Combined Notice of Filings #1, 60200-60201 [2023-18867]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
60200
Federal Register / Vol. 88, No. 168 / Thursday, August 31, 2023 / Notices
making its decision on this Project, it is
important that we receive your
comments in Washington, DC on or
before 5:00 p.m. Eastern Time on
September 25, 2023.
For your convenience, there are three
methods you can use to file your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions, so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. This is an easy method for
submitting brief, text-only comments on
a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You must select the type of
filing you are making. If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’; or
(1) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP23–29–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Filing environmental comments will
not give you intervenor status, but you
do not need intervenor status to have
your comments considered. Only
intervenors have the right to seek
rehearing or judicial review of the
Commission’s decision. At this point in
this proceeding, the timeframe for filing
timely intervention requests has
expired. Any person seeking to become
a party to the proceeding must file a
motion to intervene out-of-time
pursuant to Rule 214(b)(3) and (d) of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time
limitation should be waived. Motions to
intervene are more fully described at
https://www.ferc.gov/how-intervene.
VerDate Sep<11>2014
18:04 Aug 30, 2023
Jkt 259001
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: August 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18869 Filed 8–30–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–263–000.
Applicants: Parliament Solar LLC.
Description: Parliament Solar LLC
submits Notice of Self–Certification of
Exempt Wholesale Generator Status.
Filed Date: 8/24/23.
Accession Number: 20230824–5177.
Comment Date: 5 p.m. ET 9/14/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–829–001.
Applicants: Weaver Wind, LLC.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Description: Compliance filing: Notice
of Change in Status to be effective 8/25/
2023.
Filed Date: 8/24/23.
Accession Number: 20230824–5163.
Comment Date: 5 p.m. ET 9/14/23.
Docket Numbers: ER21–830–001.
Applicants: Weaver Wind Maine
Master Tenant, LLC.
Description: Compliance filing: Notice
of Change in Status to be effective 8/25/
2023.
Filed Date: 8/24/23.
Accession Number: 20230824–5165.
Comment Date: 5 p.m. ET 9/14/23.
Docket Numbers: ER23–2147–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
1885R13 Evergy Kansas Central, Inc.
NITSA NOA—Bronson to be effective 9/
1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5140.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2224–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
1976R13 FreeState Electric Cooperative,
Inc. NITSA and NOA to be effective 9/
1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5104.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2255–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
3599R2 Missouri Electric Commission
NITSA NOA to be effective 9/1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5173.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2278–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
1276R31 Evergy Metro NITSA NOA to
be effective 9/1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5153.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2428–002.
Applicants: Bucksport Generation
LLC.
Description: Tariff Amendment:
Bucksport Generation LLC, IROL–CIP
Rate Schedule Further Amendment to
be effective 9/29/2023.
Filed Date: 8/24/23.
Accession Number: 20230824–5171.
Comment Date: 5 p.m. ET 9/14/23.
Docket Numbers: ER23–2703–000.
Applicants: MRP Elgin LLC.
Description: Initial rate filing: MRP
Elgin LLC Initial Reactive Rate Schedule
to be effective 8/25/2023.
E:\FR\FM\31AUN1.SGM
31AUN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 168 / Thursday, August 31, 2023 / Notices
Filed Date: 8/25/23.
Accession Number: 20230825–5047.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2704–000.
Applicants: MRP Rocky Road LLC.
Description: Initial rate filing: MRP
Rocky Road LLC Initial Reactive Rate
Schedule to be effective 8/25/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5048.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2705–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Initial Filing of Rate Schedule FERC No.
358 to be effective 7/26/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5075.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2706–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
39 to be effective 10/24/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5085.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2707–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–08–25_Tariff Sheet Consolidation
True-Up Filing to be effective 6/1/2021.
Filed Date: 8/25/23.
Accession Number: 20230825–5091.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23–2710–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC
submits tariff filing per 35.13(a)(2)(iii:
MAIT submits one Construction
Agreement, SA No. 6624 to be effective
10/25/2023.
Filed Date: 8/25/23.
Accession Number: 20230825–5149.
Comment Date: 5 p.m. ET 9/15/23.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR23–3–000.
Applicants: North American Electric
Reliability Corporation.
Description: Request of North
American Electric Reliability
Corporation for Acceptance of 2024
Business Plans and Budgets of NERC
and Regional Entities and for Approval
of Proposed Assessments to Fund
Budgets.
Filed Date: 8/24/23.
Accession Number: 20230824–5178.
Comment Date: 5 p.m. ET 9/14/23.
