Download as PDF ddrumheller on DSK120RN23PROD with NOTICES1 60200 Federal Register / Vol. 88, No. 168 / Thursday, August 31, 2023 / Notices making its decision on this Project, it is important that we receive your comments in Washington, DC on or before 5:00 p.m. Eastern Time on September 25, 2023. For your convenience, there are three methods you can use to file your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions, so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (1) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP23–29–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. At this point in this proceeding, the timeframe for filing timely intervention requests has expired. Any person seeking to become a party to the proceeding must file a motion to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the Commission’s Rules of Practice and Procedures (18 CFR 385.214(b)(3) and (d)) and show good cause why the time limitation should be waived. Motions to intervene are more fully described at https://www.ferc.gov/how-intervene. VerDate Sep<11>2014 18:04 Aug 30, 2023 Jkt 259001 Additional information about the Project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: August 25, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–18869 Filed 8–30–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–263–000. Applicants: Parliament Solar LLC. Description: Parliament Solar LLC submits Notice of Self–Certification of Exempt Wholesale Generator Status. Filed Date: 8/24/23. Accession Number: 20230824–5177. Comment Date: 5 p.m. ET 9/14/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER21–829–001. Applicants: Weaver Wind, LLC. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Description: Compliance filing: Notice of Change in Status to be effective 8/25/ 2023. Filed Date: 8/24/23. Accession Number: 20230824–5163. Comment Date: 5 p.m. ET 9/14/23. Docket Numbers: ER21–830–001. Applicants: Weaver Wind Maine Master Tenant, LLC. Description: Compliance filing: Notice of Change in Status to be effective 8/25/ 2023. Filed Date: 8/24/23. Accession Number: 20230824–5165. Comment Date: 5 p.m. ET 9/14/23. Docket Numbers: ER23–2147–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 1885R13 Evergy Kansas Central, Inc. NITSA NOA—Bronson to be effective 9/ 1/2023. Filed Date: 8/25/23. Accession Number: 20230825–5140. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2224–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 1976R13 FreeState Electric Cooperative, Inc. NITSA and NOA to be effective 9/ 1/2023. Filed Date: 8/25/23. Accession Number: 20230825–5104. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2255–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 3599R2 Missouri Electric Commission NITSA NOA to be effective 9/1/2023. Filed Date: 8/25/23. Accession Number: 20230825–5173. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2278–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 1276R31 Evergy Metro NITSA NOA to be effective 9/1/2023. Filed Date: 8/25/23. Accession Number: 20230825–5153. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2428–002. Applicants: Bucksport Generation LLC. Description: Tariff Amendment: Bucksport Generation LLC, IROL–CIP Rate Schedule Further Amendment to be effective 9/29/2023. Filed Date: 8/24/23. Accession Number: 20230824–5171. Comment Date: 5 p.m. ET 9/14/23. Docket Numbers: ER23–2703–000. Applicants: MRP Elgin LLC. Description: Initial rate filing: MRP Elgin LLC Initial Reactive Rate Schedule to be effective 8/25/2023. E:\FR\FM\31AUN1.SGM 31AUN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 88, No. 168 / Thursday, August 31, 2023 / Notices Filed Date: 8/25/23. Accession Number: 20230825–5047. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2704–000. Applicants: MRP Rocky Road LLC. Description: Initial rate filing: MRP Rocky Road LLC Initial Reactive Rate Schedule to be effective 8/25/2023. Filed Date: 8/25/23. Accession Number: 20230825–5048. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2705–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Initial Filing of Rate Schedule FERC No. 358 to be effective 7/26/2023. Filed Date: 8/25/23. Accession Number: 20230825–5075. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2706–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Amendment to Rate Schedule FERC No. 39 to be effective 10/24/2023. Filed Date: 8/25/23. Accession Number: 20230825–5085. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2707–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2023–08–25_Tariff Sheet Consolidation True-Up Filing to be effective 6/1/2021. Filed Date: 8/25/23. Accession Number: 20230825–5091. Comment Date: 5 p.m. ET 9/15/23. Docket Numbers: ER23–2710–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT submits one Construction Agreement, SA No. 6624 to be effective 10/25/2023. Filed Date: 8/25/23. Accession Number: 20230825–5149. Comment Date: 5 p.m. ET 9/15/23. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR23–3–000. Applicants: North American Electric Reliability Corporation. Description: Request of North American Electric Reliability Corporation for Acceptance of 2024 Business Plans and Budgets of NERC and Regional Entities and for Approval of Proposed Assessments to Fund Budgets. Filed Date: 8/24/23. Accession Number: 20230824–5178. Comment Date: 5 p.m. ET 9/14/23. VerDate Sep<11>2014 18:04 Aug 30, 2023 Jkt 259001 The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: August 25, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–18867 Filed 8–30–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2610–012; Project No. 2587– 066] Northern States Power Company; Notice of Scoping Meetings and Environmental Site Reviews and Soliciting Scoping Comments Take notice that the following hydroelectric applications have been filed with the Commission and are available for public inspection. a. Type of Applications: Subsequent Minor (P–2610–012), New Major License (P–2587–066). b. Project Nos.: P–2610–012 and P– 2587–066. c. Date Filed: December 30, 2022. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 60201 d. Applicant: Northern States Power Company, a Wisconsin Corporation. e. Names of Projects: Saxon Falls Hydroelectric Project (Saxon Project) and Superior Falls Hydroelectric Project (Superior Project). f. Location: The projects are located on the Montreal River in Gogebic County, Michigan and Iron County, Wisconsin near the cities of Ironwood, Michigan and Hurley, Wisconsin. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Matthew Miller, Hydro License Consultant, Northern States Power Company, 1414 West Hamilton Avenue, P.O. Box 8, Eau Claire, Wisconsin 54702–0008; telephone at (715) 737–1353 or email at matthew.j.miller@xcelenergy.com. i. FERC Contact: Nicholas Ettema, telephone at (312) 596–4447; or email at nicholas.ettema@ferc.gov. j. Deadline for filing scoping comments: October 28, 2023. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. All filings must clearly identify the following on the first page: Saxon Project No. 2610–012, and/or Superior Project No. 2587–066. The Commission’s Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. E:\FR\FM\31AUN1.SGM 31AUN1

