ANR Pipeline Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Oak Grove Enhancement Project, 59901-59903 [2023-18638]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices clear bar-space; (7) a 36-inch-diameter bypass pipe; (8) a 22.5-foot-high, 49.5foot-long, 48.75-foot-wide powerhouse containing two Francis-type generating units with a total capacity of 0.64 megawatts; (9) a concrete lined tailrace discharging flows back into the South Fork Catawba River; (10) a substation containing a 2.3/44-kilovolt (kV) transformer and interconnection to Duke Energy’s 44 kV transmission line; and (11) appurtenant facilities. The project operates in a run-of-river mode with a minimum bypass flow of 76 cubic feet per second. Spencer Mountain Hydropower, LLC proposes no changes to the project facilities or operations. The project has an average annual generation of 4,064 megawatthours. m. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact FERC Online Support at FERCOnllineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements VerDate Sep<11>2014 17:31 Aug 29, 2023 Jkt 259001 of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. o. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Issue Scoping Document 1 for comments. Scoping Document 1 comments due. Request Additional Information (if necessary). Issue Scoping Document 2 (if necessary). Issue Notice of Ready for Environmental Analysis. September 2023. October 2023. November 2023. November 2023. January 2024. Dated: August 24, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–18744 Filed 8–29–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–523–000] ANR Pipeline Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Oak Grove Enhancement Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental document, that will discuss the environmental impacts of the Oak Grove Enhancement Project involving construction and operation of facilities by ANR Pipeline Company (ANR) in Richland and West Carroll Parishes, Louisiana. The Commission will use this environmental document in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies regarding the project. As part of the National Environmental Policy Act (NEPA) review process, the Commission takes into account concerns the public may have about proposals and the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 59901 Convenience and Necessity. This gathering of public input is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the environmental document on the important environmental issues. Additional information about the Commission’s NEPA process is described below in the NEPA Process and Environmental Document section of this notice. By this notice, the Commission requests public comments on the scope of issues to address in the environmental document. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC, on or before 5:00 p.m. Eastern Time on September 25, 2023. Comments may be submitted in written form. Further details on how to submit comments are provided in the Public Participation section of this notice. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the environmental document. Commission staff will consider all written comments during the preparation of the environmental document. If you submitted comments on this project to the Commission before the opening of this docket on August 1, 2023, you will need to file those comments in Docket No. CP23–523–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the project, the Natural Gas Act conveys the right of eminent domain to the company. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with State law. The E:\FR\FM\30AUN1.SGM 30AUN1 59902 Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices lotter on DSK11XQN23PROD with NOTICES1 Commission does not subsequently grant, exercise, or oversee the exercise of that eminent domain authority. The courts have exclusive authority to handle eminent domain cases; the Commission has no jurisdiction over these matters. ANR provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know? ’’ which addresses typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. This fact sheet along with other landowner topics of interest are available for viewing on the FERC website (www.ferc.gov) under the Natural Gas, Landowner Topics link. Public Participation There are three methods you can use to submit your comments to the Commission. Please carefully follow these instructions so that your comments are properly recorded. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; a comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP23–523–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Additionally, the Commission offers a free service called eSubscription which VerDate Sep<11>2014 17:31 Aug 29, 2023 Jkt 259001 makes it easy to stay informed of all issuances and submittals regarding the dockets/projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. Go to https:// www.ferc.gov/ferc-online/overview to register for eSubscription. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Summary of the Proposed Project ANR proposes to construct and operate 34.1 miles of new 30-inchdiameter natural gas pipeline to replace 33.6 miles of existing 30-inch-diameter natural gas pipeline that ANR would abandon. The Oak Grove Enhancement Project would continue to provide about 1,233 million square cubic feet per day of natural gas to its existing end user. No increase in natural gas capacity is anticipated. According to ANR, its project would improve the integrity and reliability of ANR’s system by replacing vintage pipeline facilities installed in the 1950’s with new pipeline facilities. The Oak Grove Enhancement Project would consist of the following facilities: • Installation of 34.1 miles of new 30inch-diameter segment of natural gas pipeline, which will begin at ANR’s existing Delhi Compressor Station (CS) in Richland Parish and primarily parallel the existing Line 0–501, 1–501, and 2–501 pipelines before the new segment ties into the existing route just south of State Route 586 in West Carroll Parish at the terminus of the existing Line 0–501 segment to be abandoned. • Abandonment in place