Cove Point LNG, LP; Notice of Application and Establishing Intervention Deadline, 66835-66837 [2023-21261]
Download as PDF
66835
Federal Register / Vol. 88, No. 187 / Thursday, September 28, 2023 / Notices
Annual
estimated
number of
responses per
respondent
Number of
respondents
Area of modification
I
A.
I
B.
C.
Annual estimated
number of responses
(column B × column C)
Average burden
hours & cost 1
per response
Total estimated
burden hours & total
estimated cost
(column D × column E)
D.
E.
F.
I
FERC–516H (Control No. 1902–0303)
Transmission owners update forecasts and ratings, and share transmission line ratings and facility ratings methodologies w/transmission providers and, if applicable, RTOs/ISOs & market
monitors (Year 1 and Ongoing).
289 (TOs)
1
289
176 hrs; $16,192 ....
50,864 hrs; $4,679,488.
1 The hourly cost (for salary plus benefits) uses the figures from the Bureau of Labor Statistics (BLS) for three positions involved in the reporting and recordkeeping
requirements. These figures include salary (based on BLS data for May 2023, https://bls.gov/oes/current/naics2_22.htm) and benefits (based on BLS data issued
March 19, 2022, https://www.bls.gov/news.release/ecec.nr0.htm) and are Manager (Code 11–0000 $106.33/hour), Electrical Engineer (Code 17–2071 $77.29/hour).
The hourly cost for the reporting requirements ($91.81 = $92 rounded) is an average of the cost of a manager and engineer.
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: September 22, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–21259 Filed 9–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas and
Oil Pipeline Rate and Refund Report
filings:
ddrumheller on DSK120RN23PROD with NOTICES1
Filings Instituting Proceedings
Docket Numbers: RP23–1048–000.
Applicants: Natural Gas Pipeline
Company of America LLC.
Description: Compliance filing:
Penalty Revenue Crediting Report from
January through June 2023 to be
effective N/A.
Filed Date: 9/22/23.
Accession Number: 20230922–5021.
Comment Date: 5 p.m. ET 10/4/23.
Docket Numbers: RP23–1049–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
VerDate Sep<11>2014
18:09 Sep 27, 2023
Jkt 259001
Description: Compliance filing:
Annual Cash-Out Report Period Ending
July 31, 2023 to be effective N/A.
Filed Date: 9/22/23.
Accession Number: 20230922–5057.
Comment Date: 5 p.m. ET 10/4/23.
Docket Numbers: RP23–1050–000.
Applicants: Wyoming Interstate
Company, L.L.C.
Description: § 4(d) Rate Filing:
Agreement Housekeeping Filing to be
effective 11/1/2023.
Filed Date: 9/22/23.
Accession Number: 20230922–5095.
Comment Date: 5 p.m. ET 10/4/23.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP23–789–001.
Applicants: Kinetica Deepwater
Express, LLC.
Description: Compliance filing:
Settlement Compliance Filing to be
effective 11/1/2023.
Filed Date: 9/22/23.
Accession Number: 20230922–5056.
Comment Date: 5 p.m. ET 10/4/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
For other information, call (866) 208–
3676 (toll free). For TTY, call (202) 502–
8659. The Commission’s Office of
Public Participation (OPP) supports
meaningful public engagement and
participation in Commission
proceedings. OPP can help members of
the public, including landowners,
environmental justice communities,
Tribal members and others, access
publicly available information and
navigate Commission processes. For
public inquiries and assistance with
making filings such as interventions,
comments, or requests for rehearing, the
public is encouraged to contact OPP at
(202) 502–6595 or OPP@ferc.gov.
