Eastern Shore Natural Gas Company; Notice of Application and Establishing Intervention Deadline, 65170-65172 [2023-20456]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
65170
Federal Register / Vol. 88, No. 182 / Thursday, September 21, 2023 / Notices
Docket Numbers: ER23–2867–000.
Applicants: Hunter Solar LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5144.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2868–000.
Applicants: Rancho Seco Solar, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5145.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2869–000.
Applicants: Sigurd Solar LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5146.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2870–000.
Applicants: Drew Solar-CA, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5147.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2871–000.
Applicants: Drew Solar, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5149.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2872–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of ISA, SA No.
3407; Queue No. W4–001A_AT9 to be
effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5160.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2873–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC
submits tariff filing per 35.13(a)(2)(iii:
MAIT Submits Revised Interconnection
Agreement, Service Agreement No. 4578
to be effective 11/15/2023.
Filed Date: 9/15/23.
Accession Number: 20230915–5165.
Comment Date: 5 p.m. ET 10/6/23.
Docket Numbers: ER23–2874–000.
Applicants: NorthWestern Energy
Public Service Corporation.
Description: Baseline eTariff Filing:
NWPS Baseline Market Based Rate
Tariff to be effective 11/15/2023.
VerDate Sep<11>2014
17:11 Sep 20, 2023
Jkt 259001
Filed Date: 9/15/23.
Accession Number: 20230915–5172.
Comment Date: 5 p.m. ET 10/6/23.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR23–2–001.
Applicants: North American Electric
Reliability Corporation.
Description: Revised SERC Reliability
Corporation Report of Comparisons of
Budgeted to Actual Costs for 2022.
Filed Date: 9/14/23.
Accession Number: 20230914–5123.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: RR23–4–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation for approval of revisions to
the NERC Rules of Procedure regarding
Reliability Standards.
Filed Date: 9/15/23.
Accession Number: 20230915–5151.
Comment Date: 5 p.m. ET 10/6/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Dated: September 15, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–20468 Filed 9–20–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–536–000]
Eastern Shore Natural Gas Company;
Notice of Application and Establishing
Intervention Deadline
Take notice that on August 31, 2023,
Eastern Shore Natural Gas Company
(Eastern Shore), 500 Energy Lane, Suite
200, Dover, Delaware, 19901, filed an
application under section 7(c) of the
Natural Gas Act (NGA), and part 157 of
the Commission’s regulations requesting
authorization for its Worcester
Resiliency Upgrade Project (Project).
The Project consists of the installation
of five (5) liquified natural gas (LNG)
storage tanks and LNG vaporizers in
Worcester County, MD. Eastern Shore
also proposes to install approximately
1.1 miles of 10-inch-diameter pipeline
looping in Sussex County, DE and
Wicomico County, MD, upgrades to an
existing pressure control station in
Sussex County, DE, and upgrades to
three (3) existing meter and regulating
(M&R) stations in Sussex County, DE,
Worcester County, MD, and Somerset
County, MD. The Project is designed to
store approximately 475,000 gallons of
LNG, equivalent to 39,627 Dth, and
provide 14,000 Dth/d of corresponding
peak firm natural gas transportation
service, as well as enhance the
resiliency of Eastern Shore’s system.
Eastern Shore estimates the total cost of
the Project to be $79,878,927 and
proposes an initial recourse rate under
new Rate Schedules PEAK–FT and
PEAK–IT, all as more fully set forth in
the application which is on file with the
Commission and open for public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
E:\FR\FM\21SEN1.SGM
21SEN1
Federal Register / Vol. 88, No. 182 / Thursday, September 21, 2023 / Notices
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions regarding the proposed
project should be directed to Matt
Everngam, Director, Regulatory Affairs,
Eastern Shore Natural Gas Company,
500 Energy Lane, Suite 200, Dover, DE
19901 by phone 1–844–366–3764 or by
email to meverngam@chpk.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify Federal and State
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Water Quality Certification
Eastern Shore’s application states that
a water quality certificate under section
401 of the Clean Water Act is required
for the project from Delaware’s DNREC
Division of Water Resources and
Maryland’s MDE Water Management
Administration. The request for
certification must be submitted to the
certifying agency and to the
Commission concurrently. Proof of the
certifying agency’s receipt date must be
filed no later than five (5) days after the
request is submitted to the certifying
agency.
ddrumheller on DSK120RN23PROD with NOTICES1
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, you can protest the filing,
and you can file a motion to intervene
in the proceeding. There is no fee or
cost for filing comments or intervening.
