Application for Renewal of Authorization To Export Electric Energy; Mercuria Energy America, LLC, 70656-70657 [2023-22594]
Download as PDF
70656
Federal Register / Vol. 88, No. 196 / Thursday, October 12, 2023 / Notices
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
Copies of this Application will be
made available, upon request, on the
program website at /www.energy.gov/
gdo/pending-applications-0 or by
emailing Electricity.Exports@
hq.doe.gov.
Signing Authority
This document of the Department of
Energy was signed on October 6, 2023,
by Maria Robinson, Director, Grid
Deployment Office, pursuant to
delegated authority from the Secretary
of Energy. That document with the
original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on October 6,
2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–22596 Filed 10–11–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[GDO Docket No. EA–459–A]
Application for Renewal of
Authorization To Export Electric
Energy; Mercuria Energy America, LLC
Grid Deployment Office,
Department of Energy.
ACTION: Notice of application.
ddrumheller on DSK120RN23PROD with NOTICES1
AGENCY:
Mercuria Energy America,
LLC (the Applicant or Mercuria) has
applied for renewed authorization to
transmit electric energy from the United
States to Mexico pursuant to the Federal
Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before November 13, 2023.
SUMMARY:
VerDate Sep<11>2014
17:34 Oct 11, 2023
Jkt 262001
Comments, protests,
motions to intervene, or requests for
more information should be addressed
by electronic mail to
Electricity.Exports@hq.doe.gov.
FOR FURTHER INFORMATION CONTACT:
Christina Gomer, (240) 474–2403,
electricity.exports@hq.doe.gov.
SUPPLEMENTARY INFORMATION: The
United States Department of Energy
(DOE) regulates electricity exports from
the United States to foreign countries in
accordance with section 202(e) of the
Federal Power Act (FPA) (16 U.S.C.
824a(e)) and regulations thereunder (10
CFR 205.300 et seq.). Sections 301(b)
and 402(f) of the DOE Organization Act
(42 U.S.C. 7151(b) and 7172(f))
transferred this regulatory authority,
previously exercised by the nowdefunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides
that an entity which seeks to export
electricity must obtain an order from
DOE authorizing that export. (16 U.S.C.
824a(e)). On April 10, 2023, the
authority to issue such orders was
delegated to the DOE’s Grid Deployment
Office (GDO) by Delegation Order No.
S1–DEL–S3–2023 and Redelegation
Order No. S3–DEL–GD1–2023.
On November 19, 2018, DOE issued
Order No. EA–459 authorizing Mercuria
to transmit electric energy from the
United States to Mexico as a power
marketer. On August 18, 2023, Mercuria
filed an application with DOE
(Application or App.) for renewal of
their export authority for an additional
five-year term. App. at 1.
In its Application, Mercuria states
that neither it ‘‘nor any of its affiliates
owns or controls any generation or
transmission facilities.’’ App. at 2.
Further, the Applicant notes ‘‘neither
Mercuria nor any of its affiliates is a
franchised utility or affiliated with any
franchised utilities in North America.’’
Id. Mercuria represents that it ‘‘will
acquire electricity on both a firm and
interruptible basis from a variety of
suppliers (i.e., generators, electric
utilities and other power marketers) that
would enter into such transactions
voluntarily, and therefore will be
surplus of the selling entities.’’ Id. at 4.
Mercuria therefore asserts that ‘‘as
required by FPA Section 202(e), the
proposed exports will not impair or
tend to impede the sufficiency of
electricity supplies in the United States
or the regional coordination of electric
utility planning or operations.’’ Id.
The existing international
transmission facilities to be utilized by
the Applicant have been previously
authorized by Presidential permits
ADDRESSES:
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
issued pursuant to Executive Order
10485, as amended, and are appropriate
for open access transmission by third
parties. See App. at Attachment 1.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at Electricity.Exports@
hq.doe.gov. Protests should be filed in
accordance with Rule 211 of FERC’s
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at
Electricity.Exports@hq.doe.gov in
accordance with FERC Rule 214 (18 CFR
385.214).
Comments and other filings
concerning Mercuria’s Application
should be clearly marked with GDO
Docket No. EA–459–A. Additional
copies are to be provided directly to
Steven Bunkin, Mercuria Energy
America, LLC, 33 Benedict Place,
Greenwich, CT 06830, sbunkin@
mercuria.com, and Jay Michals,
Mercuria Energy America, LLC, 20 E
Greenway Plaza, Ste. 650, Houston, TX
77046, jmichaels@mercuria.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the United States electric power supply
system.
Copies of this Application will be
made available, upon request, by
accessing the program website at
www.energy.gov/gdo/pendingapplications-0 or by emailing
Electricity.Exports@hq.doe.gov.