Dated: September 22, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–21257 Filed 9–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Cove Point LNG, LP; Notice of
Application and Establishing
Intervention Deadline
Take notice that on September 8,
2023, Cove Point LNG, LP (CPL), 2100
Cove Point Road, Lusby, Maryland
20657, filed an application under
sections 3 and 7(b) of the Natural Gas
Act (NGA), and part 157 of the
Commission’s regulations requesting
authorization to: (1) abandon certain
liquefied natural gas (LNG) Terminaling
and Processing facilities previously
certificated under NGA section 7; (2)
abandon services provided under CPL’s
Rate Schedule LTD–1 of its FERC Gas
Tariff and the cancellation of that Rate
Schedule; (3) modify CPL’s FERC Gas
E:\FR\FM\28SEN1.SGM
28SEN1
ddrumheller on DSK120RN23PROD with NOTICES1
66836
Federal Register / Vol. 88, No. 187 / Thursday, September 28, 2023 / Notices
Tariff to fully reflect the elimination of
Rate Schedule LTD–1; and (4) convert
such certificated facilities and operation
under NGA section 3, so that the
entirety of CPL’s LNG Terminaling and
Processing facilities and related
operations are authorized solely under
NGA section 3, all as more fully set
forth in the application which is on file
with the Commission and open for
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions regarding the proposed
project should be directed to Matthew
Bley, Director, Gas Transmission
Certificates, 6603 West Broad Street,
Richmond, Virginia 23230 by phone at
(804) 221–7854, or by email at
Matthew.bley@bhegts.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file comments on
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
18:09 Sep 27, 2023
Jkt 259001
the project, you can protest the filing,
and you can file a motion to intervene
in the proceeding. There is no fee or
cost for filing comments or intervening.
The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on
October 13, 2023. How to file protests,
motions to intervene, and comments is
explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections, to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be.
Protests
Pursuant to sections 157.10(a)(4) 2 and
385.211 3 of the Commission’s
regulations under the NGA, any person 4
may file a protest to the application.
Protests must comply with the
requirements specified in section
385.2001 5 of the Commission’s
regulations. A protest may also serve as
a motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
To ensure that your comments or
protests are timely and properly
recorded, please submit your comments
on or before October 13, 2023.
There are three methods you can use
to submit your comments or protests to
the Commission. In all instances, please
reference the Project docket number
CP23–539–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
2 18
CFR 157.10(a)(4).
CFR 385.211.
4 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
5 18 CFR 385.2001.
3 18
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
(2) You may file your comments or
protests electronically by using the
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments or protests by mailing them
to the following address below. Your
written comments must reference the
Project docket number (CP23–539–000).
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To file via any other courier: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,6 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
6 18
E:\FR\FM\28SEN1.SGM
CFR 385.102(d).
28SEN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 187 / Thursday, September 28, 2023 / Notices
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 7 and the regulations under
the NGA 8 by the intervention deadline
for the project, which is October 13,
2023. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP23–539–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below. Your motion to
intervene must reference the Project
docket number CP23–539–000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To file via any other courier: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email at: Matthew Bley,
Director, Gas Transmission Certificates,
6603 West Broad Street, Richmond,
7 18
8 18
CFR 385.214.
CFR 157.10.
VerDate Sep<11>2014
18:09 Sep 27, 2023
Jkt 259001
Virginia 23230 or at Matthew.bley@
bhegts.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 9 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).10 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on October 13, 2023.
Dated: September 22, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–21261 Filed 9–27–23; 8:45 am]
BILLING CODE 6717–01–P
9 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
10 18 CFR 385.214(c)(1).
11 18 CFR 385.214(b)(3) and (d).
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
66837
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD23–9–000]
Reliability Technical Conference;
Supplemental Notice of Technical
Conference
As announced in the Notice of
Technical Conference issued in this
proceeding on August 3, 2023, the
Federal Energy Regulatory Commission
(Commission) will convene its annual
Reliability Technical Conference in the
above-referenced proceeding on
Thursday, November 9, 2023, from
approximately 9 a.m. to 5 p.m. eastern
time. The conference will include
Commissioner-led and staff-led panels.
The conference will be held in-person at
the Commission’s headquarters at 888
First Street NE, Washington, DC 20426
in the Commission Meeting Room.
The purpose of this conference is to
discuss policy issues related to the
reliability and security of the BulkPower System. The conference will also
discuss the impact of the Environmental
Protection Agency’s proposed rule
under section 111 of the Clean Air Act
on electric reliability.1
The conference will be open for the
public to attend, and there is no fee for
attendance. Supplemental notices will
be issued prior to the conference with
further details regarding the agenda.
Information on this technical conference
will also be posted on the Calendar of
Events on the Commission’s website,
www.ferc.gov, prior to the event.
The conference will also be
transcribed. Transcripts will be
available for a fee from Ace Reporting,
(202) 347–3700.