and by removal of 33.6 miles of existing 30inch-diameter natural gas pipeline, which begins at ANR’s existing Delhi CS in Richland Parish and terminates just south of State Route 586 in West Carroll Parish. Approximately 1 percent (0.25 mile) of the existing Line 0–501 segment would be abandoned by removal, while the remaining existing pipeline segments (totaling 33.35 miles) would be abandoned in place. PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 The general location of the project facilities is shown in appendix 1.1 Land Requirements for Construction Construction and abandonment of the proposed facilities would disturb about 702.4 acres of land for the replacement pipeline. Following construction, ANR would maintain about 170.3 acres for permanent operation of the project’s facilities; the remaining acreage would be restored. Approximately 91 percent (31.1 miles) of the new pipeline would be co-located with existing rights-of-way or paralleling existing utility corridors. Areas where ANR was unable to colocate the pipeline with existing rightsof-way or parallel existing corridors was primarily due to reroutes around Wetland Reserve Program easements, sensitive environmental areas, and constructability issues (e.g., crossings of waterbodies). NEPA Process and the Environmental Document Any environmental document issued by the Commission will discuss impacts that could occur as a result of the abandonment, construction, and operation of the proposed project under the relevant general resource areas: • geology and soils; • water resources and wetlands; • vegetation and wildlife; • threatened and endangered species; • cultural resources; • land use; • environmental justice; • air quality and noise; and • reliability and safety. Commission staff will also evaluate reasonable alternatives to the proposed project or portions of the project and make recommendations on how to lessen or avoid impacts on the various resource areas. Your comments will help Commission staff identify and focus on the issues that might have an effect on the human environment and potentially eliminate others from further study and discussion in the environmental document. Following this scoping period, Commission staff will determine whether to prepare an Environmental Assessment (EA) or an Environmental Impact Statement (EIS). The EA or the EIS will present Commission staff’s 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’. For instructions on connecting to eLibrary, refer to the last page of this notice. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll free, (886) 208–3676 or TTY (202) 502–8659. E:\FR\FM\30AUN1.SGM 30AUN1 Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices independent analysis of the issues. If Commission staff prepares an EA, a Notice of Schedule for the Preparation of an Environmental Assessment will be issued. The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed project. If Commission staff prepares an EIS, a Notice of Intent to Prepare an EIS/ Notice of Schedule will be issued, which will open up an additional comment period. Staff will then prepare a draft EIS which will be issued for public comment. Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS. Any EA or draft and final EIS will be available in electronic format in the public record through eLibrary 2 and the Commission’s natural gas environmental documents web page (https://www.ferc.gov/industries-data/ natural-gas/environment/ environmental-documents). If eSubscribed, you will receive instant email notification when the environmental document is issued. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this project to formally cooperate in the preparation of the environmental document.3 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. lotter on DSK11XQN23PROD with NOTICES1 Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office(s), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.4 2 For instructions on connecting to eLibrary, refer to the last page of this notice. 3 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at title 40, Code of Federal Regulations, section 1501.8. 4 The Advisory Council on Historic Preservation’s regulations are at title 36, Code of Federal Regulations, part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. VerDate Sep<11>2014 17:31 Aug 29, 2023 Jkt 259001 The environmental document for this project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project and includes a mailing address with their comments. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please complete one of the following steps: (1) Send an email to GasProjectAddressChange@ferc.gov stating your request. You must include the docket number CP23–523–000 in your request. If you are requesting a change to your address, please be sure to include your name and the correct address. If you are requesting to delete your address from the mailing list, please include your name and address as it appeared on this notice. This email address is unable to accept comments. OR (2) Return the attached ‘‘Mailing List Update Form’’ (appendix 2). Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 59903 provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. Public sessions or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/newsevents/events along with other related information. Dated: August 23, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–18638 Filed 8–29–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2146–275] Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Capacity Amendment of License. b. Project No: P–2146–275. c. Date Filed: August 8, 2023. d. Applicant: Alabama Power Company (Alabama Power). e. Name of Project: Coosa River Project. f. Location: The project is located on the Coosa River, in Coosa, Chilton, Talladega and Shelby counties, Alabama. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Alan L. Peeples, Alabama Power Company, 600 North 18th Street, P.O. Box 2641, Birmingham, AL 35291–8180, (205) 257–1401. i. FERC Contact: Zeena Aljibury, (202) 502–6065, zeena.aljibury@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, E:\FR\FM\30AUN1.SGM 30AUN1