The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on
October 6, 2023. How to file protests,
motions to intervene, and comments is
explained below.
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
17:11 Sep 20, 2023
Jkt 259001
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections, to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be.
Protests
Pursuant to sections 157.10(a)(4) 2 and
385.211 3 of the Commission’s
regulations under the NGA, any person 4
may file a protest to the application.
Protests must comply with the
requirements specified in section
385.2001 5 of the Commission’s
regulations. A protest may also serve as
a motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
To ensure that your comments or
protests are timely and properly
recorded, please submit your comments
on or before October 6, 2023.
There are three methods you can use
to submit your comments or protests to
the Commission. In all instances, please
reference the Project docket number
CP23–536–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments or
protests electronically by using the
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
2 18
CFR 157.10(a)(4).
CFR 385.211.
4 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
5 18 CFR 385.2001.
3 18
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
65171
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments or protests by mailing them
to the following address below. Your
written comments must reference the
Project docket number (CP23–536–000).
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
To file via any other courier: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,6 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 7 and the regulations under
the NGA 8 by the intervention deadline
for the project, which is October 6,
2023. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
6 18
CFR 385.102(d).
CFR 385.214.
8 18 CFR 157.10.
7 18
E:\FR\FM\21SEN1.SGM
21SEN1
ddrumheller on DSK120RN23PROD with NOTICES1
65172
Federal Register / Vol. 88, No. 182 / Thursday, September 21, 2023 / Notices
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP23–536–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below. Your motion to
intervene must reference the Project
docket number CP23–536–000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
To file via any other courier: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email at: Matt Everngam,
Director, Regulatory Affairs, Eastern
Shore Natural Gas Company, 500 Energy
Lane, Suite 200, Dover, DE 19901 or by
email to meverngam@chpk.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
VerDate Sep<11>2014
17:11 Sep 20, 2023
Jkt 259001
All timely, unopposed 9 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).10 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on October 6, 2023.
Dated: September 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–20456 Filed 9–20–23; 8:45 am]
BILLING CODE 6717–01–P
9 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
10 18 CFR 385.214(c)(1).
11 18 CFR 385.214(b)(3) and (d).
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
DEPARTMENT OF HEALTH AND
HUMAN SERVICES
Food and Drug Administration
[Docket No. FDA–2023–N–0001]
Menopause: Potential Impact on
Clinical Pharmacology and
Opportunities for Future Research;
Public Workshop
AGENCY:
Food and Drug Administration,
HHS.
ACTION:
Notice of public workshop.
The Food and Drug
Administration (FDA) Office of
Women’s Health and Office of Clinical
Pharmacology is announcing the
following public workshop:
‘‘Menopause: Potential Impact on
Clinical Pharmacology and
Opportunities for Future Research.’’ The
purpose of the public workshop is to
discuss the current understanding of the
impact of menopause on the
pharmacokinetics (PK),
pharmacodynamics (PD), and exposureresponse relationships of FDA-regulated
drugs and biologics used by menopausal
women for non-menopause-related
indications. Researchers, educators,
clinicians, and patients may benefit
from attending this scientific workshop.
Presentations will discuss whether
changes in drug absorption,
distribution, metabolism, and
elimination, if any, could be affected by
hormonal changes of menopause
(independent of age), or other nonhormonal influences (including agerelated renal and hepatic changes). The
discussion is further intended to
identify the research and data gaps
regarding the potential impact of
menopause on PK/PD. Speakers will
highlight areas with the greatest need
for further research and exploration.
DATES: The public workshop will be
held virtually on October 11, 2023, from
10 a.m. to 2 p.m. Eastern Time. See the
SUPPLEMENTARY INFORMATION section for
registration date and information.
ADDRESSES: The public workshop will
be held virtually using the Zoom
platform. The link for the public
workshop will be sent to registrants
upon registration.
FOR FURTHER INFORMATION CONTACT: Lisa
Lineberger, Food and Drug
Administration, Office of the
Commissioner, Office of Women’s
Health, Bldg. 32, Rm. 2333, 10903 New
Hampshire Ave., Silver Spring, MD
20993, 301–796–8751, OWHmeetings@
fda.hhs.gov.
