Watershed Ranch, LLC; Notice of Authorization for Continued Project Operation, 67273-67274 [2023-21505]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 88, No. 188 / Friday, September 29, 2023 / Notices
Filed Date: 9/22/23.
Accession Number: 20230922–5157.
Comment Date: 5 p.m. ET 10/13/23.
Docket Numbers: ER23–2922–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
7079; Queue No. AE1–106 to be
effective 8/24/2023.
Filed Date: 9/25/23.
Accession Number: 20230925–5063.
Comment Date: 5 p.m. ET 10/16/23.
Docket Numbers: ER23–2923–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: ESM
Const Agmt Klamath Decommissioning
Rev 1 to be effective 11/25/2023.
Filed Date: 9/25/23.
Accession Number: 20230925–5064.
Comment Date: 5 p.m. ET 10/16/23.
Docket Numbers: ER23–2924–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, SA No. 1373;
Queue No. H23/W70/K28 (amend) to be
effective 11/25/2023.
Filed Date: 9/25/23.
Accession Number: 20230925–5107.
Comment Date: 5 p.m. ET 10/16/23.
Docket Numbers: ER23–2925–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, Service Agreement No.
7106; Queue No. AE2–309 to be
effective 11/25/2023.
Filed Date: 9/25/23.
Accession Number: 20230925–5079.
Comment Date: 5 p.m. ET 10/16/23.
Docket Numbers: ER23–2926–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Michigan Electric Transmission
Company, LLC.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2023–09–25_SA 4164
METC–DTE Electric E&P (J1914) to be
effective 11/25/2023.
Filed Date: 9/25/23.
Accession Number: 20230925–5090.
Comment Date: 5 p.m. ET 10/16/23.
Docket Numbers: ER23–2927–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Attachment AE Concerning
Multi-Day Reliability Assessment
Design to be effective 12/31/9998.
Filed Date: 9/25/23.
Accession Number: 20230925–5117.
Comment Date: 5 p.m. ET 10/16/23.
Docket Numbers: ER23–2928–000.
Applicants: Pennsylvania Electric
Company, PJM Interconnection, L.L.C.
VerDate Sep<11>2014
21:46 Sep 28, 2023
Jkt 259001
Description: § 205(d) Rate Filing:
Pennsylvania Electric Company submits
tariff filing per 35.13(a)(2)(iii: Penelec
Amends 10 ECSAs (5573 5574 5577
5641 5647 5649 5651 5652 5653 5655)
to be effective 12/31/9998.
Filed Date: 9/25/23.
Accession Number: 20230925–5122.
Comment Date: 5 p.m. ET 10/16/23.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES23–71–000.
Applicants: ALLETE, Inc.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
ALLETE, Inc.
Filed Date: 9/25/23.
Accession Number: 20230925–5084.
Comment Date: 5 p.m. ET 10/16/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Dated: September 25, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–21503 Filed 9–28–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
67273
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10102–000]
Watershed Ranch, LLC; Notice of
Authorization for Continued Project
Operation
The license for the Springer Hydro
No. 1 Project No. 10102 was issued for
a period ending August 31, 2023.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 10102
is issued to Watershed Ranch, LLC for
a period effective September 1, 2023,
through August 31, 2024, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before August 31,
2024, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Watershed Ranch, LLC is
authorized to continue operation of the
Springer Hydro No. 1 Project under the
terms and conditions of the prior license
until the issuance of a subsequent
license for the project or other
E:\FR\FM\29SEN1.SGM
29SEN1
67274
Federal Register / Vol. 88, No. 188 / Friday, September 29, 2023 / Notices
disposition under the FPA, whichever
comes first.
Dated: September 25, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–21505 Filed 9–28–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Southwestern Power Administration
Robert D. Willis Hydropower Project
Rate Schedule
Southwestern Power
Administration, DOE.
ACTION: Notice of rate order.
AGENCY:
The Administrator,
Southwestern Power Administration
(Southwestern), has approved and
placed into effect Rate Order No.
SWPA–83, which provides a temporary
extension of Southwestern’s current
Robert D. Willis Hydropower Project
rate schedule (RDW–15) through
September 30, 2024, unless superseded.
DATES: Extension of the rate schedule is
effective October 1, 2023.
FOR FURTHER INFORMATION CONTACT: Ms.
Fritha Ohlson, Senior Vice President,
Chief Operating Officer, Office of
Corporate Operations, (918) 595–6684,
fritha.ohlson@swpa.gov.
SUPPLEMENTARY INFORMATION: Rate Order
No. SWPA–83, as contained herein, has
been approved and placed into effect by
the Administrator, Southwestern, and
provides for the temporary extension,
through September 30, 2024, unless
superseded, of the Robert D. Willis
Hydropower Project Rate Schedule
RDW–15, Wholesale Rates for Hydro
Power and Energy.
SUMMARY:
United States of America
Department of Energy
lotter on DSK11XQN23PROD with NOTICES1
Administrator, Southwestern Power
Administration
In the matter of: Southwestern Power
Administration, Robert D. Willis
Hydropower Project Rate Schedule,
Rate Order No. SWPA–83
Order Approving Extension of Rate
Schedule on a Temporary Basis ( 9/25/
2023 )
Pursuant to Sections 301(b) and
302(a) of the Department of Energy
Organization Act, 42 U.S.C. 7151(b) and
7152(a), the functions of the Secretary of
the Interior and the Federal Power
Commission under Section 5 of the
Flood Control Act of 1944, 16 U.S.C.
