-long, 10-foothigh diversion dam (York Dam); (3) a 50-foot-wide concrete gated intake structure; (4) a 7,000-foot-long, 75-foot- E:\FR\FM\18OCN1.SGM 18OCN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 88, No. 200 / Wednesday, October 18, 2023 / Notices wide, and 9-foot-deep power canal; (5) an additional impoundment (created by York Dam at the end of the power canal) with surface area of 3-acres, at elevation of 342.5 feet NGVD29, and a negligible storage capacity; (6) a 130-foot-long, 17foot-high granite block intake dam; (7) a 950-foot-long underground penstock; (8) a 32-foot-wide by 90-foot-long, concrete powerhouse containing one Kaplan turbine-generating unit with a capacity of 4.285 megawatts; (9) a 1,200-foot-long tailrace; (10) transmission facilities consisting of a three-phase 4.16/34.5kilovolt (kV) transformer, and a 34.5-kV, 650-foot-long transmission line; and (11) other appurtenances. The project has a 4,000-foot-long bypassed reach. The project operates in a run-of-river mode with a minimum flow of 338 cubic feet per second (cfs), or inflow, whichever is less, into the York impoundment, a minimum flow of 50 cfs into the York bypass, and a minimum flow of 5 cfs into a historic channel that bypasses the penstock. The project had an average annual generation of 19,585,884 kilowatt-hours between 2014 and 2018. Briar Hydro proposes to increase the minimum flow into the York bypass to 100 cfs. m. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact FERC at FERCOnlineSupport@ferc.gov, or call (886) 208–3676 (toll free) or (202) 502–8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members, and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to VerDate Sep<11>2014 18:01 Oct 17, 2023 Jkt 262001 contact OPP at (202) 502–6595, or OPP@ ferc.gov. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR. 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. o. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Issue Scoping Document 1 for comments. Request Additional Information (if necessary). Issue Scoping Document 2. Issue Notice of Ready for Environmental Analysis. November 2023. November 2023. December 2023. December 2023. Dated: October 12, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–22979 Filed 10–17–23; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 71849 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3342–025] Briar Hydro Associates, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New License. b. Project No.: 3342–025. c. Date Filed: November 30, 2022. d. Applicant: Briar Hydro Associates, LLC. e. Name of Project: Penacook Lower Falls Hydroelectric Project. f. Location: On the Contoocook River, in the City of Concord, and Town of Boscawen, Merrimack County, New Hampshire. No Federal lands are located within the project boundary. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Andrew J. Locke, Essex Hydro Associates, LLC, 55 Union Street, Boston, MA 02108; (617) 357–0032; email—alocke@ essexhydro.com. i. FERC Contact: Jeanne Edwards at (202) 502–6181; or jeanne.edwards@ ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Penacook Lower Falls Project (P–3342– 025). The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the E:\FR\FM\18OCN1.SGM 18OCN1

Agencies

[Federal Register Volume 88, Number 200 (Wednesday, October 18, 2023)]
[Notices]
[Pages 71848-71849]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-22979]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3240-040]


Briar Hydro Associates, LLC; Notice of Application Accepted for 
Filing and Soliciting Motions To Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New License.
    b. Project No.: 3240-040.
    c. Date Filed: November 30, 2022.
    d. Applicant: Briar Hydro Associates, LLC.
    e. Name of Project: Rolfe Canal Hydroelectric Project.
    f. Location: On the Contoocook River, in the City of Concord, 
Merrimack County New Hampshire. No federal lands are located within the 
project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Andrew J. Locke, Essex Hydro Associates, LLC, 
55 Union Street, Boston, MA 02108; (617) 357-0032; email: 
[email protected].
    i. FERC Contact: Jeanne Edwards at (202) 502-6181; or 
[email protected].
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests using the Commission's eFiling system 
at https://ferconline.ferc.gov/FERCOnline.aspx. For assistance, please 
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, you may submit a paper copy. Submissions sent via the U.S. 
Postal Service must be addressed to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426. Submissions sent via any other carrier must be 
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All 
filings must clearly identify the project name and docket number on the 
first page: Rolfe Canal Hydroelectric Project (P-3240-040).
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted but is not ready for 
environmental analysis.
    l. The Rolfe Canal Project diverts water from the York Dam into the 
Rolfe Canal and consists of the following existing facilities: (1) York 
impoundment with a surface area of 50-acres, at elevation of 342.5 feet 
National Geodetic Vertical Datum 1929 (NGVD29); (2) a 300-foot-long, 
10-foot-high diversion dam (York Dam); (3) a 50-foot-wide concrete 
gated intake structure; (4) a 7,000-foot-long, 75-foot-

[[Page 71849]]

wide, and 9-foot-deep power canal; (5) an additional impoundment 
(created by York Dam at the end of the power canal) with surface area 
of 3-acres, at elevation of 342.5 feet NGVD29, and a negligible storage 
capacity; (6) a 130-foot-long, 17-foot-high granite block intake dam; 
(7) a 950-foot-long underground penstock; (8) a 32-foot-wide by 90-
foot-long, concrete powerhouse containing one Kaplan turbine-generating 
unit with a capacity of 4.285 megawatts; (9) a 1,200-foot-long 
tailrace; (10) transmission facilities consisting of a three-phase 
4.16/34.5- kilovolt (kV) transformer, and a 34.5-kV, 650-foot-long 
transmission line; and (11) other appurtenances. The project has a 
4,000-foot-long bypassed reach.
    The project operates in a run-of-river mode with a minimum flow of 
338 cubic feet per second (cfs), or inflow, whichever is less, into the 
York impoundment, a minimum flow of 50 cfs into the York bypass, and a 
minimum flow of 5 cfs into a historic channel that bypasses the 
penstock. The project had an average annual generation of 19,585,884 
kilowatt-hours between 2014 and 2018. Briar Hydro proposes to increase 
the minimum flow into the York bypass to 100 cfs.
    m. In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number, excluding the last 
three digits in the docket number field to access the document. At this 
time, the Commission has suspended access to the Commission's Public 
Reference Room. For assistance, contact FERC at 
[email protected], or call (886) 208-3676 (toll free) or (202) 
502-8659 (TTY).
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members, and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595, or [email protected].
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR. 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application.
    o. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
 
------------------------------------------------------------------------
Issue Scoping Document 1 for comments.....  November 2023.
Request Additional Information (if          November 2023.
 necessary).
Issue Scoping Document 2..................  December 2023.
Issue Notice of Ready for Environmental     December 2023.
 Analysis.
------------------------------------------------------------------------


    Dated: October 12, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-22979 Filed 10-17-23; 8:45 am]
BILLING CODE 6717-01-P