Federal Register / Vol. 88, No. 181 / Wednesday, September 20, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12532–008]
Pine Creek Mine, LLC; Notice of
Effectiveness of Withdrawal of
Application for Surrender
On December 16, 2022, the Pine Creek
Mine, LLC, filed an application for
surrender of the Pine Creek Mine
Tunnel Hydroelectric Project No. 12532.
On August 18, 2023, the Pine Creek
Mine, LLC, filed a request to withdraw
its surrender application.
No motion in opposition to the
request for withdrawal has been filed,
and the Commission has taken no action
to disallow the withdrawal. Pursuant to
Rule 216(b) of the Commission’s Rules
of Practice and Procedure,1 the
withdrawal of the application became
effective on September 5, 2023,2 and
this proceeding is hereby terminated.3
Dated: September 14, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–20353 Filed 9–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–130–000.
Applicants: Albany Green Energy,
LLC, ReEnergy Livermore Falls LLC,
ReEnergy Stratton LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Albany Green
Energy, LLC, et al.
Filed Date: 9/13/23.
Accession Number: 20230913–5137.
1 18
CFR 385.216(b) (2022).
Commission’s Rules of Practice and
Procedure provide that if a filing deadline falls on
a Saturday, Sunday, holiday, or other day when the
Commission is closed for business, the filing
deadline does not end until the close of business
on the next business day. 18 CFR 385.2007(a)(2)
(2022). Because the 15-day deadline fell on a
Saturday (i.e., September 2, 2023), and Monday,
September 4, 2023 was a holiday, the filing
deadline was extended until the close of business
on Tuesday, September 5, 2023.
3 On April 4, 2023, Pine Creek Partnership filed
a motion requesting stay of the license surrender
proceeding, and on April 17, 2023, Pine Creek
Mine, LLC filed a request for a show cause order
and enforcement sanctions. Since the surrender
proceeding is terminated, the requests are moot.
lotter on DSK11XQN23PROD with NOTICES1
2 The
VerDate Sep<11>2014
16:38 Sep 19, 2023
Jkt 259001
Comment Date: 5 p.m. ET 10/4/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–2540–001.
Applicants: Energy Prepay II, LLC.
Description: Tariff Amendment:
Amendment to 1 to be effective 8/2/
2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5054.
Comment Date: 5 p.m. ET 9/25/23.
Docket Numbers: ER23–2833–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
7070; Queue No. AE1–207/AE2–172 to
be effective 8/15/2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5005.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23–2834–000.
Applicants: Jicarilla Solar 1 LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/14/2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5008.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23–2835–000.
Applicants: Jicarilla Storage 1 LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 11/14/2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5009.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23–2836–000.
Applicants: Basin Electric Power
Cooperative, Southwest Power Pool, Inc.
Description: § 205(d) Rate Filing:
Basin Electric Power Cooperative
submits tariff filing per 35.13(a)(2)(iii:
Basin Electric Power Cooperative
Formula Rate Revisions to be effective
1/1/2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5011.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23–2837–000.
Applicants: Earp Solar, LLC.
Description: Baseline eTariff Filing:
Earp Solar, LLC MBR Tariff to be
effective 9/15/2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5029.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23–2838–000.
Applicants: BCD 2023 Fund 1 Lessee,
LLC.
Description: Baseline eTariff Filing:
BCD 2023 Fund 1 Lessee, LLC MBR
Tariff to be effective 9/15/2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5030.
Comment Date: 5 p.m. ET 10/5/23.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
64903
Docket Numbers: ER23–2839–000.
Applicants: Southwest Power Pool,
Inc., ITC Great Plains, LLC.
Description: § 205(d) Rate Filing:
Southwest Power Pool, Inc. submits
tariff filing per 35.13(a)(2)(iii: ITC Great
Plains, LLC Formula Rate Revisions to
be effective 1/1/2024.
Filed Date: 9/14/23.
