Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; Renewable Energy and Alternate Uses of Existing Facilities on the Outer Continental Shelf, 66501-66507 [2023-21038]
Download as PDF
Federal Register / Vol. 88, No. 186 / Wednesday, September 27, 2023 / Notices
to match an increase in prices in the
Washington State Lottery.
Bryan Newland,
Assistant Secretary—Indian Affairs.
[FR Doc. 2023–20969 Filed 9–26–23; 8:45 am]
BILLING CODE 4337–15–P
DEPARTMENT OF THE INTERIOR
Bureau of Safety and Environmental
Enforcement
[Docket ID BSEE–2023–0013; EEEE500000
234E1700D2 ET1SF0000.EAQ000; OMB
Control Number 1014–0034]
Agency Information Collection
Activities; Submission to the Office of
Management and Budget for Review
and Approval; Renewable Energy and
Alternate Uses of Existing Facilities on
the Outer Continental Shelf
Bureau of Safety and
Environmental Enforcement, Interior.
ACTION: Notice of information collection;
request for comment.
AGENCY:
In accordance with the
Paperwork Reduction Act (PRA) of
1995, the Bureau of Safety and
Environmental Enforcement (BSEE)
proposes to renew an information
collection with revisions.
DATES: Interested persons are invited to
submit comments on or before October
27, 2023.
ADDRESSES: Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to www.reginfo.gov/public/do/
PRAMain. Find this particular
information collection by selecting
‘‘Currently under 30-day Review—Open
for Public Comments’’ or by using the
search function. Please provide a copy
of your comments to Nikki Mason, BSEE
ICCO, 45600 Woodland Road, Sterling,
VA 20166; or by email to nikki.mason@
bsee.gov. Please reference OMB Control
Number 1014–0034 in the subject line of
your comments.
FOR FURTHER INFORMATION CONTACT: To
request additional information about
this ICR, contact Nikki Mason by email
at nikki.mason@bsee.gov, or by
telephone at (703) 787–1607.
Individuals in the United States who are
deaf, deafblind, hard of hearing, or have
a speech disability may dial 711 (TTY,
TDD, or TeleBraille) to access
telecommunications relay services.
Individuals outside the United States
should use the relay services offered
within their country to make
international calls to the point-ofcontact in the United States. You may
ddrumheller on DSK120RN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
18:44 Sep 26, 2023
Jkt 259001
also view the ICR at https://
www.reginfo.gov/public/do/PRAMain.
SUPPLEMENTARY INFORMATION: In
accordance with the PRA and 5 CFR
1320.8(d)(1), we provide the general
public and other Federal agencies with
an opportunity to comment on new,
proposed, revised, and continuing
collections of information. This helps us
assess the impact of our information
collection requirements and minimize
the public’s reporting burden. It also
helps the public understand our
information collection requirements and
provide the requested data in the
desired format.
A Federal Register notice with a 60day public comment period soliciting
comments on this collection of
information was published on July 13,
2023 (88 FR 44834). No comments were
received.
As part of our continuing effort to
reduce paperwork and respondent
burdens, we are again soliciting
comments from the public and other
Federal agencies on the proposed ICR
that is described below. We are
especially interested in public comment
addressing the following:
(1) Whether or not the collection of
information is necessary for the proper
performance of the functions of the
agency, including whether or not the
information will have practical utility;
(2) The accuracy of our estimate of the
burden for this collection of
information, including the validity of
the methodology and assumptions used;
(3) Ways to enhance the quality,
utility, and clarity of the information to
be collected; and
(4) How might the agency minimize
the burden of the collection of
information on those who are to
respond, including through the use of
appropriate automated, electronic,
mechanical, or other technological
collection techniques or other forms of
information technology, e.g., permitting
electronic submission of response.
Comments that you submit in
response to this notice are a matter of
public record. Before including your
address, phone number, email address,
or other personal identifying
information in your comment, you
should be aware that your entire
comment—including your personal
identifying information—may be made
publicly available at any time. While
you can ask us in your comment to
withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Abstract: BSEE will use the
information to oversee facility design,
PO 00000
Frm 00141
Fmt 4703
Sfmt 4703
66501
fabrication, installation, and safety
management systems; ensure the safety
of operations, including inspection
programs and incident reporting and
investigations; enforce compliance with
all applicable safety, environmental,
and other laws and regulations through
enforcement actions (such as
noncompliance notices, cessation
orders, and certain lease suspensions);
and oversee decommissioning activities.
These responsibilities include
enforcement provisions under the
existing part 285 subpart D, various
information submittal requirements
under subpart F, as well as provisions
governing activities conducted under an
approved plan, including the design,
construction, operation, and
decommissioning of facilities under
subparts G, H, and I. The requirements
for and standards of review regarding
the Facility Design Report (FDR) and
Facility Fabrication and Installation
Report (FIR) are unchanged: the FDR
and FIR will continue to be evaluated
for consistency with the Construction
and Operations Plan (COP) and
applicable engineering standards.
Decommissioning requirements related
to rights-of-use and easement for
alternate uses of existing OCS facilities
(Alternate Use RUE) have also been
transferred from the existing subpart J to
part 285.
BSEE assumes the responsibility for
ordering a lease or grant suspension
when continued activities pose an
imminent threat of serious or irreparable
harm or damage to natural resources,
life, property, the marine coastal, or
human environment, or sites, structures,
or objects of historical or archaeological
significance. BSEE may also order a
suspension when necessary to comply
with a judicial decree. Under the rule,
BSEE also assumes authority to issue
cessation orders to address
noncompliance on the part of the
grantee or lessee.
The Department does not issue
Suspensions for Alternate Use RUEs
upon the grantee’s request, but only by
order. BOEM will retain authority to
order suspensions required for National
security, and BSEE will assume
authority to order suspensions to
address a threat of harm from continued
operations. Either bureau may order a
suspension when necessary to comply
with a judicial decree. BSEE will order
suspensions when operations are halted
on the existing facility and BSEE
determines continuation of the alternate
use is unsafe or causes undue
interference with the facility.
Part 285 subpart D, Lease and Grant
Administration, includes the authority
to issue notices of noncompliance
E:\FR\FM\27SEN1.SGM
27SEN1
66502
Federal Register / Vol. 88, No. 186 / Wednesday, September 27, 2023 / Notices
(NONCs) and cessation orders, and to
pursue civil penalties and recommend
criminal penalties. BSEE assumes
authority for oversight and enforcement
of the design, construction, operation,
and decommissioning phases of offshore
wind development, as well as
enforcement of requirements related to
Alternate Use RUEs.
This ICR includes a new form:
Form BSEE–1835, Notification of
Noncompliance (NONC).
