Download as PDF 66835 Federal Register / Vol. 88, No. 187 / Thursday, September 28, 2023 / Notices Annual estimated number of responses per respondent Number of respondents Area of modification I A. I B. C. Annual estimated number of responses (column B × column C) Average burden hours & cost 1 per response Total estimated burden hours & total estimated cost (column D × column E) D. E. F. I FERC–516H (Control No. 1902–0303) Transmission owners update forecasts and ratings, and share transmission line ratings and facility ratings methodologies w/transmission providers and, if applicable, RTOs/ISOs & market monitors (Year 1 and Ongoing). 289 (TOs) 1 289 176 hrs; $16,192 .... 50,864 hrs; $4,679,488. 1 The hourly cost (for salary plus benefits) uses the figures from the Bureau of Labor Statistics (BLS) for three positions involved in the reporting and recordkeeping requirements. These figures include salary (based on BLS data for May 2023, https://bls.gov/oes/current/naics2_22.htm) and benefits (based on BLS data issued March 19, 2022, https://www.bls.gov/news.release/ecec.nr0.htm) and are Manager (Code 11–0000 $106.33/hour), Electrical Engineer (Code 17–2071 $77.29/hour). The hourly cost for the reporting requirements ($91.81 = $92 rounded) is an average of the cost of a manager and engineer. Comments: Comments are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: September 22, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–21259 Filed 9–27–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas and Oil Pipeline Rate and Refund Report filings: ddrumheller on DSK120RN23PROD with NOTICES1 Filings Instituting Proceedings Docket Numbers: RP23–1048–000. Applicants: Natural Gas Pipeline Company of America LLC. Description: Compliance filing: Penalty Revenue Crediting Report from January through June 2023 to be effective N/A. Filed Date: 9/22/23. Accession Number: 20230922–5021. Comment Date: 5 p.m. ET 10/4/23. Docket Numbers: RP23–1049–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. VerDate Sep<11>2014 18:09 Sep 27, 2023 Jkt 259001 Description: Compliance filing: Annual Cash-Out Report Period Ending July 31, 2023 to be effective N/A. Filed Date: 9/22/23. Accession Number: 20230922–5057. Comment Date: 5 p.m. ET 10/4/23. Docket Numbers: RP23–1050–000. Applicants: Wyoming Interstate Company, L.L.C. Description: § 4(d) Rate Filing: Agreement Housekeeping Filing to be effective 11/1/2023. Filed Date: 9/22/23. Accession Number: 20230922–5095. Comment Date: 5 p.m. ET 10/4/23. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP23–789–001. Applicants: Kinetica Deepwater Express, LLC. Description: Compliance filing: Settlement Compliance Filing to be effective 11/1/2023. Filed Date: 9/22/23. Accession Number: 20230922–5056. Comment Date: 5 p.m. ET 10/4/23. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. For other information, call (866) 208– 3676 (toll free). For TTY, call (202) 502– 8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ferc.gov. Dated: September 22, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–21257 Filed 9–27–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Cove Point LNG, LP; Notice of Application and Establishing Intervention Deadline Take notice that on September 8, 2023, Cove Point LNG, LP (CPL), 2100 Cove Point Road, Lusby, Maryland 20657, filed an application under sections 3 and 7(b) of the Natural Gas Act (NGA), and part 157 of the Commission’s regulations requesting authorization to: (1) abandon certain liquefied natural gas (LNG) Terminaling and Processing facilities previously certificated under NGA section 7; (2) abandon services provided under CPL’s Rate Schedule LTD–1 of its FERC Gas Tariff and the cancellation of that Rate Schedule; (3) modify CPL’s FERC Gas E:\FR\FM\28SEN1.SGM 28SEN1 ddrumheller on DSK120RN23PROD with NOTICES1 66836 Federal Register / Vol. 88, No. 187 / Thursday, September 28, 2023 / Notices Tariff to fully reflect the elimination of Rate Schedule LTD–1; and (4) convert such certificated facilities and operation under NGA section 3, so that the entirety of CPL’s LNG Terminaling and Processing facilities and related operations are authorized solely under NGA section 3, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact the Federal Energy Regulatory Commission at FercOnlineSupport@ ferc.gov or call toll-free, (886) 208–3676 or TTY (202) 502–8659. Any questions regarding the proposed project should be directed to Matthew Bley, Director, Gas Transmission Certificates, 6603 West Broad Street, Richmond, Virginia 23230 by phone at (804) 221–7854, or by email at Matthew.bley@bhegts.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file comments on 1 18 CFR (Code of Federal Regulations) 157.9. VerDate Sep<11>2014 18:09 Sep 27, 2023 Jkt 259001 the project, you can protest the filing, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on October 13, 2023. How to file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections, to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. Protests Pursuant to sections 157.10(a)(4) 2 and 385.211 3 of the Commission’s regulations under the NGA, any person 4 may file a protest to the application. Protests must comply with the requirements specified in section 385.2001 5 of the Commission’s regulations. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. To ensure that your comments or protests are timely and properly recorded, please submit your comments on or before October 13, 2023. There are three methods you can use to submit your comments or protests to the Commission. In all instances, please reference the Project docket number CP23–539–000 in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project; 2 18 CFR 157.10(a)(4). CFR 385.211. 4 Persons include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 5 18 CFR 385.2001. 3 18 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 (2) You may file your comments or protests electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments or protests by mailing them to the following address below. Your written comments must reference the Project docket number (CP23–539–000). To file via USPS: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To file via any other courier: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of comments (options 1 and 2 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list, and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be notified of meetings associated with the Commission’s environmental review process. The Commission considers all comments received about the project in determining the appropriate action to be taken. However, the filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. For instructions on how to intervene, see below. Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,6 has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission 6 18 E:\FR\FM\28SEN1.SGM CFR 385.102(d). 28SEN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 88, No. 187 / Thursday, September 28, 2023 / Notices in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 7 and the regulations under the NGA 8 by the intervention deadline for the project, which is October 13, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number CP23–539–000 in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf.; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below. Your motion to intervene must reference the Project docket number CP23–539–000. To file via USPS: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To file via any other courier: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email at: Matthew Bley, Director, Gas Transmission Certificates, 6603 West Broad Street, Richmond, 7 18 8 18 CFR 385.214. CFR 157.10. VerDate Sep<11>2014 18:09 Sep 27, 2023 Jkt 259001 Virginia 23230 or at Matthew.bley@ bhegts.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 9 motions to intervene are automatically granted by operation of Rule 214(c)(1).10 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.11 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on October 13, 2023. Dated: September 22, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–21261 Filed 9–27–23; 8:45 am] BILLING CODE 6717–01–P 9 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 10 18 CFR 385.214(c)(1). 11 18 CFR 385.214(b)(3) and (d). PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 66837 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD23–9–000] Reliability Technical Conference; Supplemental Notice of Technical Conference As announced in the Notice of Technical Conference issued in this proceeding on August 3, 2023, the Federal Energy Regulatory Commission (Commission) will convene its annual Reliability Technical Conference in the above-referenced proceeding on Thursday, November 9, 2023, from approximately 9 a.m. to 5 p.m. eastern time. The conference will include Commissioner-led and staff-led panels. The conference will be held in-person at the Commission’s headquarters at 888 First Street NE, Washington, DC 20426 in the Commission Meeting Room. The purpose of this conference is to discuss policy issues related to the reliability and security of the BulkPower System. The conference will also discuss the impact of the Environmental Protection Agency’s proposed rule under section 111 of the Clean Air Act on electric reliability.1 The conference will be open for the public to attend, and there is no fee for attendance. Supplemental notices will be issued prior to the conference with further details regarding the agenda. Information on this technical conference will also be posted on the Calendar of Events on the Commission’s website, www.ferc.gov, prior to the event. The conference will also be transcribed. Transcripts will be available for a fee from Ace Reporting, (202) 347–3700. Those who wish to nominate themselves for consideration as a panel participant should submit their name, title, company (or organization they are representing), telephone, email, a oneparagraph biography, picture, and panel in which they wish to participate to: 2023_Reliability_Conf@ferc.gov by close of business on October 2, 2023. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov, 1 New Source Performance Standards for Greenhouse Gas Emissions from New, Modified, and Reconstructed Fossil Fuel-Fired Electric Generating Units; Emission Guidelines for Greenhouse Gas Emissions from Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule, 88 FR 33240 (proposed May 23, 2023) (to be codified at 40 CFR part 60). E:\FR\FM\28SEN1.SGM 28SEN1

