Order; (Providing Notice of Hearing), 67828 [2023-21577]

Download as PDF 67828 Federal Register / Vol. 88, No. 189 / Monday, October 2, 2023 / Notices licensees may submit amendments or revisions to the plans as necessary. Reports are submitted as events occur. 6. Who will be required or asked to respond: Persons licensed under part 74 of title 10 of the Code of Federal Regulations (10 CFR), who possess and use certain forms and quantities of special nuclear material (SNM). 7. The estimated number of annual responses: 183. 8. The estimated number of annual respondents: 163. 9. The estimated number of hours needed annually to comply with the information collection requirement or request: 9,439 hours (939 reporting + 8,500 recordkeeping). 10. Abstract: 10 CFR part 74 establishes requirements for material control and accounting of SNM, and specific performance-based regulations for licensees authorized to possess, use, or produce strategic SNM, SNM of moderate strategic significance, or SNM of low strategic significance. The information is used by the NRC to make licensing and regulatory determinations concerning material control of SNM and to satisfy obligations of the United States to the International Atomic Energy Agency. Submission or retention of the information is mandatory for persons subject to the requirements. III. Specific Requests for Comments lotter on DSK11XQN23PROD with NOTICES1 The NRC is seeking comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? Please explain your answer. 2. Is the estimate of the burden of the information collection accurate? Please explain your answer. 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology? Dated: September 26, 2023. For the Nuclear Regulatory Commission. David C. Cullison, NRC Clearance Officer, Office of the Chief Information Officer. [FR Doc. 2023–21613 Filed 9–29–23; 8:45 am] BILLING CODE 7590–01–P VerDate Sep<11>2014 18:41 Sep 29, 2023 Jkt 262001 NUCLEAR REGULATORY COMMISSION POSTAL REGULATORY COMMISSION [Docket No. 40–8903–LA; ASLBP No. 23– 980–03–LA–BD01] New Postal Products Order; (Providing Notice of Hearing) ACTION: Atomic Safety and Licensing Board, Nuclear Regulatory Commission. SUMMARY: [Docket Nos. MC2023–284 and CP2023–287] AGENCY: This proceeding concerns the Nuclear Regulatory Commission (NRC) Staff’s August 15, 2023 denial of Homestake Mining Company of California’s (HMC) December 10, 2020, license amendment application to make changes to the monitoring station configuration at HMC’s Grants, New Mexico reclamation project site.1 On September 5, 2023, HMC filed a hearing demand challenging the denial of its license amendment application.2 On September 20, 2023, the Board held a status conference with the parties to discuss matters relating to this 10 CFR part 2, subpart L proceeding.3 At this status conference, the NRC Staff indicated that it did not oppose HMC’s hearing demand.4 Thus, on September 25, 2023, the Board granted HMC’s hearing demand.5 In light of the foregoing, a hearing will be conducted in this proceeding at a date to be determined. The hearing will be governed by the informal hearing procedures set forth in 10 CFR part 2, subparts C and L, 10 CFR 2.300–2.390, 2.1200–2.1213. It is so ordered. For the Atomic Safety and Licensing Board. Dated: September 26, 2023. Rockville, Maryland. Michael M. Gibson, Chair, Administrative Judge. [FR Doc. 2023–21577 Filed 9–29–23; 8:45 am] BILLING CODE 7590–01–P 1 See Letter from Jane Marshall, Division Director, Office of Nuclear Material Safety and Safeguards, NRC, to Brad R. Bingham, Closure Manager, HMC (Aug. 15, 2023) (ADAMS Accession No. ML23186A150); Letter from Brad. R. Bingham, Closure Manager, HMC, to NRC Document Control Desk (Dec. 18, 2020) (ADAMS Accession No. ML20356A288). 2 See [HMC]’s Demand for Hearing on the NRC Staff’s Denial of the License Amendment Request to Change the Background Monitoring Location for Radon and Ambient Gamma Radiation for Source Materials License No. SUA–1471 (Sept. 5, 2023). 3 See Tr. at 3. 4 See id. at 4–5. 5 See Licensing Board Order (Granting Hearing Demand; Deferring Scheduling Conference) (Sept. 25, 2023) (unpublished). PO 00000 Frm 00102 Fmt 4703 Sfmt 4703 Postal Regulatory Commission. Notice. AGENCY: The Commission is noticing a recent Postal Service filing for the Commission’s consideration concerning a negotiated service agreement. This notice informs the public of the filing, invites public comment, and takes other administrative steps. DATES: Comments are due: October 4, 2023. Submit comments electronically via the Commission’s Filing Online system at https:// www.prc.gov. Those who cannot submit comments electronically should contact the person identified in the FOR FURTHER INFORMATION CONTACT section by telephone for advice on filing alternatives. ADDRESSES: FOR FURTHER INFORMATION CONTACT: David A. Trissell, General Counsel, at 202–789–6820. SUPPLEMENTARY INFORMATION: Table of Contents I. Introduction II. Docketed Proceeding(s) I. Introduction The Commission gives notice that the Postal Service filed request(s) for the Commission to consider matters related to negotiated service agreement(s). The request(s) may propose the addition or removal of a negotiated service agreement from the Market Dominant or the Competitive product list, or the modification of an existing product currently appearing on the Market Dominant or the Competitive product list. Section II identifies the docket number(s) associated with each Postal Service request, the title of each Postal Service request, the request’s acceptance date, and the authority cited by the Postal Service for each request. For each request, the Commission appoints an officer of the Commission to represent the interests of the general public in the proceeding, pursuant to 39 U.S.C. 505 (Public Representative). Section II also establishes comment deadline(s) pertaining to each request. The public portions of the Postal Service’s request(s) can be accessed via the Commission’s website (https:// www.prc.gov). Non-public portions of the Postal Service’s request(s), if any, can be accessed through compliance E:\FR\FM\02OCN1.SGM 02OCN1

