Environmental Impact Statements; Notice of Availability, 67277 [2023-21435]

Download as PDF Federal Register / Vol. 88, No. 188 / Friday, September 29, 2023 / Notices plus or minus five percent of the revenue estimated from the current rate schedule. Therefore, the Administrator deferred revenue adjustments annually for Sam Rayburn Dam through 2022. The 2023 PRS indicated a need for a revenue adjustment above five percent and therefore a new rate is needed. However, finalization of the 2023 PRS, development of a rate adjustment plan including a new rate schedule (SRD– 23), and the associated procedures for public participation in accordance with 10 CFR part 903 will not be completed in time for the new rate schedule to be placed into effect prior to the September 30, 2023, expiration of the current rate schedule and thus temporary extension of the current rate schedule is necessary. Pursuant to 10 CFR 903.23(b) and Redelegation Order No. S3–DEL– SWPA1–2023, Southwestern’s Administrator may extend existing rates on a temporary basis without advance notice or comment pending further action. In such a circumstance, the Administrator shall publish notice of said extension in the Federal Register and promptly advise FERC of the extension. The revenue collection associated with the extension of the current rate will be considered in the development of the new rate based on the 2023 PRS such that repayment obligations are met consistent with the provisions of U.S. Department of Energy (DOE) Order No. RA 6120.2. Availability of Information Information regarding the extension of the rate schedule is available for public review in the offices of Southwestern Power Administration, Williams Tower I, One West Third Street Suite 1500, Tulsa, Oklahoma 74103. The rate schedule is available on the Southwestern website at www.energy.gov/swpa/rates-andrepayment. lotter on DSK11XQN23PROD with NOTICES1 Order In view of the foregoing and pursuant to the authority delegated to me by the Secretary of Energy, I hereby extend, effective October 1, 2023, Sam Rayburn Dam Rate Schedule SRD–15, Wholesale Rates for Hydro Power and Energy. The rate schedule shall remain in effect on a temporary basis through September 30, 2024, unless superseded. Signing Authority This document of the Department of Energy was signed on September 25, 2023, by Mike Wech, Administrator for Southwestern Power Administration, pursuant to delegated authority from the Secretary of Energy. That document, with the original signature and date, is VerDate Sep<11>2014 21:46 Sep 28, 2023 Jkt 259001 maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of DOE. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC, on September 26, 2023. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. [FR Doc. 2023–21451 Filed 9–28–23; 8:45 am] BILLING CODE 6450–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL OP–OFA–088] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/nepa. Weekly receipt of Environmental Impact Statements (EIS) Filed September 18, 2023 10 a.m. EST Through September 25, 2023 10 a.m. EST Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxapps.epa.gov/cdx-enepa-II/public/ action/eis/search. EIS No. 20230124, Final, FHWA, LA, I– 10 Calcasieu River Bridge Improvements, Review Period Ends: 10/30/2023, Contact: Charles Harkless 225–757–7621. EIS No. 20230125, Draft, UDOT, UT, I– 15 Farmington to Salt Lake City, Comment Period Ends: 11/13/2023, Contact: Brandon Weston 801–965– 4603. EIS No. 20230126, Draft, BLM, CA, Northwest California Resource Management Plan (NCIP), Comment Period Ends: 12/28/2023, Contact: Victoria Slaughter 707–825–2315. EIS No. 20230127, Draft, NPS, USFWS, WA, Draft Grizzly Bear Restoration Plan—Environmental Impact Statement North Cascades Ecosystem, Comment Period Ends: 11/13/2023, Contact: Denise Shultz 360–854–7200. PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 67277 EIS No. 20230128, Final, BOEM, VA, Coastal Virginia Offshore Wind Commercial, Review Period Ends: 10/ 30/2023, Contact: Jessica Stromberg 703–787–1730. EIS No. 20230129, Final Supplement, USPS, DC, Next Generation Delivery Vehicle Acquisitions, Review Period Ends: 10/30/2023, Contact: Davon Collins 202–268–4570. EIS No. 20230130, Final, DOE, NV, ADOPTION—Thacker Pass Lithium Mine Project, Review Period Ends: 10/ 30/2023, Contact: Anna Eskridge 240– 743–1304. The Department of Energy (DOE) has adopted the Bureau of Land Management’s Final EIS No. 20200247 filed 11/25/2020 with the Environmental Protection Agency. The DOE was not a cooperating agency on this project. Therefore, republication of the document is necessary under Section 1506.3(b)(1) of the CEQ regulations. Amended Notice EIS No. 20230096, Draft, NHTSA, REG, Corporate Average Fuel Economy Standards for Passenger Cars and Light Trucks, Model Years 2027– 2032, and Fuel Efficiency Standards for Heavy-Duty Pickup Trucks and Vans, Model Years 2030–2035, Comment Period Ends: 10/16/2023, Contact: Hannah Fish 202–366–1099. Revision to FR Notice Published 08/ 04/2023; Extending the Comment Period from 10/04/2023 to 10/16/2023. Dated: September 25, 2023. Nancy Abrams, Associate Director, Office of Federal Activities. [FR Doc. 2023–21435 Filed 9–28–23; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OLEM–2023–0416; FRL–11354– 01–OLEM] Agency Information Collection Activities; Proposed Information Collection Request; Comment Request; Materials Management Information Collection Request Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) is planning to submit an information collection request (ICR), Materials Management Information Collection Request (EPA ICR Number 2789.01, OMB Control Number 2050– SUMMARY: E:\FR\FM\29SEN1.SGM 29SEN1

