Download as PDF Federal Register / Vol. 88, No. 181 / Wednesday, September 20, 2023 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12532–008] Pine Creek Mine, LLC; Notice of Effectiveness of Withdrawal of Application for Surrender On December 16, 2022, the Pine Creek Mine, LLC, filed an application for surrender of the Pine Creek Mine Tunnel Hydroelectric Project No. 12532. On August 18, 2023, the Pine Creek Mine, LLC, filed a request to withdraw its surrender application. No motion in opposition to the request for withdrawal has been filed, and the Commission has taken no action to disallow the withdrawal. Pursuant to Rule 216(b) of the Commission’s Rules of Practice and Procedure,1 the withdrawal of the application became effective on September 5, 2023,2 and this proceeding is hereby terminated.3 Dated: September 14, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–20353 Filed 9–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–130–000. Applicants: Albany Green Energy, LLC, ReEnergy Livermore Falls LLC, ReEnergy Stratton LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Albany Green Energy, LLC, et al. Filed Date: 9/13/23. Accession Number: 20230913–5137. 1 18 CFR 385.216(b) (2022). Commission’s Rules of Practice and Procedure provide that if a filing deadline falls on a Saturday, Sunday, holiday, or other day when the Commission is closed for business, the filing deadline does not end until the close of business on the next business day. 18 CFR 385.2007(a)(2) (2022). Because the 15-day deadline fell on a Saturday (i.e., September 2, 2023), and Monday, September 4, 2023 was a holiday, the filing deadline was extended until the close of business on Tuesday, September 5, 2023. 3 On April 4, 2023, Pine Creek Partnership filed a motion requesting stay of the license surrender proceeding, and on April 17, 2023, Pine Creek Mine, LLC filed a request for a show cause order and enforcement sanctions. Since the surrender proceeding is terminated, the requests are moot. lotter on DSK11XQN23PROD with NOTICES1 2 The VerDate Sep<11>2014 16:38 Sep 19, 2023 Jkt 259001 Comment Date: 5 p.m. ET 10/4/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER23–2540–001. Applicants: Energy Prepay II, LLC. Description: Tariff Amendment: Amendment to 1 to be effective 8/2/ 2023. Filed Date: 9/14/23. Accession Number: 20230914–5054. Comment Date: 5 p.m. ET 9/25/23. Docket Numbers: ER23–2833–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 7070; Queue No. AE1–207/AE2–172 to be effective 8/15/2023. Filed Date: 9/14/23. Accession Number: 20230914–5005. Comment Date: 5 p.m. ET 10/5/23. Docket Numbers: ER23–2834–000. Applicants: Jicarilla Solar 1 LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 11/14/2023. Filed Date: 9/14/23. Accession Number: 20230914–5008. Comment Date: 5 p.m. ET 10/5/23. Docket Numbers: ER23–2835–000. Applicants: Jicarilla Storage 1 LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 11/14/2023. Filed Date: 9/14/23. Accession Number: 20230914–5009. Comment Date: 5 p.m. ET 10/5/23. Docket Numbers: ER23–2836–000. Applicants: Basin Electric Power Cooperative, Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Basin Electric Power Cooperative submits tariff filing per 35.13(a)(2)(iii: Basin Electric Power Cooperative Formula Rate Revisions to be effective 1/1/2023. Filed Date: 9/14/23. Accession Number: 20230914–5011. Comment Date: 5 p.m. ET 10/5/23. Docket Numbers: ER23–2837–000. Applicants: Earp Solar, LLC. Description: Baseline eTariff Filing: Earp Solar, LLC MBR Tariff to be effective 9/15/2023. Filed Date: 9/14/23. Accession Number: 20230914–5029. Comment Date: 5 p.m. ET 10/5/23. Docket Numbers: ER23–2838–000. Applicants: BCD 2023 Fund 1 Lessee, LLC. Description: Baseline eTariff Filing: BCD 2023 Fund 1 Lessee, LLC MBR Tariff to be effective 9/15/2023. Filed Date: 9/14/23. Accession Number: 20230914–5030. Comment Date: 5 p.m. ET 10/5/23. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 64903 Docket Numbers: ER23–2839–000. Applicants: Southwest Power Pool, Inc., ITC Great Plains, LLC. Description: § 205(d) Rate Filing: Southwest Power Pool, Inc. submits tariff filing per 35.13(a)(2)(iii: ITC Great Plains, LLC Formula Rate Revisions to be effective 1/1/2024. Filed Date: 9/14/23. Accession Number: 20230914–5038. Comment Date: 5 p.m. ET 10/5/23. Docket Numbers: ER23–2840–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Rate Schedule No. 217, Exhibit B.NGA to be effective 11/15/2023. Filed Date: 9/14/23. Accession Number: 20230914–5048. Comment Date: 5 p.m. ET 10/5/23. Docket Numbers: ER23–2841–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Postponing Implementation of Capacity Market Mitigation Rules Applicable to DERs to be effective 7/1/2023. Filed Date: 9/14/23. Accession Number: 20230914–5060. Comment Date: 5 p.m. ET 10/5/23. Docket Numbers: ER23–2842–000. Applicants: Sunnyside Cogeneration Associates. Description: Baseline eTariff Filing: Baseline new to be effective 9/15/2023. Filed Date: 9/14/23. Accession Number: 20230914–5069. Comment Date: 5 p.m. ET 10/5/23. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES23–69–000. Applicants: Georgia Power Company. Description: Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of Georgia Power Company. Filed Date: 9/13/23. Accession Number: 20230913–5134. Comment Date: 5 p.m. ET 10/4/23. Docket Numbers: ES23–70–000. Applicants: Mississippi Power Company. Description: Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of Mississippi Power Company. Filed Date: 9/13/23. Accession Number: 20230913–5135. Comment Date: 5 p.m. ET 10/4/23. Take notice that the Commission received the following PURPA 210(m)(3) filings: Docket Numbers: QM23–7–000. Applicants: Entergy Services, LLC, Entergy Mississippi, LLC, Entergy Louisiana, LLC, Entergy New Orleans, E:\FR\FM\20SEN1.SGM 20SEN1 64904 Federal Register / Vol. 88, No. 181 / Wednesday, September 20, 2023 / Notices [Project No. 3562–000] Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 3562 is issued to KEI (Maine) Power Management (III), LLC for a period effective August 1, 2023, through July 31, 2024, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before July 31, 2024, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that KEI (Maine) Power Management (III), LLC is authorized to continue operation of Barker Mill Upper Hydroelectric Project under the terms and conditions of the prior license until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. KEI (Maine) Power Management (III), LLC; Notice of Authorization for Continued Project Operation Dated: September 14, 2023. Kimberly D. Bose, Secretary. LLC, Entergy Arkansas, LLC, Entergy Texas, Inc. Description: Application of Entergy Services, LLC to Terminate Its Mandatory Purchase Obligation under the Public Utility Regulatory Policies Act of 1978. Filed Date: 9/13/23. Accession Number: 20230913–5142. Comment Date: 5 p.m. ET 10/11/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: September 14, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–20373 Filed 9–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY lotter on DSK11XQN23PROD with NOTICES1 Federal Energy Regulatory Commission The license for the Barker Mill Upper Hydroelectric Project No. 3562 was issued for a period ending July 31, 2023. VerDate Sep<11>2014 16:38 Sep 19, 2023 Jkt 259001 [FR Doc. 2023–20354 Filed 9–19–23; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–538–000] Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on September 7, 2023, Texas Eastern Transmission, LP (Texas Eastern), 915 N Eldridge Parkway, Suite 1100, Houston, Texas 77079–2703, filed in the above referenced docket, a prior notice request pursuant to sections 157.205 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA), and Texas Eastern’s blanket certificate issued in Docket No. CP82–535–000, for authorization to: (1) abandon in-place an approximately 1.75-mile-long, 20inch-diameter portion of its Line 40–G supply lateral; and (2) abandon by removal its M&R Station 72138 and related piping, all located in offshore federal waters in the Gulf of Mexico near Louisiana (Line 40–G Partial Abandonment Project). Texas Eastern states that the project will allow Texas Eastern to eliminate the need for capital expenditures associated with the ongoing maintenance and repair of facilities that are no longer required for gas transportation service. Texas Eastern states that the project will have no impact on the certificated capacity of Texas Eastern’s system, and no customer has a primary firm receipt point or primary firm delivery point on the segments to be abandoned. The estimated cost of removal related to the abandonment for the project is $4,200,000, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact the Federal Energy Regulatory Commission at FercOnlineSupport@ ferc.gov or call toll-free, (886) 208–3676 or TTY (202) 502–8659. Any questions concerning this request should be directed to Brian Kim, E:\FR\FM\20SEN1.SGM 20SEN1