BSEE will use the information to
determine that respondents have
corrected all Notifications of
Noncompliance (NONCs) identified
during inspections. Everything on the
NONC form is filled out by a BSEE
inspector/representative. The only thing
industry does with this form is sign the
document upon receipt and respond to
BSEE when each NONC has been
corrected. Dependent on the severity of
the non-compliance identified by the
BSEE inspector, the responses are
assigned different intervals and are
described in the form table titled
Enforcement Timeline:
1—At Time of Inspection
14—Within 14 Days
30—Within 30 Days
50—Prior to Returning to Service/
Operation
60—Prior to Next Scheduled
Maintenance
70—During Next Scheduled
Maintenance
80—Prior to Next scheduled Audit
90—During Next Scheduled Audit.
Title of Collection: 30 CFR part 285,
Renewable Energy and Alternate Uses of
Existing Facilities on the Outer
Continental Shelf.
OMB Control Number: 1014–0034.
Form Number: Form BSEE–1835,
Notice(s) of Noncompliance.
Type of Review: Revision of a
currently approved collection.
Respondents/Affected Public: Primary
respondents comprise Federal OCS
companies that submit unsolicited
proposals or responses to Federal
Register notices; or are lessees,
designated operators, and ROW or RUE
grant holders. Other potential
respondents are companies or state and
local governments that submit
information or comments relative to
alternative energy-related uses of the
OCS; certified verification agents
(CVAs); and surety or third-party
guarantors.
Total Estimated Number of Annual
Respondents: Currently there are
approximately 47 Lessees in the OCS.
Not all the potential respondents will
submit information in any given year,
and some may submit multiple times.
Total Estimated Number of Annual
Responses: 103.
Estimated Completion Time per
Response: Varies from 30 minutes to
6,000 hours, depending on activity.
Total Estimated Number of Annual
Burden Hours: 8,908
Respondent’s Obligation: Responses
are mandatory and are required to
obtain or retain a benefit.
Frequency of Collection: generally
occasional or annual.
Total Estimated Annual Nonhour
Burden Cost: $1,908,000.
BURDEN TABLE
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Hour
burden
Average
number of
annual
responses
Annual
burden
hours
Non-hour cost
burdens
ddrumheller on DSK120RN23PROD with NOTICES1
Subpart A—General Provisions
102; 105; 110 .....................................
These sections contain general references to submitting comments, requests, applications, plans, notices, reports, and/or supplemental information for BSEE approval—burdens covered under specific
requirements.
103; 904; ............................................
Request general departures not specifically covered
elsewhere in part 285.
.5 ...............
6 requests .........
3
105(c) .................................................
Make oral requests or notifications and submit written
follow up within 3 business days not specifically covered elsewhere in part 285.
1 ................
2 requests .........
2
1016 ...................................................
Request reconsideration and/or hearing .........................
Requirement not considered IC
under 5 CFR 1320.3(h)(9).
0
111(b)(3); (b)(5); (b)(6) ......................
Within 30 days of receiving bill, submit processing fee
payments for BSEE document or study preparation to
process applications and other requests.
.5 ...............
1
..........................................................................................
...................
111(b)(2), (3) ......................................
Submit comments on proposed processing fee or request approval to perform or directly pay contractors
for all or part of any document, study, or other activity, to reduce BSEE processing costs.
2 ................
2 requests .........
4
111(b)(3) ............................................
Perform, conduct, develop, etc., all or part of any document, study, or other activity; and provide results to
BSEE to reduce BSEE processing fee. Pay processing fee for all or part of any document, study, or
other activity, and provide results to BSEE to reduce
BSEE processing costs.
6,000 .........
1 submission .....
6,000
VerDate Sep<11>2014
18:44 Sep 26, 2023
Jkt 259001
PO 00000
Frm 00142
Fmt 4703
Sfmt 4703
E:\FR\FM\27SEN1.SGM
27SEN1
2 submissions ...
2 payments × $4,000 = $8,000
66503
Federal Register / Vol. 88, No. 186 / Wednesday, September 27, 2023 / Notices
BURDEN TABLE—Continued
Hour
burden
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Average
number of
annual
responses
Annual
burden
hours
Non-hour cost
burdens
..........................................................................................
...................
1 contractor payment ×
$950,000 = $950,000
111(b)(7) ............................................
Appeal BSEE estimated processing costs, decisions, or
orders pursuant to 30 CFR 290.
Exempt under 5 CFR
1320.4(a)(2), (c).
0
115 .....................................................
Request approval to use later edition of a document incorporated by reference or alternative compliance.
1 ................
1 request ...........
1
118 .....................................................
Request appeal within 15 days of bid rejection, request
reconsideration of bid decision or rejection.
Requirement not considered IC
under 5 CFR 1320.3(h)(9).
0
400; 401; 402 NONCs .......................
These sections contain references to information submissions, approvals, requests, applications, plans, payments, etc., the burdens for which are covered elsewhere in part 285.
0
401(b) .................................................
Take measures directed by BSEE in cessation order
and submit reports to resume activities.
100 ............
1 report ..............
100
417(b) .................................................
Conduct, and if required pay for, site-specific study to
evaluate cause of harm or damage; and submit copies of study and results, in format specified.
110 ............
1 study/submission.
110
..........................................................................................
...................
1 study × $950,000 = $950,000
Provide information for reconsideration of BSEE decision to contract or cancel lease or grant area.
Requirement not considered IC
under 5 CFR 1320.3(h)(9).
Subpart B—Reserved
Subpart C—Reserved
Subpart D—Lease and Grant Administration
437 .....................................................
0
Subpart E—Reserved
Subpart F—Plans and Information Requirements
ddrumheller on DSK120RN23PROD with NOTICES1
** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations Plans (COPs), and General Activities Plans
(GAPs); and the burdens include any previous or subsequent references throughout part 285 to submission and approval. This subpart
contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 285.
** 606; 614; 810 .................................
Within time specified after issuance of a competitive
lease or grant, or within time specified after determination of no competitive interest, submit copies of
SAP, including required information to assist BSEE to
comply with NEPA/CZMA such as hazard info, air
quality, SMS, and all required information, certifications, requests, etc., in format specified.
48 ..............
2 SAPs ..............
96
** 621; 632; 637; 810 .........................
If requesting an operations term for commercial lease,
within time specified before the end of site assessment term, submit copies of COP, or FERC license
application, including required information to assist
BSEE to comply with NEPA/CZMA such as hazard
info, air quality, SMS, and all required information,
surveys and/or their results, reports, certifications,
project easements, supporting data and information,
requests, etc., in format specified.
200 ............
