Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 59903-59904 [2023-18640]
Download as PDF
Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices
independent analysis of the issues. If
Commission staff prepares an EA, a
Notice of Schedule for the Preparation
of an Environmental Assessment will be
issued. The EA may be issued for an
allotted public comment period. The
Commission would consider timely
comments on the EA before making its
decision regarding the proposed project.
If Commission staff prepares an EIS, a
Notice of Intent to Prepare an EIS/
Notice of Schedule will be issued,
which will open up an additional
comment period. Staff will then prepare
a draft EIS which will be issued for
public comment. Commission staff will
consider all timely comments received
during the comment period on the draft
EIS and revise the document, as
necessary, before issuing a final EIS.
Any EA or draft and final EIS will be
available in electronic format in the
public record through eLibrary 2 and the
Commission’s natural gas
environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
email notification when the
environmental document is issued.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the environmental document.3
Agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice.
lotter on DSK11XQN23PROD with NOTICES1
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office(s), and to solicit
their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.4
2 For instructions on connecting to eLibrary, refer
to the last page of this notice.
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at title 40, Code of Federal
Regulations, section 1501.8.
4 The Advisory Council on Historic Preservation’s
regulations are at title 36, Code of Federal
Regulations, part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
17:31 Aug 29, 2023
Jkt 259001
The environmental document for this
project will document findings on the
impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
includes Federal, State, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP23–523–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
59903
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18638 Filed 8–29–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2146–275]
Alabama Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Capacity
Amendment of License.
b. Project No: P–2146–275.
c. Date Filed: August 8, 2023.
d. Applicant: Alabama Power
Company (Alabama Power).
e. Name of Project: Coosa River
Project.
f. Location: The project is located on
the Coosa River, in Coosa, Chilton,
Talladega and Shelby counties,
Alabama.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Alan L. Peeples,
Alabama Power Company, 600 North
18th Street, P.O. Box 2641, Birmingham,
AL 35291–8180, (205) 257–1401.
i. FERC Contact: Zeena Aljibury, (202)
502–6065, zeena.aljibury@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
E:\FR\FM\30AUN1.SGM
30AUN1
lotter on DSK11XQN23PROD with NOTICES1
59904
Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–2146–275. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Alabama
Power requests approval to modify Unit
1 at the Bouldin Development to
address significant maintenance needs
and to improve power and efficiency.
The proposed scope of work for Unit 1
includes complete turbine replacement,
wicket gate replacement, wicket gate
stem bushings installation, turbine, and
generator bearing upgrades, and related
component replacement. Alabama
Power states the turbine replacement is
not expected to result in an increase to
the total rated capacity or the maximum
discharge of the unit at rated conditions.
Alabama Power notes that project
operations will not change, and
refurbishment will not include any
structural changes to the project
facilities. Furthermore, the intake
structure will not be modified, nor will
there be any modifications to the
existing trash racks. Therefore, Alabama
Power states that the current approach
velocity at the trash racks will remain
the same.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
VerDate Sep<11>2014
17:31 Aug 29, 2023
Jkt 259001
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
p. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18640 Filed 8–29–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Pacific Northwest-Pacific Southwest
Intertie Project and Parker-Davis
Project—Rate Order No. WAPA–210
Western Area Power
Administration, DOE.
ACTION: Notice of rate order extending
transmission and firm electric service
rates.
AGENCY:
The extension of the Desert
Southwest Region’s (DSW) existing
transmission service rates for the Pacific
Northwest-Pacific Southwest Intertie
Project (Intertie) and the existing
transmission and firm electric service
formula rates for the Parker-Davis
Project (PDP) have been confirmed,
approved, and placed into effect on an
interim basis. The existing rates under
Rate Schedules INT–FT5, INT–NFT4,
PD–F7, PD–FT7, PD–FCT7, and PD–
NFT7 are set to expire on September 30,
2023. This rate extension makes no
changes to the existing rates and
extends them through September 30,
2024.
DATES: The extended rates under Rate
Schedules INT–FT5, INT–NFT4, PD–F7,
PD–FT7, PD–FCT7, and PD–NFT7 will
be placed into effect on an interim basis
on October 1, 2023.
FOR FURTHER INFORMATION CONTACT: Jack
D. Murray, Regional Manager, Desert
Southwest Region, Western Area Power
Administration, P.O. Box 6457,
Phoenix, AZ 85005–6457, or Tina
Ramsey, Rates Manager, Desert
Southwest Region, Western Area Power
Administration, (602) 605–2565, or
email: dswpwrmrk@wapa.gov.
SUPPLEMENTARY INFORMATION: Western
Area Power Administration (WAPA)
published a Federal Register notice
(Proposed FRN) on June 23, 2023 (88 FR
41101), proposing to extend the existing
Intertie transmission service rates and
the existing PDP transmission and firm
electric service formula rates under Rate
Schedules INT–FT5, INT–NFT4, PD–F7,
PD–FT7, PD–FCT7, and PD–NFT7. The
Proposed FRN also initiated a 30-day
public consultation and comment
period.
SUMMARY:
Legal Authority
By Delegation Order No. S1–DEL–
RATES–2016, effective November 19,
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 88, Number 167 (Wednesday, August 30, 2023)]
[Notices]
[Pages 59903-59904]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18640]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2146-275]
Alabama Power Company; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Capacity Amendment of License.
b. Project No: P-2146-275.
c. Date Filed: August 8, 2023.
d. Applicant: Alabama Power Company (Alabama Power).
e. Name of Project: Coosa River Project.
f. Location: The project is located on the Coosa River, in Coosa,
Chilton, Talladega and Shelby counties, Alabama.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Alan L. Peeples, Alabama Power Company, 600
North 18th Street, P.O. Box 2641, Birmingham, AL 35291-8180, (205) 257-
1401.
i. FERC Contact: Zeena Aljibury, (202) 502-6065,
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 30 days from the issuance date of this notice by the Commission.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, or recommendations using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance,
[[Page 59904]]
please contact FERC Online Support at [email protected], (866)
208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, you may submit a paper copy. Submissions sent via the U.S.
Postal Service must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426. Submissions sent via any other carrier must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first
page of any filing should include the docket number P-2146-275.
Comments emailed to Commission staff are not considered part of the
Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: Alabama Power requests approval to
modify Unit 1 at the Bouldin Development to address significant
maintenance needs and to improve power and efficiency. The proposed
scope of work for Unit 1 includes complete turbine replacement, wicket
gate replacement, wicket gate stem bushings installation, turbine, and
generator bearing upgrades, and related component replacement. Alabama
Power states the turbine replacement is not expected to result in an
increase to the total rated capacity or the maximum discharge of the
unit at rated conditions. Alabama Power notes that project operations
will not change, and refurbishment will not include any structural
changes to the project facilities. Furthermore, the intake structure
will not be modified, nor will there be any modifications to the
existing trash racks. Therefore, Alabama Power states that the current
approach velocity at the trash racks will remain the same.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
p. The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-18640 Filed 8-29-23; 8:45 am]
BILLING CODE 6717-01-P