Combined Notice of Filings #2, 65169-65170 [2023-20468]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 182 / Thursday, September 21, 2023 / Notices
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Georgia
Power Company (licensee) requests
Commission approval to replace and
upgrade two generating units in the
Nacoochee powerhouse. The licensee
proposes to replace turbine runners and
generators. The proposed upgrades
would increase the Nacoochee
Development’s installed capacity from
4.8 megawatt (MW) to 5.48 MW. The
maximum hydraulic capacity would
decrease from 1,382 cubic feet per
second (cfs) to 1,258 cfs (9% decrease).
The licensee does not anticipate any
adverse effect to environmental
resources as a result of the proposed
amendment.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
VerDate Sep<11>2014
17:11 Sep 20, 2023
Jkt 259001
number of the person commenting,
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
p. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: September 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–20455 Filed 9–20–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–2857–000.
Applicants: MS Solar 2, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5158.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2858–000.
Applicants: Balko Wind, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5084.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2859–000.
Applicants: Balko Wind
Transmission, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5087.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
65169
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2860–000.
Applicants: DWW Solar II, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5090.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2861–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of Interim ISA,
SA No. 5471; Queue No. AC1–051 to be
effective 1/10/2022.
Filed Date: 9/15/23.
Accession Number: 20230915–5097.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2862–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of ISA, SA No.
3407; Queue No. W4–001A_AT9 to be
effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5117.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2863–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of WMPA, SA
No. 6398; Queue No. AG1–029 to be
effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5124.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2864–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Designated Entity Agreement, SA No.
7062 between PJM and PPL EU to be
effective 8/16/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5127.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2865–000.
Applicants: Cove Mountain Solar 2,
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5142.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2866–000.
Applicants: Cove Mountain Solar,
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5143.
Comment Date: 5 p.m. ET 10/6/23.
E:\FR\FM\21SEN1.SGM
21SEN1
ddrumheller on DSK120RN23PROD with NOTICES1
65170
Federal Register / Vol. 88, No. 182 / Thursday, September 21, 2023 / Notices
Docket Numbers: ER23–2867–000.
Applicants: Hunter Solar LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5144.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2868–000.
Applicants: Rancho Seco Solar, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5145.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2869–000.
Applicants: Sigurd Solar LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5146.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2870–000.
Applicants: Drew Solar-CA, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5147.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2871–000.
Applicants: Drew Solar, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5149.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2872–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of ISA, SA No.
3407; Queue No. W4–001A_AT9 to be
effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5160.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2873–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC
submits tariff filing per 35.13(a)(2)(iii:
MAIT Submits Revised Interconnection
Agreement, Service Agreement No. 4578
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5165.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2874–000.
Applicants: NorthWestern Energy
Public Service Corporation.
Description: Baseline eTariff Filing:
NWPS Baseline Market Based Rate
Tariff to be effective 11/15/2023.
VerDate Sep<11>2014
17:11 Sep 20, 2023
Jkt 259001
Filed Date: 9/15/23.
Accession Number: 20230915–5172.
Comment Date: 5 p.m. ET 10/6/23.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR23–2–001.
Applicants: North American Electric
Reliability Corporation.
Description: Revised SERC Reliability
Corporation Report of Comparisons of
Budgeted to Actual Costs for 2022.
Filed Date: 9/14/23.
Accession Number: 20230914–5123.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: RR23–4–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for approval of revisions to
the NERC Rules of Procedure regarding
Reliability Standards.
Filed Date: 9/15/23.
Accession Number: 20230915–5151.
Comment Date: 5 p.m. ET 10/6/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Dated: September 15, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–20468 Filed 9–20–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–536–000]
Eastern Shore Natural Gas Company;
Notice of Application and Establishing
Intervention Deadline
Take notice that on August 31, 2023,
Eastern Shore Natural Gas Company
(Eastern Shore), 500 Energy Lane, Suite
200, Dover, Delaware, 19901, filed an
application under section 7(c) of the
Natural Gas Act (NGA), and part 157 of
the Commission’s regulations requesting
authorization for its Worcester
Resiliency Upgrade Project (Project).
