Environmental Impact Statements; Notice of Availability, 67277 [2023-21435]
Download as PDF
Federal Register / Vol. 88, No. 188 / Friday, September 29, 2023 / Notices
plus or minus five percent of the
revenue estimated from the current rate
schedule. Therefore, the Administrator
deferred revenue adjustments annually
for Sam Rayburn Dam through 2022.
The 2023 PRS indicated a need for a
revenue adjustment above five percent
and therefore a new rate is needed.
However, finalization of the 2023 PRS,
development of a rate adjustment plan
including a new rate schedule (SRD–
23), and the associated procedures for
public participation in accordance with
10 CFR part 903 will not be completed
in time for the new rate schedule to be
placed into effect prior to the September
30, 2023, expiration of the current rate
schedule and thus temporary extension
of the current rate schedule is necessary.
Pursuant to 10 CFR 903.23(b) and
Redelegation Order No. S3–DEL–
SWPA1–2023, Southwestern’s
Administrator may extend existing rates
on a temporary basis without advance
notice or comment pending further
action. In such a circumstance, the
Administrator shall publish notice of
said extension in the Federal Register
and promptly advise FERC of the
extension. The revenue collection
associated with the extension of the
current rate will be considered in the
development of the new rate based on
the 2023 PRS such that repayment
obligations are met consistent with the
provisions of U.S. Department of Energy
(DOE) Order No. RA 6120.2.
Availability of Information
Information regarding the extension of
the rate schedule is available for public
review in the offices of Southwestern
Power Administration, Williams Tower
I, One West Third Street Suite 1500,
Tulsa, Oklahoma 74103. The rate
schedule is available on the
Southwestern website at
www.energy.gov/swpa/rates-andrepayment.
lotter on DSK11XQN23PROD with NOTICES1
Order
In view of the foregoing and pursuant
to the authority delegated to me by the
Secretary of Energy, I hereby extend,
effective October 1, 2023, Sam Rayburn
Dam Rate Schedule SRD–15, Wholesale
Rates for Hydro Power and Energy. The
rate schedule shall remain in effect on
a temporary basis through September
30, 2024, unless superseded.
Signing Authority
This document of the Department of
Energy was signed on September 25,
2023, by Mike Wech, Administrator for
Southwestern Power Administration,
pursuant to delegated authority from the
Secretary of Energy. That document,
with the original signature and date, is
VerDate Sep<11>2014
21:46 Sep 28, 2023
Jkt 259001
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
DOE. This administrative process in no
way alters the legal effect of this
document upon publication in the
Federal Register.
Signed in Washington, DC, on September
26, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–21451 Filed 9–28–23; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL OP–OFA–088]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed September 18, 2023 10 a.m. EST
Through September 25, 2023 10 a.m.
EST
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxapps.epa.gov/cdx-enepa-II/public/
action/eis/search.
EIS No. 20230124, Final, FHWA, LA, I–
10 Calcasieu River Bridge
Improvements, Review Period Ends:
10/30/2023, Contact: Charles Harkless
225–757–7621.
EIS No. 20230125, Draft, UDOT, UT, I–
15 Farmington to Salt Lake City,
Comment Period Ends: 11/13/2023,
Contact: Brandon Weston 801–965–
4603.
EIS No. 20230126, Draft, BLM, CA,
Northwest California Resource
Management Plan (NCIP), Comment
Period Ends: 12/28/2023, Contact:
Victoria Slaughter 707–825–2315.
EIS No. 20230127, Draft, NPS, USFWS,
WA, Draft Grizzly Bear Restoration
Plan—Environmental Impact
Statement North Cascades Ecosystem,
Comment Period Ends: 11/13/2023,
Contact: Denise Shultz 360–854–7200.
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
67277
EIS No. 20230128, Final, BOEM, VA,
Coastal Virginia Offshore Wind
Commercial, Review Period Ends: 10/
30/2023, Contact: Jessica Stromberg
703–787–1730.
EIS No. 20230129, Final Supplement,
USPS, DC, Next Generation Delivery
Vehicle Acquisitions, Review Period
Ends: 10/30/2023, Contact: Davon
Collins 202–268–4570.
EIS No. 20230130, Final, DOE, NV,
ADOPTION—Thacker Pass Lithium
Mine Project, Review Period Ends: 10/
30/2023, Contact: Anna Eskridge 240–
743–1304.