Agencies

[Federal Register Volume 88, Number 187 (Thursday, September 28, 2023)]
[Notices]
[Pages 66835-66837]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-21261]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Cove Point LNG, LP; Notice of Application and Establishing 
Intervention Deadline

    Take notice that on September 8, 2023, Cove Point LNG, LP (CPL), 
2100 Cove Point Road, Lusby, Maryland 20657, filed an application under 
sections 3 and 7(b) of the Natural Gas Act (NGA), and part 157 of the 
Commission's regulations requesting authorization to: (1) abandon 
certain liquefied natural gas (LNG) Terminaling and Processing 
facilities previously certificated under NGA section 7; (2) abandon 
services provided under CPL's Rate Schedule LTD-1 of its FERC Gas 
Tariff and the cancellation of that Rate Schedule; (3) modify CPL's 
FERC Gas

[[Page 66836]]

Tariff to fully reflect the elimination of Rate Schedule LTD-1; and (4) 
convert such certificated facilities and operation under NGA section 3, 
so that the entirety of CPL's LNG Terminaling and Processing facilities 
and related operations are authorized solely under NGA section 3, all 
as more fully set forth in the application which is on file with the 
Commission and open for public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (www.ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room. For assistance, contact the Federal Energy Regulatory 
Commission at [email protected] or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
    Any questions regarding the proposed project should be directed to 
Matthew Bley, Director, Gas Transmission Certificates, 6603 West Broad 
Street, Richmond, Virginia 23230 by phone at (804) 221-7854, or by 
email at [email protected].
    Pursuant to section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file comments on the project, you can protest 
the filing, and you can file a motion to intervene in the proceeding. 
There is no fee or cost for filing comments or intervening. The 
deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on 
October 13, 2023. How to file protests, motions to intervene, and 
comments is explained below.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

Comments

    Any person wishing to comment on the project may do so. Comments 
may include statements of support or objections, to the project as a 
whole or specific aspects of the project. The more specific your 
comments, the more useful they will be.

Protests

    Pursuant to sections 157.10(a)(4) \2\ and 385.211 \3\ of the 
Commission's regulations under the NGA, any person \4\ may file a 
protest to the application. Protests must comply with the requirements 
specified in section 385.2001 \5\ of the Commission's regulations. A 
protest may also serve as a motion to intervene so long as the 
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.10(a)(4).
    \3\ 18 CFR 385.211.
    \4\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
    \5\ 18 CFR 385.2001.
---------------------------------------------------------------------------

    To ensure that your comments or protests are timely and properly 
recorded, please submit your comments on or before October 13, 2023.
    There are three methods you can use to submit your comments or 
protests to the Commission. In all instances, please reference the 
Project docket number CP23-539-000 in your submission.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's website at www.ferc.gov 
under the link to Documents and Filings. Using eComment is an easy 
method for interested persons to submit brief, text-only comments on a 
project;
    (2) You may file your comments or protests electronically by using 
the eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. With eFiling, 
you can provide comments in a variety of formats by attaching them as a 
file with your submission. New eFiling users must first create an 
account by clicking on ``eRegister.'' You will be asked to select the 
type of filing you are making; first select ``General'' and then select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments or protests by 
mailing them to the following address below. Your written comments must 
reference the Project docket number (CP23-539-000).

