ANR Pipeline Company; Notice of Schedule for the Preparation of an Environmental Assessment for the Oak Grove Enhancement Project, 70659-70660 [2023-22481]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 196 / Thursday, October 12, 2023 / Notices
Comment Date: 5 p.m. ET 10/25/23.
Docket Numbers: ER24–20–000.
Applicants: Cottontail Solar 2, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Baseline
to be effective 12/4/2023.
Filed Date: 10/4/23.
Accession Number: 20231004–5069.
Comment Date: 5 p.m. ET 10/25/23.
Docket Numbers: ER24–21–000.
Applicants: Cottontail Solar 8, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Baseline
to be effective 12/15/2023.
Filed Date: 10/4/23.
Accession Number: 20231004–5078.
Comment Date: 5 p.m. ET 10/25/23.
Docket Numbers: ER24–22–000.
Applicants: Pennsylvania Electric
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Pennsylvania Electric Company submits
tariff filing per 35.13(a)(2)(iii: Penelec
Amends 10 ECSAs (6053 6137 6138
6141 6148 6287 6288 6289 6294 6295)
to be effective 12/31/9998.
Filed Date: 10/4/23.
Accession Number: 20231004–5091.
Comment Date: 5 p.m. ET 10/25/23.
Docket Numbers: ER24–23–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
OATT Attachment M (LGIP) Appendix
7 Standard (LGIA) Preamble and
Recitals to be effective 12/4/2023.
Filed Date: 10/4/23.
Accession Number: 20231004–5114.
Comment Date: 5 p.m. ET 10/25/23.
Docket Numbers: ER24–24–000.
Applicants: ISO New England Inc.,
Versant Power.
Description: § 205(d) Rate Filing: ISO
New England Inc. submits tariff filing
per 35.13(a)(2)(iii: ISO–NE/Versant
Power; Local Service Agreement LSA/
ISONE/VERSANT–23–01 to be effective
12/2/2022.
Filed Date: 10/4/23.
Accession Number: 20231004–5118.
Comment Date: 5 p.m. ET 10/25/23.
Docket Numbers: ER24–25–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: § 205(d) Rate Filing:
2023–10–5 GRE Century Sub-FSA 743–
NSP to be effective 10/5/2023.
Filed Date: 10/4/23.
Accession Number: 20231004–5126.
Comment Date: 5 p.m. ET 10/25/23.
Docket Numbers: ER24–26–000.
Applicants: East Point Energy Center,
LLC.
Description: Baseline eTariff Filing:
East Point Energy Center, LLC
Application for Market-Based Rate
Authorization to be effective 12/4/2023.
VerDate Sep<11>2014
17:34 Oct 11, 2023
Jkt 262001
Filed Date: 10/4/23.
Accession Number: 20231004–5131.
Comment Date: 5 p.m. ET 10/25/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: October 4, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–22471 Filed 10–11–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4334–017]
EONY Generation Limited; Notice of
Waiver Period for Water Quality
Certification Application
On September 29, 2023, EONY
Generation Limited submitted to the
Federal Energy Regulatory Commission
(Commission) a copy of its application
for a Clean Water Act section 401(a)(1)
water quality certification filed with
New York State Department of
Environmental Conservation (New York
DEC), in conjunction with the above
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
70659
captioned project. Pursuant to 40 CFR
121.6 and section 4.34(b)(5) of the
Commission’s regulations,1 we hereby
notify the New York DEC of the
following:
Date of Receipt of the Certification
Request: September 26, 2023.
Reasonable Period of Time to Act on
the Certification Request: One year
(September 26, 2024).
If New York DEC fails or refuses to act
on the water quality certification request
on or before the above date, then the
agency certifying authority is deemed
waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C.
1341(a)(1).
Dated: October 4, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–22478 Filed 10–11–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–523–000]
ANR Pipeline Company; Notice of
Schedule for the Preparation of an
Environmental Assessment for the Oak
Grove Enhancement Project
On August 1, 2023, ANR Pipeline
Company (ANR) filed an application in
Docket No. CP23–523–000 requesting a
Certificate of Public Convenience and
Necessity pursuant to section 7(c) and
Authorization pursuant to section 7(b)
of the Natural Gas Act to construct,
operate, and abandon certain natural gas
pipeline facilities. The proposed project
is known as the Oak Grove
Enhancement Project (Project). The
Project would include construction of
34.1 miles of new 30-inch-diameter
natural gas pipeline to replace 33.6
miles of existing 30-inch-diameter
natural gas pipeline in Richland and
West Carroll Parishes, Louisiana.