The Project consists of the installation
of five (5) liquified natural gas (LNG)
storage tanks and LNG vaporizers in
Worcester County, MD. Eastern Shore
also proposes to install approximately
1.1 miles of 10-inch-diameter pipeline
looping in Sussex County, DE and
Wicomico County, MD, upgrades to an
existing pressure control station in
Sussex County, DE, and upgrades to
three (3) existing meter and regulating
(M&R) stations in Sussex County, DE,
Worcester County, MD, and Somerset
County, MD. The Project is designed to
store approximately 475,000 gallons of
LNG, equivalent to 39,627 Dth, and
provide 14,000 Dth/d of corresponding
peak firm natural gas transportation
service, as well as enhance the
resiliency of Eastern Shore’s system.
Eastern Shore estimates the total cost of
the Project to be $79,878,927 and
proposes an initial recourse rate under
new Rate Schedules PEAK–FT and
PEAK–IT, all as more fully set forth in
the application which is on file with the
Commission and open for public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
E:\FR\FM\21SEN1.SGM
21SEN1
Agencies
[Federal Register Volume 88, Number 182 (Thursday, September 21, 2023)]
[Notices]
[Pages 65169-65170]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-20468]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER23-2857-000.
Applicants: MS Solar 2, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5158.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2858-000.
Applicants: Balko Wind, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5084.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2859-000.
Applicants: Balko Wind Transmission, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5087.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2860-000.
Applicants: DWW Solar II, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5090.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2861-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of Interim
ISA, SA No. 5471; Queue No. AC1-051 to be effective 1/10/2022.
Filed Date: 9/15/23.
Accession Number: 20230915-5097.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2862-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of ISA, SA
No. 3407; Queue No. W4-001A_AT9 to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5117.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2863-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of WMPA, SA
No. 6398; Queue No. AG1-029 to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5124.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2864-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Designated Entity Agreement,
SA No. 7062 between PJM and PPL EU to be effective 8/16/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5127.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2865-000.
Applicants: Cove Mountain Solar 2, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5142.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2866-000.
Applicants: Cove Mountain Solar, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5143.
Comment Date: 5 p.m. ET 10/6/23.
[[Page 65170]]
Docket Numbers: ER23-2867-000.
Applicants: Hunter Solar LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5144.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2868-000.
Applicants: Rancho Seco Solar, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5145.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2869-000.
Applicants: Sigurd Solar LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5146.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2870-000.
Applicants: Drew Solar-CA, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5147.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2871-000.
Applicants: Drew Solar, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5149.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2872-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of ISA, SA
No. 3407; Queue No. W4-001A_AT9 to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5160.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2873-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Mid-Atlantic Interstate
Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT
Submits Revised Interconnection Agreement, Service Agreement No. 4578
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5165.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23-2874-000.
Applicants: NorthWestern Energy Public Service Corporation.
Description: Baseline eTariff Filing: NWPS Baseline Market Based
Rate Tariff to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915-5172.
Comment Date: 5 p.m. ET 10/6/23.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR23-2-001.
Applicants: North American Electric Reliability Corporation.
Description: Revised SERC Reliability Corporation Report of
Comparisons of Budgeted to Actual Costs for 2022.
Filed Date: 9/14/23.
Accession Number: 20230914-5123.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: RR23-4-000.
Applicants: North American Electric Reliability Corporation.
Description: Petition of the North American Electric Reliability
Corporation for approval of revisions to the NERC Rules of Procedure
regarding Reliability Standards.
Filed Date: 9/15/23.
Accession Number: 20230915-5151.
Comment Date: 5 p.m. ET 10/6/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: September 15, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-20468 Filed 9-20-23; 8:45 am]