825s, relating to the Southwestern
Power Administration (Southwestern),
VerDate Sep<11>2014
21:46 Sep 28, 2023
Jkt 259001
were transferred to and vested in the
Secretary of Energy. By Delegation
Order No. S1–DEL–RATES–2016,
effective November 19, 2016, the
Secretary of Energy delegated: (1) the
authority to develop power and
transmission rates to Southwestern’s
Administrator; (2) the authority to
confirm, approve, and place such rates
into effect on an interim basis to the
Deputy Secretary of Energy; and (3) the
authority to confirm, approve, and place
into effect on a final basis, or to remand
or disapprove such rates, to the Federal
Energy Regulatory Commission (FERC).
By Delegation Order No. S1–DEL–S3–
2023, effective April 10, 2023, the
Secretary of Energy also delegated the
authority to confirm, approve, and place
such rates into effect on an interim basis
to the Under Secretary for
Infrastructure. By Redelegation Order
No. S3–DEL–SWPA1–2023, effective
April 10, 2023, the Under Secretary for
Infrastructure redelegated the authority
to confirm, approve, and place such
rates into effect on an interim basis to
the Southwestern Administrator.
Background
On December 17, 2015, in Rate Order
No. SWPA–70, the Deputy Secretary of
Energy placed into effect the current
Robert D. Willis Hydropower Project
(Robert D. Willis) rate schedule (RDW–
15) on an interim basis for the period
January 1, 2016 to September 30, 2019.
FERC confirmed and approved RDW–15
on a final basis on June 15, 2016 for a
period ending September 30, 2019. On
September 22, 2019, in Rate Order No.
SWPA–76, the Assistant Secretary for
Electricity extended RDW–15 for two
years, for the period of October 1, 2019
through September 30, 2021. On August
30, 2021, in Rate Order No. SWPA–79,
the Administrator, Southwestern,
extended RDW–15 for two years, for the
period of October 1, 2021 through
September 30, 2023.
Discussion
Southwestern’s current rate schedule
for the Robert D. Willis isolated rate
system, RDW–15, is based on the 2015
Power Repayment Study (PRS). Each
subsequent annual PRS through 2022
indicated the need for a revenue
adjustment within a plus or minus five
percent range of the current revenue
estimate. It is Southwestern’s practice
for the Administrator to defer, on a caseby-case basis, revenue adjustments for
isolated rate systems that are within
plus or minus five percent of the
revenue estimated from the current rate
schedule. Therefore, the Administrator
deferred revenue adjustments annually
for Robert D. Willis through 2022. The
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
2023 PRS indicated a need for a revenue
adjustment above five percent and
therefore a new rate is needed.
However, finalization of the 2023 PRS,
development of a rate adjustment plan
including a new rate schedule (RDW–
23), and the associated procedures for
public participation in accordance with
10 CFR part 903 will not be completed
in time for the new rate schedule to be
placed into effect prior to the September
30, 2023, expiration of the current rate
schedule and thus temporary extension
of the current rate schedule is necessary.
Pursuant to 10 CFR 903.23(b) and
Redelegation Order No. S3–DEL–
SWPA1–2023, Southwestern’s
Administrator may extend existing rates
on a temporary basis without advance
notice or comment pending further
action. In such a circumstance, the
Administrator shall publish notice of
said extension in the Federal Register
and promptly advise FERC of the
extension. The revenue collection
associated with the extension of the
current rate will be considered in the
development of the new rate based on
the 2023 PRS such that repayment
obligations are met consistent with the
provisions of U.S. Department of Energy
(DOE) Order No. RA 6120.2.
Availability of Information
Information regarding the extension of
the rate schedule is available for public
review in the offices of Southwestern
Power Administration, Williams Tower
I, One West Third Street Suite 1500,
Tulsa, Oklahoma 74103. The rate
schedule is available on the
Southwestern website at
www.energy.gov/swpa/rates-andrepayment.
Order
In view of the foregoing and pursuant
to the authority delegated to me by the
Secretary of Energy, I hereby extend,
effective October 1, 2023, Robert D.
Willis Rate Schedule RDW–15,
Wholesale Rates for Hydro Power and
Energy. The rate schedule shall remain
in effect on a temporary basis through
September 30, 2024, unless superseded.
Signing Authority
This document of the Department of
Energy was signed on September 25,
2023, by Mike Wech, Administrator for
Southwestern Power Administration,
pursuant to delegated authority from the
Secretary of Energy. That document,
with the original signature and date, is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 88, Number 188 (Friday, September 29, 2023)]
[Notices]
[Pages 67273-67274]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-21505]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10102-000]
Watershed Ranch, LLC; Notice of Authorization for Continued
Project Operation
The license for the Springer Hydro No. 1 Project No. 10102 was
issued for a period ending August 31, 2023.
Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee(s) under the terms and
conditions of the prior license until a new license is issued, or the
project is otherwise disposed of as provided in section 15 or any other
applicable section of the FPA. If the project's prior license waived
the applicability of section 15 of the FPA, then, based on section 9(b)
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth
at 18 CFR 16.21(a), if the licensee of such project has filed an
application for a subsequent license, the licensee may continue to
operate the project in accordance with the terms and conditions of the
license after the minor or minor part license expires, until the
Commission acts on its application. If the licensee of such a project
has not filed an application for a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b), to continue project operations
until the Commission issues someone else a license for the project or
otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 10102 is issued to
Watershed Ranch, LLC for a period effective September 1, 2023, through
August 31, 2024, or until the issuance of a new license for the project
or other disposition under the FPA, whichever comes first. If issuance
of a new license (or other disposition) does not take place on or
before August 31, 2024, notice is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that Watershed Ranch, LLC is authorized to continue
operation of the Springer Hydro No. 1 Project under the terms and
conditions of the prior license until the issuance of a subsequent
license for the project or other
[[Page 67274]]
disposition under the FPA, whichever comes first.
Dated: September 25, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-21505 Filed 9-28-23; 8:45 am]
BILLING CODE 6717-01-P