Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 60
[EPA–HQ–OAR–2002–0049; FRL–8150–01–
OAR]
RIN 2060–AU96
New Source Performance Standards
Review for Steel Plants: Electric Arc
Furnaces and Argon-Oxygen
Decarburization Vessels
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
The Environmental Protection
Agency (EPA) is finalizing amendments
to the new source performance
standards (NSPS) for electric arc
furnaces (EAF) and argon-oxygen
decarburization (AOD) vessels in the
steel industry pursuant to the review
required by the Clean Air Act.
DATES:
Effective date: This final rule is
effective August 25, 2023. The
incorporation by reference of certain
publications listed in the rule is
approved by the Director of the Federal
Register as of August 25, 2023.
Compliance dates: Affected sources
that commence construction,
reconstruction, or modification after
May16, 2022, must comply with all
requirements of 40 CFR part 60, subpart
AAb no later than August 25, 2023 or
upon startup, whichever is later. The
date for complying with the changes in
the current rules, 40 CFR part 60,
subparts AA and AAa is February 21,
2024 publication of the final rule. The
date for complying with the ERT
submission requirements is February 21,
2024.
ADDRESSES: The EPA has established a
docket for this action under Docket ID
No. EPA–HQ–OAR–2002–0049. All
documents in the docket are listed on
the https://www.regulations.gov
website. Although listed, some
information is not publicly available,
e.g., Confidential Business Information
(CBI) or other information whose
disclosure is restricted by statute.
Certain other material, such as
copyrighted material, is not placed on
the internet and will be publicly
available only in hard copy form.
Publicly available docket materials are
available electronically through https://
www.regulations.gov.
FOR FURTHER INFORMATION CONTACT:
Donna Lee Jones, Sector Policies and
Programs Division (D243–02), P.O. Box
12055, Office of Air Quality Planning
and Standards, U.S. Environmental
ddrumheller on DSK120RN23PROD with RULES2
SUMMARY:
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
Protection Agency, Research Triangle
Park, North Carolina 27711; telephone
number: (919) 541–5251; and email
address: Jones.DonnaLee@epa.gov.
SUPPLEMENTARY INFORMATION:
Preamble acronyms and
abbreviations. Throughout this
document the use of ‘‘we,’’ ‘‘us,’’ or
‘‘our’’ is intended to refer to the EPA.
We use multiple acronyms and terms in
this preamble. While this list may not be
exhaustive, to ease the reading of this
preamble and for reference purposes,
the EPA defines the following terms and
acronyms here:
A/C air-to-cloth
ANSI American National Standards
Institute
AOD argon-oxygen decarburization
ASME American Society of Mechanical
Engineers
BACT best available control technology
BID background information document
BLDS bag leak detection systems
BPT benefits per ton
BSER best system of emissions reduction
CAA Clean Air Act
CBI confidential business information
CDX Central Data Exchange
CEDRI Compliance and Emissions Data
Reporting Interface
CEMS continuous emission monitoring
systems
CFR Code of Federal Regulations
CO carbon monoxide
COMS continuous opacity monitoring
systems
DCOT digital camera opacity technique
DEC direct shell evacuation control
EAF electric arc furnace
EIA economic impact assessment
EJ environmental justice
E.O. executive order
EPA Environmental Protection Agency
ERT electronic reporting tool
FR Federal Register
FRED Federal Reserve Economic Data
GASP Group Against Smog and Pollution
gr grains
gr/dscf grans per dry standard cubic feet
HAP hazardous air pollutants
ICR information collection request
II&S integrated iron and steel industry
ISA Integrated Science Assessment for
Particulate Matter
LAER Lowest Achievable Emission Rate
lb pounds
lb/ton pounds per ton
mg/dscm milligrams per dry standard cubic
meters
NAICS North American Industry
Classification System
NAPCTAC National Air Pollution Control
Technical Advisory Committee
NOX nitrogen oxides
NSPS new source performance standards
NTTAA National Technology Transfer and
Advancement
OAQPS Office of Air Quality Planning and
Standards
OMB Office of Management and Budget
PDF portable document format
PM particulate matter
PM2.5 particulate matter less than 2.5
micrometers
PO 00000
Frm 00002
Fmt 4701
Sfmt 4700
PRA Paperwork Reduction Act
PS performance specification
RACT reasonably available control
technology
RFA Regulatory Flexibility Act
RIN regulatory information number
SMA Steel Manufacturers Association
SSM startup, shutdown, and malfunction
tpy tons per year
UMRA Unfunded Mandates Reform Act of
1995
U.S. United States
U.S.C. United States Code
VCS voluntary consensus standard
VE visible emissions
Organization of this document. The
information in this preamble is
organized as follows:
I. General Information
A. Does this action apply to me?
B. Where can I get a copy of this document
and other related information?
C. Judicial Review and Administrative
Review
II. Background
A. What is the statutory authority for this
final action?
B. How does the EPA perform the NSPS
review?
C. What is the source category regulated in
this final action?
D. What outreach and engagement did the
EPA conduct?
III. What changes did we propose for the steel
plants: Electric Arc Furnaces (EAF) and
argon-oxygen decarburization vessels
NSPS?
A. Standards of Performance for Steel
Plants: Electric Arc Furnaces and ArgonOxygen Decarburization Vessels
Constructed, Reconstructed, or Modified
After May 16, 2022
B. Proposed Changes to Current NSPS, 40
CFR Part 60, Subparts AA and AAa
IV. What actions are we finalizing, and what
is our rationale for such decisions?
A. NSPS Requirements for PM Emissions
From Control Devices for Electric Arc
Furnaces and Argon-Oxygen
Decarburization Vessels Constructed
After May 16, 2022
B. NSPS Requirements for Opacity From
Melt Shops for Electric Arc Furnaces and
Argon-Oxygen Decarburization Vessels
Constructed After May 16, 2022
C. NSPS Requirements for Opacity From
Control Devices and Dust Handling for
Electric Arc Furnaces and Argon-Oxygen
Decarburization Vessels Constructed
After May 16, 2022
D. Startup, Shutdown, Malfunctions
Requirements for Electric Arc Furnaces
and Argon-Oxygen Decarburization
Vessels Modified, Reconstructed, or
Constructed After May 16, 2022
E. Testing and Monitoring Requirements
for Electric Arc Furnaces and ArgonOxygen Decarburization Vessels
F. Electronic Reporting
G. Effective Date and Compliance Dates
V. Summary of Cost, Environmental, and
Economic Impacts
A. What are the air quality impacts?
B. What are the secondary impacts?
C. What are the cost impacts?
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
D. What are the economic impacts?
E. What are the benefits?
F. What analysis of environmental justice
did we conduct?
VI. Statutory and Executive Order Reviews
A. Executive Order 12866: Regulatory
Planning and Review and Executive
Order 14094: Modernizing Regulatory
Review
B. Paperwork Reduction Act (PRA)
C. Regulatory Flexibility Act (RFA)
D. Unfunded Mandates Reform Act
(UMRA)
E. Executive Order 13132: Federalism
F. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
G. Executive Order 13045: Protection of
Children From Environmental Health
Risks and Safety Risks
H. Executive Order 13211: Actions
Concerning Regulations That
Significantly Affect Energy Supply,
Distribution, or Use
I. National Technology Transfer and
Advancement Act (NTTAA) and 1 CFR
Part 51
J. Executive Order 12898: Federal Actions
To Address Environmental Justice in
Minority Populations and Low-Income
Populations
K. Congressional Review Act (CRA)
I. General Information
ddrumheller on DSK120RN23PROD with RULES2
A. Does this action apply to me?
The source category that is the subject
of this final action is composed of steel
manufacturing facilities that operate
electric arc furnaces (EAF) and argonoxygen decarburization (AOD) vessels
regulated under CAA section 111 New
Source Performance Standards (NSPS).
The 2022 North American Industry
Classification System (NAICS) code for
the source category is 331110 for ‘‘Iron
and Steel Mills and Ferroalloy
Manufacturing’’ processes. The NAICS
code serves as a guide for readers
outlining the type of entities that this
final action is likely to affect. The NSPS
codified in 40 CFR part 60, subpart AAb
are directly applicable to affected
facilities that begin construction,
reconstruction, or modification after
May 16, 2022. Final amendments to 40
CFR part 60, subpart AA are applicable
to affected EAF and AOD facilities that
begin construction, reconstruction, or
modification after October 21, 1974, and
on or before August 17, 1983. Final
amendments to 40 CFR part 60, subpart
AAa are applicable to affected EAF and
AOD vessels facilities that begin
construction, reconstruction, or
modification after August 17, 1983, and
on or before May 16, 2022. Federal,
state, local and Tribal government
entities would not be affected by this
action. If you have any questions
regarding the applicability of this action
to a particular entity, you should
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
carefully examine the applicability
criteria found in 40 CFR part 60,
subparts AA, AAa, and AAb, and
consult the person listed in the FOR
FURTHER INFORMATION CONTACT section of
this preamble, your state air pollution
control agency with delegated authority
for NSPS, or your EPA Regional Office.
B. Where can I get a copy of this
document and other related
information?
In addition to being available in the
docket, an electronic copy of this final
action is available on the internet at
https://www.epa.gov/stationary-sourcesair-pollution/electric-arc-furnaces-eafsand-argon-oxygen-decarburization.
Following publication in the Federal
Register, the EPA will post the Federal
Register version of the final rule and
key technical documents at this same
website.
C. Judicial Review and Administrative
Review
Under Clean Air Act (CAA) section
307(b)(1), judicial review of this final
action is available only by filing a
petition for review in the United States
Court of Appeals for the District of
Columbia Circuit by October 24, 2023.
Under CAA section 307(b)(2), the
requirements established by this final
rule may not be challenged separately in
any civil or criminal proceedings
brought by the EPA to enforce the
requirements.
Section 307(d)(7)(B) of the CAA
further provides that ‘‘[o]nly an
objection to a rule or procedure which
was raised with reasonable specificity
during the period for public comment
(including any public hearing) may be
raised during judicial review.’’ This
section also provides a mechanism for
the EPA to convene a proceeding for
reconsideration, ‘‘[i]f the person raising
an objection can demonstrate to the EPA
that it was impracticable to raise such
objection within [the period for public
comment] or if the grounds for such
objection arose after the period for
public comment, (but within the time
specified for judicial review) and if such
objection is of central relevance to the
outcome of the rule.’’ Any person
seeking to make such a demonstration to
us should submit a Petition for
Reconsideration to the Office of the
Administrator, U.S. Environmental
Protection Agency, Room 3000, WJC
West Building, 1200 Pennsylvania Ave.
NW, Washington, DC 20460, with a
copy to both the person(s) listed in the
preceding FOR FURTHER INFORMATION
CONTACT section, and the Associate
General Counsel for the Air and
Radiation Law Office, Office of General
PO 00000
Frm 00003
Fmt 4701
Sfmt 4700
58443
Counsel (Mail Code 2344A), U.S.
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460.
II. Background
A. What is the statutory authority for
this final action?
The EPA’s authority for this final rule
is CAA section 111, which governs the
establishment of standards of
performance for stationary sources.
Section 111(b)(1)(A) of the CAA requires
the EPA Administrator to list categories
of stationary sources that in the
Administrator’s judgment cause or
contribute significantly to air pollution
that may reasonably be anticipated to
endanger public health or welfare. The
EPA must then issue performance
standards for new (and modified or
reconstructed) sources in each source
category pursuant to CAA section
111(b)(1)(B). These standards are
referred to as NSPS. The EPA has the
authority to define the scope of the
source categories, determine the
pollutants for which standards should
be developed, set the emission level of
the standards, and distinguish among
classes, types, and sizes within
categories in establishing the standards.
CAA section 111(b)(1)(B) requires the
EPA to ‘‘at least every 8 years review
and, if appropriate, revise’’ NSPS.
However, the Administrator need not
review any such standard if the
‘‘Administrator determines that such
review is not appropriate in light of
readily available information on the
efficacy’’ of the standard. When
conducting a review of an existing
performance standard, the EPA has the
discretion and authority to add emission
limits for pollutants or emission sources
not currently regulated for that source
category.
In setting or revising a performance
standard, CAA section 111(a)(1)
provides that performance standards are
to reflect ‘‘the degree of emission
limitation achievable through the
application of the best system of
emission reduction which (taking into
account the cost of achieving such
reduction and any nonair quality health
and environmental impact and energy
requirements) the Administrator
determines has been adequately
demonstrated.’’ The term ‘‘standard of
performance’’ in CAA section 111(a)(1)
makes clear that the EPA is to determine
both the best system of emission
reduction (BSER) for the regulated
sources in the source category and the
degree of emission limitation achievable
through application of the BSER. The
EPA must then, under CAA section
E:\FR\FM\25AUR2.SGM
25AUR2
58444
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ddrumheller on DSK120RN23PROD with RULES2
111(b)(1)(B), promulgate standards of
performance for new sources that reflect
that level of stringency. CAA section
111(b)(5) generally precludes the EPA
from prescribing a particular
technological system that must be used
to comply with a standard of
performance. Rather, sources can select
any measure or combination of
measures that will achieve the standard.
CAA section 111(h)(1) authorizes the
Administrator to promulgate ‘‘a design,
equipment, work practice, or
operational standard, or combination
thereof’’ if in his or her judgment, ‘‘it is
not feasible to prescribe or enforce a
standard of performance.’’ CAA section
111(h)(2) provides the circumstances
under which prescribing or enforcing a
standard of performance is ‘‘not
feasible,’’ such as, when the pollutant
cannot be emitted through a conveyance
designed to emit or capture the
pollutant, or when there is no
practicable measurement methodology
for the particular class of sources.
Pursuant to the definition of new
source in CAA section 111(a)(2),
standards of performance apply to
facilities that begin construction,
reconstruction, or modification after the
date of publication of the proposed
standards in the Federal Register.
Under CAA section 111(a)(4),
‘‘modification’’ means any physical
change in, or change in the method of
operation of, a stationary source which
increases the amount of any air
pollutant emitted by such source or
which results in the emission of any air
pollutant not previously emitted.
Changes to an existing facility that do
not result in an increase in emissions
are not considered modifications. Under
the provisions in 40 CFR 60.15,
reconstruction means the replacement
of components of an existing facility
such that: (1) The fixed capital cost of
the new components exceeds 50 percent
of the fixed capital cost that would be
required to construct a comparable
entirely new facility; and (2) it is
technologically and economically
feasible to meet the applicable
standards. Pursuant to CAA section
111(b)(1)(B), the standards of
performance or revisions thereof shall
become effective upon promulgation.
B. How does the EPA perform the NSPS
review?
As noted in section II. A of this
preamble, CAA section 111 requires the
EPA to, at least every 8 years review
and, if appropriate, revise the standards
of performance applicable to new,
modified, and reconstructed sources. If
the EPA revises the standards of
performance, they must reflect the
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
degree of emission limitation achievable
through the application of the BSER
considering the cost of achieving such
reduction and any nonair quality health
and environmental impact and energy
requirements. CAA section 111(a)(1).
In reviewing an NSPS to determine
whether it is ‘‘appropriate’’ to revise the
standards of performance, the EPA
evaluates the statutory factors, which
may include consideration of the
following information:
• Expected growth for the source
category, including how many new
facilities, reconstructions, and
modifications may trigger NSPS in the
future.
• Pollution control measures,
including advances in control
technologies, process operations, design
or efficiency improvements, or other
systems of emission reduction, that are
‘‘adequately demonstrated’’ in the
regulated industry.
• Available information from the
implementation and enforcement of
current requirements indicates that
emission limitations and percent
reductions beyond those required by the
current standards are achieved in
practice.
• Costs (including capital and annual
costs) associated with implementation
of the available pollution control
measures.
• The amount of emission reductions
achievable through application of such
pollution control measures.
• Any nonair quality health and
environmental impact and energy
requirements associated with those
control measures.
In evaluating whether the cost of a
particular system of emission reduction
is reasonable, the EPA considers various
costs associated with the particular air
pollution control measure or a level of
control, including capital costs and
operating costs, and the emission
reductions that the control measure or
particular level of control can achieve.
The Agency considers these costs in the
context of the industry’s overall capital
expenditures and revenues. The Agency
also considers cost-effectiveness
analysis as a useful metric, and a means
of evaluating whether a given control
achieves emission reduction at a
reasonable cost. A cost-effectiveness
analysis allows comparisons of relative
costs and outcomes (effects) of 2 or more
options. In general, cost effectiveness is
a measure of the outcomes produced by
resources spent. In the context of air
pollution control options, cost
effectiveness typically refers to the
annualized cost of implementing an air
pollution control option divided by the
PO 00000
Frm 00004
Fmt 4701
Sfmt 4700
amount of pollutant reductions realized
annually.
After the EPA evaluates the statutory
factors, the EPA compares the various
systems of emission reductions and
determines which system is ‘‘best,’’ and
therefore represents the BSER. The EPA
then establishes a standard of
performance that reflects the degree of
emission limitation achievable through
the implementation of the BSER. In
doing this analysis, the EPA can
determine whether subcategorization is
appropriate based on classes, types, and
sizes of sources, and may identify a
different BSER and establish different
performance standards for each
subcategory. The result of the analysis
and BSER determination leads to
standards of performance that apply to
facilities that begin construction,
reconstruction, or modification after the
date of publication of the proposed
standards in the Federal Register.
Because the NSPS reflect the best
system of emission reduction under
conditions of proper operation and
maintenance, in doing its review, the
EPA also evaluates and determines the
proper testing, monitoring,
recordkeeping and reporting
requirements needed to ensure
compliance with the emission
standards.
C. What is the source category regulated
in this final action?
The EPA first promulgated NSPS
under CAA section 111 for EAF at steel
plants source category on September 23,
1975 (40 FR 43850). These standards of
performance are codified in 40 CFR part
60, subpart AA and are applicable to
sources that commence construction,
modification, or reconstruction after
October 21, 1974, and on or before
August 17, 1983. These standards of
performance regulate emissions of
particulate matter (PM) from EAF
capture systems and control devices
with a PM concentration limit of 12
milligrams per dry standard cubic meter
(mg/dscm) [0.0052 grains per dry
standard cubic feet (gr/dscf)] and set
opacity limits for using capture
technology controlling EAF melt shop
emissions, which include, but are not
limited to, emissions via roof vents,
doors, and cracks in walls of 6 percent
opacity, with 20 percent and 40 percent
opacity allowed during charging and
tapping, respectively; control device
exhaust at 3 percent opacity due to
proper operation of control devices; and
dust handling procedures due to proper
handling of captured PM at 10 percent
opacity.
In 1984, the NSPS rule, 40 CFR part
60, subpart AA (for EAF constructed
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
after October 21, 1974, and on or before
August 17, 1983) was reviewed and
revised as part of NSPS statutory review
(49 FR 43838; October 31, 1984). The
1984 action amended 40 CFR part 60,
subpart AA to include AOD and raise
the melt shop opacity from 0 percent to
6 percent opacity, keeping the
exceptions for charging (20 percent
opacity) and tapping (40 percent
opacity). The 1984 action also codified
a new NSPS subpart, 40 CFR part 60,
subpart AAa, to regulate EAF and AOD
vessels that commenced construction
after August 17, 1983 (49 FR 43843).
The NSPS codified at 40 CFR part 60,
subpart AAa set requirements for melt
shop opacity at 6 percent with no
exceptions. Finally, the 1984 action
promulgated requirements to include
EPA Method 5D (Appendix A to 40 CFR
part 60) for the determination of PM
emissions from positive-pressure fabric
filters, which are common control
devices for EAF and AOD vessels for
both 40 CFR part 60, subparts AA and
AAa.
On February 14, 1989, 40 CFR part 60,
subparts AA and AAa (and Appendix A
to 40 CFR part 60) were amended to
consolidate the EPA test methods and
delete repetitions of methods already
referenced (54 FR 6672). Then, on May
17, 1989, minor clarifications and
corrections were made to the February
1989 revisions (54 FR 21344). On March
2, 1999, as a result of recommendations
made by the EPA’s sector policy
established in 1994,1 called the
‘‘Common Sense Initiative,’’ 40 CFR part
60, subparts AA and AAa were
amended to add an option to monitor
furnace static pressure instead of melt
shop opacity and to monitor baghouse
(fabric filter) fan amperage instead of
baghouse flowrate (64 FR 10109). On
October 17, 2000, amendments were
made to 40 CFR part 60, subparts AA
and AAa to promulgate Performance
Specification (PS) 15 for certifying
continuous emission monitoring
systems (CEMS) with Fourier transform
infrared spectroscopy (FTIR); to
reformat various methods as per
recommendations by the Environmental
Monitoring Management Council; and to
make miscellaneous clarifications and
technical and editorial corrections (65
FR 61758). On February 22, 2005, 40
CFR part 60, subparts AA and AAa were
amended in response to a petition by
the American Iron and Steel Institute,
Steel Manufacturers Association (SMA),
1 See Analysis and Evaluation of the EPA
Common Sense Initiative. Prepared by: Kerr
Greiner, Andersen, and April, Inc. Funded by the
U.S. Environmental Protection Agency under PO
No. No. 9W–0753–NTSA. 1999. Available at https://
NEPIS.epa.gov.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
and Specialty Steel Industry of North
America to add bag leak detection
systems (BLDS) as an alternative
monitoring method to the continuous
opacity monitoring systems currently
cited in the rules (70 FR 8523).
An EAF is a metallurgical furnace
used to produce carbon and alloy steels.
The input material to an EAF is
typically almost 100 percent scrap steel.
Cylindrical, refractory-lined EAF are
equipped with carbon electrodes to be
raised or lowered through the furnace
roof. With electrodes retracted, the
furnace roof can be rotated to permit
charging scrap steel into the EAF by
overhead crane. Alloying agents and
fluxing materials usually are added
through doors on the side of the furnace.
Electric current is passed between the
electrodes and through the scrap,
producing an arc and generating enough
heat to melt the scrap steel charge. After
the melting and refining periods,
impurities (in the form of slag 2) and the
refined steel are poured from the
furnace, in a process called ‘‘tapping.’’
If AOD vessels are present, they follow
the EAF in the production sequence and
are used to oxidize carbon, silicon, and
impurities, such as sulfur. For these
reasons, the AOD vessels reduce
additions of alloying material compared
to an EAF alone. Use of AOD vessels
also reduce EAF heat times, improve
quality control, and increase daily steel
production. AOD vessels are primarily
used in stainless steel making.
The production of steel in an EAF is
a batch process. Cycles, also called
heats, range from about 1.5 to 5 hours
to produce carbon steel and from 5 to
10 hours to produce alloy steel. Scrap
steel is charged to begin a cycle, with
alloying agents and slag forming
materials added later in the process for
refining purposes. The stages of each
cycle normally include charging,
melting, refining (which also usually
includes oxygen blowing), and tapping,
all of which generate PM emissions.
Air emission control techniques
typically involve an air emission
capture system and a gas cleaning
system. The air emission capture
systems used in the EAF industry
include direct shell evacuation control
(DEC) systems, side draft hoods,
combination hoods, canopy hoods,
scavenger ducts, and furnace
enclosures. The DEC system consists of
ductwork attached to a separate
opening, or ‘‘fourth hole,’’ in the furnace
roof (top) that draws emissions from the
furnace to a gas cleaner and which
2 Slag is the molten metal oxides and other
impurities that float to the surface of the molten
steel product.
PO 00000
Frm 00005
Fmt 4701
Sfmt 4700
58445
works only when the furnace is up-right
and the roof is in place. Side draft hoods
collect furnace exhaust gases from
around the electrode holes and work
doors after the gases leave the furnace.
Combination hoods incorporate
elements from the side draft and direct
shell evacuation systems. Canopy hoods
and scavenger ducts are used to address
charging and tapping emissions.
Baghouses, also called fabric filters, are
typically used as gas cleaning systems
(i.e., emissions control devices).
There are approximately 88 EAF in
the United States (U.S.), with most (>95
percent) EAF subject to one of the EAF
NSPS subparts. Thirty-one states have
one or more EAF facilities, with most of
the EAF facilities east of the Mississippi
River. Pennsylvania (15), Ohio (10),
Alabama (7), and Indiana (7) have the
most EAF facilities per state
(approximate number of EAF facilities
in each state).
The EPA proposed amendments to the
NSPS subparts AA and AAa, and a new
subpart AAb, based on the current
review on May 16, 2022 (87 FR 29710).
We received 11 comments from
industry, environmental groups, state
environmental agencies, and others
during the comment period. A summary
of the more significant comments we
timely received regarding the proposed
rule and our responses are provided in
this preamble. A summary of all other
public comments on the proposal and
the EPA’s responses to those comments
is available in the document Summary
of Public Comments and Responses for
Standards of Performance for Steel
Plants: Electric Arc Furnaces
Constructed After October 21, 1974, and
On or Before August 17, 1983; and
Standards of Performance for Steel
Plants: Electric Arc Furnaces and
Argon-Oxygen Decarburization Vessels,
Docket ID No. EPA–HQ–OAR–2002–
0049 located in the docket for this rule.
In this action, the EPA is finalizing
decisions and revisions pursuant to
CAA section 111(b)(1)(B) review for
Steel Plants: Electric Arc Furnaces
(EAF) and Argon-Oxygen
Decarburization Vessels NSPS (40 CFR
part 60, subpart AAa) after our
considerations of all the comments
received.
D. What outreach and engagement did
the EPA conduct?
As part of this rulemaking, and
pursuant to multiple Executive Orders
addressing environmental justice, the
EPA engaged and consulted with the
public, including populations of
overburdened communities and lowincome populations, through
interactions, such as a letter sent on
E:\FR\FM\25AUR2.SGM
25AUR2
58446
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
May 17, 2022, to 40 leaders of Tribal
nations (see Docket ID No. EPA–HQ–
OAR–2002–0049). The EPA received
comments from the following
environmental groups during the
comment period: Group Against Smog
and Pollution (GASP), Fairfield
Environmental Justice Action Coalition
(FEJA), Sierra Club, California
Communities Against Toxics, and
Greater Birmingham Alliance to Stop
Pollution, et al. These opportunities
gave the EPA a chance to hear from the
public, especially communities
potentially impacted by this final
action.
Some of the key issues raised by
environmental justice stakeholders
included a specific area of the country
where there are PM problems and where
there are 2 EAF facilities; and regulating
other pollutants, such as sulfur dioxide
(SO2) and greenhouse gases (GHG).
Section V of the preamble provides a
description of how the Agency
considered these comments in the
context of regulatory development.
III. What changes did we propose for
the Steel Plants: Electric Arc Furnaces
(EAF) and Argon-Oxygen
Decarburization Vessels NSPS?
ddrumheller on DSK120RN23PROD with RULES2
On May 16, 2022, the EPA proposed
the results of the review of the EAF and
AOD source category standards of
performance to determine if revisions
were warranted pursuant to CAA
section 111(b)(1)(B).