According to ANR, its project would
improve the integrity and reliability of
ANR’s system by replacing vintage
pipeline facilities installed in the 1950’s
with new pipeline facilities.
On August 11, 2023, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
1 18
E:\FR\FM\12OCN1.SGM
CFR 4.34(b)(5).
12OCN1
70660
Federal Register / Vol. 88, No. 196 / Thursday, October 12, 2023 / Notices
within 90 days of the date of issuance
of the Commission staff’s environmental
document for the Project.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for the
completion of the environmental
review.1
Schedule for Environmental Review
Issuance of EA—March 1, 2024
90-day Federal Authorization Decision
Deadline 2—May 30, 2024
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The Oak Grove Enhancement Project
would consist of the following facilities:
• Installation of 34.1 miles of new 30inch-diameter segment of natural gas
pipeline, which will begin at ANR’s
existing Delhi Compressor Station (CS)
in Richland Parish, Louisiana and
primarily parallel the existing Line 0–
501, 1–501, and 2–501 pipelines before
the new segment ties into the existing
route just south of State Route 586 in
West Carroll Parish, Louisiana at the
terminus of the existing Line 0–501
segment to be abandoned.
• Abandonment in place and by
removal of 33.6 miles of existing 30inch-diameter natural gas pipeline,
which begins at ANR’s existing Delhi CS
in Richland Parish and terminates just
south of State Route 586 in West Carroll
Parish. Approximately one percent (0.25
mile) of the existing Line 0–501 segment
would be abandoned by removal, while
the remaining existing pipeline
segments (totaling 33.35 miles) would
be abandoned in place.
The Oak Grove Enhancement Project
would not increase or reduce service to
any existing ANR customer and no
changes to system capacity are
proposed. ANR’s Project design would
allow the existing segment to remain in
operation until the replacement pipeline
is placed into service.
ddrumheller on DSK120RN23PROD with NOTICES1
Background
On August 23, 2023, the Commission
issued a Notice of Scoping Period
Requesting Comments on
1 40
CFR 1501.10 (2020).
Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
2 The
VerDate Sep<11>2014
17:34 Oct 11, 2023
Jkt 262001
Environmental Issues for the Proposed
Oak Grove Enhancement Project (Notice
of Scoping). The Notice of Scoping was
sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the Notice of Scoping, the Commission
received one comment from the
Louisiana Department of Wildlife and
Fisheries regarding impacts on wildlife
habitats. All substantive comments will
be addressed in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP23–523), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: October 4, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–22481 Filed 10–11–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
FEDERAL ELECTION COMMISSION
Sunshine Act Meetings
Tuesday, October 17,
2023 at 10:30 a.m. and its continuation
at the conclusion of the open meeting
on October 19, 2023.
PLACE: 1050 First Street NE,
Washington, DC and virtual (this
meeting will be a hybrid meeting).
STATUS: This meeting will be closed to
the public.
MATTERS TO BE CONSIDERED: Compliance
matters pursuant to 52 U.S.C. 30109.
Investigatory records compiled for
law enforcement purposes and
production would disclose investigative
techniques.
Information the premature disclosure
of which would be likely to have a
considerable adverse effect on the
implementation of a proposed
Commission action.
Matters concerning participation in
civil actions or proceedings or
arbitration.
CONTACT PERSON FOR MORE INFORMATION:
Judith Ingram, Press Officer, Telephone:
(202) 694–1220.
TIME AND DATE:
(Authority: Government in the Sunshine Act,
5 U.S.C. 552b)
Vicktoria J. Allen,
Deputy Secretary of the Commission.
[FR Doc. 2023–22685 Filed 10–10–23; 4:15 pm]
BILLING CODE 6715–01–P
FEDERAL RESERVE SYSTEM
Change in Bank Control Notices;
Acquisitions of Shares of a Bank or
Bank Holding Company
The notificants listed below have
applied under the Change in Bank
Control Act (Act) (12 U.S.C. 1817(j)) and
§ 225.41 of the Board’s Regulation Y (12
CFR 225.41) to acquire shares of a bank
or bank holding company. The factors
that are considered in acting on the
applications are set forth in paragraph 7
of the Act (12 U.S.C. 1817(j)(7)).
