Combined Notice of Filings #1, 65381-65382 [2023-20583]
Download as PDF
Federal Register / Vol. 88, No. 183 / Friday, September 22, 2023 / Notices
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.3 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.4 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.5 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, The Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov
or call toll-free, (886) 208–3676 or TTY
(202) 502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and three copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on, October 5, 2023.
Dated: September 18, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–20570 Filed 9–21–23; 8:45 am]
BILLING CODE 6717–01–P
lotter on DSK11XQN23PROD with NOTICES1
3 Id.
at P 40.
the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
5 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
4 Similarly,
VerDate Sep<11>2014
16:40 Sep 21, 2023
Jkt 259001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–133–000.
Applicants: Fox Squirrel Solar LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Fox Squirrel Solar
LLC.
Filed Date: 9/15/23.
Accession Number: 20230915–5222.
Comment Date: 5 p.m. ET 10/6/23.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–292–000.
Applicants: Amcor Storage LLC.
Description: Amcor Storage LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 9/15/23.
Accession Number: 20230915–5221.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: EG23–293–000.
Applicants: South Energy
Investments, LLC.
Description: South Energy
Investments, LLC submits Notice of
Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 9/18/23.
Accession Number: 20230918–5081.
Comment Date: 5 p.m. ET 10/10/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–2479–001.
Applicants: American Electric Power
Service Corporation, PJM
Interconnection, L.L.C.
Description: Tariff Amendment:
American Electric Power Service
Corporation submits tariff filing per
35.17(b): AEP Amendment Update to
Att. 1 of ILDSA, SA No. 1336 in ER23–
2479 to be effective 7/1/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5028.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2875–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Fourth Amendment to ISA, Service
Agreement No. 5548; Queue No. AC1–
076/AE2–134 to be effective 11/20/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5017.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2876–000.
Applicants: CPV Retail Energy LP.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
65381
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5042.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2877–000.
Applicants: CPV Three Rivers, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5044.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2878–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
7094; Queue No. AG1–041 to be
effective 8/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5046.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2879–000.
Applicants: Hecate Energy Johanna
Facility LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5047.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2880–000.
Applicants: Hecate Energy Desert
Storage 1 LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5051.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2881–000.
Applicants: Pennsylvania Electric
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Pennsylvania Electric Company submits
tariff filing per 35.13(a)(2)(iii: Penelec
amends 10 ECSAs (4992 5171 5280
5328–5330 5334 5337 5341 6491) to be
effective 12/31/9998.
Filed Date: 9/18/23.
Accession Number: 20230918–5062.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2882–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Hancock
County Solar Project LGIA Filing to be
effective 9/1/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5070.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2883–000.
E:\FR\FM\22SEN1.SGM
22SEN1
lotter on DSK11XQN23PROD with NOTICES1
65382
Federal Register / Vol. 88, No. 183 / Friday, September 22, 2023 / Notices
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: Rate
Schedule FERC No. 317 Agreement
Regarding Hold Harmless Commitment
to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5073.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2884–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: Rate
Schedule FERC No. 322 Agreement
Regarding Hold Harmless Commitment
to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5074.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2885–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, Service Agreement No.
7076; Queue No. AD1–031 to be
effective 8/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5094.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2886–000.
Applicants: South Energy
Investments, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 11/18/
2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5100.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2887–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 265 to be effective 11/18/
2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5107.
Comment Date: 5 p.m. ET 10/10/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
VerDate Sep<11>2014
16:40 Sep 21, 2023
Jkt 259001
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: September 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–20583 Filed 9–21–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2322–069; 2322–071; 2325–
100; 2574–092; 2611–091]
Brookfield White Pine Hydro, LLC,
Merimil Limited Partnership, HydroKennebec, LLC; Notice of Revised
Procedural Schedule for
Environmental Impact Statement for
the Proposed Project Relicense,
Interim Species Protection Plan, and
Final Species Protection Plan
On January 31, 2020, Brookfield
White Pine Hydro, LLC filed an
application for a new license to
continue to operate and maintain the
8.65-megawatt (MW) Shawmut
Hydroelectric Project No. 2322
(Shawmut Project). On June 1, 2021, in
a separate compliance proceeding for
the Shawmut Project, Brookfield White
Pine Hydro, LLC filed an Interim
Species Protection Plan (Interim Plan)
for Atlantic salmon and requested
Commission approval to amend the
current Shawmut license to incorporate
the Interim Plan. The Interim Plan
includes measures to protect
endangered Atlantic salmon until the
Commission issues a decision on the
relicense application for the Shawmut
Project.