Pursuant to this review, we proposed
to revise the NSPS for EAF and AOD
vessels. We also proposed several
clarifications and corrections to existing
NSPS rules (40 CFR part 60, subparts
AA and AAa). These proposed actions
are discussed below in sections III.A
and III.B. We also proposed: periodic
compliance testing at least once every 5
years; results of the review of opacity
from control device exhaust and from
dust handling systems to keep same
BSER and limits as in 40 CFR part 6,
subpart AAa of 3 percent and 10
percent, respectively; that the emission
limits would apply at all times; and
electronic reporting.
A. Standards of Performance for Steel
Plants: Electric Arc Furnaces and
Argon-Oxygen Decarburization Vessels
Constructed, Reconstructed, or Modified
After May 16, 2022
1. Analyses To Determine BSER for Melt
Shop Opacity and PM Emissions From
Control Devices
The EPA proposed to determine that
the use of a baghouse with a fabric filter
is the BSER for EAF and AOD vessels.
The EPA proposed that a limit of at 0.16
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
pounds (lb) PM emitted per ton steel
produced (lb/ton) reflects the degree of
emission limitation achievable through
application of the BSER. The EPA also
proposed to determine using a partial
roof canopy to control visible fugitive
emissions (VE) from EAF and AOD in
the melt shop is BSER. The EPA
proposed that a limit of 0 percent
opacity during all phases of EAF
operation reflects the degree of emission
limitation achievable through
application of the BSER.
The BSER and proposed standards of
performance for PM emissions from
capture systems and fabric filters, and
for capture of emissions from melt
shops was developed from an analysis
of EAF PM test reports from 2005
through 2017 obtained by the EPA. The
PM data contained in these reports
reflected 33 facilities, 46 EAF, 5 AOD,
and 54 baghouses in 154 emission and
opacity tests (hereafter referred to as the
‘‘EAF dataset’’). The EAF dataset
showed a substantial improvement in
EAF, AOD, and baghouse performance
beyond the current NSPS PM standards
(40 CFR part 60, subparts AA, AAa) for
control devices as well as for melt shop
opacity. The costs of control, emissions
reductions, and other factors were used
in the determination of BSER, as
explained in next sections.
a. BSER for Melt Shop Opacity
From the EAF dataset described
earlier in this preamble, the EPA
identified 15 EAF facilities,
approximately half of the EAF dataset,
that reported 0 percent melt shop
opacity. To determine BSER and its
costs to reduce melt shop opacity at
EAF facilities from 6 percent to 0
percent opacity, the costs for an
addition of a partition roof canopy
(above the crane rails) were estimated
for the proposal. Canopy hoods are a
common method of controlling fugitive
EAF emissions. In the proposal cost
analysis, we estimated that the annual
costs would be $800,000 ($2020 3) for a
medium-sized steelmaking EAF with
installation of a partition roof canopy
(above the crane rails). With an
estimated PM reduction of 730 tpy to
achieve 0 percent melt shop opacity
down from the current 6 percent opacity
(in 40 CFR part 60, subparts AA, AAa),
the cost effectiveness in $2020 was
estimated to be $1,100 per ton PM
removed ($2020). Similar results were
obtained for both small and large EAF.
3 The cost analyses for the 2022 proposal used a
3.25 percent interest rate. Federal Reserve
Economic Data (FRED). Bank Prime Loan Rate
Changes: Historical Dates of Changes and Rates.
Available at: https://fred.stlouisfed.org/series/
PRIME. Accessed 11/6/2020.
PO 00000
Frm 00006
Fmt 4701
Sfmt 4700
Based on the BSER analysis as
explained at proposal, the EPA
proposed that BSER for melt shop is a
partition roof canopy (above the crane
rails) and proposed in 40 CFR part 60,
subpart AAb to revise the opacity limit
to 0 percent to limit visible emissions
from EAF and AOD that exit from the
melt shop during all phases of
operation.
b. Capture System, Baghouse, and
Facility-Wide Total PM Control Device
Emission Limit
The EPA proposed as the BSER a
capture system and fabric filter. For the
standard, we proposed a facility-wide
mass-based PM limit from all EAF and
AOD capture systems and control
devices of 0.16 lb total PM per ton steel
instead of a PM concentration limit that
applies to each capture system and
control device, which is the format of
the current standards in 40 CFR part 60,
subparts AA, AAa. As explained in the
proposal, the EPA proposed a facilitywide mass-based PM limit because this
form of standard was thought to result
in better overall PM control and provide
greater assurance of limiting PM
emissions from the facility. Most
importantly, if EAF emissions can be
divided up into separate baghouses, for
practical purposes or otherwise, with
each device falling under the same
NSPS PM limit based on air flow in gr/
dscf, there is no accounting for the total
PM emissions from the facility. A
facility-wide total control device PM
emissions limit in units of lb PM/ton of
steel produced was expected to
eliminate the disparity in control device
emissions between low- and high-PM
concentration exhaust, such as that for
control devices for primary emissions
(i.e., directly from the EAF or AOD) v.
secondary emissions (i.e., from fugitive
emissions), as well as the disparity
between well-operated v. inefficientlyoperated control devices in the cases
where both types of control devices
operate below the current individual
baghouse limit in 40 CFR part 60,
subparts AA, AAa.
To evaluate the BSER to reduce
emissions from EAF and AOD capture
systems and control devices, the EPA
evaluated the baghouse air-to-cloth (A/
C) ratio, expressed in units of volume of
air flow per unit bag area (i.e., cloth),
using EAF facility baghouse model
plants developed from the EPA dataset
describe earlier in this preamble (87 FR
29718–29720). This was done to
evaluate BSER, of which cost is a factor.
The A/C ratio is generally accepted as
the most important design parameter
between baghouses of different
performance levels, where a low A/C
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ratio is considered to be the best level
of control (less air and more baghouse
filter cloth) and a high A/C ratio is a low
or poor level control (high air volume
and low baghouse filter area).
Using model plants developed from
the EAF dataset and the EPA costestimating procedures,4 an A/C ratio of
2.2 m/min (7.2 ft/min) leading to a value
of 0.16 lb total PM per ton steel
produced was determined to be cost
effective (87 FR29710). For a mediumsized model plant consisting of an EAF
and all its baghouses, i.e., EAF facility,
emitting 0.16 lb PM/ton steel produced,
the cost effectiveness at this lb/ton level
was approximately $1,800 per ton PM
removed $2020, an acceptable cost
effectiveness, with an incremental cost
effectiveness compared to a model plant
at the next higher level of control (A/C
ratio of 4.9 ft/min) at $8,500/ton $2020,
which was not considered reasonable.
Similar results were obtained for small
and large EAF. Therefore, a facility-wide
total 0.16 lb PM/ton steel produced
limit from capture systems and control
devices was proposed to represent
performance level for the BSER for EAF
and AOD capture systems and fabric
filters for 40 CFR part 60, subpart AAb.
ddrumheller on DSK120RN23PROD with RULES2
2. Requirement for Compliance Testing
Every Five Years
We proposed that sources complying
with 40 CFR part 60, subpart AAb
would be required to perform
compliance testing every 5 years after
the initial testing performed upon
startup, as required under 40 CFR part
60.8. This requirement already is
required in many of the permits for
existing EAF in the EAF dataset and in
the industry, and also is a standard
requirement for testing for other sources
of PM emissions for many other
industrial sectors.
3. Review of EAF NSPS Standards for
Opacity From EAF Control Devices and
Dust Handling Systems
The current NSPS standards for EAF
in 40 CFR part 60, subparts AA and
AAa, require less than 3 percent opacity
from control device (baghouse) exhaust
and less than 10 percent for dust
handling procedures. We proposed to
retain these limits in 40 CFR part 60,
subpart AAb. (87 FR 29720–29721). In
reviewing the EAF dataset, the EPA
based these limits on the fact that no
4 Cost Analyses to Determine BSER for PM
Emissions and Opacity from EAF Facilities. D.L.
Jones, U.S. Environmental Protection Agency,
Office of Air Quality Planning and Standards,
Research Triangle Park, North Carolina, and G.E.
Raymond, RTI International, Research Triangle
Park, North Carolina. May 1, 2023 (Docket ID No.
EPA–OAR–2002–0049).
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
facilities reported lower levels of
opacity for these sources, nor were
lower levels required in any permits for
these or any other EAF facilities. In
addition, commensurate with
determinations reported in the RACT/
BACT/LAER Clearinghouse,5 the
current levels for baghouse exhaust (9
facilities) and dust handling systems (3
facilities) in 40 CFR part 60, subparts
AA, AAa were considered BACT.
Therefore, we concluded in the proposal
that the opacity standards for control
device exhaust and dust handling
systems would remain the same.
4. Startup, Shutdown, Malfunction
Exemption Removal From 40 CFR Part
60, Subpart AAb
The NSPS general provisions (40 CFR
60.11(c)) currently exclude opacity
requirements during periods of startup,
shutdown and malfunction (SSM). We
proposed that opacity limits in 40 CFR
part 60, subpart AAb would apply at all
times along with all other emissions
limits and standards, as provided in 40
CFR 60.11(f), because we concluded in
the proposal that there were no
technical limitations known to prevent
new, reconstructed, or modified
facilities from meeting all standards at
all times. The language overriding the
general provisions SSM opacity
exemption was proposed for 40 CFR
part 60, subpart AAb at 40 CFR
60.272b(c).
In its 2008 decision in Sierra Club v.
EPA, 551 F.3d 1019 (D.C. Cir. 2008), the
United States Court of Appeals for the
District of Columbia Circuit vacated
portions of two provisions in the EPA’s
CAA section 112 regulations governing
the emissions of HAP during periods of
SSM. Specifically, the court vacated the
SSM exemption contained in 40 CFR
63.6(f)(1) and 40 CFR 63.6(h)(1), holding
that under section 302(k) of the CAA,
emissions standards or limitations must
be continuous in nature and that the
SSM exemption violates the CAA’s
requirement that some CAA section 112
standards apply continuously. The EPA
has determined the reasoning in the
court’s decision in Sierra Club applies
equally to CAA section 111 because the
5 See https://www.epa.gov/catc/
ractbactlaerclearinghouse-rblc-basic-information
for more information. RACT, or reasonably
available control technology, is required on existing
sources in areas that are not meeting national
ambient air quality standards (i.e., nonattainment
areas); BACT, or best available control technology,
is required on major new or modified sources in
clean areas (i.e., attainment areas); and LAER, or
lowest achievable emission rate, is required on
major new or modified sources in nonattainment
areas. See the RACT/BACT/LAER determinations
made for EAF in the cost memorandum prepared
for proposal (03–01–22); Docket ID No. EPA–HQ–
OAR–2002–0049–0060.
PO 00000
Frm 00007
Fmt 4701
Sfmt 4700
58447
definition of emission or standard in
CAA section 302(k), and the embedded
requirement for continuous standards,
also applies to the NSPS. Therefore,
consistent with Sierra Club, we
proposed the NSPS standards in the 40
CFR part 60, subpart AAb would apply
at all times.
5. Electronic Reporting for 40 CFR Part
60, Subparts AA, AAa, and AAb
The EPA proposed the requirement
that owners and operators of EAF and
AOD subject to the current and new
NSPS at 40 CFR part 60, subparts AA,
AAa, and AAb submit electronic copies
of required performance test reports and
any semiannual excess emissions and
continuous monitoring system
performance and summary reports,
through the EPA’s Central Data
Exchange (CDX) using the Compliance
and Emissions Data Reporting Interface
(CEDRI). The proposed rule required
that performance test/demonstration of
compliance results collected using test
methods that are supported by the
EPA’s Electronic Reporting Tool (ERT)
as listed on the ERT website 6 at the time
of the test be submitted in the format
generated through the use of the ERT or
an electronic file consistent with the
xml schema on the ERT website, and
other performance test/demonstration of
compliance results be submitted in
portable document format (PDF) using
the attachment module of the ERT.
For semiannual reports, the proposed
rule required that owners and operators
use the appropriate spreadsheet
template to submit information to
CEDRI. The final versions of the
templates for these reports are included
in the docket for this action.7
Additionally, the EPA identified the
circumstances in which electronic
reporting extensions may be provided.
B. Proposed Changes to Current NSPS,
40 CFR Part 60, Subparts AA and AAa
We proposed the following
amendments and requested comments
on the existing NSPS rules for EAF, 40
CFR part 60, subpart AA, and EAF and
AOD, 40 CFR part 60, subpart AAa, to
update, correct, or clarify these rules to
enhance compliance and enforcement.
• Amendments to clarify and refine
the rule requirements in 40 CFR part 60,
sections 60.271 and 60.271a
‘‘Definitions’’, 60.272 and 60.272a
6 https://www.epa.gov/electronic-reporting-airemissions/electronic-reporting-tool-ert.
7 See 40 CFR part 60, subpart AA, AAa, and AAb,
Standards of Performance for Steel Plants: Electric
Arc Furnaces and Argon-Oxygen Decarburization
Vessels, 40 CFR part 60.276(g) Semiannual
Compliance Report Spreadsheet Template, available
at Docket ID No. EPA–HQ–OAR–2002–0049–0064.
E:\FR\FM\25AUR2.SGM
25AUR2
58448
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ddrumheller on DSK120RN23PROD with RULES2
‘‘Standard for particulate matter’’,
60.273 and 60.273a ‘‘Emission
monitoring’’, 60.274a ‘‘Monitoring of
operations’’, 60.275a ‘‘Test methods and
procedures’’, and 60.276a
‘‘Recordkeeping and reporting
requirements’’.
• Minor revisions to clarify the rule
and enhance compliance and
enforcement.
• Solicited comments, data, and other
information on whether the EPA should
change the time to both find and fix the
cause of a BLDS alarm from 3 hours to
a longer timeframe (e.g., 24 hours as in
other rules), or some other duration.
• Requirement that owners and
operators of EAF facilities submit
electronic copies of required
performance test/demonstration of
compliance reports and semiannual
reports through the EPA’s CDX using
the CEDRI and ERT.
• Requirement that performance test/
demonstration of compliance results
collected using test methods that are
supported by the EPA’s ERT as listed on
the ERT website 8 at the time of the test
be submitted in the format generated
through the use of the ERT or an
electronic file consistent with the xml
schema on the ERT website, and other
performance test/demonstration of
compliance results be submitted in PDF
using the attachment module of the
ERT.
• For semiannual reports,
requirement that owners and operators
use the appropriate spreadsheet
template to submit information to
CEDRI.
IV. What actions are we finalizing, and
what is our rationale for such
decisions?
The EPA is finalizing revisions to the
NSPS for EAF and AOD at steel plants
pursuant the CAA section 111(b)(1)(B)
review. The EPA is promulgating the
NSPS revisions in a new subpart, 40
CFR part 60, subpart AAb that are
applicable to affected facilities
constructed, modified, or reconstructed
after May 16, 2022. The new subpart
reflects a BSER for a PM capture system
and fabric filter, and a total facility limit
for PM from control devices in units of
lb PM/ton steel produced, and a canopy
hood to capture melt shop VE, and a 0
percent opacity limit during melting
and refining.
We also are finalizing results of the
review of opacity from control device
exhaust and from dust handling systems
to keep same BSER and limits as in 40
CFR part 60, subpart AAa of 3 percent
8 https://www.epa.gov/electronic-reporting-airemissions/electronic-reporting-tool-ert.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
and 10 percent, respectively; that the
emission limits would apply at all
times; periodic compliance testing at
least once every 5 years; and electronic
reporting.
The facility-wide PM limit of 0.16 lb/
ton as finalized will apply to all EAF
and AOD control devices subject to 40
CFR part 60, subpart AAb and also all
the air pollution control equipment
used to remove particulate matter from
the effluent gas stream generated by the
EAF and AOD. The melt shop opacity
standard of 0 percent as finalized will
apply during the melting and refining
period, and a 6 percent opacity limit
will apply during the charging period
and during the tapping period, with
daily opacity or VE testing required
during all 3 periods. We are finalizing
that the PM limit of 0.16 lb/ton standard
apply at all times, including during
SSM, and that an opacity limit will also
apply at all times (i.e., 6 percent opacity
during charging and tapping and 0
percent opacity at all other times). We
are finalizing the requirement to submit
the required compliance test reports
through CDX using CEDRI and the ERT.
We also are finalizing clarifications
and corrections to the 2 existing EAF
rules: 40 CFR 60 subpart AA, Standards
of Performance for Steel Plants: Electric
Arc Furnaces Constructed After 10/21/
74 & On or Before 8/17/83; and 40 CFR
60 subpart AAa, Standards of
Performance for Steel Plants: Electric
Arc Furnaces & Argon-Oxygen
Decarburization Constructed After 8/17/
83 and On or Before May 16, 2022. For
these rules, we are finalizing
amendments to certain parts of the
current NSPS standards and to allow 24
hours for owners and operators a find
and fix the cause of a BLDS alarm.
A. NSPS Requirements for PM
Emissions From Control Devices for
Electric Arc Furnaces and ArgonOxygen Decarburization Vessels
Constructed After May 16, 2022
1. What did we propose as the BSER
determination and standard of
performance for PM emissions from
EAF control devices?
We proposed that BSER for new,
modified, and reconstructed EAF and
AOD sources is a capture system and
fabric filter. We proposed that the PM
limit that reflects BSER is a total facility
emission rate of 0.16 lb PM/ton of steel
from control devices at an affected
facility. The EPA proposed a facilitywide mass-based PM limit from all EAF
and AOD control devices per ton of steel
produced instead of a PM concentration
limit based on mass of PM per control
device air flow that applies to each
PO 00000
Frm 00008
Fmt 4701
Sfmt 4700
control device, which is the format of
the standards in 40 CFR part 60,
subparts AA, AAa.
2. What significant comments did we
receive and what are our responses?
Comment: One commenter asserted
that the form of the standard should not
be changed from the original form of the
standard in NSPS subpart AAa. The
commenter stated for the NSPS subpart
AAa rulemaking, the EPA rejected a
production-based (or mass-based)
standard in favor of a concentrationbased limit in a NSPS proposed rule
that was published on August 17, 1983.
The commenter notes that, in that 1983
FR document, the EPA stated:
‘‘A process weight format is based on
a direct relationship between the
quantity of pollutant emitted and the
amount of input material consumed or
product produced. Because of wide
differences between EAF and AOD
shops in operating procedures, such as
the length of the steel production cycle,
grade of steel produced, control
technologies, vessel capacities, and
other operating parameters, a simple
direct relationship between mass
emissions and steel production does not
exist. Therefore, a process weight format
was not selected for control devices
regulated by the proposed standards.’’
‘‘Methodology to measure the
concentration of emissions discharged
to the atmosphere from control devices
is readily available and well
demonstrated. Concentration
measurements are obtained directly
from the stack emission test data. A
concentration standard can be met
equally well by a large or a small shop
and by carbon and specialty steel shops.
Consequently, a concentration format
(i.e., mass emissions per unit volume of
gas) was selected for control devices
regulated by the proposed standards to
ensure control of captured process and
fugitive emissions.’’ (48 FR 37347)
The commenter continued that the
EPA provides no explanation for the
change in its position and fails to
address the rationale the Agency
provided in 1983 for adopting the
current grain-loading standards in NSPS
subpart AA and NSPS subpart AAa.
Another commenter added that the
EPA’s failure to justify this ‘‘depart[ure]
from a prior policy’’ would render
abandonment of the current
concentration-based standard ‘‘arbitrary
and capricious,’’ citing to FCC v. Fox
Television Stations, Inc., 556 U.S. 502,
515–16 (2009).
EPA Response: The EPA disagrees
with the comment that the EPA did not
provide an adequate explanation for
changing the form of the standard from
E:\FR\FM\25AUR2.SGM
25AUR2
58449
concentration-based to a productionbased limit. The new format of the EAF
NSPS subpart AAb, in units of lb/ton,
ensures compliance as well as ensures
that every facility is accountable for the
total PM contribution from its EAF to
the environment in the nearby
community for every unit of steel
produced. The EPA fully explained its
justification for use of lb/ton format in
the 2022 proposal, as follows here.
In the 2022 proposal, we explained
that the emissions, and, hence, collected
PM, from baghouses that control only
secondary emissions can be much lower
than the other two types of baghouses,
as seen in the EAF dataset where the
baghouse with the lowest PM emissions
controlled only secondary emissions (87
FR 29715). We also explained that
because of the inherent lower baghouse
PM input (loading), secondary
baghouses can be operated inefficiently
without exceeding the current NSPS
limit, which is expressed in the units of
mass PM per unit of control device
exhaust air. In addition, where there is
a standard in terms of mass PM per unit
of total exhaust air, baghouse dilution
air (added to EAF exhaust air) can be
increased with the effect of lowering
measured baghouse PM emission
concentration and disguising the true
performance of the baghouse.
Further, at 87 FR 29715, the EPA
proposed to set a facility-wide PM limit
instead of a limit that applies to each
control device (the format of the current
standard) because we think this form of
standard will result in better control and
provide greater assurance of
compliance. Most importantly, if EAF
emissions can be divided up into
separate baghouses, for practical
purposes or otherwise, with each device
falling under the same NSPS PM limit,
there is no accounting for the total PM
emissions from the facility. A facilitywide total control device PM emissions
limit in units of lb of PM per ton of steel
produced also would alleviate the
potential disparity in control device
emissions between low-and highloading control devices, such as that for
control devices for primary v. secondary
emissions, as well as for well-operated
v. inefficiently-operated control devices
that both operate below the individual
baghouse limit (87 FR 29715).
Therefore, we did adequately explain
our change in position at the proposal
and also explained why we now think
a facility-wide limit is more protective
than a concentration-based limit,
thereby satisfying the standard in Fox
Television. See 556 U.S. at 515–16
(when the Agency acknowledges change
in position, ‘‘it suffices that the new
policy is permissible under the statute,
that there are good reasons for it, and
that the Agency believes it to be better,
which the conscious change of course
adequately indicates’’).
The commenter did not include any
current data showing the lack of a direct
relationship between mass emissions
and steel production. The graphs in
Figure 1 from the memorandum titled
Particulate Matter Emissions from
Electric Arc Furnace Facilities,9
hereafter called the ‘‘Emissions
Memorandum,’’ show a similar curve
shape when data for the total EAF
facility average concentration of PM in
gr/dscf from the 2010 EPA/EAF data
set 10 are plotted compared to the same
PM data expressed as lb/ton PM
emissions.
In 1973, the EPA originally presented
a NSPS standard in units of lb/hr-ton
during the National Air Pollution
Control Technical Advisory Committee
(NAPTAC) meeting when the EAF NSPS
was first being developed, as described
in the 1974 Background Information for
Standards of Performance 11 (BID). On
February 22, 1973, the Agency
presented to the National Air Pollution
Control Techniques Advisory
Committee (NAPCTAC) a draft standard
PM limitation of 0.06 lb/hr-ton.
However, this standard was ultimately
not used by the EPA for the NSPS
because of the industry objections with
the lb/ton format and interest in the
concentration-based limit.
It should be noted that the first
promulgated NSPS limit, at 0.0052 gr/
dscf, was based on test data from only
9 Particulate Matter Emissions from Electric Arc
Furnace Facilities. D.L. Jones, U.S. Environmental
Protection Agency, Office of Air Quality Planning
and Standards, Research Triangle Park, North
Carolina, and G.E. Raymond, RTI International,
Research Triangle Park, North Carolina. May 1,
2023. (Docket ID No. EPA–OAR–2002–0049–0061).
10 In 2010, the EPA acquired EAF data from
approximately 30 EAF facilities via a CAA section
114 test and information request. These data are
located in the docket for the EAF NESHAP, 40 CFR
part 63, subpart YYYYY at https://
www.regulations.gov/docket/EPA-HQ-OAR-20040083 and incorporated by reference into the docket
for the EAF NSPS at https://www.regulations.gov/
docket/EPA-HQ-OAR-2002-0049.
11 Background Information for Standards of
Performance: Electric Arc Furnaces in the Steel
Industry, Volume 1: Proposed Standards.
Publication No. EPA–450/2–74–017a. U.S.
Environmental Protection Agency, Office of Air
Quality Planning and Standards, Research Triangle
Park, North Carolina (October 1974).
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
PO 00000
Frm 00009
Fmt 4701
Sfmt 4700
E:\FR\FM\25AUR2.SGM
25AUR2
ER25AU23.000
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
58450
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ddrumheller on DSK120RN23PROD with RULES2
one facility, as described in the 1974
BID 12 for EAF under 40 CFR part 60,
subpart AA, the original EAF NSPS.
Preliminary investigations for the
NSPS identified 30 plants from a review
of the literature and contacts with
industry, a described in the 1974 BID,
discussed earlier in this section. From
these 30 plants, 11 plants were
identified that reportedly were wellcontrolled for PM emissions. Ten of the
11 facilities were visited, their visible
emissions evaluated, and information
obtained on the process and control
equipment. Although many of the 11
plants practiced good control
techniques, the facilities at only 3 plants
(Plants A, I and J) were amenable to
testing with EPA Method 5. Other
facilities were not suitable for emission
measurements because they use positive
pressure baghouses, which have no
stacks. Although development work was
in progress, sampling methodology for
this type of installation had not been
standardized. These 3 plants were
nearly identical except for size. They all
produced alloy steels and controlled PM
emissions with a building evacuation
system. Each had a fabric filter control
device that exhausted through multiple
stacks. Rather than spread the test
program effort over 3 tests at nearly
identical plants, it was decided a more
comprehensive test of one plant would
provide more information. The middlesized plant offered the best possibilities
for this comprehensive test. Its size was
typical of the mid-range for the
industry, and the fabric filter did not
have an inordinately large number of
exhaust stacks.
To show that a mass-based limit has
been considered by the EPA previously,
the chronological history of the EAF
NSPS subpart AA and AAa standards
for PM from control devices, as taken
from the 1974 BID, discussed earlier in
this section, is as follows:
• In 1972, 299 EAF’s in the United
States were operated by 99 companies at
121 locations. On February 22, 1973, the
Agency presented to the NAPCTAC a
draft standard PM limitation of 0.06
pound per hour-ton (lb/hr-ton). Steel
industry representatives attending the
meeting suggested that the PM standard
should be 0.244 lb/hr-ton.
• On May 30 and 31, 1973, at another
NAPCTAC meeting, the EPA presented
12 Background Information for Standards of
Performance: Electric Arc Furnaces in the Steel
Industry, Volume 1: Proposed Standards. Chapter
V. Summary of the Procedure For Developing
Standards, Section D, Plant Inspections. Publication
No. EPA–450/2–74–017a. U.S. Environmental
Protection Agency, Office of Air Quality Planning
and Standards, Research Triangle Park, North
Carolina (October 1974. pg. 63 (pdf pg. 88)).