2 COPs ..............
400
VerDate Sep<11>2014
18:44 Sep 26, 2023
Jkt 259001
PO 00000
Frm 00143
Fmt 4703
Sfmt 4703
E:\FR\FM\27SEN1.SGM
27SEN1
66504
Federal Register / Vol. 88, No. 186 / Wednesday, September 27, 2023 / Notices
BURDEN TABLE—Continued
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Hour
burden
Average
number of
annual
responses
Annual
burden
hours
Non-hour cost
burdens
** 641; 651; 810 .................................
Within time specified after issuance of a competitive
lease or grant, or within time specified after determination of no competitive interest, submit copies of
GAP, including required information to assist BSEE to
comply with NEPA/CZMA such as hazard info, air
quality, SMS, and all required information, surveys
and reports, certifications, project easements, requests, etc., in format specified.
48 ..............
2 GAPs ..............
96
** 632(c); 907 .....................................
Submit revised or modified COPs, including project
easements, and all required additional information.
10 ..............
1 revised or
modified COP.
10
602 .....................................................
Until BSEE releases financial assurance, respondents
must maintain, and provide to BSEE if requested, all
data and information related to compliance with required terms and conditions of SAP, COP, or
GAP 2.
2 ................
9 records/submissions.
18
615; 800(b) .........................................
Submit annual, or at other time periods as BSEE determines, SAP compliance certification, effectiveness
statement, recommendations, reports, supporting
documentation, etc.
40 ..............
4 certifications ...
160
633; 800(b) .........................................
Submit annual, or at other time periods as BOEM/BSEE
determines, COP compliance certification, effectiveness statement, recommendations, reports, supporting documentation, etc.
45 ..............
9 certifications ...
405
636(a) .................................................
Notify BSEE in writing no later than 30 days after commencing activities associated with placement of facilities on lease area.
1 ................
2 notices ............
2
636(b) .................................................
Notify BSEE in writing no later than 30 days after completion of construction and installation activities.
1 ................
2 notices ............
2
636(c) .................................................
Notify BSEE in writing at least 7 days before commencing commercial operations.
1 ................
1 notice ..............
1
651 .....................................................
Before beginning construction of OCS facility described
in GAP, demonstrate operational SMS identified in
GAP, submit initial findings.
27.5 ...........
2 notices ............
55
653(a), (b); 800(b) ..............................
Submit annual, or at other time periods as BSEE determines, GAP compliance certification, recommendations, reports, etc.
40 ..............
4 certifications ...
160
Subpart G—Facility Design, Fabrication, and Installation
ddrumheller on DSK120RN23PROD with NOTICES1
*** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent references throughout part 285 to submitting and obtaining approval. This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 285.
*** 700(a) (1), (c); 701 ........................
Submit Facility Design Report, including copies of the
cover letter, certification statement, and all required
information (1–3 paper or electronic copies as specified).
200 ............
1 report ..............
200
*** 700(a) (2), (c); 702 ........................
Submit Fabrication and Installation Report, including
copies of the cover letter, certification statement, and
all required information, in format specified.
160 ............
1 report ..............
160
705(a); 707(a); 712 ............................
Certified Verification Agent (CVA) conducts independent
assessment of the facility design and submits copies
of all reports/certifications to lessee or grant holder
and BSEE—interim reports if required, in format
specified.
100 ............
1 interim report ..
100
VerDate Sep<11>2014
19:58 Sep 26, 2023
Jkt 259001
PO 00000
Frm 00144
Fmt 4703
Sfmt 4703
E:\FR\FM\27SEN1.SGM
27SEN1
66505
Federal Register / Vol. 88, No. 186 / Wednesday, September 27, 2023 / Notices
BURDEN TABLE—Continued
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Hour
burden
Average
number of
annual
responses
Annual
burden
hours
Non-hour cost
burdens
..........................................................................................
100 ............
1 final report ......
100
CVA conducts independent assessments/inspections on
the fabrication and installation activities, informs lessee or grant holder if procedures are changed or design specifications are modified; and submits copies
of all reports/certifications to lessee or grant holder
and BSEE—interim reports if required, in format
specified.
100 ............
1 interim report ..
100
..........................................................................................
100 ............
1 final report ......
100
CVA/project engineer monitors major project modifications and repairs and submits copies of all reports/
certifications to lessee or grant holder and BSEE—interim reports if required, in format specified.
20 ..............
1 interim report ..
20
..........................................................................................
15 ..............
1 final report ......
15
705(b), (c) ..........................................
Request waiver of CVA requirement in writing; lessee 16 ..............
must demonstrate standard design and best practices.
1 waiver .............
16
706 .....................................................
Submit for approval with SAP, COP, or GAP, initial
nominations for a CVA or new replacement CVA
nomination and required information.
6.5 .............
2 nominations ....
13
708(b)(2) ............................................
Notify BSEE if modifications identified by CVA/project
engineer are accepted.
1 ................
1 notice ..............
1
709(a); 710 .........................................
Make fabrication quality control, installation towing, and
other records available to CVA/project engineer for
review (retention required by § 285.714).
1 ................
3 records ...........
3
713 .....................................................
Notify BSEE within 10 business days after commencing
commercial operations.
Until BOEM releases financial assurance, compile, retain, and make available to BSEE and/or CVA the asbuilt drawings, design assumptions/analyses, summary of fabrication and installation examination
records, inspection results, and records of repairs not
covered in inspection report. Record original and relevant material test results of all primary structural
materials; retain records during all stages of construction 2.
1 ................
1 notice ..............
1
100 ............
1 lessee .............
100
705(a); 707(b); 708; 709; ...................
710; 712; 637 .....................................
*** 703; 705(a); 712; 815 ...................
714; 703(b) .........................................
ddrumheller on DSK120RN23PROD with NOTICES1
Subpart H—Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs,
COPs, and GAPs
802(a); 902(e) ....................................
Notify BSEE of archaeological resource within 72 hours
of discovery.
3 ................
1 notice ..............
3
802(d) .................................................
If applicable, submit payment for BSEE costs in carrying out National Historic Preservation Act responsibilities.
.5 ...............
1 payment .........
1
810; 614(b); 632(b); 651 ....................
Submit safety management system description with the
SAP, COP, or GAP.
30 ..............
2 submissions ...
60
813(b)(1) ............................................
Report within 24 hours when any required equipment
taken out of service for more than 12 hours; provide
written confirmation if reported orally.
.5 ...............
2 reports ............
1
1 ................
1 written confirmation.
1
VerDate Sep<11>2014
18:44 Sep 26, 2023
Jkt 259001
PO 00000
Frm 00145
Fmt 4703
Sfmt 4703
E:\FR\FM\27SEN1.SGM
27SEN1
66506
Federal Register / Vol. 88, No. 186 / Wednesday, September 27, 2023 / Notices
BURDEN TABLE—Continued
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Hour
burden
Average
number of
annual
responses
Annual
burden
hours
Non-hour cost
burdens
813(b)(3) ............................................
