Trunkline Gas Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 60449-60450 [2023-18947]
Download as PDF
Federal Register / Vol. 88, No. 169 / Friday, September 1, 2023 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: August 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–18962 Filed 8–31–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–530–000]
lotter on DSK11XQN23PROD with NOTICES1
Trunkline Gas Company, LLC; Notice
of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on August 18, 2023,
Trunkline Gas Company, LLC
(Trunkline), 1300 Main Street, P.O. Box
4967, filed in the above referenced
docket, a prior notice request pursuant
to sections 157.205,157.208, and
157.211 of the Commission’s regulations
under the Natural Gas Act (NGA), and
Trunkline’s blanket certificate issued in
Docket No. CP83–84–000. Trunkline
seeks authorization to construct/
relocate/replace, own, operate and
maintain certain modifications to an
existing interconnection, Trunkline’s
Metering & Regulation station 81717,
between Trunkline’s pipeline system
and Texas Eastern Transmission, LP’s
pipeline system, install interconnection
piping and related facilities, and install
a new compressor booster station on
Trunkline’s pipeline system. All of the
above facilities are located in
Beauregard Parish, Louisiana. The
project will allow Trunkline to increase
the delivery pressure at the
Interconnection to effectuate gas flow
from Trunkline’s pipeline system into
VerDate Sep<11>2014
17:24 Aug 31, 2023
Jkt 259001
Texas Eastern’s pipeline system. The
estimated cost for the project is $26.3
million, all as more fully set forth in the
request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions concerning this request
should be directed to Blair
Lichtenwalter, 1300 Main Street, P.O.
Box 4967, (713) 989–2605
Blair.Lichtenwalter@energytransfer.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on October 27, 2023. How
to file protests, motions to intervene,
and comments is explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 Persons
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
60449
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is October
27, 2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is October 27,
2023. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
3 18
CFR 157.205(e).
CFR 385.214.
5 18 CFR 157.10.
4 18
E:\FR\FM\01SEN1.SGM
01SEN1
60450
Federal Register / Vol. 88, No. 169 / Friday, September 1, 2023 / Notices
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
lotter on DSK11XQN23PROD with NOTICES1
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before October 27,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–530–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–530–
000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To file via any other method:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
17:24 Aug 31, 2023
Jkt 259001
document) at: to Blair Lichtenwalter,
Senior Director, Certificates 1300 Main
Street, P.O. Box 4967, or by email:
Blair.Lichtenwalter@energytransfer.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: August 28, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18947 Filed 8–31–23; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OA–2010–0757; FRL–11344–01–
OMS]
Proposed Information Collection
Request; Comment Request;
Confidential Financial Disclosure Form
for Special Government Employees
Serving on Federal Advisory
Committees at the U.S. Environmental
Protection Agency (Renewal); EPA ICR
No. 2260.08, OMB Control No. 2090–
0029
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) is planning to submit an
information collection request (ICR),
‘‘Confidential Financial Disclosure
Form for Special Government
Employees Serving on Federal Advisory
SUMMARY:
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Committees at the U.S. Environmental
Protection Agency, EPA Form 3110–48
(Renewal)’’ (EPA ICR No. 2260.08, OMB
Control No. 2090–0029) to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act. Before
doing so, EPA is soliciting public
comments on specific aspects of the
proposed information collection as
described below. This is a proposed
extension of the ICR, which is currently
approved through June 30, 2024. An
Agency may not conduct, or sponsor
and a person is not required to respond
to a collection of information unless it
displays a currently valid OMB control
number.
DATES: Comments must be submitted on
or before November 8, 2023.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
OA–2010–0757, online using
www.regulations.gov (our preferred
method), by email to oei.docket@
epa.gov, or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW, Washington, DC
20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be confidential
business information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT: Gina
Moore, Office of Resources and Business
Operations, Federal Advisory
Committee Management Division, Mail
Code 1601M, Environmental Protection
Agency, 1200 Pennsylvania Ave. NW,
Washington, DC 20460; telephone
number: 202–566–0462; email address:
moore.gina@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
be collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
William Jefferson Clinton West, Room
3334, 1301 Constitution Avenue NW,
Washington, DC The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit https://
www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA is soliciting comments
and information to enable it to: (i)
evaluate whether the proposed
collection of information is necessary
for the proper performance of the
E:\FR\FM\01SEN1.SGM
01SEN1
Agencies
[Federal Register Volume 88, Number 169 (Friday, September 1, 2023)]
[Notices]
[Pages 60449-60450]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18947]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-530-000]
Trunkline Gas Company, LLC; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on August 18, 2023, Trunkline Gas Company, LLC
(Trunkline), 1300 Main Street, P.O. Box 4967, filed in the above
referenced docket, a prior notice request pursuant to sections
157.205,157.208, and 157.211 of the Commission's regulations under the
Natural Gas Act (NGA), and Trunkline's blanket certificate issued in
Docket No. CP83-84-000. Trunkline seeks authorization to construct/
relocate/replace, own, operate and maintain certain modifications to an
existing interconnection, Trunkline's Metering & Regulation station
81717, between Trunkline's pipeline system and Texas Eastern
Transmission, LP's pipeline system, install interconnection piping and
related facilities, and install a new compressor booster station on
Trunkline's pipeline system. All of the above facilities are located in
Beauregard Parish, Louisiana. The project will allow Trunkline to
increase the delivery pressure at the Interconnection to effectuate gas
flow from Trunkline's pipeline system into Texas Eastern's pipeline
system. The estimated cost for the project is $26.3 million, all as
more fully set forth in the request which is on file with the
Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact the Federal Energy Regulatory
Commission at [email protected] or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
Any questions concerning this request should be directed to Blair
Lichtenwalter, 1300 Main Street, P.O. Box 4967, (713) 989-2605
[email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on October 27, 2023.
How to file protests, motions to intervene, and comments is explained
below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is October 27, 2023. A protest may also
serve as a motion to intervene so long as the protestor states it also
seeks to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is October 27, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A
[[Page 60450]]
person obtaining party status will be placed on the service list
maintained by the Secretary of the Commission and will receive copies
(paper or electronic) of all documents filed by the applicant and by
all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before October 27, 2023. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-530-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-530-000.
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other method: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: to Blair
Lichtenwalter, Senior Director, Certificates 1300 Main Street, P.O. Box
4967, or by email: [email protected].
Any subsequent submissions by an intervenor must be served on the
applicant and all other parties to the proceeding. Contact information
for parties can be downloaded from the service list at the eService
link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: August 28, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-18947 Filed 8-31-23; 8:45 am]
BILLING CODE 6717-01-P