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
a revised draft technical report and
standard. The PM standard presented by
the EPA was changed from 0.06 lb/hrton to 0.10 lb/hr-ton. The industry
representatives at the meeting suggested
that the standard be expressed on a
concentration basis and be set at 0.008
grains per dry standard cubic feet (gr/
dscf) for a dry collector (e.g., baghouse
or fabric filter) and 0.02 gr/dscf for a wet
collector (scrubber).
• At the January 9, 1974, NAPCTAC
meeting, available emission data
indicated that a 0.0039 gr/dscf PM
standard could be easily achieved.
These data were supported by a vendor
guarantee of 0.004 gr/dscf on fabric
filters at 3 building evacuation systems
at 3 similar shops. These shops, owned
by one company at one location,
produced alloy steel. Another vendor
also signed a statement that they would
guarantee 0.004 gr/dscf on a system
planned for the capture of charging and
tapping emissions at a plant which
produced carbon steel. Two other
vendors stated that although 0.004 gr/
dscf was achievable for fabric filters
designed to treat large volumes of
exhaust gas with low concentrations of
PM, it could not be guaranteed, but
0.004 gr/actual cubic feet (acf),
approximately equivalent to 0.005 gr/
dscf, could be guaranteed. Further,
industry representatives at the meeting
commented that the 0.0039 gr/dscf level
was too stringent for the industry to
meet at all times. Therefore, the
industry representatives suggested the
limitation be 0.008 gr/dscf.
• After the January 9, 1974,
NAPCTAC meeting, a vendor stated
that, for a fabric filter controlling a
direct shell evacuation (DEC) system
with a relatively high inlet
concentration of PM, 0.005 gr/dscf was
a reasonable level to guarantee.
• In the October 21, 1974 proposal
(39 FR 37466), the Agency proposed a
PM standard to be no more than 0.0052
gr/dscf of PM from the control device,
which relaxed the previous presented
value of 0.0039 gr/dscf for the limit for
the PM concentration emitted from an
EAF control device.
In summary, this history of
discussions around the first PM limit for
EAF control devices in the NSPS is as
follows: the EPA originally put forward
an EAF control device standard in the
form of lb/hr-ton in 1973. The following
year, industry suggested a PM limit of
0.008 gr/dscf and vendors presented a
guaranteed fabric filter limit of 0.005 gr/
dscf. Subsequently, in 1974, the EPA
proposed a standard of 0.0039 gr/dscf,
which was based on ‘‘available emission
data’’ from one facility, as noted in the
1974 BID. However, after NAPCTAC
PO 00000
Frm 00010
Fmt 4701
Sfmt 4700
discussions with industry and vendors,
a limit of 0.0052 gr/dscf was
promulgated by the EPA in 1975 in the
EAF NSPS subpart AA and confirmed
again in 1984 in the EAF NSPS subpart
AAa.
Regardless of the EPA’s discussions
during prior rulemakings, as detailed in
the proposed rule and in this final
action, we now have a strong basis to
find a direct relationship between mass
emissions and steel production that
justifies our facility-wide PM limit in
units of lb/ton. We show in our analyses
of 2010 data from 30 facilities discussed
in this preamble (see Figure 1), as well
as in data from more facilities from
2005, as discussed in another EPA
response in this preamble section, that
there is a direct relationship. As
explained earlier in section IV.A.1 and
in other comments in this section, and
in the proposal, the EPA analyzed the
total facility PM mass emissions versus
production at a number of EAF facilities
and found that a correlation exists, and
that promulgating a PM standard for
NSPS subpart AAb in this form would
enhance compliance and may reduce
emissions. As noted earlier in this EPA
response, the new format of the EAF
NSPS subpart AAb, in units of lb/ton
ensures that every facility is accountable
for the total PM contribution from its
EAF and AOD to the environment in the
nearby community for every unit of
steel produced. As an example of
similar thoughts on the value of EAF
standards in lb/ton, we note a 2017
facility construction permit for
prevention of significant deterioration
that included a lb/ton PM limit (0.19 lb/
ton), as well as a ‘‘no visible emissions’’
limit for the EAF.13
Comment: The commenter asserted
that the EPA conducted evaluation on a
concentration basis and not in the form
of the proposed standard (lb/ton). A
commenter stated the EPA in its
proposal performed cost analyses based
upon the air flowrates to the air
pollution control device, and rather
than establishing a standard of
performance for the air pollution control
device (baghouse), the EPA proposed
the PM emissions standard in terms of
lb/ton steel produced on a facility-wide
basis. The EPA analyzed the
performance of emissions controls from
EAF on a concentration basis (milligram
per dry standard cubic meters (mg/
13 Finkl & Sons Co. DBA Finkl Steel—Chicago.
1355 East 93rd Street, Chicago, Illinois 60619. State
of Illinois Clean Air Act Permit Program (CAAPP)
Permit. ID No. 031600GUC. Permit No. 14030029.
Permitting Authority, Illinois Environmental
Protection Agency Bureau of Air, Permit Section
217/785–1705. Final issue date July 5, 2018. pp. 21
and 23 of 129.
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
dscm)—grain per dry standard cubic
feet (gr/dscf))—and not in the form of
the proposed standard. The EPA must
be consistent with the basis of its
evaluation and establish a standard
measuring compliance as a
concentration exiting the control device.
EPA Response: The commenter
correctly notes that, rather than
establishing a concentration standard of
performance for each individual air
pollution control device (baghouse), the
EPA in 2022 proposed to set the PM
emissions standard in terms of lb/ton
steel produced on a facility-wide basis
from all control devices at the EAF
facility. However, the EPA disagrees
that we analyzed the performance of
emissions controls from EAF on a
concentration basis (gr/dscf)—and not
in the form of the proposed standard.
The EPA’s analysis in the ‘‘Emissions
Memorandum’’ discussed earlier in this
section clearly demonstrates that the
EPA evaluated costs and emission
reductions on a facility-wide basis in lb/
ton format. [See figures and tables in the
‘‘Emissions Memorandum’’ discussed
earlier in this section: Figure 3 (EAF
baghouse data in mass PM per mass of
steel produced (lb/ton)); Figure 4 (EAF
facility total baghouse mass PM per
mass of steel produced (lb/ton)); Table
3 (EAF Baghouse Information and
Average PM Emissions (lb/ton)); and
Table 5 (Facility Total EAF Baghouse
Average PM Emissions (lb/ton))].
Further, the EPA outlined in multiple
locations in the proposal that the
performance of emissions controls from
EAF were done on a facility-wide basis.
For example, at 87 FR 29716, the EPA
described the PM and opacity test data
that was used in the BSER analysis. At
87 FR 29715–29716, the EPA explained
how the opacity limit was developed
considering facility-wide emissions. To
determine the PM limit for control
device PM emissions under the BSER,
the EPA only used data from EAF
facilities with 0 percent melt shop
opacity. This was because facilities that
control their melt shop opacity to 0
percent are collecting more PM
(specifically from the melt shop) than
facilities that have a nonzero melt shop
opacity and, as a result, are sending
more PM to their control devices.
Consequently, EAF facilities with 0
percent melt shop opacity are expected
to have a slightly higher control device
PM emission rate on average compared
to EAF facilities with greater than 0
percent melt shop opacity, as evidenced
by the EAF dataset of 33 EAF facilities.
As a corollary, at EAF facilities with 6
percent melt shop opacity, some of the
PM generated by the EAF is not
captured, avoids the control device, and
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
can exit through the melt shop roof,
thus raising the melt shop opacity to
above 0 percent. In turn, facilities with
6 percent melt shop opacity collect less
PM and, therefore, less PM is sent to
control device, which results in
(slightly) lower PM emissions in the
control device exhaust.
Overall, because of the large amount
of PM emission differential between 6
percent and 0 percent melt shop
opacity, much less PM is emitted to the
environment with 0 percent melt shop
opacity than with 6 percent opacity,
despite the higher level of control
device emissions with 0 percent melt
shop opacity. This effect is described
quantitatively in the proposal preamble
(87 FR 29720). Of the 15 EAF facilities
in the EPA dataset with 0 percent melt
shop opacity, control device PM
emissions data and steel production
values needed to develop an emission
standard in mass of PM per mass of steel
production were available for 13 of the
15 facilities; these data included 51
individual tests from 23 baghouses and
21 EAF. The 13 EAF facilities and their
PM emissions were used to demonstrate
that 0 percent melt shop opacity is
BSER and to develop a facility-wide
total PM control device emission
standard in lb/ton under the BSER for
new, modified, and reconstructed EAF
or AOD.
As explained earlier in section IV.A.1
and other comments in this section, and
in the proposal, the EPA analyzed the
total facility PM mass emissions versus
production at a number of EAF facilities
and found that a correlation exists, and
that promulgating a PM standard for
NSPS subpart AAb in this form would
enhance compliance and may reduce
emissions. As noted earlier in this EPA
response, the new format of the EAF
NSPS subpart AAb, in units of pound
per ton (lb/ton), ensures that every
facility is accountable for the total PM
contribution from its EAF to the
environment in the nearby community
for every unit of steel produced.
Comment: A commenter asserted that
a lb/ton steel limit does not consider the
different types of EAF mills. A
commenter stated the EPA does not
acknowledge nor address the
fundamental fact that a ‘‘facility-wide
lb/ton’’ production, or mass-based
standard, ignores the substantial
differences among EAF steel mills that
directly bear on the PM emissions per
ton of steel produced. The commenter
claims it is both unfair and inconsistent
with the BSER to hold a small specialty
steel EAF facility, with low tonnages
and more time-intensive steel refining
requirements, to the same productionbased standard as a facility that
PO 00000
Frm 00011
Fmt 4701
Sfmt 4700
58451
produces 10-times or more steel with
much shorter heat times (i.e., 2 facilities
with vastly different production rates).
The commenter stated a compliance
method based on PM per ton of steel
produced does not take into
consideration the various subcategories
of EAF operations, differences in steel
products, and variation in heat times
and tonnages produced, which vary
considerably depending on the product
grade of steel and the mix of such
products at various mills. Some carbon
EAF mills produce high tonnages in
relatively short heat times, while
specialty EAF steel facilities produce
much smaller tonnages over heat times
that can be 2 to 3 times as long.
The commenter continued, as the EPA
noted in developing the NSPS subpart
AAa standards in 1984, the production
of steel in an EAF is a batch process
where ‘heats’ or cycles range from 1 to
5 hours, depending upon the size and
quality of the charge, the power input to
the furnace, and the desired quality of
the steel produced. The commenter
added, the EPA’s statement in the
proposal that ‘‘[t]he production of steel
in an EAF is a batch process’’ (87 FR
29713), is not accurate and fails to
acknowledge ‘‘Endless Charging
Systems’’ and Consteel® continuous
feed systems (i.e., continuous charging
systems). The commenter added that, to
determine appropriate standards of
performance, the EPA should conduct a
comprehensive evaluation of the
different types of EAF mills (such as
bar, sheet, and plate) and consider
establishing different limitations and
requirements for each subcategory.
Another commenter encourages the EPA
to evaluate current designs and
applications of baghouses for the control
of PM.
EPA Response: We disagree with the
commenter on the relevance of lb/ton
standard to the variation in EAF
operations. The lb/ton limit being
promulgated (0.16 lb/ton) reflects the
highest emitting facility in the EPA
dataset, which is a stainless steel
facility. Therefore, we expect both EAF
carbon and stainless steel facilities,
continuous or batch, that modify or
reconstruct and then are subject to the
NSPS subpart AAb will be able to meet
the new PM limit. Moreover, future
new, reconstructed, and modified
facilities will be in an even better
position to meet this limit because they
can plan their construction,
reconstruction, or modification
accordingly. For these reasons, and
because the facility which represents
the PM limit, at 0.16 lb/ton total facility
PM control device emissions, is the
highest emitting facility in the dataset
E:\FR\FM\25AUR2.SGM
25AUR2
58452
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
(and 1 of only a total of 4 steel facilities
in the industry that produce only
stainless steel), we do not think a
subcategory is warranted.
The commenter is correct that the lb/
ton limit does not take into account the
different types of EAF mills, but the
various types of steel and production
have all been meeting the single
concentration standard in subpart AAa
(and AA) without issue in the many
years since this limit was first set in
1975. Therefore, meeting a lb/ton
standard based on the emissions of one
third of the facilities in the industry that
also are meeting the current standard
will not be a problem. Whether a mill
is batch or continuous, slow or fast, will
not affect the total amount of PM
emitted per amount of steel produced
for each facility. When a batch process
stops producing steel (i.e., stops tapping
steel), it typically also will stop emitting
PM from the EAF. If PM emissions
continue after the EAF has stopped
processing scrap, or steel has stopped
being tapped in a batch process, any
‘‘trailing’’ PM emitted is still a result of
the steel that has just been produced.
Therefore, this ‘‘trailing’’ PM should be
included in the total PM catch for the
test run.
Similarly, a continuous EAF process
will emit PM as it continues to produce
steel. And a relatively large amount of
steel produced in a short time will also
produce a relatively large amount of PM
in a short period. The effect of dividing
the PM emitted by the tons of steel
produced normalizes the different
processes to a common lb/ton term.
Comment: Air-to-cloth (A/C) ratios
from integrated iron and steel (II&S)
industry were used instead of EAF data.
The commenter asserted that the EPA
offers no explanation why using II&S
baghouse data was relevant to EAF
baghouse controls in the first place or
why the EPA presumed that relative
rank placement of 5 facilities along a
ranking of II&S baghouse A/C ratios
allowed the EPA to presume those
facilities’ PM emissions were based on
control through a baghouse with the
same A/C ratios. Moreover, the
commenter asserts that the use of II&S
data is inexplicable because the EPA has
in its possession the A/C ratios for many
plants with EAF. This information was
available to the EPA in the rulemaking
docket for the 40 CFR part 63, subpart
YYYYY NESHAP for EAF, and the EPA
even summarized the A/C ratios for the
EAF baghouses that were operated
during these performance tests.
The commenter continued to assert
that the EPA’s derived average, median,
minimum, and maximum A/C ratios are
all incorrect. The derived A/C ratios
misstate the actual A/C ratios reported
by the 3 model facilities for which the
EPA had actual performance test data
(Model Plants A, B, and E). For instance,
Model Plant E is the North American
Stainless facility in Ghent, Kentucky
(NAS–KY), which operates 4 baghouses.
For those 4 baghouses, the facility
reported to the EPA A/C ratios of 4.1,
4.5, 4.5, and 5.0 ft/min—none of which
are close to the EPA’s erroneously
derived A/C ratio of 7.2 ft/min.
EPA Response: The EPA disagrees
with the commenter’s assertion that the
use of II&S data in lieu of the A/C ratios
for plants with EAF is inappropriate.
The EPA stated in the EAF NSPS
proposal (87 FR 29718) that the reason
for using more recent 2011 II&S
baghouse data was because no A/C ratio
data were available in the EAF PM test
reports from 2010. Therefore, values for
A/C ratios from CAA section 114
responses submitted in 2011 by the II&S
industry for the risk and technology
review for 40 CFR part 63, subpart
FFFFF (85 FR 42074) were used in the
EAF BSER PM cost analysis. The
baghouses used for emissions from
furnaces in the II&S industry are
expected to be similar in operation as
the baghouses used at EAF/AOD for the
purposes of this analysis.
The baghouse A/C ratios from in the
NSPS proposal based on II&S data
submitted in 2011 for a CAA section 114
request were similar to those submitted
in 2005 for another CAA section 114
request for the EAF NESHAP (40 CFR
part 63, subpart YYYYY),14 as shown in
Table 1. A quantitative comparison of
the A/C ratios from the 2005 EAF
NESHAP data to the II&S 2011 data is
also shown in Table 1.
TABLE 1—COMPARING A/C RATIOS FOR 2011 II&S DATA V. 2005 EAF NESHAP
Model plant
A/C ratio (ft/min)
2011 II&S
A
B
C
D
E
Comparing 2011 II&S A/C data to 2005 NESHAP data
2005 EAF NESHAP
..........................................
..........................................
..........................................
..........................................
..........................................
1.3
2.9
4.0
4.9
7.2
1.4
2.2
3.0
4.5
6
ddrumheller on DSK120RN23PROD with RULES2
Average
As the commenter points out, the
2005 EAF data does not include all of
the facilities from the 2010 dataset. In
addition, the 2005 data did not have
A/C data for all the facilities’ baghouses,
where there were multiple baghouses,
and for some facilities the number of
baghouses for each facility changed
from 2005 to 2010.
In response to this comment, for the
final rule, we re-examined the BSER
analysis of total facility PM lb/ton steel
from capture systems and fabric filters
14 Docket
¥7 percent ..........................
32 percent ...........................
33 percent ...........................
9 percent .............................
20 percent ...........................
II&S
II&S
II&S
II&S
II&S
17 percent ...........................
II&S higher.
using A/C ratios from the EAF 2005
CAA section 114 request that ranged
from 1.4 to 6.0 ft/min. For Model Plant
A, corresponding to Timken-FaircrestOH, the A/C ratio in the 2005 CAA
section 114 request (3.4 A/C) was higher
than the 2011 II&S data point (at 1.3 A/
C), but the A/C ratio derived using a
regression analysis that produced the
line of best fit from the 2005 CAA
section 114 request data (at 1.4 A/C), is
very similar to the II&S datapoint (1.3
A/C).
For Model Plant B, based on TimkenHarrison-OH, the A/C ratio from the
2005 CAA section 114 request (at 2.7 A/
C) is very similar to the II&S data point
(2.9 A/C) and also from a regression
analysis that produced the line of best
fit from 2005 (2.7 A/C).
For Model Plant E, based on NAS-KY,
an average A/C ratio of 4.5 ft/min A/C
was derived from the data reported to
the EPA in 2010 (and also provided by
the commenter). However, the A/C ratio
of 6.0 assigned to the same emissions as
ID No. EPA–HQ–OAR–2004–0083.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
PO 00000
Frm 00012
Fmt 4701
Sfmt 4700
lower.
higher.
higher.
higher.
higher.
E:\FR\FM\25AUR2.SGM
25AUR2
58453
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
NAS-KY (0.16 lb/ton) derived from the
curve of 2005 CAA section 114 data is
not much different than what was used
in the EAF proposal (at 7.2 A/C) based
on II&S data. These values are shown in
Table 2.
TABLE 2—COMPARING A/C RATIO DATA BETWEEN 2005 AND 2010 EAF DATA AND 2011 II&S DATA
Comparing 2005 to 2010
data
Timken-Faircrest-OH ..........
Timken-Harrison-OH ...........
NAS-Ghent-KY ....................
Different baghouses ...........
Same baghouses ...............
Same baghouses ...............
Model plant
2011 II&S
data
A
B
E
2005 EPA
data
1.3
2.9
7.2
3.4
2.7
NA
2010 EPA
data
NA
NA
4.5
Curve using
2005 data
1.4
2.2
6.0
In addition, the EPA used the data
from the 2005 CAA section 114 request
for the EAF NESHAP to add to the 2010
CAA section 114 request data used for
the lb/ton BSER PM limit analyses for
capture systems and fabric filters
reported in the proposal in order to reevaluate the proposed lb/ton BSER
standard for capture system and fabric
filter PM emissions. The 2005 EAF
emission data that was able to be
converted to lb/ton values and also had
A/C ratio data were used along with
2010 CAA 114 request data used to
develop BSER for the proposal. A
similar trend in PM lb/ton data was seen
in the 2005 data as compared to 2010
data, as shown in Figure 2 below, with
a lower maximum PM lb/ton value in
the 2005 data.
The 2010 CAA section 114 request
data used to develop the PM lb/ton
standard for the proposal were matched
to the A/C ratios in the 2005 CAA
section 114 data for the NAS-Ghent-KY
facility, to provide a total of 18 facilities
in the dataset for PM lb/ton standard for
capture systems and fabric filters for the
final rule. See the memorandum titled
Cost Analyses to
Determine BSER for PM Emissions and
Opacity from EAF Facilities,15 as
updated for the final rule, hereafter
referred to as the ‘‘Cost Memorandum,’’
located in the docket for this rule. The
results of the analyses of a PM limit that
reflects BSER were similar between
proposal and final producing the same
PM 0.16 lb/ton limit for the BSER
capture system and fabric filter. See
Table 3 for the combined 2005 and 2011
lb/ton data set using EAF A/C ratios and
both 2005 and 2011 EAF submitted
emissions data. Table 4 shows the
results from the model plant analyses
comparing the results for the 2
approaches. Note Model Plants E and F
are both the highest emitting model
plant in the proposal (using 2011 II&S
A/C ratios) and final rule (Using 2005
EAF A/C ratios) analyses, respectively.
Because Model Plants E and F are the
highest emitting model plants, the EPA
does not have a baseline with which to
compare the costs and emission
reductions in order to develop average
cost effectiveness values. However, the
EPA’s determination of the BSER in this
review is consistent with its
determination of the BSER in the prior
40 CFR 60, subpart AAa rulemaking.
And as noted elsewhere in this
preamble, a third of the industry is
already achieving the PM 0.16 lb/ton
limit through application of that BSER,
which demonstrates that the costs of
meeting that limit are reasonable, and
not exorbitant or excessive. See Lignite
Energy Council v. EPA, 198 F.3d 930,
933 (D.C. Cir. 1999) (‘‘EPA’s choice will
be sustained unless the environmental
15 Cost Analyses to Determine BSER for PM
Emissions and Opacity from EAF Facilities. D.L.
Jones, U.S. Environmental Protection Agency,
Office of Air Quality Planning and Standards,
Research Triangle Park, North Carolina, and G.E.
Raymond, RTI International, Research Triangle
Park, North Carolina. May 1, 2023; Docket ID No.
EPA–OAR–2002–0049–0061.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
PO 00000
Frm 00013
Fmt 4701
Sfmt 4700
E:\FR\FM\25AUR2.SGM
25AUR2
ER25AU23.001
ddrumheller on DSK120RN23PROD with RULES2
A/C ratio (ft/min)
Facility
58454
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
or economic costs of using the
technology are exorbitant.’’); Sierra Club
v. Costle, 657 F.2d 298, 343 (D.C. Cir.
1981) (the court is not inclined to
‘‘quarrel’’ with the EPA’s judgment that
‘‘forecasted cost was not excessive and
did not make the cost of compliance
with the standard unreasonable’’);
Portland Cement Association v. Train,
513 F.2d 506, 508 (D.C. Cir. 1975) (the
inquiry is whether the costs of the
standard are ‘‘greater than the industry
could bear and survive’’). Moreover, the
capital costs and annual costs associated
with compliance with the PM 0.16 lb/
ton limit are similar to, and in some
cases lower than, the costs that the EPA
found to be reasonable for implementing
the BSER to meet the final opacity
standard, discussed in section IV.B. See
the ‘‘Cost Memorandum,’’ discussed
earlier in this section, for details of both
the canopy costs for the opacity limit
and fabric filter costs for the PM limit.
This further demonstrates that the costs
of meeting the PM 0.16 lb/ton limit are
also reasonable for this industry, for all
facility sizes. However, as shown in
Table 4, the EPA does not find the
incremental costs of achieving the more
stringent standards evaluated through
application of the BSER to be cost
effective for any facility size.
Accordingly, the EPA concludes that
PM 0.16 lb/ton limit reflects the degree
of emission limitation achievable
through application of the BSER.
TABLE 3—COMBINED 2005 AND 2010 lb/ton EAF DATASETS WITH 2005 EAF A/C RATIOS
Count
1
2
3
4
5
6
7
8
2010
lb/ton
2010 Zero opacity facilities
............................................
............................................
............................................
............................................
............................................
............................................
............................................
............................................
Timken-Faircrest-OH ..........................................................
Nucor-Crawfordsville-IN .....................................................
Gerdau-Charlotte-NC .........................................................
Timken-Harrison-OH ..........................................................
Nucor-Huger-SC ................................................................
CMC-Birmingham-AL .........................................................
CMC-Cayce-SC .................................................................
NAS-Ghent-KY ...................................................................
Count
2005 Facilities with P/S Baghouses
1 ............................................
2 ............................................
3 ............................................
4 ............................................
5 ............................................
6 ............................................
7 ............................................
8 ............................................
9 ............................................
10 ..........................................
Nucor-Norfolk-NE ...............................................................
Nucor-Cofield-NC ...............................................................
Nucor-Blytheville-AR ..........................................................
Nucor Bar Mill-Plymouth-UT ..............................................
North Star Steel-St. Paul-MN ............................................
Nucor Berkeley-Huger-SC .................................................
IPSCO Steel-Axis-AL .........................................................
SMI Steel-Cayce-SC ..........................................................
CMC/Struct Metals/SMI-Sequin-TX ...................................
IPSCO Steel-Muscatine-IA ................................................
1.3E–02
1.6E–02
2.3E–02
3.6E–02
5.2E–02
5.5E–02
6.4E–02
1.6E–01
2005 facility A/C
(weighted average)
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
2005 lb/ton
8.7E–03
1.3E–02
1.4E–02
1.8E–02
1.9E–02
2.2E–02
3.2E–02
5.8E–02
8.5E–02
8.7E–02
3.4
3.2
2.2
2.6
2.6
3.7
3.3
4.5 (2010)
2005 Facility A/C
(weighted average)
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
2.8
3.0
3.0
2.1
2.0
2.6
2.6
3.3
6.0
5.1
TABLE 4—COMPARISON OF BSER MODEL PLANTS FOR SMALL, MEDIUM, AND LARGE EAF FACILITIES USING TWO
DATASETS: 2005 EAF A/C RATIOS AND 2010 II&S A/C RATIOS, BOTH WITH 2010 EAF lb/ton DATA
Total
controlled
EAF PM
emissions
EAF facility
average
production
lb/ton
tpy
A/C ratio
(ft/min)
Cost for new baghouse
Model plant a
Value
Basis
Capital
$
Annual costs
$/yr
Incremental
cost
effectiveness
compared to
next loweremitting
model plant b
delta$/ton PM
Small Facility
E ............................
F ............................
0.16
0.16
50,000
50,000
7.2
8.0
2011 II&S ..............
2005 EAF .............
$796,912
767,439
$341,981
338,610
$13,340
7,196
4,778,920
4,361,224
2,045,443
1,997,701
12,197
6,575
21,929,003
19,839,154
8,598,613
8,359,718
13,708
7,390
Medium Facility
ddrumheller on DSK120RN23PROD with RULES2
E ............................
F ............................
0.16
0.16
775,000
775,000
7.2
8.0
2011 II&S ..............
2005 EAF .............
Large Facility
E ............................
F ............................