The public portions of the
applications listed below, as well as
other related filings required by the
Board, if any, are available for
immediate inspection at the Federal
Reserve Bank(s) indicated below and at
the offices of the Board of Governors.
This information may also be obtained
on an expedited basis, upon request, by
contacting the appropriate Federal
Reserve Bank and from the Board’s
Freedom of Information Office at
https://www.federalreserve.gov/foia/
request.htm. Interested persons may
express their views in writing on the
E:\FR\FM\12OCN1.SGM
12OCN1
Agencies
[Federal Register Volume 88, Number 196 (Thursday, October 12, 2023)]
[Notices]
[Pages 70659-70660]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-22481]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-523-000]
ANR Pipeline Company; Notice of Schedule for the Preparation of
an Environmental Assessment for the Oak Grove Enhancement Project
On August 1, 2023, ANR Pipeline Company (ANR) filed an application
in Docket No. CP23-523-000 requesting a Certificate of Public
Convenience and Necessity pursuant to section 7(c) and Authorization
pursuant to section 7(b) of the Natural Gas Act to construct, operate,
and abandon certain natural gas pipeline facilities. The proposed
project is known as the Oak Grove Enhancement Project (Project). The
Project would include construction of 34.1 miles of new 30-inch-
diameter natural gas pipeline to replace 33.6 miles of existing 30-
inch-diameter natural gas pipeline in Richland and West Carroll
Parishes, Louisiana. According to ANR, its project would improve the
integrity and reliability of ANR's system by replacing vintage pipeline
facilities installed in the 1950's with new pipeline facilities.
On August 11, 2023, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
[[Page 70660]]
within 90 days of the date of issuance of the Commission staff's
environmental document for the Project.
This notice identifies Commission staff's intention to prepare an
environmental assessment (EA) for the Project and the planned schedule
for the completion of the environmental review.\1\
---------------------------------------------------------------------------
\1\ 40 CFR 1501.10 (2020).
---------------------------------------------------------------------------
Schedule for Environmental Review
Issuance of EA--March 1, 2024
90-day Federal Authorization Decision Deadline \2\--May 30, 2024
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
---------------------------------------------------------------------------
\2\ The Commission's deadline applies to the decisions of other
federal agencies, and state agencies acting under federally
delegated authority, that are responsible for federal
authorizations, permits, and other approvals necessary for proposed
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the
Commission's deadline for other agency's decisions applies unless a
schedule is otherwise established by federal law.
---------------------------------------------------------------------------
Project Description
The Oak Grove Enhancement Project would consist of the following
facilities:
Installation of 34.1 miles of new 30-inch-diameter segment
of natural gas pipeline, which will begin at ANR's existing Delhi
Compressor Station (CS) in Richland Parish, Louisiana and primarily
parallel the existing Line 0-501, 1-501, and 2-501 pipelines before the
new segment ties into the existing route just south of State Route 586
in West Carroll Parish, Louisiana at the terminus of the existing Line
0-501 segment to be abandoned.
Abandonment in place and by removal of 33.6 miles of
existing 30-inch-diameter natural gas pipeline, which begins at ANR's
existing Delhi CS in Richland Parish and terminates just south of State
Route 586 in West Carroll Parish. Approximately one percent (0.25 mile)
of the existing Line 0-501 segment would be abandoned by removal, while
the remaining existing pipeline segments (totaling 33.35 miles) would
be abandoned in place.
The Oak Grove Enhancement Project would not increase or reduce
service to any existing ANR customer and no changes to system capacity
are proposed. ANR's Project design would allow the existing segment to
remain in operation until the replacement pipeline is placed into
service.
Background
On August 23, 2023, the Commission issued a Notice of Scoping
Period Requesting Comments on Environmental Issues for the Proposed Oak
Grove Enhancement Project (Notice of Scoping). The Notice of Scoping
was sent to affected landowners; federal, state, and local government
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries
and newspapers. In response to the Notice of Scoping, the Commission
received one comment from the Louisiana Department of Wildlife and
Fisheries regarding impacts on wildlife habitats. All substantive
comments will be addressed in the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of formal issuances and submittals in specific dockets, the
Commission offers a free service called eSubscription. This service
provides automatic notification of filings made to subscribed dockets,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP23-523), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: October 4, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-22481 Filed 10-11-23; 8:45 am]
BILLING CODE 6717-01-P