Those who wish to nominate
themselves for consideration as a panel
participant should submit their name,
title, company (or organization they are
representing), telephone, email, a oneparagraph biography, picture, and panel
in which they wish to participate to:
2023_Reliability_Conf@ferc.gov by close
of business on October 2, 2023.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov,
1 New Source Performance Standards for
Greenhouse Gas Emissions from New, Modified,
and Reconstructed Fossil Fuel-Fired Electric
Generating Units; Emission Guidelines for
Greenhouse Gas Emissions from Existing Fossil
Fuel-Fired Electric Generating Units; and Repeal of
the Affordable Clean Energy Rule, 88 FR 33240
(proposed May 23, 2023) (to be codified at 40 CFR
part 60).
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 88, Number 187 (Thursday, September 28, 2023)]
[Notices]
[Pages 66835-66837]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-21261]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Cove Point LNG, LP; Notice of Application and Establishing
Intervention Deadline
Take notice that on September 8, 2023, Cove Point LNG, LP (CPL),
2100 Cove Point Road, Lusby, Maryland 20657, filed an application under
sections 3 and 7(b) of the Natural Gas Act (NGA), and part 157 of the
Commission's regulations requesting authorization to: (1) abandon
certain liquefied natural gas (LNG) Terminaling and Processing
facilities previously certificated under NGA section 7; (2) abandon
services provided under CPL's Rate Schedule LTD-1 of its FERC Gas
Tariff and the cancellation of that Rate Schedule; (3) modify CPL's
FERC Gas
[[Page 66836]]
Tariff to fully reflect the elimination of Rate Schedule LTD-1; and (4)
convert such certificated facilities and operation under NGA section 3,
so that the entirety of CPL's LNG Terminaling and Processing facilities
and related operations are authorized solely under NGA section 3, all
as more fully set forth in the application which is on file with the
Commission and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact the Federal Energy Regulatory
Commission at [email protected] or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
Any questions regarding the proposed project should be directed to
Matthew Bley, Director, Gas Transmission Certificates, 6603 West Broad
Street, Richmond, Virginia 23230 by phone at (804) 221-7854, or by
email at [email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file comments on the project, you can protest
the filing, and you can file a motion to intervene in the proceeding.
There is no fee or cost for filing comments or intervening. The
deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on
October 13, 2023. How to file protests, motions to intervene, and
comments is explained below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections, to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be.
Protests
Pursuant to sections 157.10(a)(4) \2\ and 385.211 \3\ of the
Commission's regulations under the NGA, any person \4\ may file a
protest to the application. Protests must comply with the requirements
specified in section 385.2001 \5\ of the Commission's regulations. A
protest may also serve as a motion to intervene so long as the
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------
\2\ 18 CFR 157.10(a)(4).
\3\ 18 CFR 385.211.
\4\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
\5\ 18 CFR 385.2001.
---------------------------------------------------------------------------
To ensure that your comments or protests are timely and properly
recorded, please submit your comments on or before October 13, 2023.
There are three methods you can use to submit your comments or
protests to the Commission. In all instances, please reference the
Project docket number CP23-539-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments or protests electronically by using
the eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. With eFiling,
you can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making; first select ``General'' and then select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments or protests by
mailing them to the following address below. Your written comments must
reference the Project docket number (CP23-539-000).
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other courier: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\6\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\6\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission
[[Page 66837]]
in accordance with Rule 214 of the Commission's Rules of Practice and
Procedure \7\ and the regulations under the NGA \8\ by the intervention
deadline for the project, which is October 13, 2023. As described
further in Rule 214, your motion to intervene must state, to the extent
known, your position regarding the proceeding, as well as your interest
in the proceeding. For an individual, this could include your status as
a landowner, ratepayer, resident of an impacted community, or
recreationist. You do not need to have property directly impacted by
the project in order to intervene. For more information about motions
to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\7\ 18 CFR 385.214.
\8\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP23-539-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below. Your
motion to intervene must reference the Project docket number CP23-539-
000.
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other courier: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email at: Matthew Bley, Director, Gas Transmission
Certificates, 6603 West Broad Street, Richmond, Virginia 23230 or at
[email protected]. Any subsequent submissions by an intervenor
must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online. Service can be via
email with a link to the document.
All timely, unopposed \9\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\10\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\11\ A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\9\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\10\ 18 CFR 385.214(c)(1).
\11\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on October 13, 2023.
Dated: September 22, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-21261 Filed 9-27-23; 8:45 am]
BILLING CODE 6717-01-P