Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline, 59888-59890 [2023-18639]
Download as PDF
59888
Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices
Comments are invited on whether or
not: (a) The proposed collection of
information is necessary for the proper
performance of agency functions,
including whether the information will
have a practical utility; (b) DOE’s
estimate of the burden of the proposed
collection of information, including the
validity of the methodology and
assumptions used, is accurate; (c) DOE
can improve the quality, utility, and
clarity of the information it will collect;
and (d) DOE can minimize the burden
of the collection of information on
respondents, such as automated
collection techniques or other forms of
information technology.
Statutory Authority: 15 U.S.C. 772(b),
764(b); 764(a); and 790a and 42 U.S.C.
7101 et seq. and the Public Utility
Regulatory Policies Act of 1978 (16
U.S.C. 2601, Pub. L. 93–275.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Signed in Washington, DC, on August 24,
2023.
Samson A. Adeshiyan,
Director, Office of Statistical Methods &
Research, U. S. Energy Information
Administration.
Dated: August 24, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–18729 Filed 8–29–23; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2023–18741 Filed 8–29–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. CP23–531–00]
lotter on DSK11XQN23PROD with NOTICES1
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas and
Oil Pipeline Rate and Refund Report
filings:
Filings Instituting Proceedings
Docket Numbers: RP23–977–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing:
Termination of Rate Schedules X–6, X–
57, and X–75 Compliance Filing to be
effective 9/2/2023.
Filed Date: 8/24/23.
Accession Number: 20230824–5016.
Comment Date: 5 pm ET 9/5/23.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
VerDate Sep<11>2014
17:31 Aug 29, 2023
Jkt 259001
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
and Establishing Intervention Deadline
Take notice that on August 18, 2023,
Transcontinental Gas Pipe Line
Company, LLC (Transco), P.O. Box
1396, Houston, Texas 77251, filed an
application under section 7(b) of the
Natural Gas Act (NGA), and part 157 of
the Commission’s regulations requesting
authorization for its Abandonment of
South Marsh Island 147 to South Marsh
Island 130 Project (Project). The Project
consists of the abandonment of its
offshore transmission lateral extending
from South Marsh Island Block 147 to
a subsea tie-in in South Marsh Island
Block 130 and auxiliary facilities,
Offshore, Louisiana. Transco states that
the Project will permit it to eliminate
costs and risks associated with retention
of the SMI 147 to SMI 130 Lateral.
Transco estimates the total cost of the
Project to be $2.56 million, all as more
fully set forth in the application which
is on file with the Commission and open
for public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions regarding the proposed
project should be directed to Andre
Pereira, Regulatory Analyst, Lead; P.O.
Box 1396, Houston, Texas 77251; by
phone at: 713–215–4362; or by email at:
Andre.S.Pereira@Williams.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify Federal and State
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, you can protest the filing,
and you can file a motion to intervene
in the proceeding. There is no fee or
cost for filing comments or intervening.
The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on
September 13, 2023. How to file
protests, motions to intervene, and
comments is explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
1 18
E:\FR\FM\30AUN1.SGM
CFR (Code of Federal Regulations) 157.9.
30AUN1
Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
lotter on DSK11XQN23PROD with NOTICES1
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections, to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be.
Protests
Pursuant to sections 157.10(a)(4) 2 and
385.211 3 of the Commission’s
regulations under the NGA, any person 4
may file a protest to the application.
Protests must comply with the
requirements specified in section
385.2001 5 of the Commission’s
regulations. A protest may also serve as
a motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
To ensure that your comments or
protests are timely and properly
recorded, please submit your comments
on or before September 13, 2023.
There are three methods you can use
to submit your comments or protests to
the Commission. In all instances, please
reference the Project docket number
CP23–531–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments or
protests electronically by using the
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments or protests by mailing them
2 18
CFR 157.10(a)(4).
CFR 385.211.
4 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
5 18 CFR 385.2001.
3 18
VerDate Sep<11>2014
17:31 Aug 29, 2023
Jkt 259001
to the following address below. Your
written comments must reference the
Project docket number CP23–531–000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
To file via any other courier: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,6 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 7 and the regulations under
the NGA 8 by the intervention deadline
for the project, which is September 13,
2023. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
CFR 385.102(d).
7 18 CFR 385.214.
8 18 CFR 157.10.
Frm 00026
Fmt 4703
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP23–531–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below. Your motion to
intervene must reference the Project
docket number CP23–531–000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
To file via any other courier: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email at: Andre Pereira,
Regulatory Analyst, Lead; P.O. Box
1396, Houston, Texas 77251; or by email
at: Andre.S.Pereira@Williams.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
All timely, unopposed 9 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).10 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
9 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
10 18 CFR 385.214(c)(1).
6 18
PO 00000
59889
Sfmt 4703
E:\FR\FM\30AUN1.SGM
30AUN1
59890
Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on September 13, 2023.
Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18639 Filed 8–29–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2333–094]
lotter on DSK11XQN23PROD with NOTICES1
Rumford Falls Hydro LLC; Notice of
Waiver Period for Water Quality
Certification Application
On August 22, 2023, Rumford Falls
Hydro LLC submitted to the Federal
Energy Regulatory Commission
(Commission) a copy of its application
for a Clean Water Act Section 401(a)(1)
water quality certification filed with the
Maine Department of Environmental
Protection (Maine DEP), in conjunction
with the above captioned project.