Also on June 1, 2021, Brookfield
Power US Asset Management, LLC
(Brookfield), on behalf of the affiliated
licensees for the 6.915–MW Lockwood
Hydroelectric Project No. 2574, 15.433MW Hydro-Kennebec Hydroelectric
PO 00000
Frm 00024
Fmt 4703
Sfmt 9990
Project No. 2611, and 15.98-MW Weston
Hydroelectric Project No. 2325, filed a
Final Species Protection Plan (Final
Plan) for Atlantic salmon, Atlantic
sturgeon, and shortnose sturgeon and
requested Commission approval to
amend the three project licenses to
incorporate the Final Plan. All four
projects are located on the Kennebec
River, in Kennebec and Somerset
Counties, Maine.
On November 23, 2021, Commission
staff issued a notice of intent to prepare
a draft and final Environmental Impact
Statement (EIS) to evaluate the effects of
relicensing the Shawmut Project and
amending the licenses of all four
projects to incorporate the measures in
the Interim and Final Plans. The notice
of intent included a schedule for
preparing a draft and final EIS. The
schedule was updated on February 15,
2023, in response to Brookfield’s filing
of supplemental information for the
Final Plan, Interim Plan, and License
Application.
On March 29, 2023, Commission staff
initiated Tribal consultation with
potentially affected Indian Tribes on the
proposed license amendments. The
Houlton Band of Maliseet Indians filed
comments and recommendations on
May 4, 2023, and the Penobscot Indian
Nation filed comments and
recommendations on May 1, 2023, and
August 17, 2023. The EIS will consider
the comments and recommendations
from the Tribes. Therefore, by this
notice, Commission staff is updating the
procedural schedule for completing a
draft and final EIS.
The revised schedule is shown below.
Further revisions to the schedule may
be made as appropriate.
Milestone
Target date
Issue Draft EIS ................
Issue Final EIS ................
March 2024.
September 2024.
Any questions regarding this notice
may be directed to Matt Cutlip at (503)
552–2762, or by email at matt.cutlip@
ferc.gov.
Dated: September 18, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–20569 Filed 9–21–23; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\22SEN1.SGM
22SEN1
Agencies
[Federal Register Volume 88, Number 183 (Friday, September 22, 2023)]
[Notices]
[Pages 65381-65382]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-20583]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC23-133-000.
Applicants: Fox Squirrel Solar LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Fox Squirrel Solar LLC.
Filed Date: 9/15/23.
Accession Number: 20230915-5222.
Comment Date: 5 p.m. ET 10/6/23.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG23-292-000.
Applicants: Amcor Storage LLC.
Description: Amcor Storage LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 9/15/23.
Accession Number: 20230915-5221.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: EG23-293-000.
Applicants: South Energy Investments, LLC.
Description: South Energy Investments, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 9/18/23.
Accession Number: 20230918-5081.
Comment Date: 5 p.m. ET 10/10/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER23-2479-001.
Applicants: American Electric Power Service Corporation, PJM
Interconnection, L.L.C.
Description: Tariff Amendment: American Electric Power Service
Corporation submits tariff filing per 35.17(b): AEP Amendment Update to
Att. 1 of ILDSA, SA No. 1336 in ER23-2479 to be effective 7/1/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5028.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2875-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Fourth Amendment to ISA,
Service Agreement No. 5548; Queue No. AC1-076/AE2-134 to be effective
11/20/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5017.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2876-000.
Applicants: CPV Retail Energy LP.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5042.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2877-000.
Applicants: CPV Three Rivers, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5044.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2878-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, Service
Agreement No. 7094; Queue No. AG1-041 to be effective 8/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5046.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2879-000.
Applicants: Hecate Energy Johanna Facility LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5047.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2880-000.
Applicants: Hecate Energy Desert Storage 1 LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5051.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2881-000.
Applicants: Pennsylvania Electric Company, PJM Interconnection,
L.L.C.
Description: Sec. 205(d) Rate Filing: Pennsylvania Electric
Company submits tariff filing per 35.13(a)(2)(iii: Penelec amends 10
ECSAs (4992 5171 5280 5328-5330 5334 5337 5341 6491) to be effective
12/31/9998.
Filed Date: 9/18/23.
Accession Number: 20230918-5062.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2882-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Hancock County Solar Project
LGIA Filing to be effective 9/1/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5070.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2883-000.
[[Page 65382]]
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule FERC No. 317
Agreement Regarding Hold Harmless Commitment to be effective 11/18/
2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5073.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2884-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule FERC No. 322
Agreement Regarding Hold Harmless Commitment to be effective 11/18/
2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5074.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2885-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original NSA, Service
Agreement No. 7076; Queue No. AD1-031 to be effective 8/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5094.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2886-000.
Applicants: South Energy Investments, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5100.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23-2887-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 265 to be
effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918-5107.
Comment Date: 5 p.m. ET 10/10/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: September 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-20583 Filed 9-21-23; 8:45 am]