Signing Authority
This document of the Department of
Energy was signed on October 6, 2023,
by Maria Robinson, Director, Grid
Deployment Office, pursuant to
delegated authority from the Secretary
of Energy. That document with the
original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
E:\FR\FM\12OCN1.SGM
12OCN1
Federal Register / Vol. 88, No. 196 / Thursday, October 12, 2023 / Notices
Signed in Washington, DC, on October 6,
2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–22594 Filed 10–11–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–2943–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Talen Keystone LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Talen
Keystone LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 24,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
VerDate Sep<11>2014
17:34 Oct 11, 2023
Jkt 262001
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: October 4, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–22475 Filed 10–11–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER24–15–000]
Nova Power, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Nova
Power, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
70657
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 24,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
E:\FR\FM\12OCN1.SGM
12OCN1
Agencies
[Federal Register Volume 88, Number 196 (Thursday, October 12, 2023)]
[Notices]
[Pages 70656-70657]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-22594]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[GDO Docket No. EA-459-A]
Application for Renewal of Authorization To Export Electric
Energy; Mercuria Energy America, LLC
AGENCY: Grid Deployment Office, Department of Energy.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Mercuria Energy America, LLC (the Applicant or Mercuria) has
applied for renewed authorization to transmit electric energy from the
United States to Mexico pursuant to the Federal Power Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before November 13, 2023.
ADDRESSES: Comments, protests, motions to intervene, or requests for
more information should be addressed by electronic mail to
[email protected].
FOR FURTHER INFORMATION CONTACT: Christina Gomer, (240) 474-2403,
[email protected].
SUPPLEMENTARY INFORMATION: The United States Department of Energy (DOE)
regulates electricity exports from the United States to foreign
countries in accordance with section 202(e) of the Federal Power Act
(FPA) (16 U.S.C. 824a(e)) and regulations thereunder (10 CFR 205.300 et
seq.). Sections 301(b) and 402(f) of the DOE Organization Act (42
U.S.C. 7151(b) and 7172(f)) transferred this regulatory authority,
previously exercised by the now-defunct Federal Power Commission, to
DOE.
Section 202(e) of the FPA provides that an entity which seeks to
export electricity must obtain an order from DOE authorizing that
export. (16 U.S.C. 824a(e)). On April 10, 2023, the authority to issue
such orders was delegated to the DOE's Grid Deployment Office (GDO) by
Delegation Order No. S1-DEL-S3-2023 and Redelegation Order No. S3-DEL-
GD1-2023.
On November 19, 2018, DOE issued Order No. EA-459 authorizing
Mercuria to transmit electric energy from the United States to Mexico
as a power marketer. On August 18, 2023, Mercuria filed an application
with DOE (Application or App.) for renewal of their export authority
for an additional five-year term. App. at 1.
In its Application, Mercuria states that neither it ``nor any of
its affiliates owns or controls any generation or transmission
facilities.'' App. at 2. Further, the Applicant notes ``neither
Mercuria nor any of its affiliates is a franchised utility or
affiliated with any franchised utilities in North America.'' Id.
Mercuria represents that it ``will acquire electricity on both a firm
and interruptible basis from a variety of suppliers (i.e., generators,
electric utilities and other power marketers) that would enter into
such transactions voluntarily, and therefore will be surplus of the
selling entities.'' Id. at 4. Mercuria therefore asserts that ``as
required by FPA Section 202(e), the proposed exports will not impair or
tend to impede the sufficiency of electricity supplies in the United
States or the regional coordination of electric utility planning or
operations.'' Id.
The existing international transmission facilities to be utilized
by the Applicant have been previously authorized by Presidential
permits issued pursuant to Executive Order 10485, as amended, and are
appropriate for open access transmission by third parties. See App. at
Attachment 1.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the Application at
[email protected]. Protests should be filed in accordance
with Rule 211 of FERC's Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to become a party to this proceeding
should file a motion to intervene at [email protected] in
accordance with FERC Rule 214 (18 CFR 385.214).
Comments and other filings concerning Mercuria's Application should
be clearly marked with GDO Docket No. EA-459-A. Additional copies are
to be provided directly to Steven Bunkin, Mercuria Energy America, LLC,
33 Benedict Place, Greenwich, CT 06830, [email protected], and Jay
Michals, Mercuria Energy America, LLC, 20 E Greenway Plaza, Ste. 650,
Houston, TX 77046, [email protected].
A final decision will be made on the requested authorization after
the environmental impacts have been evaluated pursuant to DOE's
National Environmental Policy Act Implementing Procedures (10 CFR part
1021) and after DOE evaluates whether the proposed action will have an
adverse impact on the sufficiency of supply or reliability of the
United States electric power supply system.
Copies of this Application will be made available, upon request, by
accessing the program website at www.energy.gov/gdo/pending-applications-0 or by emailing [email protected].
Signing Authority
This document of the Department of Energy was signed on October 6,
2023, by Maria Robinson, Director, Grid Deployment Office, pursuant to
delegated authority from the Secretary of Energy. That document with
the original signature and date is maintained by DOE. For
administrative purposes only, and in compliance with requirements of
the Office of the Federal Register, the undersigned DOE Federal
Register Liaison Officer has been authorized to sign and submit the
document in electronic format for publication, as an official document
of the Department of Energy. This administrative process in no way
alters the legal effect of this document upon publication in the
Federal Register.
[[Page 70657]]
Signed in Washington, DC, on October 6, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-22594 Filed 10-11-23; 8:45 am]
BILLING CODE 6450-01-P