Pursuant to Section 401 of the Clean
Water Act 1 and section 5.23(b) of the
Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18637 Filed 8–29–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–529–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on August 17, 2023,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
1300, Houston, Texas 77002–2700, filed
in the above referenced docket, a prior
notice request for authorization, in
accordance with section 7 of the Natural
Gas Act, and part 157 Sections 157.205
and 157.216 of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
and Columbia’s blanket certificate
issued in Docket No. CP83–76–000.
Columbia seeks authorization to
abandon two injection/withdrawal well,
connecting pipeline, and appurtenances
located in the Victory B Storage Field in
Marshall County, West Virginia, all as
more fully set forth in the application
which is on file with the Commission
and open for public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
11 18
1 33
CFR 385.214(b)(3) and (d).
U.S.C. 1341(a)(1).
Commission’s regulations,2 a state
certifying agency is deemed to have
waived its certifying authority if it fails
or refuses to act on a certification
request within a reasonable period of
time, which is one year after the date
the certification request was received.
Accordingly, we hereby notify Maine
DEP of the following:
Date Maine DEP received the
certification request: August 22, 2023.
If Maine DEP fails or refuses to act on
the water quality certification request on
or before August 22, 2024, then the
agency certifying authority is deemed
waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C.
1341(a)(1).
VerDate Sep<11>2014
17:31 Aug 29, 2023
2 18
Jkt 259001
PO 00000
CFR 5.23(b) (2022).
Frm 00027
Fmt 4703
Sfmt 4703
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov
or call toll-free, (886) 208–3676 or TYY,
(202) 502–8659.
Any questions regarding this prior
notice request should be directed to
David A. Alonzo, Manager, Project
Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002–2700, at (832) 320–5477 or david.
alonzo@tcenergy.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on October 23, 2023. How
to file protests, motions to intervene,
and comments is explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 Persons
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 88, Number 167 (Wednesday, August 30, 2023)]
[Notices]
[Pages 59888-59890]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18639]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-531-00]
Transcontinental Gas Pipe Line Company, LLC; Notice of
Application and Establishing Intervention Deadline
Take notice that on August 18, 2023, Transcontinental Gas Pipe Line
Company, LLC (Transco), P.O. Box 1396, Houston, Texas 77251, filed an
application under section 7(b) of the Natural Gas Act (NGA), and part
157 of the Commission's regulations requesting authorization for its
Abandonment of South Marsh Island 147 to South Marsh Island 130 Project
(Project). The Project consists of the abandonment of its offshore
transmission lateral extending from South Marsh Island Block 147 to a
subsea tie-in in South Marsh Island Block 130 and auxiliary facilities,
Offshore, Louisiana. Transco states that the Project will permit it to
eliminate costs and risks associated with retention of the SMI 147 to
SMI 130 Lateral. Transco estimates the total cost of the Project to be
$2.56 million, all as more fully set forth in the application which is
on file with the Commission and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact the Federal Energy Regulatory
Commission at [email protected] or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
Any questions regarding the proposed project should be directed to
Andre Pereira, Regulatory Analyst, Lead; P.O. Box 1396, Houston, Texas
77251; by phone at: 713-215-4362; or by email at:
[email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
Federal and State agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all Federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file comments on the project, you can protest
the filing, and you can file a motion to intervene in the proceeding.
There is no fee or cost for filing comments or intervening. The
deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on
September 13, 2023. How to file protests, motions to intervene, and
comments is explained below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and
[[Page 59889]]
others, access publicly available information and navigate Commission
processes. For public inquiries and assistance with making filings such
as interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections, to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be.
Protests
Pursuant to sections 157.10(a)(4) \2\ and 385.211 \3\ of the
Commission's regulations under the NGA, any person \4\ may file a
protest to the application. Protests must comply with the requirements
specified in section 385.2001 \5\ of the Commission's regulations. A
protest may also serve as a motion to intervene so long as the
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------
\2\ 18 CFR 157.10(a)(4).
\3\ 18 CFR 385.211.
\4\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
\5\ 18 CFR 385.2001.
---------------------------------------------------------------------------
To ensure that your comments or protests are timely and properly
recorded, please submit your comments on or before September 13, 2023.
There are three methods you can use to submit your comments or
protests to the Commission. In all instances, please reference the
Project docket number CP23-531-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments or protests electronically by using
the eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. With eFiling,
you can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making; first select ``General'' and then select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments or protests by
mailing them to the following address below. Your written comments must
reference the Project docket number CP23-531-000.
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other courier: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\6\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\6\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \7\ and the regulations under the NGA \8\ by the
intervention deadline for the project, which is September 13, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\7\ 18 CFR 385.214.
\8\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP23-531-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below. Your
motion to intervene must reference the Project docket number CP23-531-
000.
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other courier: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email at: Andre Pereira, Regulatory Analyst, Lead;
P.O. Box 1396, Houston, Texas 77251; or by email at:
[email protected]. Any subsequent submissions by an
intervenor must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online. Service can be via
email with a link to the document.
All timely, unopposed \9\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\10\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
[[Page 59890]]
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\11\ A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\9\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\10\ 18 CFR 385.214(c)(1).
\11\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on September 13,
2023.
Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-18639 Filed 8-29-23; 8:45 am]