0.16
0.16
3,450,000
3,450,000
7.2
8.0
2011 II&S ..............
2005 EAF .............
a Model Plants E and F are both the highest emitting model plants in the two datasets, where the A/C data for Model E is from II&S A/C data and for Model F
the 2005 CAA section 114 responses are used for A/C data. Cost analysis values for Model E are the same as from proposal, with updates to reflect $2022 for the
final rule v. $2020 that were used for the proposed rule.
b The incremental cost effectiveness from Model Plant E to D in $2022, at $12,200/ton for medium-sized facility, is higher than the same comparison of the same
model plants in $2020, at $8,500/ton, because of the increase in the values used in the cost estimate as a result of inflation and increase in interest rate from 3.5
percent to 7.5 percent from 2020 to 2022.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
PO 00000
Frm 00014
Fmt 4701
Sfmt 4700
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
Comment: The commenter asserted
that the change from a concentration to
lb/ton limit complicates compliance and
does not result in better control or
greater assurance of compliance. The
commenter stated the EPA’s assertion
that switching to a lb/ton standard will
‘‘result in better control and greater
assurance of compliance’’ is incorrect.
Under the current standards in NSPS
subparts AA and AAa, compliance is
readily demonstrated through EPA
Method 5 monitoring of the stack on the
primary control device/baghouse. This
is a direct measurement of the filtering
ability of the baghouse and evidence of
compliance with concentration limits
without all of the unnecessary variables
the new rule introduces which are not
directly related to emissions. Under the
proposal, facilities subject to NSPS
subpart AAb would be required to track
tonnages produced during stack tests
and match those to emissions data.
EPA Response: The commenter is
correct that with a lb/ton standard,
facilities subject to NSPS subpart AAb
will be required to track tonnages
produced during stack tests and match
those to emissions data. However, this
is already required in the current EAF
NSPS (compare 40 CFR 60.274(i)(1),
60.274a(h)(1) with proposed and final
40 CFR 60.274b(h)(1)). The 31 facilities
in the 2010 EPA/EAF data set were able
to report steel produced during the
testing. Therefore, we expect the entire
industry to be able to do so.
The baghouse PM emission data in gr/
dscf do not address the total emissions
generated by a facility. The gr/dscf data
can be influenced by increasing dilution
air to the baghouse and is not directly
related to steel production as PM
emissions logically should be. Using
concentration in gr/dscf to assess the
filtering ability of baghouses can still be
done at any time but it doesn’t
necessarily reflect the contribution of
PM by the facility’s steel production to
the environment. In order to assess a
facility’s impact to the local
environment, the general public would
need to know the exhaust rates of every
baghouse at a facility to determine the
facility’s PM emissions, whereas from
lb/ton facility-wide data, the maximum
amount of PM being emitted can be
easily ascertained with only one steel
production value and one facility-wide
PM limit.
Comment: The commenter asserted
that the lb/ton limit does not consider
vendor guarantees on control systems.
The commenter stated it is critical to
obtain vendor guarantees from suppliers
when constructing new facilities or EAF
and associated control systems, to
ensure that the purchased equipment
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
can comply with applicable standards.
Vendors can guarantee that the filters/
control device have a specific removal
rate (i.e., vendors can only guarantee the
difference between the clean and dirty
side of the bag). Obtaining such
guarantees is what gives facilities
comfort that the equipment they
purchase will perform such that
compliance is assured. The commenter
stated that such comfort is not possible
with the Agency’s proposed ‘‘facilitywide’’ PM limit, because vendors do not
offer lb/ton guarantees for specific
equipment and certainly not on a
facility-wide basis. This is
understandable given a supplier’s
ability to design equipment to a given
concentration or control specification,
but lack of ability to control the many
factors that influence lb/ton efficiency,
especially where a vendor may not be
the sole facility-wide designer. Vendors
have no control over the tonnage of steel
produced or how the steel tonnage
estimate comports with the duration of
the PM measurement. The commenter
concluded the EPA should take this into
account by setting a concentration-based
emission standard and noted that the
EPA has previously acknowledged the
importance of being able to obtain
vendor guarantees when setting the
NSPS subpart AAa limits in 1984 (49 FR
43840). The commenter stated that it
would thus be arbitrary and
impermissible for the EPA to ignore that
consideration here.
EPA Response: Vendors can continue
to use gr/dscf to assess the filtering
ability of a baghouse, especially since
the NESHAP for EAF (40 CFR part 63,
subpart YYYYY) still requires gr/dscf
determinations. In addition, the
calculation of PM concentration in gr
PM/dscf is an intermediate step in the
calculation of lb PM/ton steel emission
rate: concentration (gr/dscf) * flow rate
(dscf) = emission rate, as PM in lb/hr;
then divide by tons per hour steel for lb
PM/ton steel format. Moreover,
evaluating the impact of a new facility
(or reconstructed or modified facility)
under the NSPS subpart AAb, in terms
of PM emissions on the surrounding
communities, is more easily determined
from a lb/ton limit and overall facility
steel production. With a lb/ton limit,
not only must a new facility determine
that their baghouses are working
properly, but they must also determine
whether the facility is being efficient in
its generation of PM at the desired
production level compared to the best
facilities operating at the same
production level.
Comment: A commenter noted that
EAF National Emission Standards for
Hazardous Air Pollutants (NESHAP) 40
PO 00000
Frm 00015
Fmt 4701
Sfmt 4700
58455
CFR part 63 subpart YYYYY requires
concentration limits. The commenter
stated the maximum achievable control
technology (MACT) standard in the
NESHAP for EAF (40 CFR part 63,
subpart YYYYY) independently limits
PM emissions from each EAF to 0.0052
gr/dscf. The proposed NSPS would thus
have the result of subjecting facilities to
both a lb/ton limit (via NSPS) and a
concentration limit (via NESHAP).
Since facilities will still have to track gr/
dscf anyway to comply with NESHAP
limits, it would be inefficient and
unreasonable to also require a lb/ton
limit.
EPA Response: The applicability
between the NSPS and NESHAP are
different. All existing EAF facilities will
continue to meet the gr/dscf PM limit in
the NESHAP. Only new, reconstructed,
or modified EAF or AOD units and their
control devices need to meet both the
lb/ton PM total facility limit that is
being finalized in NSPS subpart AAb
along with the NESHAP’s individual
baghouse limit. As discussed in
previous responses to comments in this
section, the data needed to show
compliance with both standards are
obtained in the same test. The
combination of the two standards
results in the public and regulators
being able to more accurately evaluate
EAF operation and the potential impact
of new facilities on surrounding
communities because the rules together
limit total facility PM emissions impacts
while checking individual control
device operation. Facilities subject to
the NSPS subpart AAb, and their
vendors can continue use the gr/dscf
limit to troubleshoot baghouse operation
just as facilities have done in the past.
For facilities that modify or
reconstruct after May 16, 2022, only the
EAF(s) or AOD(s) and the air pollution
control equipment that were modified
or reconstructed after May 16, 2022,
must comply with NSPS subpart AAb.
This provision has been added to the
rule at in 40 CFR 60.271b under the
definition of ‘‘Electric arc furnace
facility.’’ If there are capture systems
and control devices that capture PM
emissions from sources subject to NSPS
subparts AA or AAa at the same site
where there are also sources subject to
NSPS subpart AAb, the procedures
described in the rule at 40 CFR
60.275b(b) include any one of the
following options (see also 40 CFR
60.276bI) to determine compliance: use
the combined emissions; use a method
that is acceptable to the Administrator
or delegated authority and that
compensates for the emissions from the
facilities not subject to the provisions of
E:\FR\FM\25AUR2.SGM
25AUR2
58456
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ddrumheller on DSK120RN23PROD with RULES2
this subpart; or any combination of the
above methods.
3. What is the rationale for the final
BSER determination and what is the
final standard of performance?
The EPA is finalizing the proposed
determination that the BSER for EAF
and AOD is capture and control of PM
with a fabric filer. The EPA is further
finalizing the proposed determination
that limit based on the BSER at 0.16 lb/
ton total facility PM is achievable for
any new, modified, or reconstructed
facility because it is based on the EPA’s
data from approximately one third of
the industry. The format of the limit
based on BSER (total facility lb PM/ton
steel produced from all affected capture
systems and fabric filters) provides
complete information on the
performance of the facility and their
EAF rather than that of just the
individual baghouse(s) and individual
EAF via a concentration based standard,
and enables the public and regulators to
know the total pollutant impact of the
facility’s EAF operation on the
surrounding community. The current
concentration-based limit in NSPS
subparts AA and AAa is influenced by
the amount of dilution air in the exhaust
going through the baghouse, which can
be adjusted to some extent by the
facility without significant detriment to
baghouse operation. Evaluating the
impact of PM emissions from a new
EAF facility (or reconstructed or
modified facility) on the surrounding
communities is more easily determined
from a facility-wide lb/ton limit. With a
lb/ton limit, not only must a new
facility determine that their baghouses
are working properly, but they must also
determine whether the facility is being
efficient in its generation of PM at the
desired production level compared to
the best facilities operating at the same
production level. In addition, the total
facility lb/ton PM limit provides an
overall assessment of emissions from
the facility in a format that scales
emissions to production, which is based
on fundamental engineering principles.
The current concentration-based limits
in NSPS subparts AA and AAa do not
limit the air flow or the number of
baghouses that could be used to comply
with the standard.
Based on data from 31 EAF facilities
(more than one third of the industry), all
31 facilities’ baghouse emissions are 40
percent or lower than the current
concentration-based limit in 40 CFR
part 60, subparts AA, AAa. Therefore,
the 0.16 lb/ton production-based limit
based on these same data is a significant
improvement in emissions control
compared to the current standard.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
Moreover, because the lb/ton limit is the
highest level in the EPA data set that
includes one third of the industry, the
standard that the EPA has determined to
reflect the application of the BSER
technology is achievable.
Lastly, we used both 2005 EAF PM
data with EAF 2005 A/C data, and 2010
EAF PM data with 2005 EAF A/C data
for the cost analysis to determine BSER
for the EAF lb/ton PM standard, and
reached the same conclusion as we did
for proposal with 2010 EAF PM data
and 2010 II&S A/C data. Therefore, in
this final rule, the use of a capture
system and fabric filter was determined
as the BSER. The PM limit based on
BSER of 0.16 lb PM/ton steel facilitywide was derived from the data
available to the EPA, which comprised
approximately one third of the industry,
and also where the EPA considered
costs, nonair quality health and
environmental impacts, and energy
requirements (described below in
sections V.A and V.B).
4. Are there any relevant energy impacts
or nonair quality health and
environmental impacts of the selection
of the final BSER and, if so, how were
the final emission limitations based on
BSER affected?
The EPA did not identify any relevant
energy impacts or nonair quality health
and environmental impacts of the
proposed or final standards for PM
emissions from EAF and AOD control
devices (baghouses). See sections V.A
and V.B. of this preamble for details. No
comments were received on these
issues.
B. NSPS Requirements for Opacity From
Melt Shops for Electric Arc Furnaces
and Argon-Oxygen Decarburization
Vessels Constructed After May 16, 2022
1. What did we propose as the BSER
determination and standard of
performance?
We proposed that VE from EAF and
AOD that exit from the melt shop would
be limited to an opacity of 0 percent
during all phases of operation, based on
the determination of BSER as the
addition of a partial roof canopy to
capture and control melt shop fugitive
emissions.
2. What significant comments did we
receive and what are our responses?
Comment: One commenter asserted
that the proposed 0 percent melt shop
opacity limit disregards workers’ safety
by requiring the closure of roof and
buildings. Specifically, the commenter
stated the proposed 0 percent melt shop
opacity limit disregarded workers’
PO 00000
Frm 00016
Fmt 4701
Sfmt 4700
safety related to heat stress and material
handling activities and that, therefore,
the EPA should reconsider the 0 percent
opacity limit. The commenter stated the
proposal did not include an analysis of
impacts for closure of building
openings. A review of the impacts on
worker heat stress would be necessary
and that the EPA had provided no
justification for requiring melt shops to
close all openings.
The commenter noted the current
proposed rule did not address heat
stress concerns, which was in conflict
with OSHA’s current Heat Stress
Initiative and National Enforcement
Program that identified ‘‘iron and steel
mills’’ specifically as a high hazard
industry for heat stress. The commenter
stated that safe melt shop operation
requires air flow to minimize potential
heat stress on workers and equipment.
The commenter claimed that negative
pressure alone was not sufficient to
maintain proper airflow through the
melt shop and that cross drafts were
necessary and doors and other access
points needed to be open. The
commenter also had significant
concerns about employee health
impacts from the proposed totally
enclosed melt shop, particularly for its
Mobile, Alabama facility, which is
located in an extreme climate area, as
the proposed changes could cause
greater heat stress on employees and
would necessitate design and structural
changes that the EPA failed to consider
in its proposal. The commenter stated
that 100 percent capture and 0 percent
opacity may not be safe. The commenter
noted when evaluating 2 different
control systems, the EPA may not
simply choose the most cost-effective air
pollution control system if it potentially
has adverse impacts on the health and
safety of workers within the melt shop.
The commenter stated that facilities
need to allow air changes to protect
worker health and safety.
The commenter referenced the 1984
amendments, which dismissed the
option for a closed roof configuration to
achieve 0 percent opacity due to the
impacts of heat stress on worker safety
and equipment functioning. A
commenter said that statements made
by the EPA in the 1984 40 CFR part 60,
subpart AAa rulemaking (49 FR 43841)
that ‘‘the visible emission limits were
selected-based on the performance of
the capture and control technologies
that served as the basis for Regulatory
Alternative B (partially open roof
monitor)’’ and that ‘‘Regulatory
Alternative C (closed roof) was not
considered suitable as the basis for
national standards of performance
because it is based on a closed roof
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
configuration which may aggravate
worker and equipment heat stress
problems.’’
EPA Response: The proposed rule 40
CFR part 60, subpart AAb did not
require a closed roof nor a totally
enclosed melt shop. In addition, the 0
percent shop opacity limit does not
restrict air flow from exiting or entering
the shop. Rather, the 0 percent opacity
limit merely necessitates that no visible
particles be emitted from the shop (as
reflected by either no VE observations
via EPA Method 22 or opacity of 0
percent using EPA Method 9 or the
DCOT method). Canopy hoods have the
benefit of being able to collect a large
volume of emissions, especially those
during charging and tapping and route
the PM to control devices. Therefore,
the basis for the addition of a partial
roof canopy with a canopy hood used in
the proposed and final cost estimates is
to ensure facilities clean the air of
particles before allowing the air to exit
the shop opening(s). We believe a
capture device such as a canopy hood,
as opposed to a closed roof, can be used
to meet the opacity limit based on BSER
and does not endanger worker safety.
Comment: The commenter asserted
that the EPA used a limited data set that
was not indicative of continuous longterm performance and did not support
a finding that 0 percent opacity was
adequately demonstrated. The
commenter stated the EPA’s dataset for
EAF steel mills is selective and not
representative of the full scope of
operations at these facilities. The
commenter stated that the EPA
purported to have based the proposed
40 CFR part 60, subpart AAb shop
opacity limit on individual performance
testing reports from a total of 13 of 31
EAF steel mills, which was less than
half. The commenter noted that most
facilities (16 out of 31) were unable to
maintain 0 percent shop opacity
throughout the duration of the
performance tests. Thus, as the majority
of facilities in the EPA’s database did
not maintain 0 percent opacity, the
short duration of performance testing
plainly demonstrated that 0 percent
shop opacity was not adequately
demonstrated.
Another commenter stated the EPA’s
proposal of 0 percent opacity from the
melt shop was based on limited
information from opacity tests
conducted at 31 facilities, of which less
than half achieved the 0 percent melt
shop opacity requirement. The
commenter stated that the short-term
observations conducted during a stack
test were taken for a few hours under a
specific set of conditions and were not
representative of long-term compliance
capability and, as such, could not
account for routine operating variability
and the full range of operating
conditions that may affect opacity. The
commenter stated that the subset of data
the EPA relied upon did not include
longer-term operating performance of
the identified mills; yet NSPS, as
defined by BSER, must account for what
was achievable and adequately
demonstrated by a wide variety of
facilities operating under a wide variety
of conditions, not simply show that the
standard was achieved at a model plant
for a short period of time. The
commenter also noted that the data
collected by the EPA generally showed
that the more years of opacity data
reviewed for a given facility, the higher
the maximum melt shop opacity.
58457
EPA Response: Thirteen facilities out
of the 31 EAF facilities in the EPA data
set had 0.00 percent shop opacity
during the tests which were reported to
the EPA. Two additional facilities in the
EPA data set achieved 0.00 percent shop
opacity as shown in the submitted test
reports and another 4 facilities achieved
0.0 percent as shown in the submitted
test reports, for a total of 19 facilities
appearing to already be complying with
a 0 percent shop standard (1 significant
figure) based on tests in the submitted
reports, and which were performed
using the same test method that would
be required to show compliance with
the NSPS. Out of the total 31 facilities
in the EPA EAF data, only 1 facility had
shop opacity greater than 1 percent as
an average of all runs in the test, with
the overall average among the 31
facilities in the EPA data set at 0.14
percent opacity. See the list of 31 EAF
facilities and the opacity test results
from reports submitted to the EPA in the
2010 EPA/EAF data set, as shown in
Table 5. None of the opacity data
submitted to the EPA in 2010 should be
construed as being from a ‘‘model
plant.’’ The opacity data was taken from
facilities responding to the CAA section
114 information request with the
primary purposes to obtain mercury
emissions data and were real facilities,
comprising a third of the industry. Data
for PM and opacity were collected as
part of the CAA section 114 information
request only for purposes of showing
that the reported mercury data were
taken during the time the facility was
complying with both the NESHAP (40
CFR part 63, subpart YYYYY) and NSPS
(40 CFR part 60, subparts AA and AAa).
TABLE 5—RANGE OF MELT SHOP OPACITY IN 31 EAF TEST REPORTS (2005–2011) FROM THE 2010 CAA SECTION 114
REQUEST
ddrumheller on DSK120RN23PROD with RULES2
[2010 EPA/EAF Data Set]
Melt shop opacity
(percent)
Count
Facility ID
1 ...............................................................................................
2 ...............................................................................................
3 ...............................................................................................
4 ...............................................................................................
5 ...............................................................................................
6 ...............................................................................................
7 ...............................................................................................
8 ...............................................................................................
9 ...............................................................................................
10 .............................................................................................
11 .............................................................................................
12 .............................................................................................
13 .............................................................................................
14 .............................................................................................
15 .............................................................................................
16 .............................................................................................
17 .............................................................................................
18 .............................................................................................
AKS-Butler-PA .........................................................................
AKS-Mansfield-OH ..................................................................
CMC-Birmingham-AL ..............................................................
CMC-Cayce-SC .......................................................................
CMC-Mesa-AZ .........................................................................
Ger-Charlotte-NC ....................................................................
Ger-Jackson-MI .......................................................................
NAS-Ghent-KY ........................................................................
Nuc-Crawfordsville-IN ..............................................................
Nuc-Huger-SC .........................................................................
Nuc-Jewett-TX .........................................................................
Nuc-Marion-OH .......................................................................
SSAB-Axis-AL .........................................................................
Tim-Faircrest-OH .....................................................................
Tim-Harrison-OH .....................................................................
Nuc-Darlington-SC ..................................................................
Ger-Knoxville-TN .....................................................................
Ger-StPaul-MN ........................................................................
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
PO 00000
Frm 00017
Fmt 4701
Sfmt 4700
E:\FR\FM\25AUR2.SGM
25AUR2
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.001
0.01
0.02
58458
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
TABLE 5—RANGE OF MELT SHOP OPACITY IN 31 EAF TEST REPORTS (2005–2011) FROM THE 2010 CAA SECTION 114
REQUEST—Continued
[2010 EPA/EAF Data Set]
Count
ddrumheller on DSK120RN23PROD with RULES2
19
20
21
22
23
24
25
26
27
28
29
30
31
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
.............................................................................................
It would be exorbitantly expensive to
the industry (as well as the EPA) for the
EPA to request and analyze round-theclock opacity testing throughout the
course of years at a number of facilities
in order to obtain data during a ‘‘wide
variety of conditions and wide variety of
facilities.’’ None of the opacity
requirements in previously promulgated
rules (40 CFR part 60, subparts AA and
AAa) have differentiated conditions or
facility types for the opacity
requirements in those rules. The
commenter does not provide any
information showing that the need for
these data is justified, except for
alluding to the fact that facilities
improved their control of opacity in
more recent years.
The goal of determining BSER is that
it is the ‘‘best’’ system of emission
reduction (considering costs and other
factors), not the system used by the
majority of the industry nor the top
facilities when ranked or any other
ranking method. However, the EPA
acknowledges that the data obtained
through CAA section 114 requests
consisted of data collected during
melting and refining, which is the time
period required to test opacity in the
current EAF NSPS rules in 40 CFR part
60, subparts AA, AAa. Therefore, in
light of comments provided by the
industry that reducing opacity during
charging and tapping is difficult to
achieve because of the physical
structure of equipment and because of
the much higher PM emissions during
charging and tapping than during
melting and refining, in the final rule for
40 FCR part 60, subpart AAb we are
maintaining the current rule limit in 40
CFR part 60, subparts AA, AAa of 6
percent opacity to apply during
charging and tapping, and retaining the
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
Melt shop opacity
(percent)
Facility ID
Nuc-Plymouth-UT ....................................................................
CMC-Seguin-TX ......................................................................
Ger-Wilton-IA ...........................................................................
Ger-Jacksonville-FL .................................................................
Ger-Jackson-TN ......................................................................
Alle-Brackenridge-PA ..............................................................
Nuc-Cofield-NC .......................................................................
Alle-Latrobe-PA .......................................................................
Nuc-Blytheville-AR ...................................................................
Nuc-Norfolk-NE .......................................................................
Ger-Beaumont-TX ...................................................................
Ger-Cartersville-GA .................................................................
Ster-Sterling-IL ........................................................................
Overall average .......................................................................
proposed 0 percent melt shop opacity
for melting and refining. We estimate
that the period of charging and tapping
is approximately 15 percent of the total
EAF operating time period.
Comment: The commenter asserted
that the EPA’s limited data set is not
representative of performance during
‘‘charging and tapping’’; 0 percent
opacity should not apply to charging
and tapping. The commenter stated the
EPA’s opacity data set did not
adequately demonstrate that a 0 percent
opacity limit could be consistently
achievable across the full spectrum of
expected operating conditions. The
commenter said the vast majority of the
opacity measurements in the data set
were based on measurements taken
during the melting and refining stage of
production (as required under 40 CFR
part 60, subpart AAa), and thus did not
demonstrate that 0 percent opacity had
been consistently achieved during
charging or tapping, which was the
established period with the greatest
potential for uncaptured emissions to
escape the melt shop. The commenter
noted that most EAF steel mills were
designed such that the primary emission
controls (DEC) could not be engaged
while the furnace roof was off during
charging and tapping.
A commenter referenced previous
rulemaking to corroborate their
statements that the EPA did not
consider its own historical information.
One commenter referred to background
documents for earlier NSPS rulings
stating that in those documents, the EPA
concluded that facilities utilizing DEC
were likely to have a visible plume
during charging and tapping and could
not meet 0 percent opacity on a
continuous basis. One commenter
referenced the 1983 rulemaking docket
PO 00000
Frm 00018
Fmt 4701
Sfmt 4700
0.05
0.10
0.10
0.10
0.20
0.20
0.20
0.30
0.30
0.30
0.50
0.80
1.2
0.14
stating it included only 7 hours of shop
opacity data from some portion of the
charging and tapping phase, and that
such limited data from 4 decades ago
was not representative of, or sufficient
to, characterize current melt shop
operations. The commenter said these
previous findings by the EPA contradict
the current proposal that 0 percent
opacity was achievable on a continuous
basis.
A commenter provided confidential
summaries of long-term shop opacity
data from the 13 facilities identified by
the EPA as achieving the 0 percent
standard, and noted that most of the
opacity data was collected only during
melting and refining, and not during
charging and tapping. The commenter
stated their summaries demonstrated
that 0 percent melt shop opacity was not
continuously achieved by the 13 mills
cited as exemplars. The commenter
noted in a reference that they would
readily provide the confidential data to
the EPA upon request.
A commenter stated that the current
design at their facilities included DEC
and a baghouse with a canopy, which
under the proposed rule was considered
the optimal design, yet it appeared the
EPA did not include opacity data from
their facilities in the limited data set.
The commenter noted they fully
complied with current limits in 40 CFR
part 60, subparts AA, AAa, including
opacity; but their facility data showed
that compliance with a 0 percent
opacity limit at all times per the
proposed standard could not be met
continuously due to the production
process variability and the raw material
inputs. The commenter stated it was
possible for the melt shop to experience
an opacity greater than 0 percent during
charging and tapping when the DEC
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
system was disengaged, and there were
other sources of opacity from concurrent
operations (e.g., vacuum tank degasser
operations, the LMF, and the Caster).
A commenter said the EPA in the
proposed rule stated 0 percent opacity
could be achieved utilizing a canopy
over the furnace with an open roof
monitor elsewhere. The commenter
operated its facilities under such a
configuration and did not meet 0
percent opacity on a continuous basis;
thus, the EPA’s data set was flawed and
58459
not representative of the steel
manufacturing operation.
EPA Response: The EPA reviewed the
summary data provided by the
commenter, where for three facilities,
the opacity summary data shown in
Table 6 were provided.
TABLE 6—SMA DATA ON OPACITY FROM THREE FACILITIES
Number
readings >0
percent
opacity
SMA facility No.
1 .......................................................................................................................
ddrumheller on DSK120RN23PROD with RULES2
2 .......................................................................................................................
3 .......................................................................................................................
Although the commenter presented
these data attempting to contradict 0
percent opacity as BSER, the data
actually support the preponderance of
opacity data at 0 percent, since the
number of readings greater than 0
percent were low, ranging from none
(i.e., no readings greater than 0 percent)
to a high of 3.7 percent, out of a total
number of readings ranging from 300 to
2,500.
The EPA’s evaluation of the degree of
emission limitation achievable with the
BSER is not based on an average of all
facility data nor an average of the best
facilities. Rather, the BSER is the best
system of control that the EPA
determines is adequately demonstrated
for EAF in the industry, and the EPA’s
charge under CAA 111(a)(1) and
(b)(1)(B) is to establish a standard of
performance that reflects the degree of
emission limitation achievable by
application of that BSER.
The EPA EAF data, taken mostly from
the 2010 CAA section 114 request,
required ‘‘an aggregate total of 180
minutes of opacity observation
concurrent with PM and/or PM less
than 2.5 micrometers (PM2.5) testing of
EAF primary control devices.’’ The
commenter stated that charging time is
less than 1 minute to 3 minutes per
charge, and tapping is 4 to 6 minutes,
so it is not surprising that most of the
time opacity was measured during
melting and refining.
