Air Plan Approval; North Carolina; Bulk Gasoline Plants, Terminals Vapor Recovery Systems; Correction, 60151 [2023-18709]
Download as PDF
Federal Register / Vol. 88, No. 168 / Thursday, August 31, 2023 / Rules and Regulations
for § 52.1770 is corrected to read as
follows:
■ 2. In § 52.1770, amend the table in
paragraph (c)(1) by revising the entries
for ‘‘Rule .0901,’’ ‘‘Rule .0902,’’ ‘‘Rule
.0903,’’ ‘‘Rule .0906,’’ ‘‘Rule .0909,’’
‘‘Rule .0912,’’ ‘‘Rule .0918,’’ ‘‘Rule
.0919,’’ ‘‘Rule .0922,’’ ‘‘Rule .0923,’’
‘‘Rule .0924,’’ ‘‘Rule .0925,’’ ‘‘Rule
.0928,’’ ‘‘Rule .0930,’’ ‘‘Rule .0931,’’
‘‘Rule .0933,’’ ‘‘Rule .0935,’’ ‘‘Rule
.0937,’’ ‘‘Rule .0943,’’ ‘‘Rule .0944,’’
‘‘Rule .0945,’’ ‘‘Rule .0947,’’ ‘‘Rule
.0948,’’ ‘‘Rule .0949,’’ ‘‘Rule .0951,’’
‘‘Rule .0955,’’ ‘‘Rule .0956,’’ ‘‘Rule
.0957,’’ ‘‘Rule .0961,’’ ‘‘Rule .0962,’’
‘‘Rule .0963,’’ ‘‘Rule .0964,’’ ‘‘Rule
.0965,’’ ‘‘Rule .0966,’’ ‘‘Rule .0967,’’ and
‘‘Rule .0968’’ to read as follows:
Dated: August 25, 2023.
Carol Kemker,
Acting Regional Administrator, Region 4.
[FR Doc. 2023–18708 Filed 8–30–23; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R04–OAR–2021–0406; FRL–10991–
03–R4]
Air Plan Approval; North Carolina;
Bulk Gasoline Plants, Terminals Vapor
Recovery Systems; Correction
Environmental Protection
Agency (EPA).
ACTION: Final rule; correction.
AGENCY:
The Environmental Protection
Agency (EPA) published a final rule in
the Federal Register on August 9, 2023,
titled ‘‘Air Plan Approval; North
Carolina; Bulk Gasoline Plants,
Terminals Vapor Recovery Systems.’’
The document approved revisions to the
North Carolina State Implementation
Plan (SIP) concerning changes to the
North Carolina Department of
Environmental Quality’s air regulations
regarding bulk gasoline terminals and
plants, gasoline cargo tanks and vapor
collection systems, and leak tightness
ddrumheller on DSK120RN23PROD with RULES1
SUMMARY:
VerDate Sep<11>2014
16:30 Aug 30, 2023
Jkt 259001
and vapor leak requirements. EPA
approved those changes pursuant to the
Clean Air Act. An error in the
instructions amending the Code of
Federal Regulations (CFR) in the
document is identified and corrected in
this action. This correction does not
change any final action taken by EPA in
the August 9, 2023, final rule.
DATES: Effective September 8, 2023.
ADDRESSES: EPA has established a
docket for this action under Docket
Identification No. EPA–R04–OAR–
2021–0406. All documents in the docket
are listed on the www.regulations.gov
website. Although listed in the index,
some information may not be publicly
available, i.e., Confidential Business
Information or other information whose
disclosure is restricted by statute.
Certain other material, such as
copyrighted material, is not placed on
the internet and will be publicly
available only in hard copy form.
Publicly available docket materials are
available either electronically through
www.regulations.gov or in hard copy at
the Air Regulatory Management Section,
Air Planning and Implementation
Branch, Air and Radiation Division,
U.S. Environmental Protection Agency,
Region 4, 61 Forsyth Street SW, Atlanta,
Georgia 30303–8960. EPA requests that
if at all possible, you contact the person
listed in the FOR FURTHER INFORMATION
CONTACT section to schedule your
inspection. The Regional Office’s
official hours of business are Monday
through Friday 8:30 a.m. to 4:30 p.m.,
excluding Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Sarah LaRocca, Air Planning and
Implementation Branch, Air and
Radiation Division, U.S. Environmental
Protection Agency, Region 4, 61 Forsyth
Street SW, Atlanta, Georgia 30303–8960.