Agencies

[Federal Register Volume 88, Number 168 (Thursday, August 31, 2023)]
[Notices]
[Pages 60200-60201]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18867]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG23-263-000.
    Applicants: Parliament Solar LLC.
    Description: Parliament Solar LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 8/24/23.
    Accession Number: 20230824-5177.
    Comment Date: 5 p.m. ET 9/14/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER21-829-001.
    Applicants: Weaver Wind, LLC.
    Description: Compliance filing: Notice of Change in Status to be 
effective 8/25/2023.
    Filed Date: 8/24/23.
    Accession Number: 20230824-5163.
    Comment Date: 5 p.m. ET 9/14/23.

    Docket Numbers: ER21-830-001.
    Applicants: Weaver Wind Maine Master Tenant, LLC.
    Description: Compliance filing: Notice of Change in Status to be 
effective 8/25/2023.
    Filed Date: 8/24/23.
    Accession Number: 20230824-5165.
    Comment Date: 5 p.m. ET 9/14/23.

    Docket Numbers: ER23-2147-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Tariff Amendment: 1885R13 Evergy Kansas Central, Inc. 
NITSA NOA--Bronson to be effective 9/1/2023.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5140.
    Comment Date: 5 p.m. ET 9/15/23.

    Docket Numbers: ER23-2224-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Tariff Amendment: 1976R13 FreeState Electric 
Cooperative, Inc. NITSA and NOA to be effective 9/1/2023.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5104.
    Comment Date: 5 p.m. ET 9/15/23.

    Docket Numbers: ER23-2255-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Tariff Amendment: 3599R2 Missouri Electric Commission 
NITSA NOA to be effective 9/1/2023.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5173.
    Comment Date: 5 p.m. ET 9/15/23.

    Docket Numbers: ER23-2278-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Tariff Amendment: 1276R31 Evergy Metro NITSA NOA to be 
effective 9/1/2023.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5153.
    Comment Date: 5 p.m. ET 9/15/23.

    Docket Numbers: ER23-2428-002.
    Applicants: Bucksport Generation LLC.
    Description: Tariff Amendment: Bucksport Generation LLC, IROL-CIP 
Rate Schedule Further Amendment to be effective 9/29/2023.
    Filed Date: 8/24/23.
    Accession Number: 20230824-5171.
    Comment Date: 5 p.m. ET 9/14/23.

    Docket Numbers: ER23-2703-000.
    Applicants: MRP Elgin LLC.
    Description: Initial rate filing: MRP Elgin LLC Initial Reactive 
Rate Schedule to be effective 8/25/2023.

[[Page 60201]]

    Filed Date: 8/25/23.
    Accession Number: 20230825-5047.
    Comment Date: 5 p.m. ET 9/15/23.

    Docket Numbers: ER23-2704-000.
    Applicants: MRP Rocky Road LLC.
    Description: Initial rate filing: MRP Rocky Road LLC Initial 
Reactive Rate Schedule to be effective 8/25/2023.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5048.
    Comment Date: 5 p.m. ET 9/15/23.

    Docket Numbers: ER23-2705-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Initial Filing of Rate 
Schedule FERC No. 358 to be effective 7/26/2023.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5075.
    Comment Date: 5 p.m. ET 9/15/23.

    Docket Numbers: ER23-2706-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Amendment to Rate Schedule 
FERC No. 39 to be effective 10/24/2023.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5085.
    Comment Date: 5 p.m. ET 9/15/23.

    Docket Numbers: ER23-2707-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2023-08-25_Tariff Sheet 
Consolidation True-Up Filing to be effective 6/1/2021.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5091.
    Comment Date: 5 p.m. ET 9/15/23.

    Docket Numbers: ER23-2710-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Mid-Atlantic Interstate 
Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT 
submits one Construction Agreement, SA No. 6624 to be effective 10/25/
2023.
    Filed Date: 8/25/23.
    Accession Number: 20230825-5149.
    Comment Date: 5 p.m. ET 9/15/23.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR23-3-000.
    Applicants: North American Electric Reliability Corporation.
    Description: Request of North American Electric Reliability 
Corporation for Acceptance of 2024 Business Plans and Budgets of NERC 
and Regional Entities and for Approval of Proposed Assessments to Fund 
Budgets.
    Filed Date: 8/24/23.
    Accession Number: 20230824-5178.
    Comment Date: 5 p.m. ET 9/14/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: August 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-18867 Filed 8-30-23; 8:45 am]
BILLING CODE 6717-01-P