However, we agree with the
commenter that because the current
EAF NSPS rules in 40 CFR part 60,
subparts AA and AAa only require
opacity measurements during melting
and refining, the data obtained by the
EPA can be assumed to reflect only
operation during melting and refining.
Therefore, while we are retaining 0
percent opacity during melting and
refining in the final rule as in the
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
3
0
11
21
61
proposal, we are reverting back to the
opacity limit of 6 percent opacity for
charging and tapping as in the current
rules in 40 CFR part 60, subparts AA,
AAa.
Additionally, opacity testing during
charging, tapping, and melting, and
refining periods is required in the final
rule. Opacity tests during tapping, and
melting and refining periods should be
able meet the minimum 6 minutes of
total opacity testing required under EPA
Method 9 in 24 consecutive tests for 15
seconds each. However, we are allowing
a modification of EPA Method 9 for
testing during charging because of the
potentially shorter time period that
charging occurs. In the final rule, we are
allowing the EPA Method 9 testing
during charging to be determined from
the average of 12 consecutive
observations recorded at 15-second
intervals for a total of 3 minutes of
opacity testing.
Comment: The commenter asserted
that the EPA did not properly evaluate
the cost of compliance with 0 percent
opacity for a source as a result of
modification.
EPA Response: The commenter was
not specific as to what type of
modification needed to be evaluated for
its costs to comply with the proposed
opacity standards. A modification that
triggers applicability of an NSPS is a
modification that increases emissions
and meets the requirements in 40 CFR
60.14. Without knowing which type of
modification is in question, it is difficult
to compare the costs of compliance and
address the commenter’s concern. A
facility may be adding another baghouse
to accommodate increased production
of the EAF. In this case, the
modification (additional baghouse) is
outside of the melt shop and, therefore,
is not affected by the melt shop
standard. If a facility is modifying an
PO 00000
Frm 00019
Fmt 4701
Sfmt 4700
Total number
opacity
readings
349
296
294
1,482
2,488
Percent >0
percent out
of all
readings
0.9
None
3.7
1.4
2.5
Year of data
2021
2020
2019
2021–2022
2021–2022
EAF to increase production, pursuant to
40 CFR 60.14 (e), an increase in
production rate of the existing EAF is
not considered a modification if that
increase can be accomplished without a
capital expenditure on that facility. The
partial roof canopy determined to be
BSER for the melt shop is a type of
capture device that can be added to any
melt shop. However, the final rule does
not require that a partial roof canopy be
installed to be in compliance with the
opacity standard. Affected sources can
seek other methods to achieve the melt
shop opacity.
Comment: In regard to canopy hood
control costs, a commenter stated the
EPA did not examine advances in
control technologies, process
operations, design or efficiency
improvements, or other systems of
emission reduction, that are ‘‘adequately
demonstrated.’’ Rather, the EPA looked
to a decades-old BID, concluded that
‘‘[c]anopy hoods are a common method
of controlling fugitive EAF emissions,’’
and assessed costs for: adding a partial
roof canopy (segmented canopy hood,
closed roof over furnace, open roof
monitor elsewhere) to collect PM
emissions that might otherwise escape
through the shops to achieve complete
control of melt shop fugitives.
The commenter stated the EPA did
not analyze whether canopy hoods were
used by the 19 facilities that recorded 0
percent opacity during performance
testing or were absent from the 9
facilities that recorded the highest
opacity during performance tests. The
commenter claims that this information
was available to the EPA in the docket
for the 40 CFR part 63, subpart YYYYY
NESHAP for EAF—the same docket that
supplied the majority of the
performance test data the EPA used in
this rule. The commenter further
asserted that the EPA’s own review of
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
58460
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
the survey responses in the 40 CFR part
60, subpart YYYYY docket in June 2005
shows that the EPA knows that canopy
hoods were used to capture fugitive
emissions from 32 of the 38 EAF
described in the CAA section 114
survey responses, and that the presence
or absence of a partial roof canopy did
not determine whether the facilities
responding to the survey could achieve
0 percent opacity. Therefore, the EPA
has no basis to now conclude for
purposes of demonstrating achievability
and cost effectiveness that the singular
act of installing a partial roof canopy
will ‘‘achieve complete control of melt
shop fugitives.’’
A commenter stated the EPA’s
conclusion is also contradicted within
the Agency’s cost analysis. In order to
estimate how much PM is emitted from
a facility that emits 6 percent opacity,
the EPA used the 1982 BID [Electric Arc
Furnaces and Argon-Oxygen
Decarburization Vessels in Steel
Industry—Background Information for
Proposed Standards. Preliminary Draft.
June 1982, Table 3–7 at 3–37; and the
1983 BID (Electric Arc Furnaces and
Argon-Oxygen Decarburization Vessels
in Steel Industry—Background
Information for Proposed Standards.
(EPA–450/3–82–020a) July 1983; Table
3–7 at 3–37] to estimate that EAF emit
an average of 29 lb/ton of uncontrolled
PM emissions. The EPA then relied on
the 1982 [and 1983] BID again to
estimate that facilities emitting 6
percent opacity captured 90 percent of
those emissions using a ‘‘segmented
canopy hood, closed roof over furnace,
open roof monitor elsewhere.’’ This is
the exact fugitive emission capture
technology that the EPA’s Cost Analysis
presumes facilities with greater than 0
percent opacity can install to achieve 0
percent opacity. In other words, the
EPA’s Cost Analysis assumes that
facilities with a ‘‘segmented canopy
hood, closed roof over furnace, open
roof monitor elsewhere’’ are emitting 6
percent opacity and if those facilities
install a ‘‘segmented canopy hood,
closed roof over furnace, open roof
monitor elsewhere’’ they will achieve 0
percent opacity. Commenter stated
because it is arbitrary and unreasonable
to assume that facilities will be able to
achieve 0 percent opacity by doing
nothing more than install the same
systems that facilities already have
installed without reaching 0 percent
opacity, the EPA has failed to provide
a cost estimate rationally related to
reduction of opacity from 6 percent to
0 percent.
EPA Response: Canopy hoods have
been in use for many years in many
industries and are still in use today. The
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
costs to install a partial roof canopy to
enhance control of EAF melt shop
fugitives was taken from relatively
recent rulemakings (2011 through
2018 16) for the Ferroalloys industry,
which also uses EAF. The 1984 EAF BID
was used only to estimate uncontrolled
EAF shop emissions in the proposal
because there is no estimate available of
uncontrolled emissions due to the fact
that most, if not all, EAF facilities,
especially those subject to the EAF
NSPS subparts AA and AAa, have some
type of control of shop emissions, e.g.,
DEC systems; canopy hoods, side draft
hoods, and tapping hoods; partial or
total enclosures; scavenger duct
systems; and building evacuation
systems (72 FR 53818). Even if a total
uncontrolled melt shop could be found,
it is not a typical source test to measure
emissions from a large opening such as
a roof vent or an industrial door, nor
does the EPA generally have the
resources to perform such a test.
If some EAF facilities with canopy
hoods are not achieving 0 percent
opacity, as the commenter alleges, it is
likely because both the NESHAP (40
CFR part 63, subpart YYYYY) and NSPS
standards (40 CFR part 60, subparts AA,
AAa) currently only require 6 percent
opacity limits for EAF and AOD, and
because the standard is higher, they are
only being designed to meet that
standard. Regardless of the fact that
some EAF and AOD facilities may have
been designed this way, they still can be
designed or modified to achieve 100
percent capture to ensure 0 percent
opacity. The fact that some hoods have
not been achieving 100 percent capture
at some facilities is not proof that
canopy hoods cannot be used to do so
for new, modified, or reconstructed
sources. The commenter fails to provide
a technical basis for why canopy hoods
cannot be designed to achieve 0 percent
melt shop opacity.
Out of 31 EAF facilities in the EPA
EAF dataset with opacity data, 13
facilities achieved 0.000 percent shop
opacity. Two additional facilities
achieved 0.00 percent shop opacity, and
another 4 facilities achieved 0.0 percent,
for a total of 19 facilities able to comply
with a 0 percent shop standard. Out of
the total 31 facilities in the EPA EAF
data, only 1 facility had shop opacity
greater than 1 percent as an average of
all runs in the test, with the average of
all 31 facilities at 0.14 percent opacity
(a value that would round down to 0
percent under the NSPS). See the
16 See https://www.epa.gov/stationary-sourcesair-pollution/ferromanganese-and-silicomanganeseproduction-national-emission for information
regarding Ferroalloys rules.
PO 00000
Frm 00020
Fmt 4701
Sfmt 4700
‘‘Emissions Memorandum,’’ discussed
earlier in this section, for more
information about these data.
The addition of a canopy hood or
alteration of existing hoods to achieve
slightly better capture is within reach by
a facility achieving less than 1 percent
opacity but greater than 0 percent. The
scenario of installation of a canopy hood
in the melt shop is used in the cost
analysis to represent one method that is
lower in cost and can be used to achieve
the standard of performance if an
existing source that is not currently
achieving 0 percent melt shop opacity
were to modify or reconstruct and
become an affected facility under 40
CFR 60, subpart AAb.
Comment: A commenter stated melt
shop partitions of the size necessary to
meaningfully contain EAF emissions
within the melt shop are not feasible in
many mills given other equipment and
shop design, including cranes. In
particular, sizable partition walls are not
feasible at many EAF steel mills because
they will interfere with overhead cranes
that transport scrap metal to the furnace.
Similarly, transfer ladles that are carried
by crane to and from the furnace for
tapping molten metal would be blocked
by partition walls.
The commenter said for existing
facilities that may trigger an NSPS
modification in the future, achieving 0
percent shop opacity would require
extensive re-engineering that would be
costly and introduce practical and
worker safety concerns as well. For
example, one [trade] association
member stated that 0 percent shop
opacity could only be achieved, if at all,
with near total enclosure of the EAF and
doubling the flow rate of the emission
control system. The commenter stated
that only very short (and therefore
marginally effective) partition walls
could be installed above the crane
because of the lack of space between the
crane and the roof. They also noted that
such short partitions deteriorated
quickly due to the heat and other
elements. Thus, to increase the size and
collection efficiency to meet a 0 percent
opacity requirement, the facility would
have to raise the roof of the structure at
an undetermined cost (a cost that likely
would trigger a ‘‘major modification’’),
and potentially enclose the entire
monovent, which would likely create
worker safety and heat stress issues.
The commenter added, facilities
would have to increase the number and
volume of fans to the baghouse, as well
as require new or additional fans in the
shop and additional baghouses because
the facility’s current baghouses are
operating at close to maximum capacity.
Moreover, for servicing, cranes have to
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
be moved to a different part of the melt
shop due to the partitions being so close
to the top of the cranes. To achieve
compliance, existing facilities such as
these also would have to enclose the
large openings in the casting area to
prevent winds from blowing through the
shop or wall off the EAF operations.
Neither option is feasible; melt shops
are typically long buildings with EAF,
LMS, and casting in the same structure.
EPA Response: The cost analysis for
new, modified, or reconstructed EAF to
achieve 0 percent opacity is based on a
‘‘partial’’ canopy hood and not
‘‘partition walls,’’ as the commenter
suggests, that would interfere with
overhead cranes. In regard to the
comment that ‘‘costly and impractical
re-engineering to achieve 0 percent shop
opacity that could only be achieved, if
at all, with near total enclosure of the
EAF that doubles the flow rate of the
emission control system,’’ there are 19
EAF facilities in the EPA EAF dataset
that demonstrated with data from 2010
that they were capable of complying
with a 0 percent melt shop opacity
standard (which we assumed was
during melting and refining) and,
therefore, belie this concern. And
because only 1 facility among the 31
facilities in the EPA EAF dataset had
shop opacity greater than 1 percent as
an average of all runs in the test, the
addition of a canopy hood may be
unnecessary and only alteration of the
operation of existing hoods may be
needed to achieve slightly better capture
to achieve 0 percent melt shop opacity
during melting and refining. This shows
that meeting a new NSPS standard of 0
percent melt shop opacity during
melting and refining is within reach by
most if not all existing EAF facilities, so
is even more likely achievable in any
new facility.
In actuality, it is not likely that all
current EAF facilities in the industry
will need to comply with 40 CFR part
60, subpart AAb, which would only be
applicable to new EAF facilities or, for
existing facilities, if the result of any
future modifications or reconstruction
increased emissions and met the
provisions in 40 CFR 60.14 for
modifications and 40 CFR 60.15 for
reconstruction, respectively.17 Whether
or not the modification or
reconstruction planned at the facility
would also trigger permitting
requirements because it is a ‘‘major’’
17 Note that modifications pursuant to CAA
section 111 need not be ‘‘major’’ to trigger
application of the NSPS. Rather, a modification
under CAA section 111(a)(4) is defined as a
physical change in, or change in the method of
operation of, a stationary source which results in
any increase in emissions. See also 40 CFR 60.14.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
modification under the permitting
regulations is not relevant to the EPA’s
determination of the BSER. Moreover,
the EPA does not agree that it is likely
that the construction of the canopy will
itself be considered a major
modification that triggers permitting
requirements. The issue here is whether
to meet the revised limit an existing
source that modifies needs to raise the
roof structure to install equipment to
meet the standard. The EPA response to
this issue is that it is not required to
raise the roof structure so as to be able
to install equipment, and we have no
knowledge (and the commenter has not
provided information showing) that
raising the melt shop roof has ever
having been done to meet a lower
opacity, such as 0 percent.
3. What is the rationale for the final
BSER determination and what is the
final standard of performance?
We established in the proposal (87 FR
29717–29718) that the use of a canopy
hood above the crane rails, while not
required to achieve 0 percent melt shop
opacity during melting and refining, is
a cost-effective method that can be used
to do so, with cost effectiveness
estimated at $1,700 per ton PM removed
in $2022 for a medium-sized facility,
annual costs of the canopy, at $1.1
million per year, and with PM reduction
of 684 tpy at a medium facility
achieving 0 percent melt shop opacity
during melting and refining and 6
percent during charging and tapping, as
compared to 6 percent opacity at all
times. Analyses performed for small and
large EAF melt shops produced similar
cost-effectiveness values, at $1,800 per
ton PM removed and $1,700 per ton PM
removed, respectively. The values of
$1,800 per ton or less are considered
cost effective and, therefore, the use of
additional canopy hoods above the
crane rails is considered BSER for melt
shop opacity for new EAF/AOD using
this approach. (See section III.A.1.a of
this preamble).
The performance data obtained by the
EPA for 31 facilities show that 13
facilities achieved 0 percent opacity
during melting and refining and the
other 17 achieved very low values of
opacity so that the overall average melt
shop opacity from all 31 facilities was
0.14 percent. Therefore, considering that
the costs are achievable even without
the addition of a canopy hood, we
conclude the 0 percent opacity is the
standard of performance that reflects the
degree of emission limitation achievable
with application of the BSER for melting
and refining.
We also concluded that full enclosure
is not needed to achieve 0 percent melt
PO 00000
Frm 00021
Fmt 4701
Sfmt 4700
58461
shop opacity during melting and
refining. The EPA acknowledges that
facilities need sufficient capture
ventilation to collect melt shop PM
emitted as fugitives, but this does not
necessarily require a fully enclosed melt
shop, as seen in the data from EAF
facilities in 2010 test reports obtained
by the EPA where 0 percent opacity was
achieved.
Because we do not have sufficient
data to show that 0 percent melt shop
opacity is achievable during charging
and tapping to refute industry’s
assertion that 0 percent melt shop
opacity is not achievable during
charging and tapping, nor are these data
likely available anywhere else, the final
rule retains the current 6 percent NSPS
limit for charging and tapping in 40 CFR
part 60, subparts AA, AAa, and adds to
the final rule for 40 CFR part 60, subpart
AAb a testing requirement during these
periods along with the requirement to
test during melting and refining that is
already required for facilities in
operation on or before May 16, 2022.
Note that the test method protocol for
measuring opacity during charging has
been modified for the final rule, as
discussed in section V.B.1 of this
preamble.
4. Are there any relevant energy impacts
or nonair quality health and
environmental impacts of the selection
of the final BSER for melt shop opacity
and, if so, how were the final emission
limitations based on the BSER affected?
There are no relevant energy impacts
or nonair quality health and significant
environmental impacts of the final
BSER for melt shop opacity. These
issues are discussed in detail in sections
V.A and V.B of this preamble. No
comments were received on these
issues.
C. NSPS Requirements for Opacity From
Control Devices and Dust Handling for
Electric Arc Furnaces and ArgonOxygen Decarburization Vessels
Constructed After May 16, 2022
We proposed to retain the BSER
determinations for proper operation of
control devices and proper dust
handling procedures from NSPS subpart
AAa in NSPS subpart AAb as well as
the limitations of 3 percent and 10
percent opacity limits from control
devices and dust handling, respectively.
No comments were received on this
subject. Similarly, we are finalizing the
requirement for opacity from control
devices and dust handling in NSPS
subpart AAb, as proposed.
E:\FR\FM\25AUR2.SGM
25AUR2
58462
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ddrumheller on DSK120RN23PROD with RULES2
D. Startup, Shutdown, Malfunction
Requirements for Electric Arc Furnaces
and Argon-Oxygen Decarburization
Vessels Modified, Reconstructed, or
Constructed After May 16, 2022
Consistent with Sierra Club v. EPA,
551 F.3d 1019 (D.C. Cir. 2008), the EPA
has established standards in 40 CFR 60
subpart AAb that apply at all times. We
also are finalizing in 40 CFR 60 subpart
AAb specific requirements at 40 CFR
60.272b(c) that override the general
provisions for SSM requirements. In
finalizing the standards in this rule, the
EPA has taken into account startup and
shutdown periods and, for the reasons
explained in section IV.D.2 of this
preamble has not finalized alternate
standards for those periods.
Periods of startup, normal operations,
and shutdown are all predictable and
routine aspects of a source’s operations.
Malfunctions, in contrast, are neither
predictable nor routine. Instead, they
are, by definition, sudden, infrequent,
and not reasonably preventable failures
of emissions control, process, or
monitoring equipment (40 CFR 60.2).
The EPA interprets CAA section 111 as
not requiring emissions that occur
during periods of malfunction to be
factored into development of CAA
section 111 standards. Nothing in CAA
section 111 or in case law requires that
the EPA consider malfunctions when
determining what standards of
performance reflect the degree of
emission limitation achievable through
‘‘the application of the best system of
emission reduction’’ that the EPA
determines is adequately demonstrated.
While the EPA accounts for variability
in setting emissions standards, nothing
in CAA section 111 requires the Agency
to consider malfunctions as part of that
analysis. The EPA is not required to
treat a malfunction in the same manner
as the type of variation in performance
that occurs during routine operations of
a source. A malfunction is a failure of
the source to perform in a ‘‘normal or
usual manner’’ and no statutory
language compels the EPA to consider
such events in setting CAA section 111
standards of performance. The EPA’s
approach to malfunctions in the
analogous circumstances (setting
‘‘achievable’’ standards under CAA
section 112) has been upheld as
reasonable by the D.C. Circuit in U.S.
Sugar Corp. v. EPA, 830 F.3d 579, 606–
610 (2016).
1. What did we propose as the BSER
determination and standard of
performance?
Consistent with Sierra Club v. EPA,
551 F.3d 1019 (D.C. Cir. 2008), the EPA
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
proposed that the PM and opacity
standards in 40 CFR subpart AAb apply
at all times. We also proposed in 40 CFR
part 60, subpart AAb specific
requirements at 40 CFR 60.272b(c) that
override the general provisions
exemptions during SSM periods.
2. What significant comments did we
receive and what are our responses?
Comment: A commenter asserted that
the EPA must provide work practice
standards if the EPA removes SSM
exemptions. Subjecting SSM periods to
the same limit as those during normal
operations was not adequately
demonstrated as required per CAA
section 111(a)(1) and was not provided
in the docket prior to promulgation as
per CAA section 307(d). The dataset of
stack tests from 33 facilities did not
include adequate testing to demonstrate
that SSM periods consistently met the
limits proposed in 40 CFR part 60,
subpart AAb. These stack tests were not
conducted during SSM periods, and as
such could not provide a basis for
concluding that emissions during
shutdown and startup could comply
with the proposed limits. The
commenter asserts that, if the EPA
cannot show that compliance with a
numerical limit was adequately
demonstrated during periods of SSM,
and provide that data in the record, then
the EPA does not have the legal
authority under CAA section 111 to
subject those emissions to such a
standard.
EPA Response: Consistent with Sierra
Club v. EPA, this action will ensure that
the PM and opacity standards in EAF
NSPS 40 CFR 60, subpart AAb apply at
all times, including during periods of
startup and shutdown. Because Sierra
Club v. EPA established that emissions
standards or limitations must be
continuous in nature, the EPA must
determine what standard will apply
during periods of SSM. Moreover, CAA
section 111(h)(1) provides that the EPA
may only provide for work practice
standards when the Administrator
determines that it is not feasible to
prescribe or enforce a numerical work
practice standard. We have determined
that the numerical standards in EAF
NSPS 40 CFR 60 subpart AAb are
appropriate as EAF and AOD facilities
can comply with the standards during
startup and shutdown because the
control devices are the same during
startup and shutdown as in normal
operation and would provide the same
protection to PM emissions, both for PM
from the control devices as well as
opacity from melt shop, control devices,
and dust handling. In regard to the 0
percent melt shop opacity standard, this
PO 00000
Frm 00022
Fmt 4701
Sfmt 4700
standard in 40 CFR part 60, subpart
AAb only applies during melting and
refining; startup or shutdown does not
fall under the operational description of
melting and refining. A opacity standard
of 6 percent would apply at all other
times.
While commenters argue that the EPA
must provide work practice standards,
the commenters have not provided
information showing that compliance
with the numerical emission limitations
is not possible during startup and
shutdown events and that, therefore, the
EPA’s determination to apply the PM
and opacity standards at all times would
be inappropriate. In addition to the
standards applying at all times, sources
will need to comply with the CAA
section 111 general provisions, which
include ‘‘general duty’’ requirements in
40 CFR 60.11(d) to operate ‘‘in a manner
consistent with good air pollution
control practice for minimizing
emissions.’’ These provisions apply at
all times, including during startup and
shutdown, as well as during
malfunctions.
Comment: A commenter stated if a 0
percent opacity standard for melt shop
emissions at all times was implemented,
the EPA must exclude periods of
malfunctions and upset conditions. The
commenter explained that malfunctions
have occurred during the melting and
casting operations that required
extraordinary measures for corrective
action, such as a ‘‘breakout.’’ In an
extremely dangerous situation,
breakouts occurred when molten steel
escaped from one or more mold strands
at the caster or during casting. The
commenter stated after a breakout and
subsequent corrective action, emissions
were generated and may exit the melt
shop, and those emissions should not be
considered in determining compliance
with the 0 percent opacity melt shop
requirement. The commenter said the
EPA’s proposed approach lacked an
understanding of the significant
dangers, risks, and related emissions
associated with ‘‘breakouts’’ and other
malfunction events that occur during
the steelmaking processes, and the EPA
should reconsider the 0 percent melt
shop opacity standard.
EPA Response: The EPA disagrees
with the commenter that emissions
during a malfunction are not
appropriately subject to the standard.
Malfunctions that cause exceedances of
any part of a rule are considered a
violation under the NSPS and are a
compliance issue that is relegated to the
EPA’s enforcement office. Facilities
should document the circumstances of
the malfunction so as to be able to
discuss the special circumstances of the
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
event with the EPA’s enforcement
officer. It is not the purpose of the BSER
to take into account unpredictable,
sudden, infrequent events such as what
is described by the commenter. We also
note that casting is not part of the EAF
NSPS source category.
E. Testing and Monitoring Requirements
for Electric Arc Furnaces and ArgonOxygen Decarburization Vessels
ddrumheller on DSK120RN23PROD with RULES2
1. What did we propose for testing and
monitoring?
From the EPA review of the current
NSPS’s testing and monitoring
requirements in 40 CFR part 60, subpart
AAa, we evaluated and determined the
testing, monitoring, recordkeeping and
reporting requirements needed to be
clarified and revised’’ to ensure
compliance with the emission
standards, considering that the NSPS
reflect BSER under conditions of proper
operation and maintenance.
Consequently, we proposed changes to
testing and monitoring in 40 CFR part
60, subparts AA and AAa, and also
incorporated some of these
requirements along with additional
requirements into new 40 CFR part 60,
subpart AAb.
Specifically, we proposed
amendments to clarify, correct, or refine
the rule requirements to enhance
compliance and enforcement with 40
CFR part 60, sections 60.271 and
60.271a ‘‘Definitions’’, 60.272 and
60.272a ‘‘Standard for particulate
matter’’, 60.273 and 60.273a ‘‘Emission
monitoring’’, 60.274a ‘‘Monitoring of
operations’’, 60.275a ‘‘Test methods and
procedures’’, and 60.276a
‘‘Recordkeeping and reporting
requirements.’’
In addition, we proposed that sources
complying with 40 CFR part 60, subpart
AAb would be required to perform
compliance testing every 5 years after
the initial testing performed upon
startup, as required under 40 CFR 60.8.
This requirement for periodic testing
already is required in many of the
permits for existing EAF in both the
EPA’s EAF dataset and in the industry,
and is a standard requirement for testing
of other sources of PM emissions in
many other industrial sectors.
We also solicited in the proposal for
comments or data and other relevant
information on whether the EPA should
change the allotted time to both find
and fix the cause of a BLDS alarm from
3 hours to a longer timeframe (e.g., 24
hours as in other rules), or some other
duration.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
2. What significant comments did we
receive on testing and monitoring and
what are our responses?
Comment: The commenter said
facilities should be allowed 24 hours to
respond to BLDS alarms and to
complete the response as soon as
practical in 40 CFR part 60, subparts
AA, AAa, and AAb. The commenter
disagreed with the proposed 40 CFR
part 60, subpart AAb provisions that
would require facilities to determine the
cause of all BLDS alarms within 1 hour
and alleviate the cause of the alarm
within 3 hours by taking the necessary
response action. The commenter
recommended the EPA adopt a 24-hour
timeframe to initiate corrective action
and to require that response actions be
completed as soon as practicable. This
approach would recognize the practical
realities in identifying and responding
to BLDS alarms. The commenter added
that this approach is the same as that
used in the Integrated Iron and Steel
NESHAP, and is consistent with 40 CFR
part 63, subparts X (NESHAP for
Secondary Lead Smelting), DDD
(NESHAP for Mineral Wool Production),
EEE (NESHAP from Hazardous Waste
Combustors), MMM (NESHAP for
Pesticide Active Ingredient Production),
RRR (NESHAP for Secondary
Aluminum Production), and TTT
(NESHAP for Primary Lead Smelting).