Ms. LaRocca can be reached via
electronic mail at larocca.sarah@
epa.gov or via telephone at (404) 562–
8994.
SUPPLEMENTARY INFORMATION: EPA
published a final rule in the Federal
Register on August 9, 2023 (88 FR
53795), titled ‘‘Air Plan Approval; North
Carolina; Bulk Gasoline Plants,
PO 00000
Frm 00047
Fmt 4700
Sfmt 9990
60151
Terminals Vapor Recovery Systems.’’
The final rule approved changes to the
following regulations in North
Carolina’s SIP: 15A North Carolina
Administrative Code, Subchapter 02D,
Rules .0926, Bulk Gasoline Plants; 1
.0927, Bulk Gasoline Terminals; 2 .0932,
Gasoline Cargo Tanks and Vapor
Collection Systems; and .2615,
Determination of Leak Tightness and
Vapor Leaks. However, the Federal
Register document contained an error in
the instructions regarding amendments
to the table titled ‘‘EPA-Approved North
Carolina Regulations’’ found at 40 CFR
52.1770(c)(1). See 88 FR 53797. In the
instructions, EPA inadvertently referred
to the table entries to be amended as
‘‘Section .0926,’’ ‘‘Section .0927,’’
‘‘Section .0932,’’ and ‘‘Section .2615’’
instead of ‘‘Rule .0926,’’ ‘‘Rule .0927,’’
‘‘Rule .0932,’’ and ‘‘Rule .2615’’ and
therefore inadvertently sought to
replace, rather than revise, those entries.
EPA is now correcting that error.
Correction
§ 52.1770
[Corrected]
In FR Doc. 2023–16564, published at
88 FR 53795 in the issue of August 9,
2023, on page 53797, in the third
column, amendatory instruction 2 for
§ 52.1770 is corrected to reads as
follows:
2. In § 52.1770, amend the table in
paragraph (c)(1) by revising the entries
‘‘Rule .0926,’’ ‘‘Rule .0927,’’ ‘‘Rule
.0932,’’ and ‘‘Rule .2615’’ to read as
follows:
■
Dated: August 25, 2023.
Carol Kemker,
Acting Regional Administrator, Region 4.
[FR Doc. 2023–18709 Filed 8–30–23; 8:45 am]
BILLING CODE 6560–50–P
1 In Paragraph (n) of Rule .0926, North Carolina’s
Rule references Rule 02D .0960 which is not in the
SIP. The Division of Air Quality (DAQ) withdrew
that reference in Paragraph (n) from the April 13,
2021, SIP revision.
2 Similar to the changes in Rule 02D .0926(n),
Rule 02D .0927(k) also references Rule 02D .0960
which is not in the SIP. DAQ withdrew that
reference in Paragraph (k) from the April 13, 2021,
SIP revision.
E:\FR\FM\31AUR1.SGM
31AUR1
Agencies
[Federal Register Volume 88, Number 168 (Thursday, August 31, 2023)]
[Rules and Regulations]
[Page 60151]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18709]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R04-OAR-2021-0406; FRL-10991-03-R4]
Air Plan Approval; North Carolina; Bulk Gasoline Plants,
Terminals Vapor Recovery Systems; Correction
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; correction.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) published a final
rule in the Federal Register on August 9, 2023, titled ``Air Plan
Approval; North Carolina; Bulk Gasoline Plants, Terminals Vapor
Recovery Systems.'' The document approved revisions to the North
Carolina State Implementation Plan (SIP) concerning changes to the
North Carolina Department of Environmental Quality's air regulations
regarding bulk gasoline terminals and plants, gasoline cargo tanks and
vapor collection systems, and leak tightness and vapor leak
requirements. EPA approved those changes pursuant to the Clean Air Act.
