Order; (Providing Notice of Hearing), 67828 [2023-21577]
Download as PDF
67828
Federal Register / Vol. 88, No. 189 / Monday, October 2, 2023 / Notices
licensees may submit amendments or
revisions to the plans as necessary.
Reports are submitted as events occur.
6. Who will be required or asked to
respond: Persons licensed under part 74
of title 10 of the Code of Federal
Regulations (10 CFR), who possess and
use certain forms and quantities of
special nuclear material (SNM).
7. The estimated number of annual
responses: 183.
8. The estimated number of annual
respondents: 163.
9. The estimated number of hours
needed annually to comply with the
information collection requirement or
request: 9,439 hours (939 reporting +
8,500 recordkeeping).
10. Abstract: 10 CFR part 74
establishes requirements for material
control and accounting of SNM, and
specific performance-based regulations
for licensees authorized to possess, use,
or produce strategic SNM, SNM of
moderate strategic significance, or SNM
of low strategic significance. The
information is used by the NRC to make
licensing and regulatory determinations
concerning material control of SNM and
to satisfy obligations of the United
States to the International Atomic
Energy Agency. Submission or retention
of the information is mandatory for
persons subject to the requirements.
III. Specific Requests for Comments
lotter on DSK11XQN23PROD with NOTICES1
The NRC is seeking comments that
address the following questions:
1. Is the proposed collection of
information necessary for the NRC to
properly perform its functions? Does the
information have practical utility?
Please explain your answer.
2. Is the estimate of the burden of the
information collection accurate? Please
explain your answer.
3. Is there a way to enhance the
quality, utility, and clarity of the
information to be collected?
4. How can the burden of the
information collection on respondents
be minimized, including the use of
automated collection techniques or
other forms of information technology?
Dated: September 26, 2023.
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief
Information Officer.
[FR Doc. 2023–21613 Filed 9–29–23; 8:45 am]
BILLING CODE 7590–01–P
VerDate Sep<11>2014
18:41 Sep 29, 2023
Jkt 262001
NUCLEAR REGULATORY
COMMISSION
POSTAL REGULATORY COMMISSION
[Docket No. 40–8903–LA; ASLBP No. 23–
980–03–LA–BD01]
New Postal Products
Order; (Providing Notice of Hearing)
ACTION:
Atomic Safety and Licensing
Board, Nuclear Regulatory Commission.
SUMMARY:
[Docket Nos. MC2023–284 and CP2023–287]
AGENCY:
This proceeding concerns the Nuclear
Regulatory Commission (NRC) Staff’s
August 15, 2023 denial of Homestake
Mining Company of California’s (HMC)
December 10, 2020, license amendment
application to make changes to the
monitoring station configuration at
HMC’s Grants, New Mexico reclamation
project site.1 On September 5, 2023,
HMC filed a hearing demand
challenging the denial of its license
amendment application.2 On September
20, 2023, the Board held a status
conference with the parties to discuss
matters relating to this 10 CFR part 2,
subpart L proceeding.3 At this status
conference, the NRC Staff indicated that
it did not oppose HMC’s hearing
demand.4 Thus, on September 25, 2023,
the Board granted HMC’s hearing
demand.5
In light of the foregoing, a hearing will
be conducted in this proceeding at a
date to be determined. The hearing will
be governed by the informal hearing
procedures set forth in 10 CFR part 2,
subparts C and L, 10 CFR 2.300–2.390,
2.1200–2.1213.
It is so ordered.
For the Atomic Safety and Licensing
Board.
Dated: September 26, 2023.
Rockville, Maryland.
Michael M. Gibson,
Chair, Administrative Judge.
[FR Doc. 2023–21577 Filed 9–29–23; 8:45 am]
BILLING CODE 7590–01–P
1 See Letter from Jane Marshall, Division Director,
Office of Nuclear Material Safety and Safeguards,
NRC, to Brad R. Bingham, Closure Manager, HMC
(Aug. 15, 2023) (ADAMS Accession No.
ML23186A150); Letter from Brad. R. Bingham,
Closure Manager, HMC, to NRC Document Control
Desk (Dec. 18, 2020) (ADAMS Accession No.
ML20356A288).
2 See [HMC]’s Demand for Hearing on the NRC
Staff’s Denial of the License Amendment Request to
Change the Background Monitoring Location for
Radon and Ambient Gamma Radiation for Source
Materials License No. SUA–1471 (Sept. 5, 2023).