Agencies

[Federal Register Volume 88, Number 167 (Wednesday, August 30, 2023)]
[Notices]
[Pages 59901-59903]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18638]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-523-000]


ANR Pipeline Company; Notice of Scoping Period Requesting 
Comments on Environmental Issues for the Proposed Oak Grove Enhancement 
Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental document, that will discuss 
the environmental impacts of the Oak Grove Enhancement Project 
involving construction and operation of facilities by ANR Pipeline 
Company (ANR) in Richland and West Carroll Parishes, Louisiana. The 
Commission will use this environmental document in its decision-making 
process to determine whether the project is in the public convenience 
and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies regarding the project. As part of the National Environmental 
Policy Act (NEPA) review process, the Commission takes into account 
concerns the public may have about proposals and the environmental 
impacts that could result from its action whenever it considers the 
issuance of a Certificate of Public Convenience and Necessity. This 
gathering of public input is referred to as ``scoping.'' The main goal 
of the scoping process is to focus the analysis in the environmental 
document on the important environmental issues. Additional information 
about the Commission's NEPA process is described below in the NEPA 
Process and Environmental Document section of this notice.
    By this notice, the Commission requests public comments on the 
scope of issues to address in the environmental document. To ensure 
that your comments are timely and properly recorded, please submit your 
comments so that the Commission receives them in Washington, DC, on or 
before 5:00 p.m. Eastern Time on September 25, 2023. Comments may be 
submitted in written form. Further details on how to submit comments 
are provided in the Public Participation section of this notice.
    Your comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. Your input will help the Commission staff determine what 
issues they need to evaluate in the environmental document. Commission 
staff will consider all written comments during the preparation of the 
environmental document.
    If you submitted comments on this project to the Commission before 
the opening of this docket on August 1, 2023, you will need to file 
those comments in Docket No. CP23-523-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the project, the Natural Gas Act conveys the right of eminent 
domain to the company. Therefore, if you and the company do not reach 
an easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with State law. The

[[Page 59902]]

Commission does not subsequently grant, exercise, or oversee the 
exercise of that eminent domain authority. The courts have exclusive 
authority to handle eminent domain cases; the Commission has no 
jurisdiction over these matters.
    ANR provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know? '' which addresses typically asked questions, including 
the use of eminent domain and how to participate in the Commission's 
proceedings. This fact sheet along with other landowner topics of 
interest are available for viewing on the FERC website (www.ferc.gov) 
under the Natural Gas, Landowner Topics link.

Public Participation

    There are three methods you can use to submit your comments to the 
Commission. Please carefully follow these instructions so that your 
comments are properly recorded. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; a comment on a particular project is considered a ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (CP23-
523-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.
    Additionally, the Commission offers a free service called 
eSubscription which makes it easy to stay informed of all issuances and 
submittals regarding the dockets/projects to which you subscribe. These 
instant email notifications are the fastest way to receive notification 
and provide a link to the document files which can reduce the amount of 
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

Summary of the Proposed Project

    ANR proposes to construct and operate 34.1 miles of new 30-inch-
diameter natural gas pipeline to replace 33.6 miles of existing 30-
inch-diameter natural gas pipeline that ANR would abandon. The Oak 
Grove Enhancement Project would continue to provide about 1,233 million 
square cubic feet per day of natural gas to its existing end user. No 
increase in natural gas capacity is anticipated. According to ANR, its 
project would improve the integrity and reliability of ANR's system by 
replacing vintage pipeline facilities installed in the 1950's with new 
pipeline facilities.
    The Oak Grove Enhancement Project would consist of the following 
facilities:
     Installation of 34.1 miles of new 30-inch-diameter segment 
of natural gas pipeline, which will begin at ANR's existing Delhi 
Compressor Station (CS) in Richland Parish and primarily parallel the 
existing Line 0-501, 1-501, and 2-501 pipelines before the new segment 
ties into the existing route just south of State Route 586 in West 
Carroll Parish at the terminus of the existing Line 0-501 segment to be 
abandoned.
     Abandonment in place and by removal of 33.6 miles of 
existing 30-inch-diameter natural gas pipeline, which begins at ANR's 
existing Delhi CS in Richland Parish and terminates just south of State 
Route 586 in West Carroll Parish. Approximately 1 percent (0.25 mile) 
of the existing Line 0-501 segment would be abandoned by removal, while 
the remaining existing pipeline segments (totaling 33.35 miles) would 
be abandoned in place.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary''. For instructions on 
connecting to eLibrary, refer to the last page of this notice. At 
this time, the Commission has suspended access to the Commission's 
Public Reference Room. For assistance, contact FERC at 
[email protected] or call toll free, (886) 208-3676 or TTY 
(202) 502-8659.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction and abandonment of the proposed facilities would 
disturb about 702.4 acres of land for the replacement pipeline. 
Following construction, ANR would maintain about 170.3 acres for 
permanent operation of the project's facilities; the remaining acreage 
would be restored. Approximately 91 percent (31.1 miles) of the new 
pipeline would be co-located with existing rights-of-way or paralleling 
existing utility corridors. Areas where ANR was unable to co-locate the 
pipeline with existing rights-of-way or parallel existing corridors was 
primarily due to reroutes around Wetland Reserve Program easements, 
sensitive environmental areas, and constructability issues (e.g., 
crossings of waterbodies).

