Rumford Falls Hydro LLC; Notice of Waiver Period for Water Quality Certification Application, 59890 [2023-18637]
Download as PDF
59890
Federal Register / Vol. 88, No. 167 / Wednesday, August 30, 2023 / Notices
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on September 13, 2023.
Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18639 Filed 8–29–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2333–094]
lotter on DSK11XQN23PROD with NOTICES1
Rumford Falls Hydro LLC; Notice of
Waiver Period for Water Quality
Certification Application
On August 22, 2023, Rumford Falls
Hydro LLC submitted to the Federal
Energy Regulatory Commission
(Commission) a copy of its application
for a Clean Water Act Section 401(a)(1)
water quality certification filed with the
Maine Department of Environmental
Protection (Maine DEP), in conjunction
with the above captioned project.
Pursuant to Section 401 of the Clean
Water Act 1 and section 5.23(b) of the
Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18637 Filed 8–29–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–529–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on August 17, 2023,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
1300, Houston, Texas 77002–2700, filed
in the above referenced docket, a prior
notice request for authorization, in
accordance with section 7 of the Natural
Gas Act, and part 157 Sections 157.205
and 157.216 of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
and Columbia’s blanket certificate
issued in Docket No. CP83–76–000.
Columbia seeks authorization to
abandon two injection/withdrawal well,
connecting pipeline, and appurtenances
located in the Victory B Storage Field in
Marshall County, West Virginia, all as
more fully set forth in the application
which is on file with the Commission
and open for public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
11 18
1 33
CFR 385.214(b)(3) and (d).
U.S.C. 1341(a)(1).
Commission’s regulations,2 a state
certifying agency is deemed to have
waived its certifying authority if it fails
or refuses to act on a certification
request within a reasonable period of
time, which is one year after the date
the certification request was received.
Accordingly, we hereby notify Maine
DEP of the following:
Date Maine DEP received the
certification request: August 22, 2023.
If Maine DEP fails or refuses to act on
the water quality certification request on
or before August 22, 2024, then the
agency certifying authority is deemed
waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C.
1341(a)(1).
VerDate Sep<11>2014
17:31 Aug 29, 2023
2 18
Jkt 259001
PO 00000
CFR 5.23(b) (2022).
Frm 00027
Fmt 4703
Sfmt 4703
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov
or call toll-free, (886) 208–3676 or TYY,
(202) 502–8659.
Any questions regarding this prior
notice request should be directed to
David A. Alonzo, Manager, Project
Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002–2700, at (832) 320–5477 or david.
alonzo@tcenergy.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on October 23, 2023. How
to file protests, motions to intervene,
and comments is explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 Persons
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 88, Number 167 (Wednesday, August 30, 2023)]
[Notices]
[Page 59890]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18637]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2333-094]
Rumford Falls Hydro LLC; Notice of Waiver Period for Water
Quality Certification Application
On August 22, 2023, Rumford Falls Hydro LLC submitted to the
Federal Energy Regulatory Commission (Commission) a copy of its
application for a Clean Water Act Section 401(a)(1) water quality
certification filed with the Maine Department of Environmental
Protection (Maine DEP), in conjunction with the above captioned
project. Pursuant to Section 401 of the Clean Water Act \1\ and section
5.23(b) of the Commission's regulations,\2\ a state certifying agency
is deemed to have waived its certifying authority if it fails or
refuses to act on a certification request within a reasonable period of
time, which is one year after the date the certification request was
received. Accordingly, we hereby notify Maine DEP of the following:
---------------------------------------------------------------------------
\1\ 33 U.S.C. 1341(a)(1).
\2\ 18 CFR 5.23(b) (2022).
---------------------------------------------------------------------------
Date Maine DEP received the certification request: August 22, 2023.
If Maine DEP fails or refuses to act on the water quality
certification request on or before August 22, 2024, then the agency
certifying authority is deemed waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C. 1341(a)(1).
Dated: August 23, 2023.
Kimberly D. Bose,
Secretary.