Combined Notice of Filings #1, 65381-65382 [2023-20583]

Download as PDF Federal Register / Vol. 88, No. 183 / Friday, September 22, 2023 / Notices address all arguments relating to whether the applicant has demonstrated there is good cause to grant the extension.3 The Commission will not consider arguments that re-litigate the issuance of the certificate order, including whether the Commission properly found the project to be in the public convenience and necessity and whether the Commission’s environmental analysis for the certificate complied with the National Environmental Policy Act.4 At the time a pipeline requests an extension of time, orders on certificates of public convenience and necessity are final and the Commission will not re-litigate their issuance.5 The OEP Director, or his or her designee, will act on all of those extension requests that are uncontested. In addition to publishing the full text of this document in the Federal Register, The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to Commission’s Public Reference Room. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and three copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on, October 5, 2023. Dated: September 18, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–20570 Filed 9–21–23; 8:45 am] BILLING CODE 6717–01–P lotter on DSK11XQN23PROD with NOTICES1 3 Id. at P 40. the Commission will not re-litigate the issuance of an NGA section 3 authorization, including whether a proposed project is not inconsistent with the public interest and whether the Commission’s environmental analysis for the permit order complied with NEPA. 5 Algonquin Gas Transmission, LLC, 170 FERC ¶ 61,144, at P 40 (2020). 4 Similarly, VerDate Sep<11>2014 16:40 Sep 21, 2023 Jkt 259001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–133–000. Applicants: Fox Squirrel Solar LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of Fox Squirrel Solar LLC. Filed Date: 9/15/23. Accession Number: 20230915–5222. Comment Date: 5 p.m. ET 10/6/23. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–292–000. Applicants: Amcor Storage LLC. Description: Amcor Storage LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 9/15/23. Accession Number: 20230915–5221. Comment Date: 5 p.m. ET 10/6/23. Docket Numbers: EG23–293–000. Applicants: South Energy Investments, LLC. Description: South Energy Investments, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 9/18/23. Accession Number: 20230918–5081. Comment Date: 5 p.m. ET 10/10/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER23–2479–001. Applicants: American Electric Power Service Corporation, PJM Interconnection, L.L.C. Description: Tariff Amendment: American Electric Power Service Corporation submits tariff filing per 35.17(b): AEP Amendment Update to Att. 1 of ILDSA, SA No. 1336 in ER23– 2479 to be effective 7/1/2023. Filed Date: 9/18/23. Accession Number: 20230918–5028. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2875–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Fourth Amendment to ISA, Service Agreement No. 5548; Queue No. AC1– 076/AE2–134 to be effective 11/20/2023. Filed Date: 9/18/23. Accession Number: 20230918–5017. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2876–000. Applicants: CPV Retail Energy LP. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 65381 Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 11/18/2023. Filed Date: 9/18/23. Accession Number: 20230918–5042. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2877–000. Applicants: CPV Three Rivers, LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 11/18/2023. Filed Date: 9/18/23. Accession Number: 20230918–5044. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2878–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 7094; Queue No. AG1–041 to be effective 8/18/2023. Filed Date: 9/18/23. Accession Number: 20230918–5046. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2879–000. Applicants: Hecate Energy Johanna Facility LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 11/18/2023. Filed Date: 9/18/23. Accession Number: 20230918–5047. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2880–000. Applicants: Hecate Energy Desert Storage 1 LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 11/18/2023. Filed Date: 9/18/23. Accession Number: 20230918–5051. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2881–000. Applicants: Pennsylvania Electric Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Pennsylvania Electric Company submits tariff filing per 35.13(a)(2)(iii: Penelec amends 10 ECSAs (4992 5171 5280 5328–5330 5334 5337 5341 6491) to be effective 12/31/9998. Filed Date: 9/18/23. Accession Number: 20230918–5062. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2882–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Hancock County Solar Project LGIA Filing to be effective 9/1/2023. Filed Date: 9/18/23. Accession Number: 20230918–5070. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2883–000. E:\FR\FM\22SEN1.SGM 22SEN1 lotter on DSK11XQN23PROD with NOTICES1 65382 Federal Register / Vol. 88, No. 183 / Friday, September 22, 2023 / Notices Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: Rate Schedule FERC No. 317 Agreement Regarding Hold Harmless Commitment to be effective 11/18/2023. Filed Date: 9/18/23. Accession Number: 20230918–5073. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2884–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: Rate Schedule FERC No. 322 Agreement Regarding Hold Harmless Commitment to be effective 11/18/2023. Filed Date: 9/18/23. Accession Number: 20230918–5074. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2885–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, Service Agreement No. 7076; Queue No. AD1–031 to be effective 8/18/2023. Filed Date: 9/18/23. Accession Number: 20230918–5094. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2886–000. Applicants: South Energy Investments, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization to be effective 11/18/ 2023. Filed Date: 9/18/23. Accession Number: 20230918–5100. Comment Date: 5 p.m. ET 10/10/23. Docket Numbers: ER23–2887–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Rate Schedule No. 265 to be effective 11/18/ 2023. Filed Date: 9/18/23. Accession Number: 20230918–5107. Comment Date: 5 p.m. ET 10/10/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings VerDate Sep<11>2014 16:40 Sep 21, 2023 Jkt 259001 can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: September 18, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–20583 Filed 9–21–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 2322–069; 2322–071; 2325– 100; 2574–092; 2611–091] Brookfield White Pine Hydro, LLC, Merimil Limited Partnership, HydroKennebec, LLC; Notice of Revised Procedural Schedule for Environmental Impact Statement for the Proposed Project Relicense, Interim Species Protection Plan, and Final Species Protection Plan On January 31, 2020, Brookfield White Pine Hydro, LLC filed an application for a new license to continue to operate and maintain the 8.65-megawatt (MW) Shawmut Hydroelectric Project No. 2322 (Shawmut Project). On June 1, 2021, in a separate compliance proceeding for the Shawmut Project, Brookfield White Pine Hydro, LLC filed an Interim Species Protection Plan (Interim Plan) for Atlantic salmon and requested Commission approval to amend the current Shawmut license to incorporate the Interim Plan. The Interim Plan includes measures to protect endangered Atlantic salmon until the Commission issues a decision on the relicense application for the Shawmut Project. Also on June 1, 2021, Brookfield Power US Asset Management, LLC (Brookfield), on behalf of the affiliated licensees for the 6.915–MW Lockwood Hydroelectric Project No. 2574, 15.433MW Hydro-Kennebec Hydroelectric PO 00000 Frm 00024 Fmt 4703 Sfmt 9990 Project No. 2611, and 15.98-MW Weston Hydroelectric Project No. 2325, filed a Final Species Protection Plan (Final Plan) for Atlantic salmon, Atlantic sturgeon, and shortnose sturgeon and requested Commission approval to amend the three project licenses to incorporate the Final Plan. All four projects are located on the Kennebec River, in Kennebec and Somerset Counties, Maine. On November 23, 2021, Commission staff issued a notice of intent to prepare a draft and final Environmental Impact Statement (EIS) to evaluate the effects of relicensing the Shawmut Project and amending the licenses of all four projects to incorporate the measures in the Interim and Final Plans. The notice of intent included a schedule for preparing a draft and final EIS. The schedule was updated on February 15, 2023, in response to Brookfield’s filing of supplemental information for the Final Plan, Interim Plan, and License Application. On March 29, 2023, Commission staff initiated Tribal consultation with potentially affected Indian Tribes on the proposed license amendments. The Houlton Band of Maliseet Indians filed comments and recommendations on May 4, 2023, and the Penobscot Indian Nation filed comments and recommendations on May 1, 2023, and August 17, 2023. The EIS will consider the comments and recommendations from the Tribes. Therefore, by this notice, Commission staff is updating the procedural schedule for completing a draft and final EIS. The revised schedule is shown below. Further revisions to the schedule may be made as appropriate. Milestone Target date Issue Draft EIS ................ Issue Final EIS ................ March 2024. September 2024. Any questions regarding this notice may be directed to Matt Cutlip at (503) 552–2762, or by email at matt.cutlip@ ferc.gov. Dated: September 18, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–20569 Filed 9–21–23; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\22SEN1.SGM 22SEN1