NEPA Process and the Environmental Document

    Any environmental document issued by the Commission will discuss 
impacts that could occur as a result of the abandonment, construction, 
and operation of the proposed project under the relevant general 
resource areas:
     geology and soils;
     water resources and wetlands;
     vegetation and wildlife;
     threatened and endangered species;
     cultural resources;
     land use;
     environmental justice;
     air quality and noise; and
     reliability and safety.
    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project and make recommendations on 
how to lessen or avoid impacts on the various resource areas. Your 
comments will help Commission staff identify and focus on the issues 
that might have an effect on the human environment and potentially 
eliminate others from further study and discussion in the environmental 
document.
    Following this scoping period, Commission staff will determine 
whether to prepare an Environmental Assessment (EA) or an Environmental 
Impact Statement (EIS). The EA or the EIS will present Commission 
staff's

[[Page 59903]]

independent analysis of the issues. If Commission staff prepares an EA, 
a Notice of Schedule for the Preparation of an Environmental Assessment 
will be issued. The EA may be issued for an allotted public comment 
period. The Commission would consider timely comments on the EA before 
making its decision regarding the proposed project. If Commission staff 
prepares an EIS, a Notice of Intent to Prepare an EIS/Notice of 
Schedule will be issued, which will open up an additional comment 
period. Staff will then prepare a draft EIS which will be issued for 
public comment. Commission staff will consider all timely comments 
received during the comment period on the draft EIS and revise the 
document, as necessary, before issuing a final EIS. Any EA or draft and 
final EIS will be available in electronic format in the public record 
through eLibrary \2\ and the Commission's natural gas environmental 
documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you will receive 
instant email notification when the environmental document is issued.
---------------------------------------------------------------------------

    \2\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the environmental document.\3\ Agencies that would like 
to request cooperating agency status should follow the instructions for 
filing comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at title 40, Code of Federal 
Regulations, section 1501.8.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office(s), 
and to solicit their views and those of other government agencies, 
interested Indian tribes, and the public on the project's potential 
effects on historic properties.\4\ The environmental document for this 
project will document findings on the impacts on historic properties 
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at title 36, Code of Federal Regulations, part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes Federal, State, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project and includes a mailing address with their 
comments. Commission staff will update the environmental mailing list 
as the analysis proceeds to ensure that Commission notices related to 
this environmental review are sent to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the proposed project.
    If you need to make changes to your name/address, or if you would 
like to remove your name from the mailing list, please complete one of 
the following steps:
    (1) Send an email to [email protected] stating your 
request. You must include the docket number CP23-523-000 in your 
request. If you are requesting a change to your address, please be sure 
to include your name and the correct address. If you are requesting to 
delete your address from the mailing list, please include your name and 
address as it appeared on this notice. This email address is unable to 
accept comments. OR
    (2) Return the attached ``Mailing List Update Form'' (appendix 2).

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field. Be sure you have selected an 
appropriate date range. For assistance, please contact FERC Online 
Support at [email protected] or (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of all formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    Public sessions or site visits will be posted on the Commission's 
calendar located at https://www.ferc.gov/news-events/events along with 
other related information.

    Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-18638 Filed 8-29-23; 8:45 am]
BILLING CODE 6717-01-P