The commenter said there was no
justification for the proposal to be
different from other existing rules. The
commenter added that the proposed 3hour time period was arbitrary and
ignored the numerous scenarios in
which it can take longer than 3 hours to
identify and fix the cause of an alarm.
Allowing facilities 24 hours to identify
the cause and requiring facilities to
alleviate the cause of the alarm ‘‘as soon
as practicable’’ is more practical,
particularly where many baghouse
compartments must be inspected to
determine the cause of an alarm.
The commenter noted that there are
situations in which more than 3 hours
is needed to respond to a BLDS alarm
and address its cause. Because many
mills calibrate their BLDS to be very
sensitive, the likelihood that a BLDS
alarm will be falsely triggered is
increased. The commenter included the
following examples of situations in
which false alarms can occur:
• Weather. BLDS alarms will
occasionally trigger during a heavy
downpour or when there are significant
changes in temperature or humidity.
• Bag Cleaning Cycle. BLDS alarm
may trigger at the end of the baghouse
cleaning cycle due to the temporary
absence of dust in the bags.
PO 00000
Frm 00023
Fmt 4701
Sfmt 4700
58463
• New Bag Start. BLDS alarms can be
triggered following a replacement of
some or all of the bags in the baghouse.
• Systems Checks/Testing. Some
facilities may run systems checks on
their BLDS that cause the system to
alarm. For example, a facility may check
the sensitivity of a BLDS by introducing
a handful of flour into a port upstream
from the probe. Facilities also evaluate
and optimize their BLDS performance
through drift checks, response tests,
calibration exercises, and other quality
assurance procedures. Some of these
procedures require the alarm to be
triggered in order to test performance,
but in other instances the BLDS alarm
may be inadvertently triggered during
testing.
• Electrical Malfunctions. As BLDS
detection is based on contact
electrification, alarms can be triggered
due to electrical surges impacting the
sensors, processing electronics, or the
connections between the sensor and
processing electronics. These surges can
either be environmental (lightning) or
from variations/malfunctions in the
BLDS system, its software, or its power
source. Additionally, the abrasive
environment in the baghouse duct can
deteriorate the BLDS probe, probe
housing, and housing insulation, which
can cause an increase in malfunctions.
BLDS alarms may be triggered during
temporary power lapses or brief
connectivity issues between the sensor
and the processing electrics, or between
the processing electronics and the
system output/alarm. The BLDS can
experience brief mechanical or software
glitches/errors, including with respect
to the sensor’s signal amplification or
with the configuration of the processing
electronics.
• Repair/Maintenance. Some
baghouse repair and maintenance
activities may be conducted while the
baghouse is in operation. In some of
these cases, proper inspection and
repair requires the baghouse to be
operating in order to observe and repair
malfunctions/maintenance issues. Often
these activities are coordinated with a
baghouse operator observing the BLDS
readout in real time in order to identify
the cause of an earlier alarm or to
proactively identify maintenance or
performance issues. Baghouse repair
and maintenance activities sometimes
must be conducted when the baghouse
is operating because the repair/
maintenance is urgently needed, and it
is infeasible to quickly shut down the
baghouse. These activities will cause
BLDS alarms to trigger. Work on
baghouse compartments and
conveyances can introduce particulates
into the system or dislodge caked or
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
58464
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
accumulated dust which triggers alarms.
Sounding of BLDS alarms also can be
caused by maintenance and repair
activities conducted when the baghouse
is not operating. These activities can
introduce foreign material or dislodge
accumulations of material from ducts,
conveyances, access panels, joints, and
other components of the system
upstream from the probe. Then when
the baghouse is restarted, the newly
introduced or dislodged material can
cause the BLDS alarm to be triggered.
The commenter pointed out that it is
possible for a baghouse to operate
within its emission and opacity limits
even if the cause of a BLDS alarm is not
identified and corrective measures
taken. For example, if a broken bag in
a compartment causes an alarm, the
compartment can be isolated and shut
down without affecting the rest of the
baghouse. The commenter noted that
determining the cause of the alarm often
requires operators to undertake a multistep troubleshooting process of
elimination requiring multiple rounds
of physical inspections and diagnostic
efforts. This process of elimination often
requires more than 3 hours to complete.
The process can be very timeconsuming, particularly when the BLDS
alarm lasts only a short time. Identifying
the cause of a brief BLDS alarm, the
commenter said, can be very difficult
and sometimes proves impossible. Some
baghouses in the EAF industry have 25
or more compartments housing 5,000 or
more individual bags. Some mills do not
have BLDS with detection capability in
each separate compartment because the
baghouse design does not allow for such
monitoring (e.g., multiple compartments
sharing common exit plenum). In these
instances, mills must continue running
and sequentially isolate compartments
to determine which compartment may
have caused the BLDS alarm. Facilities
must then physically examine the
compartment(s), which may contain 150
or more individual bags. If a bag has a
significant rupture or has been
dislodged, the cause of the alarm will
likely be readily apparent. However,
some alarms can be triggered by
extremely small holes in bags and, in
these cases, finding the leak by physical
inspection can take a long time.
The commenter said that EAF mills
can have difficulty responding to
multiple, intermittent alarms of short
duration. The commenter noted that
EAF facilities record the alarm as
resolved where investigation shows no
evidence of a bag leak. While the facility
may be able to respond to each separate
alarm in under 3 hours, the commenter
said they are aware of one instance in
which an enforcement authority
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
determined the company was in
violation of the 3-hour response
requirement because the total time the
facility spent responding to each of the
separate intermittent alarms exceeded 3
hours. The commenter said the
enforcement authority misinterpreted
the 3-hour response requirement. This
example was provided to show how a 3hour response requirement presents a
compliance risk even when individual
responses are completed within the 3hour window. The commenter
recommended the following additions
be made to 40 CFR 60.273(f) in all three
rules in regard to the leak monitors to
clarify false alarm situations.
The commenter recommended adding
to the requirements in 40 CFR
60.273(f)), 60.273a(f)), and 60.273b(f))
that begin with: ‘‘Establishing to the
extent acceptable by the delegated
authority that the alarm was a false
alarm and not caused by a bag leak or
other malfunction that could reasonably
result in excess PM emissions,’’ the
phrase ‘‘in which case alarms due to the
monitor malfunctioning are not subject
to the [24-hour] response action
requirement, as long as the [leak]
monitor malfunction is timely
corrected.’’
The commenter recommended adding
to the requirements in 40 CFR
60.273(f)), 60.273a(f)), and 60.273b(f))
that begin with: ‘‘Shutting down the
process producing the PM emissions,’’
the phrase ‘‘provided that shutting
down the process unit is not required if
an operator reasonably believes
repetitive alarms are the result of a
[leak] monitor malfunction, and the
monitor malfunction is timely
repaired.’’
EPA Response: We appreciate the
details provided by the commenters to
explain the reasons why a 24-hour
response to BLDS alarms is warranted
based on technical issues that EAF
facility operators face and also why a
24-hour response is justified based on
other similar rules that allow a 24-hour
response. In light of the rationale
provided, we are including the 24-hour
response in the revisions to 40 CFR part
60, subparts AA, AAa, and AAb,
effective upon promulgation.
In regard to the specific language the
commenter suggests including in the
rules in 40 CFR 60.273(f)), 60.273a(f)),
and 60.273b(f)), the list of potential
response actions are not to be taken as
exclusive, i.e., the responses listed have
the caveat that ‘‘response actions may
include, but are not limited to, the
following, etc.’’ The commenter’s
suggested changes for 40 CFR 60.273(f)
in all 3 rules are redundant within the
existing and proposed rules because the
PO 00000
Frm 00024
Fmt 4701
Sfmt 4700
phrase ‘‘not caused by . . . . . other
malfunction that could reasonably result
in excess PM emissions’’ already covers
leak monitor malfunction. This is the
same issue for 40 CFR 60.273(f) in all 3
rules, where a shutdown is just one
option for a response action and not a
required action. In all 3 rules in 40 CFR
60.273(f), fixing the leak monitor is the
appropriate response action if that is
determined to be the cause of the alarm.
However, along with changing the
response time to 24 hours, we have
added a specific item in all three EAF
rules in 40 CFR 60.273(f) to make it
clear that leak monitor malfunction
could be the cause, as follows:
‘‘Establishing to the extent acceptable by
the delegated authority that the alarm
was a false alarm caused by a
malfunctioning monitor and not caused
by excess PM emissions.’’
Comment: A commenter asserted that
the current compliance demonstration
requirements using the fan amperage
and damper position monitoring in 40
CFR part 60, subparts AA, AAa are the
best methods for assuring compliance
with the melt shop NSPS standards. A
commenter asserted that the existing fan
amperage and damper position
monitoring in combination with opacity
observations are the best methods of
assuring compliance with the NSPS
standards for the melt shop. The
commenter opposed the proposed new
monitoring requirements for 40 CFR
part 60, subparts AA and AAa that
included:
• Installation of BLDS on all
baghouses, including multi-stack
baghouses;
• Monitoring and operational
restriction for furnace static pressure
monitoring based on 15-minute averages
on all EAF;
• Monitoring and operational
restriction for volumetric flow rate or
static pressure at each separately-ducted
hood, based on 15-minute averages on
all EAF;
• Removal of the option for
monitoring and operational restriction
for fan amps;
• Adding inspections and
maintenance requirements for holes or
other openings in the melt shop
building; and
• Mandate for shop opacity
observations to be made during charging
and tapping or during the period of the
heat cycle that generates the greatest
uncaptured emissions.
The commenter considered these new
monitoring requirements to be
unnecessary, expensive, and, in some
cases, impractical. The commenter said
the existing monitoring requirements in
40 CFR part 60, subparts AA and AAa
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
are adequate for demonstrating
compliance with the standards. The
commenter stated that the existing fan
amperage and damper position
monitoring have worked efficiently and
effectively for many years and the
proposed new monitoring would be less
effective and would impose ‘‘. . .
extreme technical and engineering
complications’’ on EAF plants.
Similarly, the commenter urged the
EPA to keep the current requirement in
40 CFR part 60, subparts AA, AAa for
monitoring fan amperage in place,
because they said this parameter
directly correlates to the air flow to the
control device, via the fan curve, unique
to each site.
EPA Response: The responses to
BLDS monitoring requirements, damper
position, fan amperage, furnace static
pressure, melt shop inspection, melt
shop opacity, and volumetric flow and
static pressure follow here.
• BLDS Response. We proposed the
BLDS monitoring requirement for all
baghouses in 40 CFR part 60, subparts
AA, AAa, and AAb because BLDS
provides better information about EAF
baghouse operation and compliance
assurance for the PM emission and stack
opacity limits than what is currently
required in 40 CFR part 60, subparts AA
and AAa, and because BLDS monitoring
at all baghouses is technically feasible.
Currently, as an alternative to COMs,
single-stack baghouses are required to
install a BLDS and perform EPA Method
9 visible emissions at the stack, whereas
modular, multi-stack, negative-pressure
or positive-pressure fabric filters are
only required to conduct EPA Method 9
visible emissions monitoring. We agree
with the commenter that the proposed
change to require all types of baghouses
to have BLDS should not be made as a
correction in 40 CFR part 60, subparts
AA and AAa, nor included in 40 CFR
part 60, subpart AAb for all types of
baghouses. Therefore, because using
BLDS at all baghouses would involve
the purchase of equipment not currently
installed at facilities not using singlestack baghouses, this requirement is not
included in the final rules for 40 CFR
part 60, subparts AA and AAa. For 40
CFR part 60, subpart AAb, because for
existing facilities that modify or
reconstruct, requiring BLDS at
baghouses other than those with single
stacks would involve the purchase of
equipment not currently installed at
these facilities, the BLDS requirement is
included in the final rule for 40 CFR
part 60, subpart AAb only for single
stack baghouses. For new sources, the
BLDS requirement is included in the
final rule for 40 CFR part 60, subpart
AAb, only for single stack baghouses
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
because using BLDS on multi-stack
baghouses is not demonstrated in the
EAF industry due to the high capital
cost. Multi-stack baghouses in the EAF
industry have vents rather than stacks,
are operated at positive pressure, and
not amenable to leak detection systems.
• Damper Position Response. We
proposed changes to the monitoring
frequency of damper position in 40 CFR
part 60, subparts AA and AAa, and
included these proposed changes in 40
CFR part 60, subpart AAb, because of
the variability of this parameter during
a furnace cycle. As damper position is
expected to change during the heat
cycle, a once-per-shift monitoring and
recordkeeping event fails to provide
both the facility and regulatory agencies
with the ability to determine if the
emissions capture system is being
properly operated. Damper position
records are intended to be used as a way
to evaluate how the total flow (using
amperage as surrogate for flow) is
partitioned between the separately
ducted hoods. Therefore, increasing the
recording of damper position provides a
more accurate assessment of the capture
system throughout a heat cycle.
Facilities are already required to record
all damper positions during
performance testing to demonstrate
compliance pursuant to 40 CFR
60.274(c) and 60.274a(c). We disagree
with the commenter that this change
should not be made as a correction.
Therefore, for the reasons explained at
proposal, the final rules for 40 CFR part
60, subparts AA, AAa, and AAb include
the requirement for damper position
recording and frequency during
operation in a manner and frequency
consistent with damper position records
during the initial or most recent
performance test demonstrating
compliance with applicable PM
standards; and for 40 CFR part 60,
subpart AAb, only if damper position
data were recorded throughout a
complete heat cycle. See 40 CFR
60.274(c)(1) and (i)(5), 60. 274a(c)(1)
and (h)(5), and 60.274b(c)(1) and (h)(5).
Compliance with this clarified aspect of
the rule is required 180 days from the
effective date of the final rule
amendments for facilities complying
with 40 CFR part 60, subparts AA and
AAa, the same as the requirement for
electronic reporting; and no later than
the effective date of the final rule or
upon startup, whichever is later, for
facilities subject to 40 CFR part 60,
subpart AAb.
• Fan Amperage Response. The EPA
proposed deleting the monitoring of fan
amps on a once-per-shift basis as a
surrogate for volumetric flow from at 40
CFR 60.274(b)/60.274a(b) for 40 CFR
PO 00000
Frm 00025
Fmt 4701
Sfmt 4700
58465
part 60, subparts AA and AAa due to
the increased use of variable speed fans
in the industry. Based on comments
provided in response to the proposed
change, the EPA agrees with the
commenter that fan amperage
monitoring should be able to be used as
a surrogate for volumetric flow.
However, the EPA believes this
surrogate can only be allowed under
some conditions. To maintain
consistency with the original intent of
the requirement to record fan amperage
in 40 CFR part 60, subpart AAa, in the
final rules for 40 CFR part 60, subparts
AA, AAa, and AAb, fan amperage
monitoring can be used as a surrogate
for volumetric flow when recorded on a
more frequent basis than once-per-shift.
The EPA is promulgating for 40 CFR
part 60, subparts AA, AAa, and AAb,
the requirement for monitoring and
recording of fan amperage as frequently
as damper position measurement, i.e., in
a manner and frequency consistent with
damper position records during the
initial or most recent performance test
demonstrating compliance with
applicable PM standards so that the
amperage data provide information that
is proportional to volumetric flow in 40
CFR 60.274(c))1) and (i)(5); 60.274(c)(1)
and (h)(5); and 60.274b(c)(1)(h)(5).
Compliance with this clarified aspect of
the rule is required 180 days from the
effective date of the final rule
amendments for facilities complying
with 40 CFR part 60, subparts AA and
AAa, the same as the requirement for
electronic reporting and no later than
the effective date of the final rule or
upon startup, whichever is later, for
facilities subject to 40 CFR part 60,
subpart AAb.
• Furnace Static Pressure Response.
We proposed the requirement for
monitoring and operational restriction
for furnace static pressure monitoring
for 40 CFR part 60, subparts AA, AAa,
and AAb based on 15-minute averages
on all EAF because it provides better
information about emissions capture at
the EAF and compliance assurance with
melt shop opacity requirements at 40
CFR 60.272(a)(3), 60.272a(a)(3), and 40
CFR 60.272b(a)(3) than what is currently
required in 40 CFR part 60, subparts AA
and AAa. Currently, a furnace static
pressure monitoring device is not
required if the facility conducts daily
shop opacity readings. If a facility elects
to use furnace static pressure
monitoring for compliance, furnace
static pressure is only monitored once
per shift in 40 CFR part 60, subparts AA
and AAa (see 40 CFR 60.273(d)/
60.273a(d) and 40 CFR 60.273(d)/
60.274a(b)). The EPA proposed
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
58466
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
requiring continuous monitoring of
furnace static pressure because it would
provide information about capture at the
EAF on a more frequent basis and
because many facilities already use this
equipment. Because using this
monitoring method/compliance option
would involve the purchase of
equipment not currently available or
installed at all subject facilities, we
agree with the commenter that this
change should not be made as a
correction nor included in 40 CFR part
60, subparts AA, AAa, and AAb.
Therefore, this requirement for 40 CFR
part 60, subparts AA, AAa, and AAb is
not included in the final rules.
In response to comments regarding
proposed averaging periods of 15
minutes for furnace static pressure, the
EPA has modified the averaging period
language in the final rule for 40 CFR
part 60, subparts AA, AAa, and AAb (40
CFR 60.274(f), 60.274a(f), and
60.274b(f)) to be ‘‘no greater than 15
minutes.’’ This modification allows
greater flexibility for establishing
monitoring setpoints to capture the
variability during short periods that are
much less than 15 minutes.
• Melt Shop Inspection Response. We
proposed a clarification that the melt
shop be inspected for holes or other
openings that would allow particulate
matter to escape for 40 CFR part 60,
subparts AA, AAa, and included in 40
CFR part 60, AAb, because this
procedure provides compliance
assurance with melt shop opacity
requirements, and is better than what is
currently required at 40 CFR
60.272(a)(3)/60.272a(a)(3). Currently,
inspections are required for equipment
important to the performance of the
capture system at 40 CFR 60.274(e)/
60.274a(d), which specifies that
inspections must include observations
of physical appearance of the
equipment. We disagree with the
commenter that changes to 40 CFR part
60, subparts AA and AAa, should not be
made as a correction because we
understand that the melt shop building
itself acts as a portion of the capture
system particularly during charging and
tapping. Since this inspection would
not involve the purchase of equipment
not currently available or installed at
the facility and arguably is already
addressed under the current
requirement for inspections, the
clarification that inspection for holes or
other openings in the melt shop
building is part of the capture system
inspection is included in the final rules
for 40 CFR part 60, subparts AA, AAa,
and AAb. Compliance with this clarified
aspect of the rule is required 180 days
from the effective date of the final rule
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
amendments for facilities complying
with 40 CFR part 60, subparts AA and
AAa, the same as the requirement for
electronic reporting and no later than
the effective date of the final rule or
upon startup, whichever is later, for
facilities subject to 40 CFR part 60,
subpart AAb.
• Melt Shop Opacity Response. We
proposed the clarification that melt
shop opacity observations for 40 CFR
part 60, subparts AA and AAa must be
made during charging and tapping or
during the period of the heat cycle that
generates the greatest uncaptured
emissions for 40 CFR part 60, subparts
AA and AAa because this requirement
provides better information about EAF
and AOD capture system performance
and compliance assurance with melt
shop opacity requirements at 40 CFR
60.272(a)(3)/60.272a(a)(3) beyond what
is currently required. The NSPS at 40
CFR part 60, subpart AA has a 6 percent
opacity limit at the melt shop except for
during periods of charging and tapping,
for which 20 percent and 40 percent are
allowed, respectively (see 40 CFR
60.272(a)(3)). When 40 CFR part 60,
subpart AAa was promulgated in 1984,
the exceptions for periods of charging
and tapping were removed, and,
instead, the opacity limit for the EAF
melt shop was set at 6 percent at all
times (see 40 CFR 60.272a(a)(3)). In 40
CFR part 60, subpart AA, the EPA had
allowed a higher opacity limit during
charging and tapping because those
periods had greater potential for
uncaptured emissions than during
melting and refining. Therefore, we
agree with the commenter that the
clarification in the proposal that opacity
should be tested at the site with the
greatest uncaptured emissions should
not be made for 40 CFR part 60, subpart
AA. However, we disagree with the
commenter that the changes to 40 CFR
part 60, subpart AAa should not be
made as clarifications or corrections
because the proposed rule edits clarify
that the 6 percent opacity applies at all
times in all locations of the melt shop,
as explained below. In 40 CFR part 60,
subpart, AAa, it was required that
sources constructed, modified, or
reconstructed after 1983 achieve a
greater level of capture performance
during charging and tapping than
previously required, and the exceptions
during charging and tapping that were
in 40 CFR part 60, subpart AA were
removed. Therefore, the EPA is
including in the final rule for 40 CFR
part 60, subpart AAa the proposed
clarification to the opacity testing
option in 40 CFR 60.273a(d)(2), when a
facility chooses to forgo using a furnace
PO 00000
Frm 00026
Fmt 4701
Sfmt 4700
static pressure monitoring device on an
EAF equipped with a DEC system, to
test opacity no less than once per week
from the tap of one EAF heat cycle to
the tap of the following heat cycle. This
clarification along with the test method
and procedure requirements in 40 CFR
60.275a(e), make it clear that the facility
is required to demonstrate compliance
with melt shop opacity at all times,
including the period of the furnace
cycle that provides the greatest
challenge to the capture system, which
was originally intended when creating
40 CFR part 60, subpart AAa. In
addition, the proposed clarification in
40 CFR 60.272a(a)(3) is being finalized
in this rulemaking for 40 CFR part 60,
subpart AAa, that where it is possible to
determine that a number of visible
emission sites relate to only 1 incident
of visible emissions, only 1 observation
of shop opacity is required, at the site
of highest opacity that directly relates to
the cause (or location) of visible
emissions observed during the single
incident. The comments concerning the
requirement in the proposed changes to
40 CFR part 60, subpart AAb, for shop
opacity observations to be made during
charging and tapping or during the
period of the heat cycle that generates
the greatest uncaptured emissions, are
no longer relevant due to changes made
to the proposed 40 CFR part 60, subpart
AAb for the final rule, to allow 6
percent opacity during charging and
tapping and to require testing during all
phases of operation, i.e., melting and
refining, charging, and tapping, Because
monitoring opacity is already required
in 40 CFR part 60, subpart AAa in the
various parts of the rule discussed in the
preceding paragraphs, the clarifications
of measuring melt shop opacity do not
involve the purchase of equipment not
currently used at the facility and,
therefore, are included in this final rule.
Compliance with these rule
clarifications of 40 CFR part 60, subpart
AAa are required 180 days from the
effective date of the final rule
amendments, the same as the
requirement for electronic reporting.
• Volumetric Flow and Static
Pressure Response. We proposed the
requirement to continuously monitor
and have operational restrictions for
either volumetric flow rate or static
pressure at each separately ducted hood
for 40 CFR part 60, subpart AA, AAa,
and AAb because it provides better
information about emissions capture at
the EAF and AOD and compliance
assurance with melt shop opacity
requirements at 40 CFR 60.272(a)(3),
60.272a(a)(3), and 60.272b(a)(3) than
what is currently required in 40 CFR
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
part 60, subparts AA and AAa. In 40
CFR part 60, subpart AA, AAa, and
AAb, there are multiple options for
monitoring operations at a facility (40
CFR 60.274(b),60.274a(b), and
60.274b(b)), which may include
monitoring of volumetric flow and static
pressure at each separately ducted hood.
Continuous monitoring of volumetric
flow rate or static pressure at each
separately ducted hood would provide
better information about capture at each
separately ducted hood and a more
direct measure of capture at each
separately ducted hood. However, we
agree with the commenter that this
change should not be made as a
correction because using this
monitoring method/compliance option
would involve the purchase of
equipment not currently available or
installed at facilities. Therefore, this
requirement is not included in the final
rule for 40 CFR part 60, subparts AA,
AAa, and AAb.
Comment: A commenter asserted that
the CAA limits the EPA’s NSPS revision
authority to only new sources.
Commenter stated there is no denying
that the proposed monitoring and
associated revisions to 40 CFR part 60,
subpart AA and AAa are materially
substantive and are not error
corrections, clarifications, or clerical
adjustments. These changes far exceed
the EPA’s legal authority to revise a
NSPS applicable to existing sources.
The commenter continued, the EPA’s
legal authority under the CAA is very
limited as it relates to revisions to
existing NSPSs. The 40 CFR part 60,
subpart AA and AAa proposed revisions
(BLDS, furnace static pressure
monitoring, volumetric flow monitoring,
etc.) all constitute an ‘‘emission
limitation’’ as defined by the CAA and,
therefore, constitute a ‘‘standard of
performance.’’ The EPA has no
authority under the CAA to make any
such revisions to a ‘‘standard of
performance’’ unless those revisions are
expressly applicable to ‘‘new sources.’’
The commenter said the proposed
changes to the melt shop monitoring
requirements were arbitrary and violate
the basic premise of NSPS that revisions
apply only to facilities that qualify as
new, modified, or reconstructed after
proposal of the NSPS requirements.
The commenter also said the EPA
does not have the authority to add new
monitoring requirements for charging
and tapping operations. The existing
shop opacity monitoring in 40 CFR part
60, subpart AAa verifies efficiency of
the DEC during normal operations. By
expanding monitoring requirements to
cover tapping and charging (a time
period the furnace roof is rolled back,
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
and the DEC control is not engaged), the
EPA was creating new monitoring
requirements designed to monitor a
standard that was not included in the
original rule. The proposed monitoring
during charging and tapping cannot
evaluate DEC capture efficiency, as the
shop opacity observations were
originally designed to do. Hence, the
addition of the new monitoring, the
commenter said, represents an unlawful
revision to the existing NSPS standard.
The commenter was concerned the
EPA was adding entirely new
installation, monitoring, and
maintenance requirement for charging
and tapping furnace modes, including
requirements for operators to install,
calibrate, and maintain monitoring
devices that continuously record the
capture system damper position(s) and
either the volumetric flow rate through
each separately ducted hood or the
rolling 15-minute average static pressure
at each separately ducted hood. The
commenter said these requirements are
unnecessary and that they ignore the
1999 rulemaking that provided
alternative monitoring methods. The
commenter also argued the EPA failed
to provide a reasonable explanation for
these changes, had not explained why
the additional monitoring is needed,
had not explained the EPA’s change in
position from prior EAF steel NSPS
rulemakings, and had neglected to
account for any costs associated with
the monitoring requirements.
EPA Response: General Monitoring
Response: We proposed various
monitoring changes in 40 CFR part 60,
subparts AA and AAa for purposes of
providing better information about EAF
baghouse operation and compliance
assurance for the PM emission limit at
40 CFR 60.272(a)(1)/60.272a(a)(1), and
EAF capture system performance and
compliance assurance with melt shop
opacity requirements at 40 CFR
60.272(a)(3) and 60.272a(a)(3) than what
is currently required.