Agencies

[Federal Register Volume 88, Number 188 (Friday, September 29, 2023)]
[Notices]
[Page 67277]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-21435]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL OP-OFA-088]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information 202-564-5632 or https://www.epa.gov/nepa.

Weekly receipt of Environmental Impact Statements (EIS)
Filed September 18, 2023 10 a.m. EST Through September 25, 2023 10 a.m. 
EST
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxapps.epa.gov/cdx-enepa-II/public/action/eis/search.

EIS No. 20230124, Final, FHWA, LA, I-10 Calcasieu River Bridge 
Improvements, Review Period Ends: 10/30/2023, Contact: Charles Harkless 
225-757-7621.
EIS No. 20230125, Draft, UDOT, UT, I-15 Farmington to Salt Lake City, 
Comment Period Ends: 11/13/2023, Contact: Brandon Weston 801-965-4603.
EIS No. 20230126, Draft, BLM, CA, Northwest California Resource 
Management Plan (NCIP), Comment Period Ends: 12/28/2023, Contact: 
Victoria Slaughter 707-825-2315.
EIS No. 20230127, Draft, NPS, USFWS, WA, Draft Grizzly Bear Restoration 
Plan--Environmental Impact Statement North Cascades Ecosystem, Comment 
Period Ends: 11/13/2023, Contact: Denise Shultz 360-854-7200.
EIS No. 20230128, Final, BOEM, VA, Coastal Virginia Offshore Wind 
Commercial, Review Period Ends: 10/30/2023, Contact: Jessica Stromberg 
703-787-1730.
EIS No. 20230129, Final Supplement, USPS, DC, Next Generation Delivery 
Vehicle Acquisitions, Review Period Ends: 10/30/2023, Contact: Davon 
Collins 202-268-4570.
EIS No. 20230130, Final, DOE, NV, ADOPTION--Thacker Pass Lithium Mine 
Project, Review Period Ends: 10/30/2023, Contact: Anna Eskridge 240-
743-1304.

    The Department of Energy (DOE) has adopted the Bureau of Land 
Management's Final EIS No. 20200247 filed 11/25/2020 with the 
Environmental Protection Agency. The DOE was not a cooperating agency 
on this project. Therefore, republication of the document is necessary 
under Section 1506.3(b)(1) of the CEQ regulations.

Amended Notice

EIS No. 20230096, Draft, NHTSA, REG, Corporate Average Fuel Economy 
Standards for Passenger Cars and Light Trucks, Model Years 2027-2032, 
and Fuel Efficiency Standards for Heavy-Duty Pickup Trucks and Vans, 
Model Years 2030-2035, Comment Period Ends: 10/16/2023, Contact: Hannah 
Fish 202-366-1099.

    Revision to FR Notice Published 08/04/2023; Extending the Comment 
Period from 10/04/2023 to 10/16/2023.

    Dated: September 25, 2023.
Nancy Abrams,
Associate Director, Office of Federal Activities.
[FR Doc. 2023-21435 Filed 9-28-23; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.