An error in the instructions amending the Code of Federal Regulations
(CFR) in the document is identified and corrected in this action. This
correction does not change any final action taken by EPA in the August
9, 2023, final rule.
DATES: Effective September 8, 2023.
ADDRESSES: EPA has established a docket for this action under Docket
Identification No. EPA-R04-OAR-2021-0406. All documents in the docket
are listed on the www.regulations.gov website. Although listed in the
index, some information may not be publicly available, i.e.,
Confidential Business Information or other information whose disclosure
is restricted by statute. Certain other material, such as copyrighted
material, is not placed on the internet and will be publicly available
only in hard copy form. Publicly available docket materials are
available either electronically through www.regulations.gov or in hard
copy at the Air Regulatory Management Section, Air Planning and
Implementation Branch, Air and Radiation Division, U.S. Environmental
Protection Agency, Region 4, 61 Forsyth Street SW, Atlanta, Georgia
30303-8960. EPA requests that if at all possible, you contact the
person listed in the FOR FURTHER INFORMATION CONTACT section to
schedule your inspection. The Regional Office's official hours of
business are Monday through Friday 8:30 a.m. to 4:30 p.m., excluding
Federal holidays.
FOR FURTHER INFORMATION CONTACT: Sarah LaRocca, Air Planning and
Implementation Branch, Air and Radiation Division, U.S. Environmental
Protection Agency, Region 4, 61 Forsyth Street SW, Atlanta, Georgia
30303-8960. Ms. LaRocca can be reached via electronic mail at
[email protected] or via telephone at (404) 562-8994.
SUPPLEMENTARY INFORMATION: EPA published a final rule in the Federal
Register on August 9, 2023 (88 FR 53795), titled ``Air Plan Approval;
North Carolina; Bulk Gasoline Plants, Terminals Vapor Recovery
Systems.'' The final rule approved changes to the following regulations
in North Carolina's SIP: 15A North Carolina Administrative Code,
Subchapter 02D, Rules .0926, Bulk Gasoline Plants; \1\ .0927, Bulk
Gasoline Terminals; \2\ .0932, Gasoline Cargo Tanks and Vapor
Collection Systems; and .2615, Determination of Leak Tightness and
Vapor Leaks. However, the Federal Register document contained an error
in the instructions regarding amendments to the table titled ``EPA-
Approved North Carolina Regulations'' found at 40 CFR 52.1770(c)(1).
See 88 FR 53797. In the instructions, EPA inadvertently referred to the
table entries to be amended as ``Section .0926,'' ``Section .0927,''
``Section .0932,'' and ``Section .2615'' instead of ``Rule .0926,''
``Rule .0927,'' ``Rule .0932,'' and ``Rule .2615'' and therefore
inadvertently sought to replace, rather than revise, those entries. EPA
is now correcting that error.
---------------------------------------------------------------------------
\1\ In Paragraph (n) of Rule .0926, North Carolina's Rule
references Rule 02D .0960 which is not in the SIP. The Division of
Air Quality (DAQ) withdrew that reference in Paragraph (n) from the
April 13, 2021, SIP revision.
\2\ Similar to the changes in Rule 02D .0926(n), Rule 02D
.0927(k) also references Rule 02D .0960 which is not in the SIP. DAQ
withdrew that reference in Paragraph (k) from the April 13, 2021,
SIP revision.
---------------------------------------------------------------------------
Correction
Sec. 52.1770 [Corrected]
0
In FR Doc. 2023-16564, published at 88 FR 53795 in the issue of August
9, 2023, on page 53797, in the third column, amendatory instruction 2
for Sec. 52.1770 is corrected to reads as follows:
2. In Sec. 52.1770, amend the table in paragraph (c)(1) by
revising the entries ``Rule .0926,'' ``Rule .0927,'' ``Rule .0932,''
and ``Rule .2615'' to read as follows:
Dated: August 25, 2023.
Carol Kemker,
Acting Regional Administrator, Region 4.
[FR Doc. 2023-18709 Filed 8-30-23; 8:45 am]
BILLING CODE 6560-50-P