We learned through public comments
that some of the monitoring changes
would require significant capital
investment through equipment
purchases; therefore, the changes
requiring purchases of equipment are
not included in the final rule for 40 CFR
part 60, subparts AA and AAa. The
requirements that we are finalizing do
not make the standards more stringent;
therefore, these changes do not
implicate the commenter’s concern that
we have improperly revised the NSPS
applicable to existing sources. For these
other monitoring changes that are
included in the final rule, either as
proposed or with modification of
proposed requirement, the compliance
PO 00000
Frm 00027
Fmt 4701
Sfmt 4700
58467
date is 180 days from the effective date
of the final rule amendments for
facilities complying with 40 CFR part
60, subparts AA and AAa, which is the
same as the requirement for electronic
reporting. This time period is to allow
facilities to prepare for any changes to
reporting and recordkeeping.
The 4 proposed monitoring
requirements that are not included in
the final rule are for BLDS for multistack baghouses for 40 CFR part 60,
subparts AA, AAa, and AAb; melt shop
opacity for 40 CFR part 60, subpart AA
only; furnace static pressure monitoring
and operation for 40 CFR part 60,
subparts AA, AAa, and AAb; and
volumetric flow and static pressure
monitoring and operation for 40 CFR
part 60, subparts AA, AAa, and AAb.
The 2 proposed monitoring
requirements that have been retained in
the final rule, as proposed, are melt
shop inspection (for 40 CFR part 60,
subparts AA, AAa, and AAb) and melt
shop opacity (for 40 CFR part 60,
subparts AAa and AAb). The 2 proposed
monitoring requirements that have been
retained with modification are for
damper position and for fan amperage
(for 40 CFR part 60, subparts AA, AAa,
and AAb), where we are finalizing the
requirement for facilities to record
damper positions and fan amperage in
a manner and frequency consistent with
records made during the initial or most
recent performance test demonstrating
compliance with applicable PM
standards. For additional explanation
and rationale behind the 7 proposed
requirements and their disposition in
the final rule, refer to the discussions in
this preamble under the following
section headings (listed alphabetically):
BLDS Response; Damper Position
Response; Fan Amperage Response;
Furnace Static Pressure Response; Melt
Shop Inspection Response; Melt Shop
Opacity Response; and Volumetric Flow
and Static Pressure Response.
Comment: A commenter asserted that
the current compliance demonstration
requirements using the fan amperage
and damper position monitoring in 40
CFR part 60, subparts AA, AAa are the
best methods for assuring compliance
with the melt shop NSPS standards and,
therefore, the commenter opposes the
proposed new monitoring requirements
for 40 CFR part 60 subpart AAb.
The commenter opposed the
following proposed new monitoring
requirements for 40 CFR part 60 subpart
AAb:
• Installation of bag leak detection
monitoring systems on all baghouses,
including multi-stack baghouses;
• Monitoring and operational
restriction for furnace static pressure
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
58468
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
monitoring based on 15-minute averages
on all EAF;
• Monitoring and operational
restriction for volumetric flow rate or
static pressure at each separately-ducted
hood, based on 15-minute averages on
all EAF;
• Removal of the option for
monitoring and operational restriction
for fan amps;
• Adding inspections and
maintenance requirements for holes or
other openings in the melt shop
building; and
• Mandate for shop opacity
observations to be made during charging
and tapping or during the period of the
heat cycle that generates the greatest
uncaptured emissions.
The commenter considered these new
monitoring requirements to be
unnecessary, expensive, and, some
cases, impractical. The commenter said
the existing monitoring requirements (in
40 CFR part 60, subparts AA and AAa)
are adequate for demonstrating
compliance with the standards. The
commenter stated that the existing fan
amperage and damper position
monitoring have worked efficiently and
effectively for many years and the
proposed new monitoring would be less
effective and would impose extreme
technical and engineering complications
on EAF plants. Similarly, a commenter
urged the EPA to keep the current
requirement for monitoring fan
amperage in place, because they said
this parameter directly correlates to the
air flow to the control device, via the fan
curve, which is unique to each site.
A commenter stated the EPA should
clarify how the proposed new
monitoring requirements improve
compliance demonstration. The
commenter said it was unclear how the
additional monitoring requirements in
the proposed [40 CFR part 60,subpart
AAb] rule will improve data or accuracy
in demonstrating compliance with
applicable requirements. The proposed
NSPS 40 CFR part 60, subpart AAb
requires monitoring of parameters that
are not required to be monitored under
the existing NSPS 40 CFR part 60,
subparts AA and AAa standards. The
commenter recommended the EPA
explain the benefits of new monitoring
techniques and additional monitoring
parameters. The monitoring
requirements should provide enough
data to accurately demonstrate
compliance with applicable
requirements. The commenter added
that the EPA must consider the cost to
air agencies and facilities and associated
benefits to compliance before requiring
additional monitoring. Additional
monitoring with no clear benefit is
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
burdensome for both regulated facilities
and delegated authorities due to
additional equipment, maintenance, and
operator costs.
EPA Response: We considered the
comments submitted by the commenter
and have modified the final rule for 40
CFR part 60, subpart AAb for certain
proposed requirements to reflect this
and other comments received, and
removed other requirements entirely.
We included some monitoring
requirements in the final rules, as
proposed. Our response to each issue
listed by the commenter are described
in this section in the EPA responses to
the comments, as follows: BLDS
Response; Damper Position Response;
Fan Amperage Response; Furnace Static
Pressure Response; Melt Shop
Inspection Response (as well as the
EPA’s response to the proposed
requirements in 40 CFR 60.274b(d) for
40 CFR part 60, subpart AAb in regard
to allowing operators discretion in an
inspection as to what issues ‘‘materially
impact’’ the capture system
performance); Melt Shop Opacity
Response; Volumetric Flow and Static
Pressure Response; and General
Monitoring Response.
The comment concerning a proposed
requirement in 40 CFR part 60, subpart
AAb for shop opacity observations to be
made during charging and tapping or
during the period of the heat cycle that
generates the greatest uncaptured
emissions is no longer relevant due to
changes made to the proposed 40 CFR
part 60, subpart AAb for the final rule,
to allow 6 percent opacity during
charging and tapping and to require
testing during all phases of operation,
i.e., melting and refining, charging, and
tapping.
Comment: A commenter asserted that
the EPA should define the term
‘‘material impact’’ (40 CFR 60.274e,
60.274a(d), and 60.274b(d)) in terms of
opacity limits and only require repairs
when holes result in noncompliance
with the opacity standards.
A commenter recommended the EPA
better define a ‘‘material impact’’ on the
capture system because they said the
phrase was too vague. Any airflow
changes, they said, may theoretically
impact capture efficiency to some
extent, but fluctuations that do not
affect the compliance of the facility with
the substantive emission and opacity
standards should not be prohibited. The
EPA should define material impacts in
terms of opacity limits by revising 40
CFR part 60, subparts AA, AAa, and
AAb to only require repairs to openings
that lead to noncompliance with the
opacity standards.
PO 00000
Frm 00028
Fmt 4701
Sfmt 4700
EPA Response: The Melt Shop
Inspection Response earlier in this
section provides part of the EPA
response to this comment concerning
proposed requirements for 40 CFR part
60, subpart AAb (40 CFR 60.274b(d)),
which is the same as the EPA response
for the proposed clarifications in 40 CFR
part 60, subparts AA and AAa (40 CFR
60.274(e) and 60.274a(d)) and explains
why we disagree with the commenter
and are including the requirement to
inspect for holes or other openings in
the melt shop in the final rules to ensure
compliance with the opacity standards
in 40 CFR part 60, subparts AA, AAa,
and AAb.
In addition, for 40 CFR part 60,
subpart AAb, we proposed the
requirement for monthly inspections to
include the language to address issues
that are ‘‘determined by the operator to
materially impact the efficacy of the
capture system’’ in 40 CFR 60.274b(d).
This allows for a determination by the
operator as to whether an identified
issue is to be considered a true
deficiency that is expected to impact
capture system performance, as opposed
to the language in 40 CFR part 60,
subpart AAa that requires maintenance
for ‘‘any deficiency.’’ Therefore, we
agree with this aspect of the comment
and are including the proposed rule
language for monthly inspections that
allow for operator discretion as to what
issues ‘‘materially impact’’ the capture
system performance in the final rule for
40 CFR part 60, subpart AAb (40 CFR
60.274b(d)).
Comment: A commenter asserted that
the EPA should clarify the calculation
for determining compliance with the
opacity limits when using EPA Method
9 for 40 CFR part 60, subpart AAb. The
commenter asked the EPA to clarify in
the rule how facilities should determine
compliance with the opacity limits. The
commenter noted that compliance with
the shop opacity limits will be
determined based on the arithmetic
average of 24 consecutive 15-second
opacity observations over a 6-minute
period. The commenter said that it is
their understanding that the proposed
zero opacity standard does not require
all 24 15-second EPA Method 9
observation periods to be zero percent
and that some of the 24 readings may
exceed 0 percent provided the
arithmetic average rounds down to 0.
Similarly, in calculating compliance
with the existing 6 percent shop opacity
standard, some readings can exceed 6
percent provided the arithmetic average
rounded down is below 6 percent. The
commenter asked the EPA to confirm
their interpretation of the rule is correct.
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ddrumheller on DSK120RN23PROD with RULES2
The commenter noted that this
approach is consistent with prior NSPS
rulemakings, including 40 CFR part 60,
subpart KK (Lead-Acid Battery
Manufacturing) and 40 CFR part 60,
subpart NN (Phosphate Rock Plants).
However, the commenter said the EPA
specified in 40 CFR part 60, subparts KK
and NN that compliance with the
opacity standard is determined by
taking the average opacity over a 6minute period, according to EPA
Method 9, and rounding the average to
the nearest whole percentage (45 FR
2790 and 2794; January 14, 1980 and 47
FR 16564, 16566, 16582, and 16586;
April 16, 1982). The commenter
recommended the EPA add the same
explanation provided in these earlier
NSPS in the final shop opacity limit.
EPA Response: The method for
calculating opacity has not changed
substantially for 40 CFR part 60, subpart
AAb; the final rule incorporates the
current EPA Method 9 procedures for
melting and refining, and for tapping
(see section IV.B.2 in this preamble for
changes to opacity measurement
procedures with EPA Method 9 during
charging). When determining the final
value for opacity in 40 CFR part 60,
subpart AAb, facilities should round to
the nearest whole number (0 percent).
Therefore, an average opacity level
calculated to be 0.49 percent would
round (down) to 0 percent.
3. What is the rationale for the final
requirements for testing and
monitoring?
We are finalizing the proposed
requirement in 40 CFR part 60, subparts
AA, AAa, and AAb that the melt shop
be inspected for holes or other openings
that would allow PM to escape because
it clarifies the building inspection
requirement already in the current
NSPS. We are also incorporating into
the final rules for 40 CFR part 60,
subparts AA, AAa, and AAb the
allowance of up to 24 hours to find and
fix baghouse leaks following a BLDS
alarm event because it is commensurate
with many other EPA rules and no
evidence exists for the specific need for
limiting the tie period to 3 hours for
EAF. The reasons that more than 3
hours and up to 24 hours is needed to
respond to BLDS alarms provided by the
commenter are valid. We are finalizing
that sources complying with 40 CFR
part 60, subpart AAb will be required to
perform compliance testing every 5
years after the initial testing performed
upon startup, as required under 40 CFR
part 60.8. This requirement is already
required in many of the permits for
existing EAF in the EAF dataset and in
the industry, and is a standard
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
requirement for testing for other sources
of PM emissions for many other
industrial sectors.
We learned through public comments
that some of the proposed monitoring
changes, BLDS monitoring, furnace
static pressure monitoring and
operation, and volumetric flow and
static pressure monitoring and
operation, would require significant
capital investment through equipment
purchases. Therefore, these changes
requiring purchases of equipment are
not being finalized for 40 CFR part 60,
subparts AA, AAa, and AAb.
We are finalizing 2 proposed
monitoring requirements for 40 CFR
part 60, subparts AA, AAa, and AAb,
which are the requirements for melt
shop inspection and stipulation that the
melt shop opacity limits apply at all
times during the designated periods of
applicability under the rules. We are
also finalizing the proposed damper
position and fan amperage monitoring
requirements with modifications. Other
miscellaneous monitoring requirements
also are being finalized with
modifications resulting from comments
on the proposed requirements, as
described in in this section.
All testing and monitoring
requirements proposed and finalized in
this action were evaluated to ensure
compliance with the NSPS emission
standards under conditions of proper
operation and maintenance. However,
because we learned through comments
that some of the proposed changes to
monitoring in the existing NSPS rules
would incur unintended costs, these
requirements were either not finalized
in their entirety or were finalized with
modifications.
F. Electronic Reporting
The EPA is finalizing the proposed
requirement that owners and operators
of EAF and AOD subject to the current
and new NSPS at 40 CFR part 60,
subparts AA, AAa, and AAb submit
electronic copies of required
performance test reports and any
semiannual excess emissions and
continuous monitoring system
performance and summary reports,
through the EPA’s CDX using the
CEDRI. A description of the electronic
data submission process is provided in
the memorandum Electronic Reporting
Requirements for New Source
Performance Standards (NSPS) and
National Emission Standards for
Hazardous Air Pollutants (NESHAP)
Rules,18 available in the docket for this
18 Electronic Reporting Requirements for New
Source Performance Standards (NSPS) and
National Emission Standards for Hazardous Air
PO 00000
Frm 00029
Fmt 4701
Sfmt 4700
58469
action, and hereafter referred to as the
‘‘Electronic Reporting Memorandum.’’
The finalized rule requires that
performance test/demonstration of
compliance results collected using test
methods that are supported by the
EPA’s ERT as listed on the ERT
website 19 at the time of the test be
submitted in the format generated
through the use of the ERT or an
electronic file consistent with the xml
schema on the ERT website, and other
performance test/demonstration of
compliance results be submitted in PDF
using the attachment module of the
ERT.
For semiannual reports, the finalized
rule requires that owners and operators
use the appropriate spreadsheet
template to submit information to
CEDRI. The final versions of the
templates for these reports are included
in the docket for this action.20
Additionally, the EPA has identified 2
broad circumstances in which electronic
reporting extensions may be provided.
These circumstances are: (1) Outages of
the EPA’s CDX or CEDRI which
preclude an owner and operator from
accessing the system and submitting
required reports; and (2) force majeure
events, which are defined as events that
will be or have been caused by
circumstances beyond the control of the
affected facility, its contractors, or any
entity controlled by the affected facility
that prevent an owner and operator from
complying with the requirement to
submit a report electronically. Examples
of force majeure events are acts of
nature, acts of war or terrorism,
equipment failure, or safety hazards
beyond the control of the facility. The
EPA is providing these potential
extensions to protect owners and
operators from noncompliance in cases
where they cannot successfully submit
a report by the reporting deadline for
reasons outside of their control. In both
circumstances, the decision to accept
the claim of needing additional time to
report is within the discretion of the
Administrator, and reporting should
occur as soon as possible.
The electronic submittal of the reports
addressed in this final rulemaking
increase the usefulness of the data
Pollutants (NESHAP) Rules. Memorandum,
Measurement Policy Group, U.S. Environmental
Protection Agency, Research Triangle Park, NC.
August 19, 2020.
19 https://www.epa.gov/electronic-reporting-airemissions/electronic-reporting-tool-ert.
20 See 40 CFR part 60, subpart AA, AAa, and
AAb, Standards of Performance for Steel Plants:
Electric Arc Furnaces and Argon-Oxygen
Decarburization Vessels, 40 CFR part 60.276(g)
Semiannual Compliance Report Spreadsheet
Template, available at Docket ID No. EPA–HQ–
OAR–2002–0049–0064.
E:\FR\FM\25AUR2.SGM
25AUR2
58470
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
contained in those reports and is
keeping with current trends in data
availability and transparency. Electronic
submittal would further assist in the
protection of public health and the
environment by improving compliance,
facilitating the ability of regulated
facilities to demonstrate compliance
with requirements, and by facilitating
the ability of delegated state, local,
Tribal, and territorial air agencies and
the EPA to assess and determine
compliance. Ultimately, electronic
reporting would reduce the burden on
regulated facilities, delegated air
agencies, and the EPA by making the
data easy to record and read. Electronic
reporting also eliminates paper waste
and redundancies and minimizes data
reporting errors. The resulting electronic
data are more quickly and accurately
accessible to the affected facilities, air
agencies, the EPA, and the public.
Moreover, electronic reporting is
consistent with the EPA’s plan 21 to
implement Executive Order 13563 and
is in keeping with the EPA’s agencywide policy 22 developed in response to
the White House’s Digital Government
Strategy.23 For more information on the
benefits of electronic reporting, see the
‘‘Electronic Reporting Memorandum’’
discussed earlier in this section.
No comments were received on
electronic reporting. Therefore, we are
finalizing the requirements for
electronic reporting as proposed.
G. Effective Date and Compliance Dates
ddrumheller on DSK120RN23PROD with RULES2
Pursuant to CAA section 111(b)(1)(B),
affected sources that commence
construction, reconstruction, or
modification after May 16, 2022, must
comply with all requirements of 40 CFR
part 60, subpart AAb, no later than
August 25, 2023 or upon startup,
whichever is later.
The date for complying with the ERT
submission requirements is February 21,
2024. The date for complying with the
changes in the current rules, 40 CFR
part 60, subparts AA and AAa is
February 21, 2024 publication of the
final rule.
21 EPA’s Final Plan for Periodic Retrospective
Reviews (August 2011). Available at: https://
www.regulations.gov/document?D=EPA-HQ-OA2011-0156-0154.
22 E-Reporting Policy Statement for EPA
Regulations (September 2013). Available at: https://
www.epa.gov/sites/default/files/2016-03/
documents/epa-ereporting-policy-statement-201309-30.pdf.
23 Digital Government: Building a 21st Century
Platform to Better Serve the American People (May
2012). Available at: https://
obamawhitehouse.archives.gov/sites/default/files/
omb/egov/digital-government/digitalgovernment.html.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
V. Summary of Cost, Environmental,
and Economic Impacts
A. What are the air quality impacts?
For 40 CFR part 60, subpart AAb,
reductions in PM and PM2.5 potentially
emitted from new, modified, and
reconstructed EAF compared to these
emissions allowed under the current
NSPS subpart AAa with 6 percent melt
shop opacity will have a beneficial air
impact.
Based on the actual emissions emitted
by 31 facilities in the EAF dataset,
where the actual average opacity was
0.14 percent, the emissions impact for
PM from 9 new, modified, or
reconstructed EAF facilities projected in
the next 10 years (estimated to reflect 3
small, 4 medium, and 2 large) is
estimated to be an emissions reduction
of 134 tons PM that would otherwise be
emitted in 2032. Using an estimate of
0.218 24 for the ratio of PM2.5 to PM the
emissions impact for PM2.5 from nine
new facilities projected in the next 10
years, as above, there would be an
emissions reduction of 28 tons of PM2.5
in 2032. Details of these emissions
estimates can be found in the
‘‘Emissions Memorandum’’ discussed in
section IV.A.2.
No actual PM emission reductions are
estimated for the new PM limit for
facility-wide total baghouse emissions
in lb/ton. The EPA did not estimate PM
emission reductions from new,
modified, and reconstructed sources
under the facility-wide total baghouse
limit because based the 2010 EAF
dataset, all facilities in the dataset are
already achieving an emission level
comparable to the limit being finalized
in this action.
B. What are the secondary impacts?
A secondary impact as a result of this
rule is that solid wastes may increase
slightly, with an estimated 15 tons per
facility per year based on 2010 EAF
performance, with the potential
additional waste from PM collected to
meet the 0 percent melting and refining
opacity limit under NSPS subpart AAb.
The small increase in solid wastes
would be the same for both the carbon
and specialty steel shops. However,
most PM collected from EAF is recycled
24 The PM
2.5 to PM ratio is an average of similar
uncontrolled sources, as cited in Evaluation of
PM2.5 Emissions and Controls at Two Michigan
Steel Mills and a Coke Oven Battery. Final Report.
Work Assignment 4–12 under EPA Contract No. 68–
D–01–073 by RTI International, Research Triangle
Park, NC. U.S. Environmental Protection Agency,
Research Triangle Park, NC. February 2006.
PO 00000
Frm 00030
Fmt 4701
Sfmt 4700
to reclaim zinc, which also defrays some
of the disposal costs.25 26
Additionally, a relatively small
increase in energy may result from the
use of electricity to power fans that
draw EAF and AOD exhaust air into the
canopy hood that captures the PM and
sends PM-laden air to the baghouse, at
66, 940, 4,700 MW-hr per year for small,
medium, and large facilities,
respectively. However, if the A/C ratio
of the fabric filters is lowered to meet
the facility baghouse standard due to an
increase in number of bags, some
decrease in energy use may occur.
Finally, there will be no water or
noise impacts with the promulgated
NSPS subpart AAb.
C. What are the cost impacts?
Costs were estimated for regular
testing every 5 years for 9 new facilities
projected in the 10 years after May 16,
2022. The estimated annual testing costs
for each facility are $10,625 per year
($2022) for conducting EPA Method 5
for PM emissions at each baghouse’s
exhaust over a 5-year period, using an
estimate of 1.64 baghouses per facility
based on the EAF data. While new,
modified, or reconstructed sources that
start up after May 16, 2022, are subject
to testing every 5 years under the
finalized NSPS subpart AAb, EPA
Method 5 testing is required upon initial
startup under 40 CFR 60.8. Therefore, in
the first 5 years after startup, there will
be no testing costs as a result of the
finalized rule. Then, in the sixth
through the tenth year after initial
startup after May16, 2022, the estimated
new, modified, or reconstructed sources
will incur costs of approximately $9,562
per year ($2022) per facility for testing,
based on an estimate of 0.9 new,
modified, or reconstructed facilities per
year (0.9 × $10,625). Due to the
estimated staggered startup of these
new, modified, or reconstructed
facilities, with 0.9 new, modified, or
reconstructed facilities starting each
year after the proposal (May 16, 2022),
the total costs for testing for all new,
modified, or reconstructed facilities
under this rule after the initial testing
required under 40 CFR part 60.8 will
range from approximately $523,000
($2022) in the sixth year after May 16,
2022 (corresponding to 5.4 new
facilities), to a total of approximately
$900,000 in the tenth year after May 16,
2022 (reflecting costs for 9 facilities,
with testing costs of approximately
25 Proven Waelz Kiln Technology. Accessed 2/18/
22. https://www.globalsteeldust.com/waelz_kiln_
technology.
26 Ru
¨ tten, J. Application of the Waelz Technology
on Resource Recycling of Steel Mill Dust.
Du¨sseldorf: GmbH. D–40225, 2006.
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ddrumheller on DSK120RN23PROD with RULES2
$100,000 per facility per year), where
the testing costs that would occur in
years 6 through 10 are for the new,
modified, or reconstructed facilities that
start up in years 1 through 5 after May
16, 2022.
Based on information from 2010
through 2017 obtained by the EPA for
31 EAF facilities, the EPA found the
average opacity to be 0.14 percent, with
about half of the units achieving 0
percent opacity in the tests. Because
opacity in the baseline is already low,
the EPA expects any new, modified, or
reconstructed facility would be able to
meet the promulgated opacity and PM
limits without any additional control
devices beyond those already required
by the NSR program, applicable state
requirements or by minor process
changes to improve capture of exhaust
flows or other process parameters, if
needed. While the actual cost impacts of
the promulgated 0 percent opacity for
melting and refining and 6 percent
opacity for charging and tapping would
likely be substantially lower, the EPA
developed an upper bound estimate of
potential compliance costs based upon
the assumption that affected units
would install a partial roof canopy
above the crane rails to ensure 0 percent
opacity during melting and refining and
6 percent opacity during charging and
tapping compared to a hypothetical
baseline model facility meeting 6
percent opacity at all times. These costs
to achieve the opacity requirements are
estimated to be $86,000, $1,140,000,
$5,700,000 ($2022) per year per facility
for small, medium, and large model
facilities, respectively.
Total annual costs for NSPS subpart
AAb, based on nine new, modified, or
reconstructed facilities in the first 10
years after May 16, 2022, are $560,000
per year ($2022) for 3 small facilities,
$4.9M per year for 4 medium facilities,
and $11.5M per year for 2 large
facilities, for a total of $17M per year
($2022) for 9 new facilities in the tenth
year after May 16, 2022, using the same
staggered startup rate described for
testing costs. Details of the cost
estimates for the final rule can be found
in the ‘‘Cost Memorandum’’ discussed
in section IV.A.2 (with proposal costs
updated to 2022 27) which can be found
in the docket for this rule.
27 In the time since the proposal costs were
assessed in 2020, inflation has increased with a
subsequent increase in the gross national product
(GNP), which is the basis for the U.S. dollars used
in the costs estimates. In addition, interest rates,
which affect capital costs, increased from 3.5
percent to 7.5 percent from proposal cost
preparation (in 2021) to final rule cost preparation
(in 2022).
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
For the promulgated mass-based PM
standard in lb/ton for facility-wide total
baghouse PM emissions, we estimated
the capital and annual costs between a
baseline scenario based on the current
NSPS individual baghouse
concentration limit (in gr/dscf) in 40
CFR part 60, subparts AA and AAa and
a scenario based on a lower total
facility-wide baghouse PM emissions in
a mass-based limit (in lb/ton), which is
the format for the standard of
performance we are promulgating.
Because data from the 31 existing EAF
facilities in the 2010 dataset used by the
EPA to develop the facility-wide PM
limit show these facilities could already
meet the 0.16 lb/ton total facility
baghouse PM limit, we expect the
promulgated mass-based standard
applied to future new, modified, and
reconstructed EAF facilities would be
feasible and pose minimal cost impacts,
if any.
Additional cost analysis, including
calculation of costs using the upper
bound cost estimates for the installation
of partial roof canopies, can be found in
the Economic Impact Analysis (EIA)
associated with this final rule, which is
available in the docket for this rule. The
EIA additionally presents costs in terms
of the present value and equivalent
annual value of projected compliance
costs over the 2023 to 2032 period
discounted at 3 and 7 percent.
D. What are the economic impacts?
Economic impact analyses focus on
changes in market prices and output
levels. If changes in market prices and
output levels in the primary markets are
significant enough, impacts on other
markets may also be examined. Both the
magnitude of costs associated with the
promulgated requirements and the
distribution of these costs among
affected facilities can have a role in
determining how the market will change
in response to a regulatory requirement.
