Combined Notice of Filings, 60448-60449 [2023-18962]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 60448 Federal Register / Vol. 88, No. 169 / Friday, September 1, 2023 / Notices Filed Date: 8/28/23. Accession Number: 20230828–5308. Comment Date: 5 p.m. ET 9/18/23. Docket Numbers: ER23–2157–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 1887R13 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2023. Filed Date: 8/28/23. Accession Number: 20230828–5320. Comment Date: 5 p.m. ET 9/18/23. Docket Numbers: ER23–2159–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 1889R12 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2023. Filed Date: 8/28/23. Accession Number: 20230828–5326. Comment Date: 5 p.m. ET 9/18/23. Docket Numbers: ER23–2160–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 1891R12 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2023. Filed Date: 8/28/23. Accession Number: 20230828–5333. Comment Date: 5 p.m. ET 9/18/23. Docket Numbers: ER23–2163–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 1897R13 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2023. Filed Date: 8/28/23. Accession Number: 20230828–5339. Comment Date: 5 p.m. ET 9/18/23. Docket Numbers: ER23–2612–002. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Errata to Revisions to Cost Responsibility Assignments for RTEP in ER23–2612 to be effective 11/9/2023. Filed Date: 8/25/23. Accession Number: 20230825–5185. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2639–001. Applicants: NRG Business Marketing LLC. Description: Compliance filing: Informational Filing Regarding Upstream Transfer of Ownership to be effective N/A. Filed Date: 8/28/23. Accession Number: 20230828–5275. Comment Date: 5 p.m. ET 9/18/23. Docket Numbers: ER23–2711–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2023–08–25 PLA No. 5 Time Ext— CDWR to be effective 11/1/2023. Filed Date: 8/25/23. Accession Number: 20230825–5181. VerDate Sep<11>2014 17:24 Aug 31, 2023 Jkt 259001 Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2712–000. Applicants: North Bend Wind Project, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization, Request for Related Waivers to be effective 10/25/2023. Filed Date: 8/25/23. Accession Number: 20230825–5206. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2713–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 7049; Queue No. AE1–163/AE2–281 to be effective 7/27/2023. Filed Date: 8/28/23. Accession Number: 20230828–5136. Comment Date: 5 p.m. ET 9/18/23. Docket Numbers: ER23–2714–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to the PJM Tariff, OA and RAA RE GDECS Clean-Up to be effective 10/28/2023. Filed Date: 8/28/23. Accession Number: 20230828–5357. Comment Date: 5 p.m. ET 9/18/23. Docket Numbers: ER23–2715–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised ISA, Service Agreement No. 4940; Queue No. AE2–034 to be effective 7/27/2023. Filed Date: 8/28/23. Accession Number: 20230828–5364. Comment Date: 5 p.m. ET 9/18/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: August 28, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–18963 Filed 8–31–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas and Oil Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: PR23–65–000. Applicants: Northwest Natural Gas Company. Description: § 284.123(g) Rate Filing: Petition of Northwest Natural Gas Company for Approval of Rates to be effective 9/1/2023. Filed Date: 8/25/23. Accession Number: 20230825–5171. Comment Date: 5 p.m. ET 9/15/23. Protest Date: 5 p.m. ET 10/24/23. Docket Numbers: RP23–981–000. Applicants: Texas Eastern Transmission, LP. Description: Compliance filing: 2023 Operational Entitlements Filing to be effective N/A. Filed Date: 8/28/23. Accession Number: 20230828–5186. Comment Date: 5 p.m. ET 9/11/23. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. E:\FR\FM\01SEN1.SGM 01SEN1 Federal Register / Vol. 88, No. 169 / Friday, September 1, 2023 / Notices eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: August 28, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–18962 Filed 8–31–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–530–000] lotter on DSK11XQN23PROD with NOTICES1 Trunkline Gas Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on August 18, 2023, Trunkline Gas Company, LLC (Trunkline), 1300 Main Street, P.O. Box 4967, filed in the above referenced docket, a prior notice request pursuant to sections 157.205,157.208, and 157.211 of the Commission’s regulations under the Natural Gas Act (NGA), and Trunkline’s blanket certificate issued in Docket No. CP83–84–000. Trunkline seeks authorization to construct/ relocate/replace, own, operate and maintain certain modifications to an existing interconnection, Trunkline’s Metering & Regulation station 81717, between Trunkline’s pipeline system and Texas Eastern Transmission, LP’s pipeline system, install interconnection piping and related facilities, and install a new compressor booster station on Trunkline’s pipeline system. All of the above facilities are located in Beauregard Parish, Louisiana. The project will allow Trunkline to increase the delivery pressure at the Interconnection to effectuate gas flow from Trunkline’s pipeline system into VerDate Sep<11>2014 17:24 Aug 31, 2023 Jkt 259001 Texas Eastern’s pipeline system. The estimated cost for the project is $26.3 million, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact the Federal Energy Regulatory Commission at FercOnlineSupport@ ferc.gov or call toll-free, (886) 208–3676 or TTY (202) 502–8659. Any questions concerning this request should be directed to Blair Lichtenwalter, 1300 Main Street, P.O. Box 4967, (713) 989–2605 Blair.Lichtenwalter@energytransfer.com. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on October 27, 2023. How to file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 2 Persons PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 60449 no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is October 27, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is October 27, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A 3 18 CFR 157.205(e). CFR 385.214. 5 18 CFR 157.10. 4 18 E:\FR\FM\01SEN1.SGM 01SEN1

Agencies

[Federal Register Volume 88, Number 169 (Friday, September 1, 2023)]
[Notices]
[Pages 60448-60449]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18962]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas and Oil Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: PR23-65-000.
    Applicants: Northwest Natural Gas Company.
    Description: Sec.  284.123(g) Rate Filing: Petition of Northwest 
Natural Gas Company for Approval of Rates to be effective 9/1/2023.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5171.
    Comment Date: 5 p.m. ET 9/15/23.
    Protest Date: 5 p.m. ET 10/24/23.

    Docket Numbers: RP23-981-000.
    Applicants: Texas Eastern Transmission, LP.
    Description: Compliance filing: 2023 Operational Entitlements 
Filing to be effective N/A.
    Filed Date: 8/28/23.
    Accession Number: 20230828-5186.
    Comment Date: 5 p.m. ET 9/11/23.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.

[[Page 60449]]

    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: August 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-18962 Filed 8-31-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.