Notify BSEE when equipment returned to service; provide written confirmation if reported orally.
.5 ...............
2 notices ............
1
815 .....................................................
When required, analyze cable, P/L, or facility damage
or failures to determine cause and as soon as available submit comprehensive written report.
1.5 .............
1 report ..............
2
816 .....................................................
Submit plan of corrective action report on observed detrimental effects on cable, P/L, or facility within 30
days of discovery; take remedial action and submit
report of remedial action within 30 days after completion.
2 ................
1 plan/report ......
2
822 .....................................................
Maintain records of design, construction, operation,
maintenance, repairs, and investigation on or related
to lease or ROW/RUE area; make available to BSEE
for inspection 2.
1 ................
4 records retention.
4
823 .....................................................
Request reimbursement within 90 days for food, quarters, and transportation provided to BSEE reps during
inspection.
2 ................
1 request ...........
2
824(a) .................................................
Develop annual self-inspection plan covering all facilities; retain with records and make available to BSEE
upon request.
24 ..............
2 plans ...............
48
824(b) .................................................
Conduct annual self-inspection and submit report by
November 1.
36 ..............
2 reports ............
72
825 .....................................................
Based on API RP 2A–WSD, perform assessment of
structures, initiate mitigation actions for structures
that do not pass assessment process, retain information, and make available to BSEE upon request.
60 ..............
2 assessments/
actions.
120
830(a), (c); 831 thru 833 ....................
Immediately report incidents to BSEE via oral communications, submit written follow-up report within 15
business days after the incident, and submit any required additional information.
.5 Oral .......
4 Written ....
2 incidents .........
1 incident ...........
1
4
830(d) .................................................
Report oil spills as required by BSEE 30 CFR part 254
2 ................
1 report ..............
2
Subpart I—Decommissioning
ddrumheller on DSK120RN23PROD with NOTICES1
**** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent references throughout part 285 to submitting and obtaining approval. This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in parts 285.
**** 902; 905, 906; 907; 908(b), (c);
909; 638(a).
Submit for approval, in format specified, copies of the
SAP, COP, or GAP decommissioning application and
site clearance plan at least 2 years before decommissioning activities begin, 90 days after completion of
activities, or 90 days after cancellation, relinquishment, or other termination of lease or grant. Include
documentation of coordination efforts regarding requests that certain facilities remain in place for other
activities, be converted to an artificial reef, or be toppled in place. Submit additional information/evidence
requested or modify and resubmit application.
19 ..............
1 application ......
19
902(d); 908(a) ....................................
Notify BSEE at least 60 days before commencing decommissioning activities.
1 ................
1 notice ..............
1
910(b) .................................................
Within 60 days after removing a facility, verify to BSEE
that site is cleared.
1 ................
1 verification ......
1
VerDate Sep<11>2014
18:44 Sep 26, 2023
Jkt 259001
PO 00000
Frm 00146
Fmt 4703
Sfmt 4703
E:\FR\FM\27SEN1.SGM
27SEN1
66507
Federal Register / Vol. 88, No. 186 / Wednesday, September 27, 2023 / Notices
BURDEN TABLE—Continued
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Hour
burden
Average
number of
annual
responses
Annual
burden
hours
Non-hour cost
burdens
912 .....................................................
Within 60 days after removing a facility, cable, or pipeline, submit a written report.
8 ................
1 report ..............
8
BSEE does not anticipate decommissioning activities for at least 5 years, so the requirements have been given a minimal burden.
Total Burden ...............................
103 Responses
8,908 Hours
$1,908,000 Non-Hour Costs
Burdens
Kirk Malstrom,
Chief, Regulations and Standards Branch.
By order of the Commission.
Issued: September 22, 2023.
Sharon Bellamy,
Supervisory Hearings and Information
Officer.
[FR Doc. 2023–21038 Filed 9–26–23; 8:45 am]
[FR Doc. 2023–21091 Filed 9–26–23; 8:45 am]
BILLING CODE 4310–VH–P
BILLING CODE 7020–02–P
No other changes have been made in
either the membership or planned
activity of the group research project.
Membership in this group research
project remains open, and DEC intends
to file additional written notifications
disclosing all changes in membership.
On April 12, 2023, DEC filed its
original notification pursuant to section
6(a) of the Act. The Department of
Justice published a notice in the Federal
Register pursuant to section 6(b) of the
Act on August 8, 2023 (88 FR 53520).
DEPARTMENT OF JUSTICE
Suzanne Morris,
Deputy Director Civil Enforcement
Operations, Antitrust Division.
An agency may not conduct, or
sponsor and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number.
The authority for this action is the
Paperwork Reduction Act of 1995 (44
U.S.C. 3501 et seq.).
INTERNATIONAL TRADE
COMMISSION
[FR Doc. 2023–20951 Filed 9–26–23; 8:45 am]
Antitrust Division
[Investigation No. 731–TA–893 (Fourth
Review)]
Honey From China; Determination
On the basis of the record 1 developed
in the subject five-year review, the
United States International Trade
Commission (‘‘Commission’’)
determines, pursuant to the Tariff Act of
1930 (‘‘the Act’’), that revocation of the
antidumping duty order on honey from
China would be likely to lead to
continuation or recurrence of material
injury to an industry in the United
States within a reasonably foreseeable
time.
ddrumheller on DSK120RN23PROD with NOTICES1
Background
The Commission instituted this
review on March 1, 2023 (88 FR 12992)
and determined on June 5, 2023 that it
would conduct an expedited review (88
FR 44841, July 13, 2023).
The Commission made this
determination pursuant to section
751(c) of the Act (19 U.S.C. 1675(c)). It
completed and filed its determination in
this review on September 22, 2023. The
1 The record is defined in § 207.2(f) of the
Commission’s Rules of Practice and Procedure (19
CFR 207.2(f)).
VerDate Sep<11>2014
18:44 Sep 26, 2023
views of the Commission are contained
in USITC Publication 5461 (September
2023), entitled Honey from China:
Investigation No. 731–TA–893 (Fourth
Review).
Jkt 259001
BILLING CODE P
Notice Pursuant to the National
Cooperative Research and Production
Act of 1993—Defense Electronics
Consortium
Notice is hereby given that, on July
14, 2023, pursuant to section 6(a) of the
National Cooperative Research and
Production Act of 1993, 15 U.S.C. 4301
et seq. (‘‘the Act’’), the Defense
Electronics Consortium (‘‘DEC’’) has
filed written notifications
simultaneously with the Attorney
General and the Federal Trade
Commission disclosing changes in its
membership. The notifications were
filed for the purpose of extending the
Act’s provisions limiting the recovery of
antitrust plaintiffs to actual damages
under specified circumstances.