Accession Number: 20230914–5038.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23–2840–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 217, Exhibit B.NGA to be
effective 11/15/2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5048.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23–2841–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Postponing Implementation of Capacity
Market Mitigation Rules Applicable to
DERs to be effective 7/1/2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5060.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23–2842–000.
Applicants: Sunnyside Cogeneration
Associates.
Description: Baseline eTariff Filing:
Baseline new to be effective 9/15/2023.
Filed Date: 9/14/23.
Accession Number: 20230914–5069.
Comment Date: 5 p.m. ET 10/5/23.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES23–69–000.
Applicants: Georgia Power Company.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Georgia Power Company.
Filed Date: 9/13/23.
Accession Number: 20230913–5134.
Comment Date: 5 p.m. ET 10/4/23.
Docket Numbers: ES23–70–000.
Applicants: Mississippi Power
Company.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Mississippi Power Company.
Filed Date: 9/13/23.
Accession Number: 20230913–5135.
Comment Date: 5 p.m. ET 10/4/23.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM23–7–000.
Applicants: Entergy Services, LLC,
Entergy Mississippi, LLC, Entergy
Louisiana, LLC, Entergy New Orleans,
E:\FR\FM\20SEN1.SGM
20SEN1
64904
Federal Register / Vol. 88, No. 181 / Wednesday, September 20, 2023 / Notices
[Project No. 3562–000]
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 3562
is issued to KEI (Maine) Power
Management (III), LLC for a period
effective August 1, 2023, through July
31, 2024, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before July 31, 2024, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that KEI (Maine) Power Management
(III), LLC is authorized to continue
operation of Barker Mill Upper
Hydroelectric Project under the terms
and conditions of the prior license until
the issuance of a new license for the
project or other disposition under the
FPA, whichever comes first.
KEI (Maine) Power Management (III),
LLC; Notice of Authorization for
Continued Project Operation
Dated: September 14, 2023.
Kimberly D. Bose,
Secretary.
LLC, Entergy Arkansas, LLC, Entergy
Texas, Inc.
Description: Application of Entergy
Services, LLC to Terminate Its
Mandatory Purchase Obligation under
the Public Utility Regulatory Policies
Act of 1978.
Filed Date: 9/13/23.
Accession Number: 20230913–5142.
Comment Date: 5 p.m. ET 10/11/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: September 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–20373 Filed 9–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
lotter on DSK11XQN23PROD with NOTICES1
Federal Energy Regulatory
Commission
The license for the Barker Mill Upper
Hydroelectric Project No. 3562 was
issued for a period ending July 31, 2023.
VerDate Sep<11>2014
16:38 Sep 19, 2023
Jkt 259001
[FR Doc. 2023–20354 Filed 9–19–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–538–000]
Texas Eastern Transmission, LP;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on September 7,
2023, Texas Eastern Transmission, LP
(Texas Eastern), 915 N Eldridge
Parkway, Suite 1100, Houston, Texas
77079–2703, filed in the above
referenced docket, a prior notice request
pursuant to sections 157.205 and
157.216 of the Commission’s regulations
under the Natural Gas Act (NGA), and
Texas Eastern’s blanket certificate
issued in Docket No. CP82–535–000, for
authorization to: (1) abandon in-place
an approximately 1.75-mile-long, 20inch-diameter portion of its Line 40–G
supply lateral; and (2) abandon by
removal its M&R Station 72138 and
related piping, all located in offshore
federal waters in the Gulf of Mexico
near Louisiana (Line 40–G Partial
Abandonment Project). Texas Eastern
states that the project will allow Texas
Eastern to eliminate the need for capital
expenditures associated with the
ongoing maintenance and repair of
facilities that are no longer required for
gas transportation service. Texas Eastern
states that the project will have no
impact on the certificated capacity of
Texas Eastern’s system, and no
customer has a primary firm receipt
point or primary firm delivery point on
the segments to be abandoned. The
estimated cost of removal related to the
abandonment for the project is
$4,200,000, all as more fully set forth in
the request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions concerning this request
should be directed to Brian Kim,
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 88, Number 181 (Wednesday, September 20, 2023)]
[Notices]
[Pages 64903-64904]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-20373]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC23-130-000.