Agencies

[Federal Register Volume 88, Number 189 (Monday, October 2, 2023)]
[Notices]
[Page 67828]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-21577]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 40-8903-LA; ASLBP No. 23-980-03-LA-BD01]


Order; (Providing Notice of Hearing)

AGENCY: Atomic Safety and Licensing Board, Nuclear Regulatory 
Commission.

    This proceeding concerns the Nuclear Regulatory Commission (NRC) 
Staff's August 15, 2023 denial of Homestake Mining Company of 
California's (HMC) December 10, 2020, license amendment application to 
make changes to the monitoring station configuration at HMC's Grants, 
New Mexico reclamation project site.\1\ On September 5, 2023, HMC filed 
a hearing demand challenging the denial of its license amendment 
application.\2\ On September 20, 2023, the Board held a status 
conference with the parties to discuss matters relating to this 10 CFR 
part 2, subpart L proceeding.\3\ At this status conference, the NRC 
Staff indicated that it did not oppose HMC's hearing demand.\4\ Thus, 
on September 25, 2023, the Board granted HMC's hearing demand.\5\
---------------------------------------------------------------------------

    \1\ See Letter from Jane Marshall, Division Director, Office of 
Nuclear Material Safety and Safeguards, NRC, to Brad R. Bingham, 
Closure Manager, HMC (Aug. 15, 2023) (ADAMS Accession No. 
ML23186A150); Letter from Brad. R. Bingham, Closure Manager, HMC, to 
NRC Document Control Desk (Dec. 18, 2020) (ADAMS Accession No. 
ML20356A288).
    \2\ See [HMC]'s Demand for Hearing on the NRC Staff's Denial of 
the License Amendment Request to Change the Background Monitoring 
Location for Radon and Ambient Gamma Radiation for Source Materials 
License No. SUA-1471 (Sept. 5, 2023).
    \3\ See Tr. at 3.
    \4\ See id. at 4-5.
    \5\ See Licensing Board Order (Granting Hearing Demand; 
Deferring Scheduling Conference) (Sept. 25, 2023) (unpublished).
---------------------------------------------------------------------------

    In light of the foregoing, a hearing will be conducted in this 
proceeding at a date to be determined. The hearing will be governed by 
the informal hearing procedures set forth in 10 CFR part 2, subparts C 
and L, 10 CFR 2.300-2.390, 2.1200-2.1213.
    It is so ordered.

    For the Atomic Safety and Licensing Board.
    Dated: September 26, 2023.

    Rockville, Maryland.
Michael M. Gibson,
Chair, Administrative Judge.
[FR Doc. 2023-21577 Filed 9-29-23; 8:45 am]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.