Specifically, 3D Glass Solutions, Inc.,
Albuquerque, NM; Amida Technology
Solutions LLC, Washington, DC; Ceritas,
Inc., Gloucester, MA; CoolCAD
Electronics LLC, College Park, MD;
Spectrum Control, Inc., Fairview, PA;
Synopsys, Inc., Mountainview, CA; and
University of Florida Board of Trustees,
Gainesville, FL, have been added as
parties to this venture.
PO 00000
Frm 00147
Fmt 4703
Sfmt 4703
DEPARTMENT OF JUSTICE
Office of Justice Programs
[OJP (NIJ) Docket No. 1817]
Forensic Laboratory Needs–
Technology Working Group
National Institute of Justice,
Office of Justice Programs, U.S.
Department of Justice.
ACTION: Notice.
AGENCY:
The National Institute of
Justice (NIJ) is seeking qualified
individuals to serve on the Forensic
Laboratory Needs–Technology Working
Group (FLN–TWG). The FLN–TWG was
established in 2018 to build upon the
work of the National Commission of
Forensic Sciences.
DATES: Individuals wishing to submit an
application to the National Institute of
Justice must do so by 5 p.m. Eastern
Time on December 29, 2023, as
instructed below.
FOR FURTHER INFORMATION CONTACT:
Danielle McLeod-Henning, Physical
Scientist, Office of Investigative and
SUMMARY:
E:\FR\FM\27SEN1.SGM
27SEN1
Agencies
- DEPARTMENT OF THE INTERIOR
- Bureau of Safety and Environmental Enforcement
[Federal Register Volume 88, Number 186 (Wednesday, September 27, 2023)]
[Notices]
[Pages 66501-66507]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-21038]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Safety and Environmental Enforcement
[Docket ID BSEE-2023-0013; EEEE500000 234E1700D2 ET1SF0000.EAQ000; OMB
Control Number 1014-0034]
Agency Information Collection Activities; Submission to the
Office of Management and Budget for Review and Approval; Renewable
Energy and Alternate Uses of Existing Facilities on the Outer
Continental Shelf
AGENCY: Bureau of Safety and Environmental Enforcement, Interior.
ACTION: Notice of information collection; request for comment.
-----------------------------------------------------------------------
SUMMARY: In accordance with the Paperwork Reduction Act (PRA) of 1995,
the Bureau of Safety and Environmental Enforcement (BSEE) proposes to
renew an information collection with revisions.
DATES: Interested persons are invited to submit comments on or before
October 27, 2023.
ADDRESSES: Written comments and recommendations for the proposed
information collection should be sent within 30 days of publication of
this notice to www.reginfo.gov/public/do/PRAMain. Find this particular
information collection by selecting ``Currently under 30-day Review--
Open for Public Comments'' or by using the search function. Please
provide a copy of your comments to Nikki Mason, BSEE ICCO, 45600
Woodland Road, Sterling, VA 20166; or by email to [email protected].
Please reference OMB Control Number 1014-0034 in the subject line of
your comments.
FOR FURTHER INFORMATION CONTACT: To request additional information
about this ICR, contact Nikki Mason by email at [email protected],
or by telephone at (703) 787-1607. Individuals in the United States who
are deaf, deafblind, hard of hearing, or have a speech disability may
dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay
services. Individuals outside the United States should use the relay
services offered within their country to make international calls to
the point-of-contact in the United States. You may also view the ICR at
https://www.reginfo.gov/public/do/PRAMain.
SUPPLEMENTARY INFORMATION: In accordance with the PRA and 5 CFR
1320.8(d)(1), we provide the general public and other Federal agencies
with an opportunity to comment on new, proposed, revised, and
continuing collections of information. This helps us assess the impact
of our information collection requirements and minimize the public's
reporting burden. It also helps the public understand our information
collection requirements and provide the requested data in the desired
format.
A Federal Register notice with a 60-day public comment period
soliciting comments on this collection of information was published on
July 13, 2023 (88 FR 44834). No comments were received.
As part of our continuing effort to reduce paperwork and respondent
burdens, we are again soliciting comments from the public and other
Federal agencies on the proposed ICR that is described below. We are
especially interested in public comment addressing the following:
(1) Whether or not the collection of information is necessary for
the proper performance of the functions of the agency, including
whether or not the information will have practical utility;
(2) The accuracy of our estimate of the burden for this collection
of information, including the validity of the methodology and
assumptions used;
(3) Ways to enhance the quality, utility, and clarity of the
information to be collected; and
(4) How might the agency minimize the burden of the collection of
information on those who are to respond, including through the use of
appropriate automated, electronic, mechanical, or other technological
collection techniques or other forms of information technology, e.g.,
permitting electronic submission of response.
Comments that you submit in response to this notice are a matter of
public record. Before including your address, phone number, email
address, or other personal identifying information in your comment, you
should be aware that your entire comment--including your personal
identifying information--may be made publicly available at any time.
While you can ask us in your comment to withhold your personal
identifying information from public review, we cannot guarantee that we
will be able to do so.
Abstract: BSEE will use the information to oversee facility design,
fabrication, installation, and safety management systems; ensure the
safety of operations, including inspection programs and incident
reporting and investigations; enforce compliance with all applicable
safety, environmental, and other laws and regulations through
enforcement actions (such as noncompliance notices, cessation orders,
and certain lease suspensions); and oversee decommissioning activities.
These responsibilities include enforcement provisions under the
existing part 285 subpart D, various information submittal requirements
under subpart F, as well as provisions governing activities conducted
under an approved plan, including the design, construction, operation,
and decommissioning of facilities under subparts G, H, and I. The
requirements for and standards of review regarding the Facility Design
Report (FDR) and Facility Fabrication and Installation Report (FIR) are
unchanged: the FDR and FIR will continue to be evaluated for
consistency with the Construction and Operations Plan (COP) and
applicable engineering standards. Decommissioning requirements related
to rights-of-use and easement for alternate uses of existing OCS
facilities (Alternate Use RUE) have also been transferred from the
existing subpart J to part 285.
BSEE assumes the responsibility for ordering a lease or grant
suspension when continued activities pose an imminent threat of serious
or irreparable harm or damage to natural resources, life, property, the
marine coastal, or human environment, or sites, structures, or objects
of historical or archaeological significance. BSEE may also order a
suspension when necessary to comply with a judicial decree. Under the
rule, BSEE also assumes authority to issue cessation orders to address
noncompliance on the part of the grantee or lessee.