The Department of Energy (DOE) has
adopted the Bureau of Land
Management’s Final EIS No. 20200247
filed 11/25/2020 with the
Environmental Protection Agency. The
DOE was not a cooperating agency on
this project. Therefore, republication of
the document is necessary under
Section 1506.3(b)(1) of the CEQ
regulations.
Amended Notice
EIS No. 20230096, Draft, NHTSA, REG,
Corporate Average Fuel Economy
Standards for Passenger Cars and
Light Trucks, Model Years 2027–
2032, and Fuel Efficiency Standards
for Heavy-Duty Pickup Trucks and
Vans, Model Years 2030–2035,
Comment Period Ends: 10/16/2023,
Contact: Hannah Fish 202–366–1099.
Revision to FR Notice Published 08/
04/2023; Extending the Comment Period
from 10/04/2023 to 10/16/2023.
Dated: September 25, 2023.
Nancy Abrams,
Associate Director, Office of Federal
Activities.
[FR Doc. 2023–21435 Filed 9–28–23; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OLEM–2023–0416; FRL–11354–
01–OLEM]
Agency Information Collection
Activities; Proposed Information
Collection Request; Comment
Request; Materials Management
Information Collection Request
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) is planning to submit an
information collection request (ICR),
Materials Management Information
Collection Request (EPA ICR Number
2789.01, OMB Control Number 2050–
SUMMARY:
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 88, Number 188 (Friday, September 29, 2023)]
[Notices]
[Page 67277]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-21435]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL OP-OFA-088]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact Statements (EIS)
Filed September 18, 2023 10 a.m. EST Through September 25, 2023 10 a.m.
EST
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxapps.epa.gov/cdx-enepa-II/public/action/eis/search.
EIS No. 20230124, Final, FHWA, LA, I-10 Calcasieu River Bridge
Improvements, Review Period Ends: 10/30/2023, Contact: Charles Harkless
225-757-7621.
EIS No. 20230125, Draft, UDOT, UT, I-15 Farmington to Salt Lake City,
Comment Period Ends: 11/13/2023, Contact: Brandon Weston 801-965-4603.
EIS No. 20230126, Draft, BLM, CA, Northwest California Resource
Management Plan (NCIP), Comment Period Ends: 12/28/2023, Contact:
Victoria Slaughter 707-825-2315.
EIS No. 20230127, Draft, NPS, USFWS, WA, Draft Grizzly Bear Restoration
Plan--Environmental Impact Statement North Cascades Ecosystem, Comment
Period Ends: 11/13/2023, Contact: Denise Shultz 360-854-7200.
EIS No. 20230128, Final, BOEM, VA, Coastal Virginia Offshore Wind
Commercial, Review Period Ends: 10/30/2023, Contact: Jessica Stromberg
703-787-1730.
EIS No. 20230129, Final Supplement, USPS, DC, Next Generation Delivery
Vehicle Acquisitions, Review Period Ends: 10/30/2023, Contact: Davon
Collins 202-268-4570.
EIS No. 20230130, Final, DOE, NV, ADOPTION--Thacker Pass Lithium Mine
Project, Review Period Ends: 10/30/2023, Contact: Anna Eskridge 240-
743-1304.
The Department of Energy (DOE) has adopted the Bureau of Land
Management's Final EIS No. 20200247 filed 11/25/2020 with the
Environmental Protection Agency. The DOE was not a cooperating agency
on this project. Therefore, republication of the document is necessary
under Section 1506.3(b)(1) of the CEQ regulations.
Amended Notice
EIS No. 20230096, Draft, NHTSA, REG, Corporate Average Fuel Economy
Standards for Passenger Cars and Light Trucks, Model Years 2027-2032,
and Fuel Efficiency Standards for Heavy-Duty Pickup Trucks and Vans,
Model Years 2030-2035, Comment Period Ends: 10/16/2023, Contact: Hannah
Fish 202-366-1099.
Revision to FR Notice Published 08/04/2023; Extending the Comment
Period from 10/04/2023 to 10/16/2023.
Dated: September 25, 2023.
Nancy Abrams,
Associate Director, Office of Federal Activities.
[FR Doc. 2023-21435 Filed 9-28-23; 8:45 am]