3 See Tr. at 3.
4 See id. at 4–5.
5 See Licensing Board Order (Granting Hearing
Demand; Deferring Scheduling Conference) (Sept.
25, 2023) (unpublished).
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
Postal Regulatory Commission.
Notice.
AGENCY:
The Commission is noticing a
recent Postal Service filing for the
Commission’s consideration concerning
a negotiated service agreement. This
notice informs the public of the filing,
invites public comment, and takes other
administrative steps.
DATES: Comments are due: October 4,
2023.
Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Those who cannot submit
comments electronically should contact
the person identified in the FOR FURTHER
INFORMATION CONTACT section by
telephone for advice on filing
alternatives.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
David A. Trissell, General Counsel, at
202–789–6820.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Introduction
II. Docketed Proceeding(s)
I. Introduction
The Commission gives notice that the
Postal Service filed request(s) for the
Commission to consider matters related
to negotiated service agreement(s). The
request(s) may propose the addition or
removal of a negotiated service
agreement from the Market Dominant or
the Competitive product list, or the
modification of an existing product
currently appearing on the Market
Dominant or the Competitive product
list.
Section II identifies the docket
number(s) associated with each Postal
Service request, the title of each Postal
Service request, the request’s acceptance
date, and the authority cited by the
Postal Service for each request. For each
request, the Commission appoints an
officer of the Commission to represent
the interests of the general public in the
proceeding, pursuant to 39 U.S.C. 505
(Public Representative). Section II also
establishes comment deadline(s)
pertaining to each request.
The public portions of the Postal
Service’s request(s) can be accessed via
the Commission’s website (https://
www.prc.gov). Non-public portions of
the Postal Service’s request(s), if any,
can be accessed through compliance
E:\FR\FM\02OCN1.SGM
02OCN1
Agencies
[Federal Register Volume 88, Number 189 (Monday, October 2, 2023)]
[Notices]
[Page 67828]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-21577]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 40-8903-LA; ASLBP No. 23-980-03-LA-BD01]
Order; (Providing Notice of Hearing)
AGENCY: Atomic Safety and Licensing Board, Nuclear Regulatory
Commission.
This proceeding concerns the Nuclear Regulatory Commission (NRC)
Staff's August 15, 2023 denial of Homestake Mining Company of
California's (HMC) December 10, 2020, license amendment application to
make changes to the monitoring station configuration at HMC's Grants,
New Mexico reclamation project site.\1\ On September 5, 2023, HMC filed
a hearing demand challenging the denial of its license amendment
application.\2\ On September 20, 2023, the Board held a status
conference with the parties to discuss matters relating to this 10 CFR
part 2, subpart L proceeding.\3\ At this status conference, the NRC
Staff indicated that it did not oppose HMC's hearing demand.\4\ Thus,
on September 25, 2023, the Board granted HMC's hearing demand.\5\
---------------------------------------------------------------------------
\1\ See Letter from Jane Marshall, Division Director, Office of
Nuclear Material Safety and Safeguards, NRC, to Brad R. Bingham,
Closure Manager, HMC (Aug. 15, 2023) (ADAMS Accession No.
ML23186A150); Letter from Brad. R. Bingham, Closure Manager, HMC, to
NRC Document Control Desk (Dec. 18, 2020) (ADAMS Accession No.
ML20356A288).
\2\ See [HMC]'s Demand for Hearing on the NRC Staff's Denial of
the License Amendment Request to Change the Background Monitoring
Location for Radon and Ambient Gamma Radiation for Source Materials
License No. SUA-1471 (Sept. 5, 2023).
\3\ See Tr. at 3.
\4\ See id. at 4-5.
\5\ See Licensing Board Order (Granting Hearing Demand;
Deferring Scheduling Conference) (Sept. 25, 2023) (unpublished).
---------------------------------------------------------------------------
In light of the foregoing, a hearing will be conducted in this
proceeding at a date to be determined. The hearing will be governed by
the informal hearing procedures set forth in 10 CFR part 2, subparts C
and L, 10 CFR 2.300-2.390, 2.1200-2.1213.
It is so ordered.
For the Atomic Safety and Licensing Board.
Dated: September 26, 2023.
Rockville, Maryland.
Michael M. Gibson,
Chair, Administrative Judge.
[FR Doc. 2023-21577 Filed 9-29-23; 8:45 am]
BILLING CODE 7590-01-P