To file via USPS: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other courier: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 
20852

    The Commission encourages electronic filing of comments (options 1 
and 2 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected].
    Persons who comment on the environmental review of this project 
will be placed on the Commission's environmental mailing list, and will 
receive notification when the environmental documents (EA or EIS) are 
issued for this project and will be notified of meetings associated 
with the Commission's environmental review process.
    The Commission considers all comments received about the project in 
determining the appropriate action to be taken. However, the filing of 
a comment alone will not serve to make the filer a party to the 
proceeding. To become a party, you must intervene in the proceeding. 
For instructions on how to intervene, see below.

Interventions

    Any person, which includes individuals, organizations, businesses, 
municipalities, and other entities,\6\ has the option to file a motion 
to intervene in this proceeding. Only intervenors have the right to 
request rehearing of Commission orders issued in this proceeding and to 
subsequently challenge the Commission's orders in the U.S. Circuit 
Courts of Appeal.
---------------------------------------------------------------------------

    \6\ 18 CFR 385.102(d).
---------------------------------------------------------------------------

    To intervene, you must submit a motion to intervene to the 
Commission

[[Page 66837]]

in accordance with Rule 214 of the Commission's Rules of Practice and 
Procedure \7\ and the regulations under the NGA \8\ by the intervention 
deadline for the project, which is October 13, 2023. As described 
further in Rule 214, your motion to intervene must state, to the extent 
known, your position regarding the proceeding, as well as your interest 
in the proceeding. For an individual, this could include your status as 
a landowner, ratepayer, resident of an impacted community, or 
recreationist. You do not need to have property directly impacted by 
the project in order to intervene. For more information about motions 
to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \7\ 18 CFR 385.214.
    \8\ 18 CFR 157.10.
---------------------------------------------------------------------------

    There are two ways to submit your motion to intervene. In both 
instances, please reference the Project docket number CP23-539-000 in 
your submission.
    (1) You may file your motion to intervene by using the Commission's 
eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. New eFiling 
users must first create an account by clicking on ``eRegister.'' You 
will be asked to select the type of filing you are making; first select 
``General'' and then select ``Intervention.'' The eFiling feature 
includes a document-less intervention option; for more information, 
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
    (2) You can file a paper copy of your motion to intervene, along 
with three copies, by mailing the documents to the address below. Your 
motion to intervene must reference the Project docket number CP23-539-
000.

To file via USPS: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other courier: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 
20852

    The Commission encourages electronic filing of motions to intervene 
(option 1 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected].
    Protests and motions to intervene must be served on the applicant 
either by mail or email at: Matthew Bley, Director, Gas Transmission 
Certificates, 6603 West Broad Street, Richmond, Virginia 23230 or at 
[email protected]. Any subsequent submissions by an intervenor 
must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be downloaded from the 
service list at the eService link on FERC Online. Service can be via 
email with a link to the document.
    All timely, unopposed \9\ motions to intervene are automatically 
granted by operation of Rule 214(c)(1).\10\ Motions to intervene that 
are filed after the intervention deadline are untimely, and may be 
denied. Any late-filed motion to intervene must show good cause for 
being late and must explain why the time limitation should be waived 
and provide justification by reference to factors set forth in Rule 
214(d) of the Commission's Rules and Regulations.\11\ A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies (paper or 
electronic) of all documents filed by the applicant and by all other 
parties.
---------------------------------------------------------------------------

    \9\ The applicant has 15 days from the submittal of a motion to 
intervene to file a written objection to the intervention.
    \10\ 18 CFR 385.214(c)(1).
    \11\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Intervention Deadline: 5:00 p.m. Eastern Time on October 13, 2023.

    Dated: September 22, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-21261 Filed 9-27-23; 8:45 am]
BILLING CODE 6717-01-P