Brookfield White Pine Hydro, LLC, Merimil Limited Partnership, Hydro-Kennebec, LLC; Notice of Revised Procedural Schedule for Environmental Impact Statement for the Proposed Project Relicense, Interim Species Protection Plan, and Final Species Protection Plan, 65382 [2023-20569]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
65382
Federal Register / Vol. 88, No. 183 / Friday, September 22, 2023 / Notices
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: Rate
Schedule FERC No. 317 Agreement
Regarding Hold Harmless Commitment
to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5073.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2884–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: Rate
Schedule FERC No. 322 Agreement
Regarding Hold Harmless Commitment
to be effective 11/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5074.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2885–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, Service Agreement No.
7076; Queue No. AD1–031 to be
effective 8/18/2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5094.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2886–000.
Applicants: South Energy
Investments, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 11/18/
2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5100.
Comment Date: 5 p.m. ET 10/10/23.
Docket Numbers: ER23–2887–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 265 to be effective 11/18/
2023.
Filed Date: 9/18/23.
Accession Number: 20230918–5107.
Comment Date: 5 p.m. ET 10/10/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
VerDate Sep<11>2014
16:40 Sep 21, 2023
Jkt 259001
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: September 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–20583 Filed 9–21–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2322–069; 2322–071; 2325–
100; 2574–092; 2611–091]
Brookfield White Pine Hydro, LLC,
Merimil Limited Partnership, HydroKennebec, LLC; Notice of Revised
Procedural Schedule for
Environmental Impact Statement for
the Proposed Project Relicense,
Interim Species Protection Plan, and
Final Species Protection Plan
On January 31, 2020, Brookfield
White Pine Hydro, LLC filed an
application for a new license to
continue to operate and maintain the
8.65-megawatt (MW) Shawmut
Hydroelectric Project No. 2322
(Shawmut Project). On June 1, 2021, in
a separate compliance proceeding for
the Shawmut Project, Brookfield White
Pine Hydro, LLC filed an Interim
Species Protection Plan (Interim Plan)
for Atlantic salmon and requested
Commission approval to amend the
current Shawmut license to incorporate
the Interim Plan. The Interim Plan
includes measures to protect
endangered Atlantic salmon until the
Commission issues a decision on the
relicense application for the Shawmut
Project.
Also on June 1, 2021, Brookfield
Power US Asset Management, LLC
(Brookfield), on behalf of the affiliated
licensees for the 6.915–MW Lockwood
Hydroelectric Project No. 2574, 15.433MW Hydro-Kennebec Hydroelectric
PO 00000
Frm 00024
Fmt 4703
Sfmt 9990
Project No. 2611, and 15.98-MW Weston
Hydroelectric Project No. 2325, filed a
Final Species Protection Plan (Final
Plan) for Atlantic salmon, Atlantic
sturgeon, and shortnose sturgeon and
requested Commission approval to
amend the three project licenses to
incorporate the Final Plan. All four
projects are located on the Kennebec
River, in Kennebec and Somerset
Counties, Maine.
On November 23, 2021, Commission
staff issued a notice of intent to prepare
a draft and final Environmental Impact
Statement (EIS) to evaluate the effects of
relicensing the Shawmut Project and
amending the licenses of all four
projects to incorporate the measures in
the Interim and Final Plans. The notice
of intent included a schedule for
preparing a draft and final EIS. The
schedule was updated on February 15,
2023, in response to Brookfield’s filing
of supplemental information for the
Final Plan, Interim Plan, and License
Application.
On March 29, 2023, Commission staff
initiated Tribal consultation with
potentially affected Indian Tribes on the
proposed license amendments. The
Houlton Band of Maliseet Indians filed
comments and recommendations on
May 4, 2023, and the Penobscot Indian
Nation filed comments and
recommendations on May 1, 2023, and
August 17, 2023. The EIS will consider
the comments and recommendations
from the Tribes. Therefore, by this
notice, Commission staff is updating the
procedural schedule for completing a
draft and final EIS.
The revised schedule is shown below.
Further revisions to the schedule may
be made as appropriate.
Milestone
Target date
Issue Draft EIS ................
Issue Final EIS ................
March 2024.
September 2024.
Any questions regarding this notice
may be directed to Matt Cutlip at (503)
552–2762, or by email at matt.cutlip@
ferc.gov.
Dated: September 18, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–20569 Filed 9–21–23; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\22SEN1.SGM
22SEN1
Agencies
[Federal Register Volume 88, Number 183 (Friday, September 22, 2023)]
[Notices]
[Page 65382]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-20569]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2322-069; 2322-071; 2325-100; 2574-092; 2611-091]
Brookfield White Pine Hydro, LLC, Merimil Limited Partnership,
Hydro-Kennebec, LLC; Notice of Revised Procedural Schedule for
Environmental Impact Statement for the Proposed Project Relicense,
Interim Species Protection Plan, and Final Species Protection Plan
On January 31, 2020, Brookfield White Pine Hydro, LLC filed an
application for a new license to continue to operate and maintain the
8.65-megawatt (MW) Shawmut Hydroelectric Project No. 2322 (Shawmut
Project). On June 1, 2021, in a separate compliance proceeding for the
Shawmut Project, Brookfield White Pine Hydro, LLC filed an Interim
Species Protection Plan (Interim Plan) for Atlantic salmon and
requested Commission approval to amend the current Shawmut license to
incorporate the Interim Plan. The Interim Plan includes measures to
protect endangered Atlantic salmon until the Commission issues a
decision on the relicense application for the Shawmut Project.
Also on June 1, 2021, Brookfield Power US Asset Management, LLC
(Brookfield), on behalf of the affiliated licensees for the 6.915-MW
Lockwood Hydroelectric Project No. 2574, 15.433-MW Hydro-Kennebec
Hydroelectric Project No. 2611, and 15.98-MW Weston Hydroelectric
Project No. 2325, filed a Final Species Protection Plan (Final Plan)
for Atlantic salmon, Atlantic sturgeon, and shortnose sturgeon and
requested Commission approval to amend the three project licenses to
incorporate the Final Plan. All four projects are located on the
Kennebec River, in Kennebec and Somerset Counties, Maine.
On November 23, 2021, Commission staff issued a notice of intent to
prepare a draft and final Environmental Impact Statement (EIS) to
evaluate the effects of relicensing the Shawmut Project and amending
the licenses of all four projects to incorporate the measures in the
Interim and Final Plans. The notice of intent included a schedule for
preparing a draft and final EIS. The schedule was updated on February
15, 2023, in response to Brookfield's filing of supplemental
information for the Final Plan, Interim Plan, and License Application.
On March 29, 2023, Commission staff initiated Tribal consultation
with potentially affected Indian Tribes on the proposed license
amendments. The Houlton Band of Maliseet Indians filed comments and
recommendations on May 4, 2023, and the Penobscot Indian Nation filed
comments and recommendations on May 1, 2023, and August 17, 2023. The
EIS will consider the comments and recommendations from the Tribes.
Therefore, by this notice, Commission staff is updating the procedural
schedule for completing a draft and final EIS.
The revised schedule is shown below. Further revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Draft EIS........................ March 2024.
Issue Final EIS........................ September 2024.
------------------------------------------------------------------------
Any questions regarding this notice may be directed to Matt Cutlip
at (503) 552-2762, or by email at [email protected].
Dated: September 18, 2023.
Kimberly D. Bose,
Secretary.