Agencies

[Federal Register Volume 88, Number 183 (Friday, September 22, 2023)]
[Notices]
[Pages 65381-65382]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-20583]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC23-133-000.
    Applicants: Fox Squirrel Solar LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Fox Squirrel Solar LLC.
    Filed Date: 9/15/23.
    Accession Number: 20230915-5222.
    Comment Date: 5 p.m. ET 10/6/23.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG23-292-000.
    Applicants: Amcor Storage LLC.
    Description: Amcor Storage LLC submits Notice of Self-Certification 
of Exempt Wholesale Generator Status.
    Filed Date: 9/15/23.
    Accession Number: 20230915-5221.
    Comment Date: 5 p.m. ET 10/6/23.

    Docket Numbers: EG23-293-000.
    Applicants: South Energy Investments, LLC.
    Description: South Energy Investments, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5081.
    Comment Date: 5 p.m. ET 10/10/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER23-2479-001.
    Applicants: American Electric Power Service Corporation, PJM 
Interconnection, L.L.C.
    Description: Tariff Amendment: American Electric Power Service 
Corporation submits tariff filing per 35.17(b): AEP Amendment Update to 
Att. 1 of ILDSA, SA No. 1336 in ER23-2479 to be effective 7/1/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5028.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2875-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Fourth Amendment to ISA, 
Service Agreement No. 5548; Queue No. AC1-076/AE2-134 to be effective 
11/20/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5017.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2876-000.
    Applicants: CPV Retail Energy LP.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff Filing to be effective 11/18/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5042.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2877-000.
    Applicants: CPV Three Rivers, LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff Filing to be effective 11/18/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5044.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2878-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 7094; Queue No. AG1-041 to be effective 8/18/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5046.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2879-000.
    Applicants: Hecate Energy Johanna Facility LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff Filing to be effective 11/18/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5047.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2880-000.
    Applicants: Hecate Energy Desert Storage 1 LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff Filing to be effective 11/18/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5051.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2881-000.
    Applicants: Pennsylvania Electric Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: Pennsylvania Electric 
Company submits tariff filing per 35.13(a)(2)(iii: Penelec amends 10 
ECSAs (4992 5171 5280 5328-5330 5334 5337 5341 6491) to be effective 
12/31/9998.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5062.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2882-000.
    Applicants: Alabama Power Company, Georgia Power Company, 
Mississippi Power Company.
    Description: Sec.  205(d) Rate Filing: Alabama Power Company 
submits tariff filing per 35.13(a)(2)(iii: Hancock County Solar Project 
LGIA Filing to be effective 9/1/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5070.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2883-000.

[[Page 65382]]

    Applicants: Florida Power & Light Company.
    Description: Sec.  205(d) Rate Filing: Rate Schedule FERC No. 317 
Agreement Regarding Hold Harmless Commitment to be effective 11/18/
2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5073.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2884-000.
    Applicants: Florida Power & Light Company.
    Description: Sec.  205(d) Rate Filing: Rate Schedule FERC No. 322 
Agreement Regarding Hold Harmless Commitment to be effective 11/18/
2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5074.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2885-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original NSA, Service 
Agreement No. 7076; Queue No. AD1-031 to be effective 8/18/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5094.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2886-000.
    Applicants: South Energy Investments, LLC.
    Description: Baseline eTariff Filing: Application for Market-Based 
Rate Authorization to be effective 11/18/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5100.
    Comment Date: 5 p.m. ET 10/10/23.

    Docket Numbers: ER23-2887-000.
    Applicants: Arizona Public Service Company.
    Description: Sec.  205(d) Rate Filing: Rate Schedule No. 265 to be 
effective 11/18/2023.
    Filed Date: 9/18/23.
    Accession Number: 20230918-5107.
    Comment Date: 5 p.m. ET 10/10/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: September 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-20583 Filed 9-21-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.