Combined Notice of Filings, 59888 [2023-18741]
Download as PDF
59888
Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices
Comments are invited on whether or
not: (a) The proposed collection of
information is necessary for the proper
performance of agency functions,
including whether the information will
have a practical utility; (b) DOE’s
estimate of the burden of the proposed
collection of information, including the
validity of the methodology and
assumptions used, is accurate; (c) DOE
can improve the quality, utility, and
clarity of the information it will collect;
and (d) DOE can minimize the burden
of the collection of information on
respondents, such as automated
collection techniques or other forms of
information technology.
Statutory Authority: 15 U.S.C. 772(b),
764(b); 764(a); and 790a and 42 U.S.C.
7101 et seq. and the Public Utility
Regulatory Policies Act of 1978 (16
U.S.C. 2601, Pub. L. 93–275.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Signed in Washington, DC, on August 24,
2023.
Samson A. Adeshiyan,
Director, Office of Statistical Methods &
Research, U. S. Energy Information
Administration.
Dated: August 24, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–18729 Filed 8–29–23; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2023–18741 Filed 8–29–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. CP23–531–00]
lotter on DSK11XQN23PROD with NOTICES1
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas and
Oil Pipeline Rate and Refund Report
filings:
Filings Instituting Proceedings
Docket Numbers: RP23–977–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing:
Termination of Rate Schedules X–6, X–
57, and X–75 Compliance Filing to be
effective 9/2/2023.
Filed Date: 8/24/23.
Accession Number: 20230824–5016.
Comment Date: 5 pm ET 9/5/23.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
VerDate Sep<11>2014
17:31 Aug 29, 2023
Jkt 259001
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
and Establishing Intervention Deadline
Take notice that on August 18, 2023,
Transcontinental Gas Pipe Line
Company, LLC (Transco), P.O. Box
1396, Houston, Texas 77251, filed an
application under section 7(b) of the
Natural Gas Act (NGA), and part 157 of
the Commission’s regulations requesting
authorization for its Abandonment of
South Marsh Island 147 to South Marsh
Island 130 Project (Project). The Project
consists of the abandonment of its
offshore transmission lateral extending
from South Marsh Island Block 147 to
a subsea tie-in in South Marsh Island
Block 130 and auxiliary facilities,
Offshore, Louisiana. Transco states that
the Project will permit it to eliminate
costs and risks associated with retention
of the SMI 147 to SMI 130 Lateral.
Transco estimates the total cost of the
Project to be $2.56 million, all as more
fully set forth in the application which
is on file with the Commission and open
for public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions regarding the proposed
project should be directed to Andre
Pereira, Regulatory Analyst, Lead; P.O.
Box 1396, Houston, Texas 77251; by
phone at: 713–215–4362; or by email at:
Andre.S.Pereira@Williams.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify Federal and State
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, you can protest the filing,
and you can file a motion to intervene
in the proceeding. There is no fee or
cost for filing comments or intervening.
The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on
September 13, 2023. How to file
protests, motions to intervene, and
comments is explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
1 18
E:\FR\FM\30AUN1.SGM
CFR (Code of Federal Regulations) 157.9.
30AUN1
Agencies
[Federal Register Volume 88, Number 167 (Wednesday, August 30, 2023)]
[Notices]
[Page 59888]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18741]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas and Oil Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23-977-000.
Applicants: Texas Eastern Transmission, LP.
Description: Compliance filing: Termination of Rate Schedules X-6,
X-57, and X-75 Compliance Filing to be effective 9/2/2023.
Filed Date: 8/24/23.
Accession Number: 20230824-5016.
Comment Date: 5 pm ET 9/5/23.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595 or [email protected].
Dated: August 24, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-18741 Filed 8-29-23; 8:45 am]
BILLING CODE 6717-01-P