The Department does not issue Suspensions for Alternate Use RUEs
upon the grantee's request, but only by order. BOEM will retain
authority to order suspensions required for National security, and BSEE
will assume authority to order suspensions to address a threat of harm
from continued operations. Either bureau may order a suspension when
necessary to comply with a judicial decree. BSEE will order suspensions
when operations are halted on the existing facility and BSEE determines
continuation of the alternate use is unsafe or causes undue
interference with the facility.
Part 285 subpart D, Lease and Grant Administration, includes the
authority to issue notices of noncompliance
[[Page 66502]]
(NONCs) and cessation orders, and to pursue civil penalties and
recommend criminal penalties. BSEE assumes authority for oversight and
enforcement of the design, construction, operation, and decommissioning
phases of offshore wind development, as well as enforcement of
requirements related to Alternate Use RUEs.
This ICR includes a new form:
Form BSEE-1835, Notification of Noncompliance (NONC).
BSEE will use the information to determine that respondents have
corrected all Notifications of Noncompliance (NONCs) identified during
inspections. Everything on the NONC form is filled out by a BSEE
inspector/representative. The only thing industry does with this form
is sign the document upon receipt and respond to BSEE when each NONC
has been corrected. Dependent on the severity of the non-compliance
identified by the BSEE inspector, the responses are assigned different
intervals and are described in the form table titled Enforcement
Timeline:
1--At Time of Inspection
14--Within 14 Days
30--Within 30 Days
50--Prior to Returning to Service/Operation
60--Prior to Next Scheduled Maintenance
70--During Next Scheduled Maintenance
80--Prior to Next scheduled Audit
90--During Next Scheduled Audit.
Title of Collection: 30 CFR part 285, Renewable Energy and
Alternate Uses of Existing Facilities on the Outer Continental Shelf.
OMB Control Number: 1014-0034.
Form Number: Form BSEE-1835, Notice(s) of Noncompliance.
Type of Review: Revision of a currently approved collection.
Respondents/Affected Public: Primary respondents comprise Federal
OCS companies that submit unsolicited proposals or responses to Federal
Register notices; or are lessees, designated operators, and ROW or RUE
grant holders. Other potential respondents are companies or state and
local governments that submit information or comments relative to
alternative energy-related uses of the OCS; certified verification
agents (CVAs); and surety or third-party guarantors.
Total Estimated Number of Annual Respondents: Currently there are
approximately 47 Lessees in the OCS. Not all the potential respondents
will submit information in any given year, and some may submit multiple
times.
Total Estimated Number of Annual Responses: 103.
Estimated Completion Time per Response: Varies from 30 minutes to
6,000 hours, depending on activity.
Total Estimated Number of Annual Burden Hours: 8,908
Respondent's Obligation: Responses are mandatory and are required
to obtain or retain a benefit.
Frequency of Collection: generally occasional or annual.
Total Estimated Annual Nonhour Burden Cost: $1,908,000.
Burden Table
----------------------------------------------------------------------------------------------------------------
Average number of
Reporting and annual responses Annual burden
Citations in 30 CFR 285 recordkeeping Hour burden ------------------------ hours
requirement \1\ Non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
Subpart A--General Provisions
----------------------------------------------------------------------------------------------------------------
102; 105; 110.................. These sections contain general references to submitting comments, requests,
applications, plans, notices, reports, and/or supplemental information for
BSEE approval--burdens covered under specific requirements.
----------------------------------------------------------------------------------------------------------------
103; 904;...................... Request general .5............... 6 requests............ 3
departures not
specifically
covered elsewhere
in part 285.
----------------------------------------------------------------------------------------------------------------
105(c)......................... Make oral requests 1................ 2 requests............ 2
or notifications
and submit
written follow up
within 3 business
days not
specifically
covered elsewhere
in part 285.
----------------------------------------------------------------------------------------------------------------
1016........................... Request Requirement not considered IC under 5 CFR 0
reconsideration 1320.3(h)(9).
and/or hearing.
----------------------------------------------------------------------------------------------------------------
111(b)(3); (b)(5); (b)(6)...... Within 30 days of .5............... 2 submissions......... 1
receiving bill,
submit processing
fee payments for
BSEE document or
study preparation
to process
applications and
other requests.
-----------------------------------------
.................. ................. 2 payments x $4,000 = $8,000
----------------------------------------------------------------------------------------------------------------
111(b)(2), (3)................. Submit comments on 2................ 2 requests............ 4
proposed
processing fee or
request approval
to perform or
directly pay
contractors for
all or part of
any document,
study, or other
activity, to
reduce BSEE
processing costs.
----------------------------------------------------------------------------------------------------------------
111(b)(3)...................... Perform, conduct, 6,000............ 1 submission.......... 6,000
develop, etc.,
all or part of
any document,
study, or other
activity; and
provide results
to BSEE to reduce
BSEE processing
fee. Pay
processing fee
for all or part
of any document,
study, or other
activity, and
provide results
to BSEE to reduce
BSEE processing
costs.
-----------------------------------------
[[Page 66503]]
.................. ................. 1 contractor payment x $950,000 =
$950,000
----------------------------------------------------------------------------------------------------------------
111(b)(7)...................... Appeal BSEE Exempt under 5 CFR 1320.4(a)(2), (c). 0
estimated
processing costs,
decisions, or
orders pursuant
to 30 CFR 290.
----------------------------------------------------------------------------------------------------------------
115............................ Request approval 1................ 1 request............. 1
to use later
edition of a
document
incorporated by
reference or
alternative
compliance.
----------------------------------------------------------------------------------------------------------------
118............................ Request appeal Requirement not considered IC under 5 CFR 0
within 15 days of 1320.3(h)(9).
bid rejection,
request
reconsideration
of bid decision
or rejection.
----------------------------------------------------------------------------------------------------------------
Subpart B--Reserved
----------------------------------------------------------------------------------------------------------------
Subpart C--Reserved
----------------------------------------------------------------------------------------------------------------
Subpart D--Lease and Grant Administration
----------------------------------------------------------------------------------------------------------------
400; 401; 402 NONCs............ These sections contain references to information submissions, 0
approvals, requests, applications, plans, payments, etc.,
the burdens for which are covered elsewhere in part 285.
----------------------------------------------------------------------------------------------------------------
401(b)......................... Take measures 100.............. 1 report.............. 100
directed by BSEE
in cessation
order and submit
reports to resume
activities.
----------------------------------------------------------------------------------------------------------------
417(b)......................... Conduct, and if 110.............. 1 study/submission.... 110
required pay for,
site-specific
study to evaluate
cause of harm or
damage; and
submit copies of
study and
results, in
format specified.
-----------------------------------------
.................. ................. 1 study x $950,000 = $950,000
----------------------------------------------------------------------------------------------------------------
437............................ Provide Requirement not considered IC under 5 CFR 0
information for 1320.3(h)(9).
reconsideration
of BSEE decision
to contract or
cancel lease or
grant area.