Agencies

[Federal Register Volume 88, Number 181 (Wednesday, September 20, 2023)]
[Notices]
[Pages 64903-64904]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-20373]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC23-130-000.
    Applicants: Albany Green Energy, LLC, ReEnergy Livermore Falls LLC, 
ReEnergy Stratton LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Albany Green Energy, LLC, et al.
    Filed Date: 9/13/23.
    Accession Number: 20230913-5137.
    Comment Date: 5 p.m. ET 10/4/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER23-2540-001.
    Applicants: Energy Prepay II, LLC.
    Description: Tariff Amendment: Amendment to 1 to be effective 8/2/
2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5054.
    Comment Date: 5 p.m. ET 9/25/23.

    Docket Numbers: ER23-2833-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 7070; Queue No. AE1-207/AE2-172 to be effective 8/15/
2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5005.
    Comment Date: 5 p.m. ET 10/5/23.

    Docket Numbers: ER23-2834-000.
    Applicants: Jicarilla Solar 1 LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff Filing to be effective 11/14/2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5008.
    Comment Date: 5 p.m. ET 10/5/23.

    Docket Numbers: ER23-2835-000.
    Applicants: Jicarilla Storage 1 LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff Filing to be effective 11/14/2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5009.
    Comment Date: 5 p.m. ET 10/5/23.

    Docket Numbers: ER23-2836-000.
    Applicants: Basin Electric Power Cooperative, Southwest Power Pool, 
Inc.
    Description: Sec.  205(d) Rate Filing: Basin Electric Power 
Cooperative submits tariff filing per 35.13(a)(2)(iii: Basin Electric 
Power Cooperative Formula Rate Revisions to be effective 1/1/2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5011.
    Comment Date: 5 p.m. ET 10/5/23.

    Docket Numbers: ER23-2837-000.
    Applicants: Earp Solar, LLC.
    Description: Baseline eTariff Filing: Earp Solar, LLC MBR Tariff to 
be effective 9/15/2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5029.
    Comment Date: 5 p.m. ET 10/5/23.

    Docket Numbers: ER23-2838-000.
    Applicants: BCD 2023 Fund 1 Lessee, LLC.
    Description: Baseline eTariff Filing: BCD 2023 Fund 1 Lessee, LLC 
MBR Tariff to be effective 9/15/2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5030.
    Comment Date: 5 p.m. ET 10/5/23.

    Docket Numbers: ER23-2839-000.
    Applicants: Southwest Power Pool, Inc., ITC Great Plains, LLC.
    Description: Sec.  205(d) Rate Filing: Southwest Power Pool, Inc. 
submits tariff filing per 35.13(a)(2)(iii: ITC Great Plains, LLC 
Formula Rate Revisions to be effective 1/1/2024.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5038.
    Comment Date: 5 p.m. ET 10/5/23.

    Docket Numbers: ER23-2840-000.
    Applicants: Arizona Public Service Company.
    Description: Sec.  205(d) Rate Filing: Rate Schedule No. 217, 
Exhibit B.NGA to be effective 11/15/2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5048.
    Comment Date: 5 p.m. ET 10/5/23.

    Docket Numbers: ER23-2841-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Postponing Implementation of 
Capacity Market Mitigation Rules Applicable to DERs to be effective 7/
1/2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5060.
    Comment Date: 5 p.m. ET 10/5/23.

    Docket Numbers: ER23-2842-000.
    Applicants: Sunnyside Cogeneration Associates.
    Description: Baseline eTariff Filing: Baseline new to be effective 
9/15/2023.
    Filed Date: 9/14/23.
    Accession Number: 20230914-5069.
    Comment Date: 5 p.m. ET 10/5/23.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES23-69-000.
    Applicants: Georgia Power Company.
    Description: Application Under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of Georgia Power Company.
    Filed Date: 9/13/23.
    Accession Number: 20230913-5134.
    Comment Date: 5 p.m. ET 10/4/23.

    Docket Numbers: ES23-70-000.
    Applicants: Mississippi Power Company.
    Description: Application Under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of Mississippi Power Company.
    Filed Date: 9/13/23.
    Accession Number: 20230913-5135.
    Comment Date: 5 p.m. ET 10/4/23.

    Take notice that the Commission received the following PURPA 
210(m)(3) filings:

    Docket Numbers: QM23-7-000.
    Applicants: Entergy Services, LLC, Entergy Mississippi, LLC, 
Entergy Louisiana, LLC, Entergy New Orleans,

[[Page 64904]]

LLC, Entergy Arkansas, LLC, Entergy Texas, Inc.
    Description: Application of Entergy Services, LLC to Terminate Its 
Mandatory Purchase Obligation under the Public Utility Regulatory 
Policies Act of 1978.
    Filed Date: 9/13/23.
    Accession Number: 20230913-5142.
    Comment Date: 5 p.m. ET 10/11/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: September 14, 2023.