VerDate Sep<11>2014
18:04 Aug 30, 2023
Jkt 259001
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: August 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18867 Filed 8–30–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2610–012; Project No. 2587–
066]
Northern States Power Company;
Notice of Scoping Meetings and
Environmental Site Reviews and
Soliciting Scoping Comments
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection.
a. Type of Applications: Subsequent
Minor (P–2610–012), New Major
License (P–2587–066).
b. Project Nos.: P–2610–012 and P–
2587–066.
c. Date Filed: December 30, 2022.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
60201
d. Applicant: Northern States Power
Company, a Wisconsin Corporation.
e. Names of Projects: Saxon Falls
Hydroelectric Project (Saxon Project)
and Superior Falls Hydroelectric Project
(Superior Project).
f. Location: The projects are located
on the Montreal River in Gogebic
County, Michigan and Iron County,
Wisconsin near the cities of Ironwood,
Michigan and Hurley, Wisconsin.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Matthew Miller,
Hydro License Consultant, Northern
States Power Company, 1414 West
Hamilton Avenue, P.O. Box 8, Eau
Claire, Wisconsin 54702–0008;
telephone at (715) 737–1353 or email at
matthew.j.miller@xcelenergy.com.
i. FERC Contact: Nicholas Ettema,
telephone at (312) 596–4447; or email at
nicholas.ettema@ferc.gov.
j. Deadline for filing scoping
comments: October 28, 2023.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, MD 20852.
All filings must clearly identify the
following on the first page: Saxon
Project No. 2610–012, and/or Superior
Project No. 2587–066.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervener
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
E:\FR\FM\31AUN1.SGM
31AUN1
Agencies
[Federal Register Volume 88, Number 168 (Thursday, August 31, 2023)]
[Notices]
[Pages 60200-60201]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18867]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG23-263-000.
Applicants: Parliament Solar LLC.
Description: Parliament Solar LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 8/24/23.
Accession Number: 20230824-5177.
Comment Date: 5 p.m. ET 9/14/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER21-829-001.
Applicants: Weaver Wind, LLC.
Description: Compliance filing: Notice of Change in Status to be
effective 8/25/2023.
Filed Date: 8/24/23.
Accession Number: 20230824-5163.
Comment Date: 5 p.m. ET 9/14/23.
Docket Numbers: ER21-830-001.
Applicants: Weaver Wind Maine Master Tenant, LLC.
Description: Compliance filing: Notice of Change in Status to be
effective 8/25/2023.
Filed Date: 8/24/23.
Accession Number: 20230824-5165.
Comment Date: 5 p.m. ET 9/14/23.
Docket Numbers: ER23-2147-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 1885R13 Evergy Kansas Central, Inc.
NITSA NOA--Bronson to be effective 9/1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825-5140.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23-2224-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 1976R13 FreeState Electric
Cooperative, Inc. NITSA and NOA to be effective 9/1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825-5104.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23-2255-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 3599R2 Missouri Electric Commission
NITSA NOA to be effective 9/1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825-5173.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23-2278-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 1276R31 Evergy Metro NITSA NOA to be
effective 9/1/2023.
Filed Date: 8/25/23.
Accession Number: 20230825-5153.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23-2428-002.
Applicants: Bucksport Generation LLC.
Description: Tariff Amendment: Bucksport Generation LLC, IROL-CIP
Rate Schedule Further Amendment to be effective 9/29/2023.
Filed Date: 8/24/23.
Accession Number: 20230824-5171.
Comment Date: 5 p.m. ET 9/14/23.
Docket Numbers: ER23-2703-000.
Applicants: MRP Elgin LLC.
Description: Initial rate filing: MRP Elgin LLC Initial Reactive
Rate Schedule to be effective 8/25/2023.
[[Page 60201]]
Filed Date: 8/25/23.
Accession Number: 20230825-5047.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23-2704-000.
Applicants: MRP Rocky Road LLC.
Description: Initial rate filing: MRP Rocky Road LLC Initial
Reactive Rate Schedule to be effective 8/25/2023.
Filed Date: 8/25/23.
Accession Number: 20230825-5048.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23-2705-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Initial Filing of Rate
Schedule FERC No. 358 to be effective 7/26/2023.
Filed Date: 8/25/23.
Accession Number: 20230825-5075.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23-2706-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
FERC No. 39 to be effective 10/24/2023.
Filed Date: 8/25/23.
Accession Number: 20230825-5085.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23-2707-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2023-08-25_Tariff Sheet
Consolidation True-Up Filing to be effective 6/1/2021.
Filed Date: 8/25/23.
Accession Number: 20230825-5091.
Comment Date: 5 p.m. ET 9/15/23.
Docket Numbers: ER23-2710-000.
Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Mid-Atlantic Interstate
Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT
submits one Construction Agreement, SA No. 6624 to be effective 10/25/
2023.
Filed Date: 8/25/23.
Accession Number: 20230825-5149.
Comment Date: 5 p.m. ET 9/15/23.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR23-3-000.
Applicants: North American Electric Reliability Corporation.
Description: Request of North American Electric Reliability
Corporation for Acceptance of 2024 Business Plans and Budgets of NERC
and Regional Entities and for Approval of Proposed Assessments to Fund
Budgets.
Filed Date: 8/24/23.
Accession Number: 20230824-5178.
Comment Date: 5 p.m. ET 9/14/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: August 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-18867 Filed 8-30-23; 8:45 am]
BILLING CODE 6717-01-P