----------------------------------------------------------------------------------------------------------------
Subpart E--Reserved
----------------------------------------------------------------------------------------------------------------
Subpart F--Plans and Information Requirements
----------------------------------------------------------------------------------------------------------------
** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations Plans (COPs), and
General Activities Plans (GAPs); and the burdens include any previous or subsequent references throughout part
285 to submission and approval. This subpart contains references to other information submissions, approvals,
requests, applications, plans, etc., the burdens for which are covered elsewhere in part 285.
----------------------------------------------------------------------------------------------------------------
** 606; 614; 810............... Within time 48............... 2 SAPs................ 96
specified after
issuance of a
competitive lease
or grant, or
within time
specified after
determination of
no competitive
interest, submit
copies of SAP,
including
required
information to
assist BSEE to
comply with NEPA/
CZMA such as
hazard info, air
quality, SMS, and
all required
information,
certifications,
requests, etc.,
in format
specified.
----------------------------------------------------------------------------------------------------------------
** 621; 632; 637; 810.......... If requesting an 200.............. 2 COPs................ 400
operations term
for commercial
lease, within
time specified
before the end of
site assessment
term, submit
copies of COP, or
FERC license
application,
including
required
information to
assist BSEE to
comply with NEPA/
CZMA such as
hazard info, air
quality, SMS, and
all required
information,
surveys and/or
their results,
reports,
certifications,
project
easements,
supporting data
and information,
requests, etc.,
in format
specified.
----------------------------------------------------------------------------------------------------------------
[[Page 66504]]
** 641; 651; 810............... Within time 48............... 2 GAPs................ 96
specified after
issuance of a
competitive lease
or grant, or
within time
specified after
determination of
no competitive
interest, submit
copies of GAP,
including
required
information to
assist BSEE to
comply with NEPA/
CZMA such as
hazard info, air
quality, SMS, and
all required
information,
surveys and
reports,
certifications,
project
easements,
requests, etc.,
in format
specified.
----------------------------------------------------------------------------------------------------------------
** 632(c); 907................. Submit revised or 10............... 1 revised or modified 10
modified COPs, COP.
including project
easements, and
all required
additional
information.
----------------------------------------------------------------------------------------------------------------
602............................ Until BSEE 2................ 9 records/submissions. 18
releases
financial
assurance,
respondents must
maintain, and
provide to BSEE
if requested, all
data and
information
related to
compliance with
required terms
and conditions of
SAP, COP, or GAP
\ 2\.
----------------------------------------------------------------------------------------------------------------
615; 800(b).................... Submit annual, or 40............... 4 certifications...... 160
at other time
periods as BSEE
determines, SAP
compliance
certification,
effectiveness
statement,
recommendations,
reports,
supporting
documentation,
etc.
----------------------------------------------------------------------------------------------------------------
633; 800(b).................... Submit annual, or 45............... 9 certifications...... 405
at other time
periods as BOEM/
BSEE determines,
COP compliance
certification,
effectiveness
statement,
recommendations,
reports,
supporting
documentation,
etc.
----------------------------------------------------------------------------------------------------------------
636(a)......................... Notify BSEE in 1................ 2 notices............. 2
writing no later
than 30 days
after commencing
activities
associated with
placement of
facilities on
lease area.
----------------------------------------------------------------------------------------------------------------
636(b)......................... Notify BSEE in 1................ 2 notices............. 2
writing no later
than 30 days
after completion
of construction
and installation
activities.
----------------------------------------------------------------------------------------------------------------
636(c)......................... Notify BSEE in 1................ 1 notice.............. 1
writing at least
7 days before
commencing
commercial
operations.
----------------------------------------------------------------------------------------------------------------
651............................ Before beginning 27.5............. 2 notices............. 55
construction of
OCS facility
described in GAP,
demonstrate
operational SMS
identified in
GAP, submit
initial findings.
----------------------------------------------------------------------------------------------------------------
653(a), (b); 800(b)............ Submit annual, or 40............... 4 certifications...... 160
at other time
periods as BSEE
determines, GAP
compliance
certification,
recommendations,
reports, etc.
----------------------------------------------------------------------------------------------------------------
Subpart G--Facility Design, Fabrication, and Installation
----------------------------------------------------------------------------------------------------------------
*** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous
or subsequent references throughout part 285 to submitting and obtaining approval. This subpart contains
references to other information submissions, approvals, requests, applications, plans, etc., the burdens for
which are covered elsewhere in part 285..
----------------------------------------------------------------------------------------------------------------
*** 700(a) (1), (c); 701....... Submit Facility 200.............. 1 report.............. 200
Design Report,
including copies
of the cover
letter,
certification
statement, and
all required
information (1-3
paper or
electronic copies
as specified).
----------------------------------------------------------------------------------------------------------------
*** 700(a) (2), (c); 702....... Submit Fabrication 160.............. 1 report.............. 160
and Installation
Report, including
copies of the
cover letter,
certification
statement, and
all required
information, in
format specified.
----------------------------------------------------------------------------------------------------------------
705(a); 707(a); 712............ Certified 100.............. 1 interim report...... 100
Verification
Agent (CVA)
conducts
independent
assessment of the
facility design
and submits
copies of all
reports/
certifications to
lessee or grant
holder and BSEE--
interim reports
if required, in
format specified.
----------------------------------------------------------------------------------------------------------------
[[Page 66505]]
.................. 100.............. 1 final report........ 100
----------------------------------------------------------------------------------------------------------------
705(a); 707(b); 708; 709;...... CVA conducts 100.............. 1 interim report...... 100
710; 712; 637.................. independent
assessments/
inspections on
the fabrication
and installation
activities,
informs lessee or
grant holder if
procedures are
changed or design
specifications
are modified; and
submits copies of
all reports/
certifications to
lessee or grant
holder and BSEE--
interim reports
if required, in
format specified.
------------------------------------------------------------
.................. 100.............. 1 final report........ 100
----------------------------------------------------------------------------------------------------------------
*** 703; 705(a); 712; 815...... CVA/project 20............... 1 interim report...... 20
engineer monitors
major project
modifications and
repairs and
submits copies of
all reports/
certifications to
lessee or grant
holder and BSEE--
interim reports
if required, in
format specified.
------------------------------------------------------------
.................. 15............... 1 final report........ 15
----------------------------------------------------------------------------------------------------------------
705(b), (c).................... Request waiver of 16............... 1 waiver.............. 16
CVA requirement
in writing;
lessee must
demonstrate
standard design
and best
practices.
----------------------------------------------------------------------------------------------------------------
706............................ Submit for 6.5.............. 2 nominations......... 13
approval with
SAP, COP, or GAP,
initial
nominations for a
CVA or new
replacement CVA
nomination and
required
information.
