County of Coconino, AZ; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 64906-64907 [2023-20361]
Download as PDF
64906
Federal Register / Vol. 88, No. 181 / Wednesday, September 20, 2023 / Notices
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: September 14, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–20355 Filed 9–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
an annual license for Project No. 3442
is issued to The City of Nashua for a
period effective August 1, 2023, through
July 31, 2024, or until the issuance of a
new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before July 31, 2024, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that The City of Nashua is authorized to
continue operation of Mine Falls
Hydroelectric Project under the terms
and conditions of the prior license until
the issuance of a new license for the
project or other disposition under the
FPA, whichever comes first.
Federal Energy Regulatory
Commission
Dated: September 14, 2023.
Kimberly D. Bose,
Secretary.
[Project No. 3442–000]
[FR Doc. 2023–20360 Filed 9–19–23; 8:45 am]
BILLING CODE 6717–01–P
lotter on DSK11XQN23PROD with NOTICES1
The City of Nashua; Notice of
Authorization for Continued Project
Operation
DEPARTMENT OF ENERGY
The license for the Mine Falls
Hydroelectric Project No. 3442 was
issued for a period ending July 31, 2023.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
VerDate Sep<11>2014
16:38 Sep 19, 2023
Jkt 259001
Federal Energy Regulatory
Commission
[Project No. 15314–000]
County of Coconino, AZ; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 12, 2023, Western Navajo
Pumped Storage 1, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the to be located near the
City of Page in Coconino County,
Arizona. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The project is proposed as a closed
loop pumped storage hydroelectricgenerating facility, which would involve
the construction of new water storage,
water conveyance, and generation
facilities at off-channel locations where
no such facilities exist at this time. The
project would utilize water from Lake
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Powell to fill and periodically refill the
project reservoirs. The lower reservoir
would be located approximately 5,280
feet west from the proposed upper
reservoir. A zoned rockfill embankment
dike approximately 75 feet high and
8,200 feet long is proposed to be
constructed to enclose the perimeter of
the 110-acre lower reservoir with a
water surface elevation of 4,125 feet
mean sea level (msl). The upper
reservoir would be located
approximately 5,280 feet east from the
proposed lower reservoir. A zoned
rockfill embankment dike
approximately 75 feet high and 8,000
feet long is proposed to be constructed
to enclose the perimeter of the 110-acre
upper reservoir with a water surface
elevation of 4,625 feet msl. Both
embankment ring dikes would have an
impermeable clay core and an
impermeable concrete liner.
During pumping operations, water
would be drawn through the eight
reversible Francis pump-turbine units
into eight 12-foot-diameter steel pipes
that would merge into a 34 footdiameter penstock, which would convey
water to the upper reservoir. During
generation, operations would be
reversed. The total installed generation
capacity would be 396 megawatts with
a hydraulic head of 500 feet.
The proposed project would also
include a new 3-mile-long, 230-kilovolt
overhead transmission line that would
extend from a proposed substation near
the proposed powerhouse to an
interconnection point with the
substation located at the former Navajo
Generating Station. The 3-mile-long
transmission route would follow an
approximately 150-foot-wide corridor
southwest towards the former coal plant
substation. The proposed substation
would include two 200-megavoltampere Generator Step-up Units, relays
and controls, breakers, and switches as
required by the existing substation
owner/electric service provider.
Applicant Contact: Mr. Erik Steimle,
Western Navajo Pumped Storage 1, LLC,
100 S Olive Street, West Palm Beach, FL
33401; erik@ryedevelopment.com;
phone: (503) 998–0230.
FERC Contact: Everard Baker; email:
everard.baker@ferc.gov; phone: (202)
502–8554.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members, and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
E:\FR\FM\20SEN1.SGM
20SEN1
Federal Register / Vol. 88, No. 181 / Wednesday, September 20, 2023 / Notices
assistance with filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov. Comments, motions to
intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications
should be submitted within 60 days
from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Secretary Kimberly Bose, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15314–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15314) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: September 14, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–20361 Filed 9–19–23; 8:45 am]
lotter on DSK11XQN23PROD with NOTICES1
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:38 Sep 19, 2023
Jkt 259001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–2813–000]
Castle Solar, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Castle
Solar, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 4,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
64907
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: September 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–20371 Filed 9–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–2814–000]
Elektron Solar, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Elektron
Solar, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 88, Number 181 (Wednesday, September 20, 2023)]
[Notices]
[Pages 64906-64907]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-20361]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15314-000]
County of Coconino, AZ; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On June 12, 2023, Western Navajo Pumped Storage 1, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the to
be located near the City of Page in Coconino County, Arizona. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The project is proposed as a closed loop pumped storage
hydroelectric-generating facility, which would involve the construction
of new water storage, water conveyance, and generation facilities at
off-channel locations where no such facilities exist at this time. The
project would utilize water from Lake Powell to fill and periodically
refill the project reservoirs. The lower reservoir would be located
approximately 5,280 feet west from the proposed upper reservoir. A
zoned rockfill embankment dike approximately 75 feet high and 8,200
feet long is proposed to be constructed to enclose the perimeter of the
110-acre lower reservoir with a water surface elevation of 4,125 feet
mean sea level (msl). The upper reservoir would be located
approximately 5,280 feet east from the proposed lower reservoir. A
zoned rockfill embankment dike approximately 75 feet high and 8,000
feet long is proposed to be constructed to enclose the perimeter of the
110-acre upper reservoir with a water surface elevation of 4,625 feet
msl. Both embankment ring dikes would have an impermeable clay core and
an impermeable concrete liner.
During pumping operations, water would be drawn through the eight
reversible Francis pump-turbine units into eight 12-foot-diameter steel
pipes that would merge into a 34 foot-diameter penstock, which would
convey water to the upper reservoir. During generation, operations
would be reversed. The total installed generation capacity would be 396
megawatts with a hydraulic head of 500 feet.
The proposed project would also include a new 3-mile-long, 230-
kilovolt overhead transmission line that would extend from a proposed
substation near the proposed powerhouse to an interconnection point
with the substation located at the former Navajo Generating Station.
The 3-mile-long transmission route would follow an approximately 150-
foot-wide corridor southwest towards the former coal plant substation.
The proposed substation would include two 200-megavolt-ampere Generator
Step-up Units, relays and controls, breakers, and switches as required
by the existing substation owner/electric service provider.
Applicant Contact: Mr. Erik Steimle, Western Navajo Pumped Storage
1, LLC, 100 S Olive Street, West Palm Beach, FL 33401;
[email protected]; phone: (503) 998-0230.
FERC Contact: Everard Baker; email: [email protected]; phone:
(202) 502-8554.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members, and others, access
publicly available information and navigate Commission processes. For
public inquiries and
[[Page 64907]]
assistance with filings such as interventions, comments, or requests
for rehearing, the public is encouraged to contact OPP at (202) 502-
6595 or [email protected]. Comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications should be submitted within 60 days from the
issuance of this notice. Competing applications and notices of intent
must meet the requirements of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Secretary Kimberly Bose, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Submissions sent via any other
carrier must be addressed to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing should include docket number P-
15314-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15314) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 14, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-20361 Filed 9-19-23; 8:45 am]