Applicants: Albany Green Energy, LLC, ReEnergy Livermore Falls LLC,
ReEnergy Stratton LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Albany Green Energy, LLC, et al.
Filed Date: 9/13/23.
Accession Number: 20230913-5137.
Comment Date: 5 p.m. ET 10/4/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER23-2540-001.
Applicants: Energy Prepay II, LLC.
Description: Tariff Amendment: Amendment to 1 to be effective 8/2/
2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5054.
Comment Date: 5 p.m. ET 9/25/23.
Docket Numbers: ER23-2833-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, Service
Agreement No. 7070; Queue No. AE1-207/AE2-172 to be effective 8/15/
2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5005.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23-2834-000.
Applicants: Jicarilla Solar 1 LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/14/2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5008.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23-2835-000.
Applicants: Jicarilla Storage 1 LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 11/14/2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5009.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23-2836-000.
Applicants: Basin Electric Power Cooperative, Southwest Power Pool,
Inc.
Description: Sec. 205(d) Rate Filing: Basin Electric Power
Cooperative submits tariff filing per 35.13(a)(2)(iii: Basin Electric
Power Cooperative Formula Rate Revisions to be effective 1/1/2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5011.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23-2837-000.
Applicants: Earp Solar, LLC.
Description: Baseline eTariff Filing: Earp Solar, LLC MBR Tariff to
be effective 9/15/2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5029.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23-2838-000.
Applicants: BCD 2023 Fund 1 Lessee, LLC.
Description: Baseline eTariff Filing: BCD 2023 Fund 1 Lessee, LLC
MBR Tariff to be effective 9/15/2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5030.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23-2839-000.
Applicants: Southwest Power Pool, Inc., ITC Great Plains, LLC.
Description: Sec. 205(d) Rate Filing: Southwest Power Pool, Inc.
submits tariff filing per 35.13(a)(2)(iii: ITC Great Plains, LLC
Formula Rate Revisions to be effective 1/1/2024.
Filed Date: 9/14/23.
Accession Number: 20230914-5038.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23-2840-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 217,
Exhibit B.NGA to be effective 11/15/2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5048.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23-2841-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Postponing Implementation of
Capacity Market Mitigation Rules Applicable to DERs to be effective 7/
1/2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5060.
Comment Date: 5 p.m. ET 10/5/23.
Docket Numbers: ER23-2842-000.
Applicants: Sunnyside Cogeneration Associates.
Description: Baseline eTariff Filing: Baseline new to be effective
9/15/2023.
Filed Date: 9/14/23.
Accession Number: 20230914-5069.
Comment Date: 5 p.m. ET 10/5/23.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES23-69-000.
Applicants: Georgia Power Company.
Description: Application Under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Georgia Power Company.
Filed Date: 9/13/23.
Accession Number: 20230913-5134.
Comment Date: 5 p.m. ET 10/4/23.
Docket Numbers: ES23-70-000.
Applicants: Mississippi Power Company.
Description: Application Under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Mississippi Power Company.
Filed Date: 9/13/23.
Accession Number: 20230913-5135.
Comment Date: 5 p.m. ET 10/4/23.
Take notice that the Commission received the following PURPA
210(m)(3) filings:
Docket Numbers: QM23-7-000.
Applicants: Entergy Services, LLC, Entergy Mississippi, LLC,
Entergy Louisiana, LLC, Entergy New Orleans,
[[Page 64904]]
LLC, Entergy Arkansas, LLC, Entergy Texas, Inc.
Description: Application of Entergy Services, LLC to Terminate Its
Mandatory Purchase Obligation under the Public Utility Regulatory
Policies Act of 1978.
Filed Date: 9/13/23.
Accession Number: 20230913-5142.
Comment Date: 5 p.m. ET 10/11/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: September 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-20373 Filed 9-19-23; 8:45 am]