Combined Notice of Filings #1, 67272-67273 [2023-21503]

Download as PDF 67272 Federal Register / Vol. 88, No. 188 / Friday, September 29, 2023 / Notices docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: September 25, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–21508 Filed 9–28–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6440–000] lotter on DSK11XQN23PROD with NOTICES1 Lakeport Hydroelectric One, LLC; Notice of Authorization for Continued Project Operation The license for the Lakeport Hydroelectric Project No. 6440 was issued for a period ending August 31, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and VerDate Sep<11>2014 21:46 Sep 28, 2023 Jkt 259001 conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 6440 is issued to Lakeport Hydroelectric One, LLC for a period effective September 1, 2023, through August 31, 2024, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before August 31, 2024, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Lakeport Hydroelectric One, LLC is authorized to continue operation of the Lakeport Hydroelectric Project under the terms and conditions of the prior license until the issuance of a subsequent license for the project or other disposition under the FPA, whichever comes first. Dated: September 25, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–21506 Filed 9–28–23; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–134–000. Applicants: Mt. Poso Cogeneration Company, LLC, Berry Corporation. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Mt. Poso Cogeneration Company, LLC, et al. Filed Date: 9/22/23. Accession Number: 20230922–5194. Comment Date: 5 p.m. ET 10/13/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER22–290–005. Applicants: Oakland Power Company LLC. Description: Compliance filing: Compliance Amend. to RMR Agmt. to Implement Settlement Agmt. to be effective 1/1/2022. Filed Date: 9/25/23. Accession Number: 20230925–5129. Comment Date: 5 p.m. ET 10/16/23. Docket Numbers: ER23–574–002. Applicants: Oakland Power Company LLC. Description: Tariff Amendment: Amend. to RMR Agmt. for Recovery of Costs of CARB Compliance to be effective 12/8/2022. Filed Date: 9/25/23. Accession Number: 20230925–5082. Comment Date: 5 p.m. ET 10/16/23. Docket Numbers: ER23–2919–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, SA No. 5463; Queue No. AB2–190 to be effective 11/ 22/2023. Filed Date: 9/22/23. Accession Number: 20230922–5151. Comment Date: 5 p.m. ET 10/13/23. Docket Numbers: ER23–2920–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: DEF–SECI RS No. 424—Reimbursement Agreement to be effective 11/22/2023. Filed Date: 9/22/23. Accession Number: 20230922–5153. Comment Date: 5 p.m. ET 10/13/23. Docket Numbers: ER23–2921–000. Applicants: Duke Energy Progress, LLC. Description: Tariff Amendment: DEPEdenton Solar RS No. 375 Cancellation to be effective 11/22/2023. E:\FR\FM\29SEN1.SGM 29SEN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 188 / Friday, September 29, 2023 / Notices Filed Date: 9/22/23. Accession Number: 20230922–5157. Comment Date: 5 p.m. ET 10/13/23. Docket Numbers: ER23–2922–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 7079; Queue No. AE1–106 to be effective 8/24/2023. Filed Date: 9/25/23. Accession Number: 20230925–5063. Comment Date: 5 p.m. ET 10/16/23. Docket Numbers: ER23–2923–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: ESM Const Agmt Klamath Decommissioning Rev 1 to be effective 11/25/2023. Filed Date: 9/25/23. Accession Number: 20230925–5064. Comment Date: 5 p.m. ET 10/16/23. Docket Numbers: ER23–2924–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, SA No. 1373; Queue No. H23/W70/K28 (amend) to be effective 11/25/2023. Filed Date: 9/25/23. Accession Number: 20230925–5107. Comment Date: 5 p.m. ET 10/16/23. Docket Numbers: ER23–2925–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, Service Agreement No. 7106; Queue No. AE2–309 to be effective 11/25/2023. Filed Date: 9/25/23. Accession Number: 20230925–5079. Comment Date: 5 p.m. ET 10/16/23. Docket Numbers: ER23–2926–000. Applicants: Midcontinent Independent System Operator, Inc., Michigan Electric Transmission Company, LLC. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023–09–25_SA 4164 METC–DTE Electric E&P (J1914) to be effective 11/25/2023. Filed Date: 9/25/23. Accession Number: 20230925–5090. Comment Date: 5 p.m. ET 10/16/23. Docket Numbers: ER23–2927–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Revisions to Attachment AE Concerning Multi-Day Reliability Assessment Design to be effective 12/31/9998. Filed Date: 9/25/23. Accession Number: 20230925–5117. Comment Date: 5 p.m. ET 10/16/23. Docket Numbers: ER23–2928–000. Applicants: Pennsylvania Electric Company, PJM Interconnection, L.L.C. VerDate Sep<11>2014 21:46 Sep 28, 2023 Jkt 259001 Description: § 205(d) Rate Filing: Pennsylvania Electric Company submits tariff filing per 35.13(a)(2)(iii: Penelec Amends 10 ECSAs (5573 5574 5577 5641 5647 5649 5651 5652 5653 5655) to be effective 12/31/9998. Filed Date: 9/25/23. Accession Number: 20230925–5122. Comment Date: 5 p.m. ET 10/16/23. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES23–71–000. Applicants: ALLETE, Inc. Description: Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of ALLETE, Inc. Filed Date: 9/25/23. Accession Number: 20230925–5084. Comment Date: 5 p.m. ET 10/16/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202)502–6595 or OPP@ ferc.gov. Dated: September 25, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–21503 Filed 9–28–23; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 67273 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10102–000] Watershed Ranch, LLC; Notice of Authorization for Continued Project Operation The license for the Springer Hydro No. 1 Project No. 10102 was issued for a period ending August 31, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 10102 is issued to Watershed Ranch, LLC for a period effective September 1, 2023, through August 31, 2024, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before August 31, 2024, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Watershed Ranch, LLC is authorized to continue operation of the Springer Hydro No. 1 Project under the terms and conditions of the prior license until the issuance of a subsequent license for the project or other E:\FR\FM\29SEN1.SGM 29SEN1

