Combined Notice of Filings, 60448-60449 [2023-18962]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
60448
Federal Register / Vol. 88, No. 169 / Friday, September 1, 2023 / Notices
Filed Date: 8/28/23.
Accession Number: 20230828–5308.
Comment Date: 5 p.m. ET 9/18/23.
Docket Numbers: ER23–2157–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
1887R13 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2023.
Filed Date: 8/28/23.
Accession Number: 20230828–5320.
Comment Date: 5 p.m. ET 9/18/23.
Docket Numbers: ER23–2159–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
1889R12 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2023.
Filed Date: 8/28/23.
Accession Number: 20230828–5326.
Comment Date: 5 p.m. ET 9/18/23.
Docket Numbers: ER23–2160–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
1891R12 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2023.
Filed Date: 8/28/23.
Accession Number: 20230828–5333.
Comment Date: 5 p.m. ET 9/18/23.
Docket Numbers: ER23–2163–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
1897R13 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2023.
Filed Date: 8/28/23.
Accession Number: 20230828–5339.
Comment Date: 5 p.m. ET 9/18/23.
Docket Numbers: ER23–2612–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment: Errata
to Revisions to Cost Responsibility
Assignments for RTEP in ER23–2612 to
be effective 11/9/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5185.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2639–001.
Applicants: NRG Business Marketing
LLC.
Description: Compliance filing:
Informational Filing Regarding
Upstream Transfer of Ownership to be
effective N/A.
Filed Date: 8/28/23.
Accession Number: 20230828–5275.
Comment Date: 5 p.m. ET 9/18/23.
Docket Numbers: ER23–2711–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2023–08–25 PLA No. 5 Time Ext—
CDWR to be effective 11/1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5181.
VerDate Sep<11>2014
17:24 Aug 31, 2023
Jkt 259001
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2712–000.
Applicants: North Bend Wind Project,
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization, Request for Related
Waivers to be effective 10/25/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5206.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2713–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
7049; Queue No. AE1–163/AE2–281 to
be effective 7/27/2023.
Filed Date: 8/28/23.
Accession Number: 20230828–5136.
Comment Date: 5 p.m. ET 9/18/23.
Docket Numbers: ER23–2714–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to the PJM Tariff, OA and
RAA RE GDECS Clean-Up to be effective
10/28/2023.
Filed Date: 8/28/23.
Accession Number: 20230828–5357.
Comment Date: 5 p.m. ET 9/18/23.
Docket Numbers: ER23–2715–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, Service Agreement No.
4940; Queue No. AE2–034 to be
effective 7/27/2023.
Filed Date: 8/28/23.
Accession Number: 20230828–5364.
Comment Date: 5 p.m. ET 9/18/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes.
For public inquiries and assistance
with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: August 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–18963 Filed 8–31–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas and
Oil Pipeline Rate and Refund Report
filings:
Filings Instituting Proceedings
Docket Numbers: PR23–65–000.
Applicants: Northwest Natural Gas
Company.
Description: § 284.123(g) Rate Filing:
Petition of Northwest Natural Gas
Company for Approval of Rates to be
effective 9/1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5171.
Comment Date: 5 p.m. ET 9/15/23.
Protest Date: 5 p.m. ET 10/24/23.
Docket Numbers: RP23–981–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing: 2023
Operational Entitlements Filing to be
effective N/A.
Filed Date: 8/28/23.
Accession Number: 20230828–5186.
Comment Date: 5 p.m. ET 9/11/23.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
E:\FR\FM\01SEN1.SGM
01SEN1
Federal Register / Vol. 88, No. 169 / Friday, September 1, 2023 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: August 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–18962 Filed 8–31–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–530–000]
lotter on DSK11XQN23PROD with NOTICES1
Trunkline Gas Company, LLC; Notice
of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on August 18, 2023,
Trunkline Gas Company, LLC
(Trunkline), 1300 Main Street, P.O. Box
4967, filed in the above referenced
docket, a prior notice request pursuant
to sections 157.205,157.208, and
157.211 of the Commission’s regulations
under the Natural Gas Act (NGA), and
Trunkline’s blanket certificate issued in
Docket No. CP83–84–000. Trunkline
seeks authorization to construct/
relocate/replace, own, operate and
maintain certain modifications to an
existing interconnection, Trunkline’s
Metering & Regulation station 81717,
between Trunkline’s pipeline system
and Texas Eastern Transmission, LP’s
pipeline system, install interconnection
piping and related facilities, and install
a new compressor booster station on
Trunkline’s pipeline system. All of the
above facilities are located in
Beauregard Parish, Louisiana. The
project will allow Trunkline to increase
the delivery pressure at the
Interconnection to effectuate gas flow
from Trunkline’s pipeline system into
VerDate Sep<11>2014
17:24 Aug 31, 2023
Jkt 259001
Texas Eastern’s pipeline system. The
estimated cost for the project is $26.3
million, all as more fully set forth in the
request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions concerning this request
should be directed to Blair
Lichtenwalter, 1300 Main Street, P.O.
Box 4967, (713) 989–2605
Blair.Lichtenwalter@energytransfer.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on October 27, 2023. How
to file protests, motions to intervene,
and comments is explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 Persons
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
60449
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is October
27, 2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is October 27,
2023. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
3 18
CFR 157.205(e).
CFR 385.214.
5 18 CFR 157.10.
4 18
E:\FR\FM\01SEN1.SGM
01SEN1
Agencies
[Federal Register Volume 88, Number 169 (Friday, September 1, 2023)]
[Notices]
[Pages 60448-60449]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18962]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas and Oil Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR23-65-000.
Applicants: Northwest Natural Gas Company.
Description: Sec. 284.123(g) Rate Filing: Petition of Northwest
Natural Gas Company for Approval of Rates to be effective 9/1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825-5171.
Comment Date: 5 p.m. ET 9/15/23.
Protest Date: 5 p.m. ET 10/24/23.
Docket Numbers: RP23-981-000.
Applicants: Texas Eastern Transmission, LP.
Description: Compliance filing: 2023 Operational Entitlements
Filing to be effective N/A.
Filed Date: 8/28/23.
Accession Number: 20230828-5186.
Comment Date: 5 p.m. ET 9/11/23.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
[[Page 60449]]
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: August 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-18962 Filed 8-31-23; 8:45 am]