SUMMARY:
SUPPLEMENTARY INFORMATION:
E:\FR\FM\21SEN1.SGM
21SEN1
Agencies
[Federal Register Volume 88, Number 182 (Thursday, September 21, 2023)]
[Notices]
[Pages 65170-65172]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-20456]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-536-000]
Eastern Shore Natural Gas Company; Notice of Application and
Establishing Intervention Deadline
Take notice that on August 31, 2023, Eastern Shore Natural Gas
Company (Eastern Shore), 500 Energy Lane, Suite 200, Dover, Delaware,
19901, filed an application under section 7(c) of the Natural Gas Act
(NGA), and part 157 of the Commission's regulations requesting
authorization for its Worcester Resiliency Upgrade Project (Project).
The Project consists of the installation of five (5) liquified natural
gas (LNG) storage tanks and LNG vaporizers in Worcester County, MD.
Eastern Shore also proposes to install approximately 1.1 miles of 10-
inch-diameter pipeline looping in Sussex County, DE and Wicomico
County, MD, upgrades to an existing pressure control station in Sussex
County, DE, and upgrades to three (3) existing meter and regulating
(M&R) stations in Sussex County, DE, Worcester County, MD, and Somerset
County, MD. The Project is designed to store approximately 475,000
gallons of LNG, equivalent to 39,627 Dth, and provide 14,000 Dth/d of
corresponding peak firm natural gas transportation service, as well as
enhance the resiliency of Eastern Shore's system. Eastern Shore
estimates the total cost of the Project to be $79,878,927 and proposes
an initial recourse rate under new Rate Schedules PEAK-FT and PEAK-IT,
all as more fully set forth in the application which is on file with
the Commission and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact the Federal Energy Regulatory
[[Page 65171]]
Commission at [email protected] or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
Any questions regarding the proposed project should be directed to
Matt Everngam, Director, Regulatory Affairs, Eastern Shore Natural Gas
Company, 500 Energy Lane, Suite 200, Dover, DE 19901 by phone 1-844-
366-3764 or by email to [email protected].
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
Federal and State agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all Federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Water Quality Certification
Eastern Shore's application states that a water quality certificate
under section 401 of the Clean Water Act is required for the project
from Delaware's DNREC Division of Water Resources and Maryland's MDE
Water Management Administration. The request for certification must be
submitted to the certifying agency and to the Commission concurrently.
Proof of the certifying agency's receipt date must be filed no later
than five (5) days after the request is submitted to the certifying
agency.
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file comments on the project, you can protest
the filing, and you can file a motion to intervene in the proceeding.
There is no fee or cost for filing comments or intervening. The
deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on
October 6, 2023. How to file protests, motions to intervene, and
comments is explained below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections, to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be.
Protests
Pursuant to sections 157.10(a)(4) \2\ and 385.211 \3\ of the
Commission's regulations under the NGA, any person \4\ may file a
protest to the application. Protests must comply with the requirements
specified in section 385.2001 \5\ of the Commission's regulations. A
protest may also serve as a motion to intervene so long as the
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------
\2\ 18 CFR 157.10(a)(4).
\3\ 18 CFR 385.211.
\4\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
\5\ 18 CFR 385.2001.
---------------------------------------------------------------------------
To ensure that your comments or protests are timely and properly
recorded, please submit your comments on or before October 6, 2023.
There are three methods you can use to submit your comments or
protests to the Commission. In all instances, please reference the
Project docket number CP23-536-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments or protests electronically by using
the eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. With eFiling,
you can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making; first select ``General'' and then select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments or protests by
mailing them to the following address below. Your written comments must
reference the Project docket number (CP23-536-000).
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other courier: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\6\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\6\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \7\ and the regulations under the NGA \8\ by the
intervention deadline for the project, which is October 6, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
[[Page 65172]]
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\7\ 18 CFR 385.214.
\8\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP23-536-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below. Your
motion to intervene must reference the Project docket number CP23-536-
000.
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other courier: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email at: Matt Everngam, Director, Regulatory
Affairs, Eastern Shore Natural Gas Company, 500 Energy Lane, Suite 200,
Dover, DE 19901 or by email to [email protected]. Any subsequent
submissions by an intervenor must be served on the applicant and all
other parties to the proceeding. Contact information for parties can be
downloaded from the service list at the eService link on FERC Online.
Service can be via email with a link to the document.
All timely, unopposed \9\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\10\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\11\ A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\9\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\10\ 18 CFR 385.214(c)(1).
\11\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on October 6, 2023.
Dated: September 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-20456 Filed 9-20-23; 8:45 am]
BILLING CODE 6717-01-P