Agencies

[Federal Register Volume 88, Number 188 (Friday, September 29, 2023)]
[Notices]
[Pages 67272-67273]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-21503]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC23-134-000.
    Applicants: Mt. Poso Cogeneration Company, LLC, Berry Corporation.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Mt. Poso Cogeneration Company, LLC, et al.
    Filed Date: 9/22/23.
    Accession Number: 20230922-5194.
    Comment Date: 5 p.m. ET 10/13/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER22-290-005.
    Applicants: Oakland Power Company LLC.
    Description: Compliance filing: Compliance Amend. to RMR Agmt. to 
Implement Settlement Agmt. to be effective 1/1/2022.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5129.
    Comment Date: 5 p.m. ET 10/16/23.

    Docket Numbers: ER23-574-002.
    Applicants: Oakland Power Company LLC.
    Description: Tariff Amendment: Amend. to RMR Agmt. for Recovery of 
Costs of CARB Compliance to be effective 12/8/2022.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5082.
    Comment Date: 5 p.m. ET 10/16/23.

    Docket Numbers: ER23-2919-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA, SA No. 
5463; Queue No. AB2-190 to be effective 11/22/2023.
    Filed Date: 9/22/23.
    Accession Number: 20230922-5151.
    Comment Date: 5 p.m. ET 10/13/23.

    Docket Numbers: ER23-2920-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Sec.  205(d) Rate Filing: DEF-SECI RS No. 424--
Reimbursement Agreement to be effective 11/22/2023.
    Filed Date: 9/22/23.
    Accession Number: 20230922-5153.
    Comment Date: 5 p.m. ET 10/13/23.

    Docket Numbers: ER23-2921-000.
    Applicants: Duke Energy Progress, LLC.
    Description: Tariff Amendment: DEP-Edenton Solar RS No. 375 
Cancellation to be effective 11/22/2023.

[[Page 67273]]

    Filed Date: 9/22/23.
    Accession Number: 20230922-5157.
    Comment Date: 5 p.m. ET 10/13/23.

    Docket Numbers: ER23-2922-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 7079; Queue No. AE1-106 to be effective 8/24/2023.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5063.
    Comment Date: 5 p.m. ET 10/16/23.

    Docket Numbers: ER23-2923-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: ESM Const Agmt Klamath 
Decommissioning Rev 1 to be effective 11/25/2023.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5064.
    Comment Date: 5 p.m. ET 10/16/23.

    Docket Numbers: ER23-2924-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA, SA No. 
1373; Queue No. H23/W70/K28 (amend) to be effective 11/25/2023.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5107.
    Comment Date: 5 p.m. ET 10/16/23.

    Docket Numbers: ER23-2925-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original NSA, Service 
Agreement No. 7106; Queue No. AE2-309 to be effective 11/25/2023.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5079.
    Comment Date: 5 p.m. ET 10/16/23.

    Docket Numbers: ER23-2926-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
Michigan Electric Transmission Company, LLC.
    Description: Sec.  205(d) Rate Filing: Midcontinent Independent 
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023-
09-25_SA 4164 METC-DTE Electric E&P (J1914) to be effective 11/25/2023.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5090.
    Comment Date: 5 p.m. ET 10/16/23.

    Docket Numbers: ER23-2927-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: Revisions to Attachment AE 
Concerning Multi-Day Reliability Assessment Design to be effective 12/
31/9998.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5117.
    Comment Date: 5 p.m. ET 10/16/23.

    Docket Numbers: ER23-2928-000.
    Applicants: Pennsylvania Electric Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: Pennsylvania Electric 
Company submits tariff filing per 35.13(a)(2)(iii: Penelec Amends 10 
ECSAs (5573 5574 5577 5641 5647 5649 5651 5652 5653 5655) to be 
effective 12/31/9998.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5122.
    Comment Date: 5 p.m. ET 10/16/23.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES23-71-000.
    Applicants: ALLETE, Inc.
    Description: Application Under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of ALLETE, Inc.
    Filed Date: 9/25/23.
    Accession Number: 20230925-5084.
    Comment Date: 5 p.m. ET 10/16/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5 p.m. Eastern time on the specified 
comment date. Protests may be considered, but intervention is necessary 
to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202)502-6595 or [email protected].

    Dated: September 25, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-21503 Filed 9-28-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.