----------------------------------------------------------------------------------------------------------------
708(b)(2)...................... Notify BSEE if 1................ 1 notice.............. 1
modifications
identified by CVA/
project engineer
are accepted.
----------------------------------------------------------------------------------------------------------------
709(a); 710.................... Make fabrication 1................ 3 records............. 3
quality control,
installation
towing, and other
records available
to CVA/project
engineer for
review (retention
required by Sec.
285.714).
----------------------------------------------------------------------------------------------------------------
713............................ Notify BSEE within 1................ 1 notice.............. 1
10 business days
after commencing
commercial
operations.
714; 703(b).................... Until BOEM 100.............. 1 lessee.............. 100
releases
financial
assurance,
compile, retain,
and make
available to BSEE
and/or CVA the as-
built drawings,
design
assumptions/
analyses, summary
of fabrication
and installation
examination
records,
inspection
results, and
records of
repairs not
covered in
inspection
report. Record
original and
relevant material
test results of
all primary
structural
materials; retain
records during
all stages of
construction \2\.
----------------------------------------------------------------------------------------------------------------
Subpart H--Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted
Under SAPs, COPs, and GAPs
----------------------------------------------------------------------------------------------------------------
802(a); 902(e)................. Notify BSEE of 3................ 1 notice.............. 3
archaeological
resource within
72 hours of
discovery.
----------------------------------------------------------------------------------------------------------------
802(d)......................... If applicable, .5............... 1 payment............. 1
submit payment
for BSEE costs in
carrying out
National Historic
Preservation Act
responsibilities.
----------------------------------------------------------------------------------------------------------------
810; 614(b); 632(b); 651....... Submit safety 30............... 2 submissions......... 60
management system
description with
the SAP, COP, or
GAP.
----------------------------------------------------------------------------------------------------------------
813(b)(1)...................... Report within 24 .5............... 2 reports............. 1
hours when any
required
equipment taken
out of service
for more than 12
hours; provide
written
confirmation if
reported orally.
------------------------------------------------------------
1................ 1 written confirmation 1
----------------------------------------------------------------------------------------------------------------
[[Page 66506]]
813(b)(3)...................... Notify BSEE when .5............... 2 notices............. 1
equipment
returned to
service; provide
written
confirmation if
reported orally.
----------------------------------------------------------------------------------------------------------------
815............................ When required, 1.5.............. 1 report.............. 2
analyze cable, P/
L, or facility
damage or
failures to
determine cause
and as soon as
available submit
comprehensive
written report.
----------------------------------------------------------------------------------------------------------------
816............................ Submit plan of 2................ 1 plan/report......... 2
corrective action
report on
observed
detrimental
effects on cable,
P/L, or facility
within 30 days of
discovery; take
remedial action
and submit report
of remedial
action within 30
days after
completion.
----------------------------------------------------------------------------------------------------------------
822............................ Maintain records 1................ 4 records retention... 4
of design,
construction,
operation,
maintenance,
repairs, and
investigation on
or related to
lease or ROW/RUE
area; make
available to BSEE
for inspection \
2\.
----------------------------------------------------------------------------------------------------------------
823............................ Request 2................ 1 request............. 2
reimbursement
within 90 days
for food,
quarters, and
transportation
provided to BSEE
reps during
inspection.
----------------------------------------------------------------------------------------------------------------
824(a)......................... Develop annual 24............... 2 plans............... 48
self-inspection
plan covering all
facilities;
retain with
records and make
available to BSEE
upon request.
----------------------------------------------------------------------------------------------------------------
824(b)......................... Conduct annual 36............... 2 reports............. 72
self-inspection
and submit report
by November 1.
----------------------------------------------------------------------------------------------------------------
825............................ Based on API RP 2A- 60............... 2 assessments/actions. 120
WSD, perform
assessment of
structures,
initiate
mitigation
actions for
structures that
do not pass
assessment
process, retain
information, and
make available to
BSEE upon request.
----------------------------------------------------------------------------------------------------------------
830(a), (c); 831 thru 833...... Immediately report .5 Oral.......... 2 incidents........... 1
incidents to BSEE 4 Written........ 1 incident............ 4
via oral
communications,
submit written
follow-up report
within 15
business days
after the
incident, and
submit any
required
additional
information.
------------------------------------------------------------
830(d)......................... Report oil spills 2................ 1 report.............. 2
as required by
BSEE 30 CFR part
254.
----------------------------------------------------------------------------------------------------------------
Subpart I--Decommissioning
----------------------------------------------------------------------------------------------------------------
**** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous
or subsequent references throughout part 285 to submitting and obtaining approval. This subpart contains
references to other information submissions, approvals, requests, applications, plans, etc., the burdens for
which are covered elsewhere in parts 285..
----------------------------------------------------------------------------------------------------------------
**** 902; 905, 906; 907; Submit for 19............... 1 application......... 19
908(b), (c); 909; 638(a). approval, in
format specified,
copies of the
SAP, COP, or GAP
decommissioning
application and
site clearance
plan at least 2
years before
decommissioning
activities begin,
90 days after
completion of
activities, or 90
days after
cancellation,
relinquishment,
or other
termination of
lease or grant.
Include
documentation of
coordination
efforts regarding
requests that
certain
facilities remain
in place for
other activities,
be converted to
an artificial
reef, or be
toppled in place.
Submit additional
information/
evidence
requested or
modify and
resubmit
application.
----------------------------------------------------------------------------------------------------------------
902(d); 908(a)................. Notify BSEE at 1................ 1 notice.............. 1
least 60 days
before commencing
decommissioning
activities.
----------------------------------------------------------------------------------------------------------------
910(b)......................... Within 60 days 1................ 1 verification........ 1
after removing a
facility, verify
to BSEE that site
is cleared.
----------------------------------------------------------------------------------------------------------------
[[Page 66507]]
912............................ Within 60 days 8................ 1 report.............. 8
after removing a
facility, cable,
or pipeline,
submit a written
report.
----------------------------------------------------------------------------------------------------------------
BSEE does not anticipate decommissioning activities for at least 5 years, so the requirements have been given a
minimal burden..
----------------------------------------------------------------------------------------------------------------
Total Burden............... 103 Responses......... 8,908 Hours
-----------------------------------------
$1,908,000 Non-Hour Costs Burdens
----------------------------------------------------------------------------------------------------------------
An agency may not conduct, or sponsor and a person is not required
to respond to a collection of information unless it displays a
currently valid OMB control number.
The authority for this action is the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).
Kirk Malstrom,
Chief, Regulations and Standards Branch.
[FR Doc. 2023-21038 Filed 9-26-23; 8:45 am]
BILLING CODE 4310-VH-P