As discussed in section IV.B. of this
preamble, the cost analysis incorporates
the assumption that units affected by
the new NSPS subpart AAb would
install a partial roof canopy above the
crane rails to ensure 0 percent melt shop
opacity compared to a hypothetical
baseline model facility meeting 6
percent opacity. The costs should be
viewed as upper bound estimates on the
potential compliance costs as the EPA
expects any new, modified or
reconstructed facility would be able to
meet the promulgated opacity and PM
limits without any additional control
devices beyond those already required
by the NSR program, applicable state
requirements, or by minor process
changes to improve capture of exhaust
PO 00000
Frm 00031
Fmt 4701
Sfmt 4700
58471
flows or other process parameters, if
needed. As discussed in the EIA, even
under the upper bound cost
assumptions described, the EPA expects
the potential economic impacts of this
final rule will be small.
As required by the Regulatory
Flexibility Act (RFA), we performed an
analysis to determine if any small
entities might be disproportionately
impacted by the promulgated
requirements. The EPA does not know
what firms will construct new facilities
in the future and, as a result, cannot
perform a cost-to-sales analysis with the
same confidence as we do with firms
owning existing facilities. However,
based on an assessment of the new units
built during the 2011 to 2020 period and
the units that have been announced,
which are all owned by firms that are
not considered to be small businesses,
the EPA does not believe it is likely that
any future facilities will be built by a
small business. See the EIA in the
docket for this action for additional
information on the analysis presented in
this section.
E. What are the benefits?
The new requirements being finalized
in 40 CFR subpart AAb are expected to
reduce PM emissions, including PM2.5.
In addition, the revisions to 40 CFR part
60, subparts AA and AAa will clarify
the rules, enhance compliance and
enforcement, and is expected to reduce
PM emissions, including PM2.5. As
explained in section IV.A of this
preamble, the requirements are
projected to reduce 28 tons of PM2.5 in
2032. These emissions reductions are
expected to produce health benefits in
the affected locations. The Integrated
Science Assessment for Particulate
Matter (ISA) 28 contains synthesized
toxicological, clinical, and
epidemiological evidence that the EPA
uses to determine whether each
pollutant is causally related to an array
of adverse human health outcomes
associated with either acute (i.e., hours
or days-long) or chronic (i.e., years-long)
exposure. For each outcome, the ISA
includes the EPA conclusions as to
whether this relationship is causal,
likely to be causal, suggestive of a causal
relationship, inadequate to infer a
causal relationship, or not likely to be
a causal relationship.
In the ISA, it was found that acute
exposure to PM2.5 was causally related
to cardiovascular effects and mortality
(i.e., premature death), and respiratory
28 Integrated Science Assessment for Particulate
Matter (Final Report, 2019). EPA/600/R19/188. U.S.
Environmental Protection Agency, Washington, DC.
2019.
E:\FR\FM\25AUR2.SGM
25AUR2
58472
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
effects as likely-to-be-causally related.
Further, the EPA identified
cardiovascular effects and total
mortality as causally related to longterm exposure to PM2.5 and respiratory
effects as likely-to-be-causal; the
evidence was suggestive of a causal
relationship for reproductive and
developmental effects as well as cancer,
mutagenicity, and genotoxicity.
The benefits per ton (BPT) of the
PM2.5 emissions reductions cited earlier
in this preamble for years 2025 and
2030 and at 3 percent and 7 percent
discount rates are presented in Table 7
below in 2022 dollars. The BPT of the
PM2.5 emissions reductions for year
2025, at a 3 percent discount rate
translates to a low projection of
$417,000 per ton emission reduction, to
a high projection of $891,000 per ton
emission reduction (in 2022 dollars).
Information regarding the process by
which these BPTs were calculated is
available in the technical support
document Estimating the Benefit per
Ton of Reducing Directly-Emitted PM2.5,
PM2.5 Precursors, and Ozone Precursors
from 21 Sectors.
TABLE 7—BENEFITS PER TON OF PM2.5 REDUCED
$/ton PM2.5 emission reductions $2022
Year
3 Percent discount rate
2025 .................................................................................................................
2030 .................................................................................................................
7 Percent discount rate
Low
High
Low
High
$417,000
451,000
$891,000
933,000
$375,000
405,000
$803,000
839,000
Note: The range reported here reflects the use of risk estimates from two alternative long-term exposure PM-mortality studies.29
ddrumheller on DSK120RN23PROD with RULES2
F. What analysis of environmental
justice did we conduct?
Executive Order 12898 directs the
EPA to identify the populations of
concern that are most likely to
experience unequal burdens from
environmental harms, which are
specifically minority populations
(people of color), low-income
populations, and Indigenous peoples
(59 FR 7629; February 16, 1994).
Additionally, Executive Order 13985 is
intended to advance racial equity and
support underserved communities
through Federal government actions (86
FR 7009; January 20, 2021). The EPA
defines EJ as ‘‘the fair treatment and
meaningful involvement of all people
regardless of race, color, national origin,
or income, with respect to the
development, implementation, and
enforcement of environmental laws,
regulations, and policies.’’ 30 The EPA
further defines fair treatment to mean
that ‘‘no group of people should bear a
disproportionate burden of
environmental harms and risks,
including those resulting from the
negative environmental consequences of
industrial, governmental, and
commercial operations or programs and
policies.’’ In recognizing that people of
color and low-income populations often
bear an unequal burden of
environmental harms and risks, the EPA
continues to consider ways of protecting
them from adverse public health and
29 Estimating the Benefit per Ton of Reducing
Directly-emitted PM2.5, PM2.5 Precursors and Ozone
Precursors from 21 Sectors. U.S. Environmental
Protection Agency, Office of Air and Radiation,
Office of Air Quality Planning and Standards,
Research Triangle Park, NC 27711. 2022. Available
at: https://www.epa.gov/system/files/documents/
2021-10/source-apportionment-tsd-oct-2021_0.pdf.
30 See https://www.epa.gov/environmentaljustice.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
environmental effects of air pollution.
For purposes of analyzing regulatory
impacts, the EPA relies upon its June
2016 ‘‘Technical Guidance for Assessing
Environmental Justice in Regulatory
Analysis,’’ 31 which provides
recommendations that encourage
analysts to conduct the highest quality
analysis feasible, recognizing that data
limitations, time, resource constraints,
and analytical challenges will vary by
media and circumstance. The Technical
Guidance states that a regulatory action
may involve potential EJ concerns if it
could: (1) Create new disproportionate
impacts on minority populations, lowincome populations, and/or Indigenous
peoples; (2) exacerbate existing
disproportionate impacts on minority
populations, low-income populations,
and/or Indigenous peoples; or (3)
present opportunities to address
existing disproportionate impacts on
minority populations, low-income
populations, and/or Indigenous peoples
through this action under development.
The Agency has conducted an
analysis of the demographics of the
populations living near existing
facilities in the EAF population in the
U.S. Because this action finalizes
standards of performance for new,
modified, and reconstructed EAF
sources that commence construction
after May 16, 2022, the locations of the
construction of new EAF facilities are
not known. In addition, it is not known
which of the existing facilities will be
modified or reconstructed in the future.
Therefore, the demographic analysis
was conducted for the 88 existing EAF
facilities as a characterization of the
31 See https://www.epa.gov/environmentaljustice/
technical-guidance-assessing-environmentaljustice-regulatory-analysis.
PO 00000
Frm 00032
Fmt 4701
Sfmt 4700
demographics in areas where these
facilities are now located.
The full results of the demographic
analysis can be found in section E,
‘‘What are the environmental justice
impacts?,’’ of the preamble to the
proposed rule (87 FR 29724). The
analysis included an assessment of
individual demographic groups of the
populations living within 5 km and
within 50 km of the existing facilities.
We then compared the data from the
analysis to the national average for each
of the demographic groups. The results
show that for populations within 5 km
of the 87 existing EAF facilities (we
identified one additional existing
facility since the proposed rule was
published for a total of 88 facilities, but
the overall results did not change). The
percent of the population that is African
American is above the national average
(17 percent versus 12 percent). The
percent of people living below the
poverty level is also above the national
average (17 percent versus 13 percent).
The percent of the population that is
Native American, Hispanic or Latino, or
Other/Multiracial are below the national
averages. The percent of the population
over 25 without a high school diploma
and the percent of the population in
linguistic isolation are similar to the
national averages. The results of the
analysis of populations within 50 km of
the 88 EAF facilities is similar to the 5
km analysis.
The methodology and the results of
the demographic analysis for the final
rule are presented in a technical report,
Analysis of Demographic Factors for
Populations Living Near Electric Arc
Furnace Facilities, available in the
docket for this action (Docket ID No.
EPA–HQ–OAR–2002–0049).
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
The EPA expects that the Standards of
Performance for Steel Plants: Electric
Arc Furnaces and Argon-Oxygen
Decarburization Vessels Constructed
after May 16, 2022, will ensure
compliance via frequent testing and
reduce emissions via a lower opacity
limit for melt shops and with the
standards at all times (including periods
of SSM). The rule will also increase data
transparency through electronic
reporting. Therefore, effects of
emissions on populations in proximity
to any future affected sources, including
in communities potentially
overburdened by pollution, which are
often people of color, and low-income
and Indigenous communities will be
reduced due to compliance with the
standards of performance being
finalized in this action.
VI. Statutory and Executive Order
Reviews
Additional information about these
statutes and Executive Orders can be
found at https://www.epa.gov/lawsregulations/laws-and-executive-orders.
A. Executive Order 12866: Regulatory
Planning and Review and Executive
Order 14094: Modernizing Regulatory
Review
This action is not a significant
regulatory action as defined in
Executive Order 12866, as amended by
Executive Order 14094, and was,
therefore, not subject to a requirement
for Executive Order 12866 review.
ddrumheller on DSK120RN23PROD with RULES2
B. Paperwork Reduction Act (PRA)
The information collection activities
in this final rule have been submitted
for approval to OMB under the PRA.
The information collection request (ICR)
document that the EPA prepared has
been assigned the EPA ICR number
1060.21. You can find a copy of the ICR
in the docket for this rule, and it is
briefly summarized here. The
information collection requirements are
not enforceable until OMB approves
them.
These amendments to 40 CFR part 60,
subparts AA and AAa to require
electronic reporting, and implement
editorial and clarifying changes to rule
language are estimated to reduce time
spent and paperwork for rule. We are
promulgating a new subpart for new,
modified, or reconstructed facilities that
start up after May 16, 2022, under 40
CFR part 60, subpart AAb with similar
reporting, recordkeeping, and
compliance requirements as 40 CFR part
60, subparts AA and AAa.
Respondents/affected entities: EAF
and AOD facilities.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subparts
AA; AAa; and AAb).
Estimated number of respondents: 90,
includes 88 estimated current facilities
subject to 40 CFR part 60, subparts AA
and AAa, and 3 new facilities that
would be subject to 40 CFR part 60,
subpart AAb in the 3 years after
proposal (May 16, 2022).
Frequency of Response: One time.
Total estimated burden: The annual
recordkeeping and reporting burden for
facilities to comply with all the
requirements in the NSPS is estimated
to be 57,100 hours (per year). Burden is
defined at 5 CFR 1320.3(b).
Total estimated cost: The annual
recordkeeping and reporting costs for all
facilities to comply with all of the
requirements in the NSPS is estimated
to be $7,400,000 (per year), of which
$65,686 (per year) is for this final rule
($60,000 for EPA Method 5 compliance
and $696 for electronic reporting), and
$7,130,000 for other costs related to
continued compliance with the NSPS,
including $198,000 for paperwork
associated with operation and
maintenance requirements. The total
rule costs reflect an increase/decrease
cost of $450,000 (per year) from the
previous ICR that reflects savings due to
electronic reporting and an increase to
the labor rates.
An Agency may not conduct or
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a currently valid OMB
control number. The OMB control
numbers for the EPA’s regulations in 40
CFR are listed in 40 CFR part 9. When
OMB approves this ICR, the Agency will
announce that approval in the Federal
Register and publish a technical
amendment to 40 CFR part 9 to display
the OMB control number for the
approved information collection
activities contained in this final rule.
C. Regulatory Flexibility Act (RFA)
I certify that this action will not have
a significant economic impact on a
substantial number of small entities
under the RFA. This action will not
impose any requirements on the three
identified small entities among the
approximately 90 EAF facilities (36
companies), because most facilities are
likely to be performing regular
compliance tests as part of their permit
renewal process. Additionally, no
facilities are expected to be built by
small entities over the next 10 years
based on past industry growth and small
business starts. The 3 current facilities
owned by small businesses were started
in 1912, 1968, and 1994, respectively.
PO 00000
Frm 00033
Fmt 4701
Sfmt 4700
58473
Further discussion is included in the
EIA for this final rule.
D. Unfunded Mandates Reform Act
(UMRA)
This action does not contain an
unfunded mandate of $100 million or
more as described in UMRA, 2 U.S.C.
1531–1538, and does not significantly or
uniquely affect small governments.
While this action creates an enforceable
duty on the private sector, the cost does
not exceed $100 million or more.
E. Executive Order 13132: Federalism
This action does not have federalism
implications. It will not have substantial
direct effects on the states, on the
relationship between the national
government and the states, or on the
distribution of power and
responsibilities among the various
levels of government.
F. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
This action does not have Tribal
implications as specified in Executive
Order 13175. This rule will implement
improvements in air quality due to new
EAF in all locations of new EAF
facilities, including any new EAF which
are in proximity to Tribal grounds. It
would not have substantial direct effects
on Tribal governments, on the
relationship between the Federal
government and Indian tribes, or on the
distribution of power and
responsibilities between the Federal
government and Indian tribes. No Tribal
governments own facilities that are the
subject of this rulemaking. Thus,
Executive Order 13175 does not apply
to this action.
Consistent with the EPA Policy on
Consultation and Coordination with
Indian Tribes, the EPA consulted with
Tribal officials during the development
of this action. A copy of the
memorandum dated May 17, 2022, sent
to Tribal leaders concerning the EAF
NSPS is provided in the docket to this
rule.
G. Executive Order 13045: Protection of
Children From Environmental Health
Risks and Safety Risks
Executive Order 13045 (62 FR 19885;
April 23, 1997) directs Federal agencies
to include an evaluation of the health
and safety effects of the planned
regulation on children in Federal health
and safety standards and explain why
the regulation is preferable to
potentially effective and reasonably
feasible alternatives. This action is not
subject to Executive Order 13045
because it is not economically
E:\FR\FM\25AUR2.SGM
25AUR2
58474
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
significant as defined in Executive
Order 12866, and because the EPA does
not believe the environmental health or
safety risks addressed by this action
present a disproportionate risk to
children. The EPA does not believe
there are disproportionate risks to
children because the new subpart AAb
lowers emissions from the melt shop
during melting and refining, which will
benefit children’s health; and other
changes made to all subparts, AA, AAa,
and AAb, increase compliance with
emission limits, which also benefits
children’s health. However, EPA’s
Policy on Children’s Health applies to
this action. Information on how the
Policy was applied is available under
‘‘Children’s Environmental Health’’ in
the Supplementary Information section
of this preamble.
ddrumheller on DSK120RN23PROD with RULES2
H. Executive Order 13211: Actions
Concerning Regulations That
Significantly Affect Energy Supply,
Distribution, or Use
This action is not subject to Executive
Order 13211, because it is not a
significant regulatory action under
Executive Order 12866.
I. National Technology Transfer and
Advancement Act (NTTAA) and 1 CFR
Part 51
This action involves technical
standards. Therefore, the EPA
conducted searches for the EAF NSPS
through the Enhanced National
Standards Systems Network Database
managed by the American National
Standards Institute (ANSI). We also
contacted voluntary consensus
standards (VCS) organizations and
accessed and searched their databases.
We conducted searches for EPA
Methods 1, 2, 3, 3A, 3B, 4, 5, 5D, and
22 of 40 CFR part 60, appendix A.
During the EPA’s VCS search, if the title
or abstract (if provided) of the VCS
described technical sampling and
analytical procedures that are similar to
the EPA’s reference method, the EPA
reviewed it as a potential equivalent
method. We reviewed all potential
standards to determine the practicality
of the VCS for this rule. This review
requires significant method validation
data that meet the requirements of EPA
Method 301 for accepting alternative
methods or scientific, engineering and
policy equivalence to procedures in the
EPA reference methods. The EPA may
reconsider determinations of
impracticality when additional
information is available for a particular
VCS. No applicable VCS were identified
for EPA Methods 5D and 22.
The EPA is incorporating by reference
the VCS ANSI/ASME PTC 19.10–1981,
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
‘‘Flue and Exhaust Gas Analyses,’’ to
provide that the manual procedures (but
not instrumental procedures) of VCS
ANSI/ASME PTC 19.10–1981—Part 10
may be used as an alternative to EPA
Method 3B. The manual procedures (but
not instrumental procedures) of VCS
ANSI/ASME PTC 19.10–1981—Part 10
may be used as an alternative to EPA
Method 3B for measuring the oxygen or
carbon dioxide content of the exhaust
gas. This standard is acceptable as an
alternative to EPA Method 3B and is
available from ASME at www.asme.org;
by mail at Three Park Avenue, New
York, NY 10016–5990; or by telephone
at (800) 843–2763. This method
determines quantitatively the gaseous
constituents of exhausts resulting from
stationary combustion sources. The
gases covered in ANSI/ASME PTC
19.10–1981 are oxygen, carbon dioxide,
carbon monoxide, nitrogen, sulfur
dioxide, sulfur trioxide, nitric oxide,
nitrogen dioxide, hydrogen sulfide, and
hydrocarbons. However, the use in this
rule is only applicable to oxygen and
carbon dioxide.
In the final rule, the EPA is
incorporating by reference the VCS
ASTM D7520–16, Standard Test Method
for Determining the Opacity of a Plume
in the Outdoor Ambient Atmosphere,
which is an instrumental method to
determine plume opacity in the outdoor
ambient environment as an alternative
to visual measurements made by
certified smoke readers in accordance
with EPA Method 9. The concept of
ASTM D7520–16, also known as the
Digital Camera Opacity Technique or
DCOT, is a test protocol to determine
the opacity of visible emissions using a
digital camera. It was based on previous
method development using digital still
cameras and field testing of those
methods. The purpose of ASTM D7520–
16 is to set a minimum level of
performance for products that use DCOT
to determine plume opacity in ambient
environments. The DCOT method is an
acceptable alternative to EPA Method 9
with the following caveats:
• During the DCOT certification
procedure outlined in Section 9.2 of
ASTM D7520–16, the facility or the
DCOT vendor must present the plumes
in front of various backgrounds of color
and contrast representing conditions
anticipated during field use such as blue
sky, trees, and mixed backgrounds
(clouds or a sparse tree stand).
• The facility must also have standard
operating procedures in place including
daily or other frequency quality checks
to ensure the equipment is within
manufacturing specifications as
outlined in Section 8.1 of ASTM
D7520–16.
PO 00000
Frm 00034
Fmt 4701
Sfmt 4700
• The facility must follow the
recordkeeping procedures outlined in
40 CFR 63.10(b)(1) for the DCOT
certification, compliance report, data
sheets, and all raw unaltered JPEGs used
for opacity and certification
determination.
• The facility or the DCOT vendor
must have a minimum of 4 independent
technology users apply the software to
determine the visible opacity of the 300
certification plumes. For each set of 25
plumes, the user may not exceed 15
percent opacity of any one anyone
reading, and the average error must not
exceed 7.5 percent opacity.
• This approval does not provide or
imply a certification or validation of any
vendor’s hardware or software. The
onus to maintain and verify the
certification or training of the DCOT
camera, software, and operator in
accordance with ASTM D7520–16 is on
the facility, DCOT operator, and DCOT
vendor. This method describes
procedures to determine the opacity of
a plume, using digital imagery and
associated hardware and software,
where opacity is caused by PM emitted
from a stationary point source in the
outdoor ambient environment. The
opacity of emissions is determined by
the application of a DCOT that consists
of a digital still camera, analysis
software, and the output function’s
content to obtain and interpret digital
images to determine and report plume
opacity. The ASTM D7520–16
document is available from ASTM at
www.astm.org or 1100 Barr Harbor
Drive, West Conshohocken, PA 19428–
2959, telephone number: (610) 832–
9500, fax number: (610) 832–9555 at
service@astm.org.
The EPA is finalizing the use of the
guidance document, Fabric Filter Bag
Leak Detection Guidance, EPA–454/R–
98–015, Office of Air Quality Planning
and Standards (OAQPS), U.S.
Environmental Protection Agency,
Research Triangle Park, North Carolina,
September 1997. This document
provides guidance on the use of
triboelectric monitors as fabric filter bag
leak detectors. The document includes
fabric filter and monitoring system
descriptions; guidance on monitor
selection, installation, setup,
adjustment, and operation; and quality
assurance procedures. The document is
available at https://nepis.epa.gov/Exe/
ZyPDF.cgi?Dockey=2000D5T6.PDF.
Additional information for the VCS
search and determinations can be found
in the three memoranda titled Voluntary
Consensus Standard Results for
Standards of Performance for Steel
Plants: Electric Arc Furnaces
Constructed After October 21, 1974, and
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
On or Before August 17, 1983; Voluntary
Consensus Standard Results for
Standards of Performance for Steel
Plants: Electric Arc Furnaces and
Argon-Oxygen Decarburization Vessels
Constructed After August 17, 1983, and
On or Before May 16, 2022; and
Voluntary Consensus Standard Results
for Standards of Performance for Steel
Plants: Electric Arc Furnaces and
Argon-Oxygen Decarburization Vessels
Constructed After May 16, 2022,
available in the docket for this final
rule.
ddrumheller on DSK120RN23PROD with RULES2
J. Executive Order 12898: Federal
Actions To Address Environmental
Justice in Minority Populations and
Low-Income Populations
Executive Order 12898 (59 FR 7629;
February 16, 1994) directs Federal
agencies, to the greatest extent
practicable and permitted by law, to
make environmental justice part of their
mission by identifying and addressing,
as appropriate, disproportionately high
and adverse human health or
environmental effects of their programs,
policies, and activities on minority
populations (people of color and/or
Indigenous peoples) and low-income
populations.
The EPA believes that the human
health and environmental conditions
that exist prior to this action do not
result in disproportionate and adverse
effects on people of color, low-income
populations, and/or indigenous peoples
if a modified or reconstructed EAF
facility becomes subject to the final rule
for 40 CFR part 60, subpart AAb,
considering the demographics analysis
for the existing EAF facilities described
in section V.F of this preamble.
However, it is unknown where new EAF
facilities will be located so it is not
possible to predict the impacts of these
facilities on people of color, low-income
populations, and/or indigenous peoples.
The EPA believes that this action is
not likely to result in new
disproportionate and adverse effects on
people of color, low-income populations
and/or indigenous peoples. The impacts
of these final rules are beneficial to all
demographic groups, and include
requirements to clarify current rules in
40 CFR part 60, subparts AA, AAa and,
for new sources built after publication
of this final rule (in 40 CFR part 60,
subpart AAb), to ensure compliance via
frequent testing, to meet a lower opacity
limit for melt shops during melting and
refining, to meet a baghouse emissions
limit as a facility-wide total in lb/ton,
and to meet all the promulgated
standards at all times, including periods
of SSM.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
The information supporting this
Executive Order review is contained in
section V.F of this preamble and in a
technical report, Analysis of
Demographic Factors For Populations
Living Near Steel Plants Using Electric
Arc Furnaces, located in the docket for
this rule. Because the EPA does not
know where new facilities will be
located that will become subject to this
new 40 CFR part 60, subpart AAb, a
demographic analysis was performed on
the existing EAF/AOD population,
which could become subject to 40 CFR
part 60, subpart AAb if a modification
or reconstruction increases emissions.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and
the EPA will submit a rule report to
each House of the Congress and to the
Comptroller General of the United
States. This action is not a ‘‘major rule’’
as defined by 5 U.S.C. 804(2).
List of Subjects in 40 CFR Part 60
Environmental protection,
Administrative practice and procedures,
Air pollution control, Incorporation by
reference, Reporting and recordkeeping
requirements.
Michael S. Regan,
Administrator.
For the reasons set forth in the
preamble, the EPA amends 40 CFR part
60 as follows:
§ 60.270 Applicability and designation of
affected facility.
1. The authority citation for part 60
continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart A—General Provisions.
2. Section 60.17 is amended by
revising paragraphs (g)(14), (h)(206), and
(j)(2) to read as follows:
■
Incorporation by reference.
*
*
*
*
(g) * * *
(14) ASME/ANSI PTC 19.10–1981,
Flue and Exhaust Gas Analyses [Part 10,
Instruments and Apparatus], (Issued
August 31, 1981), IBR approved for
§§ 60.56c(b); 60.63(f); 60.106(e);
60.104a(d), (h), (i), and (j); 60.105a(b),
(d), (f), and (g); 60.106a(a); 60.107a(a),
(c), and (d); 60.275(e); 60.275a(e);
60.275b(e); tables 1 and 3 to subpart
EEEE; tables 2 and 4 to subpart FFFF;
table 2 to subpart JJJJ; §§ 60.285a(f);
60.396(a); 60.2145(s) and (t); 60.2710(s)
and (t); 60.2730(q); 60.4415(a);
60.4900(b); 60.5220(b); tables 1 and 2 to
subpart LLLL; tables 2 and 3 to subpart
PO 00000
Frm 00035
Fmt 4701
Sfmt 4700
Subpart AA—Standards of
Performance for Steel Plants: Electric
Arc Furnaces Constructed After
October 21, 1974, and On or Before
August 17, 1983
3. Section 60.270 is amended by
revising paragraph (b) to read as follows:
■
*
MMMM; §§ 60.5406(c); 60.5406a(c);
60.5407a(g); 60.5413(b); 60.5413a(b);
and (d).
*
*
*
*
*
(h) * * *
(206) ASTM D7520–16, Standard Test
Method for Determining the Opacity of
a Plume in the Outdoor Ambient
Atmosphere, approved April 1, 2016;
IBR approved for §§ 60.271(k); 60.272(a)
and (b); 60.273(c) and (d); 60.274(h);
60.275(e); 60.276(c); 60.271a; 60.272a(a)
and (b); 60.273a(c) and (d); 60.274a(h);
60.275a(e); 60.276a(f); 60.271b;
60.272b(a) and (b); 60.273b(c) and (d);
60.274b(h); 60.275b(e); 60.276b(f);
60.374a(d).
*
*
*
*
*
(j) * * *
(2) EPA–454/R–98–015, Office of Air
Quality Planning and Standards
(OAQPS), Fabric Filter Bag Leak
Detection Guidance, September 1997,
https://nepis.epa.gov/Exe/
ZyPDF.cgi?Dockey=2000D5T6.PDF; IBR
approved for §§ 60.273(e); 60.273a(e);
60.273b(e); 60.373a(b); 60.2145(r);
60.2710(r); 60.4905(b); 60.5225(b).
*
*
*
*
*
■
PART 60—STANDARDS OF
PERFORMANCE FOR NEW
STATIONARY SOURCES
§ 60.17
58475
*
*
*
*
*
(b) The provisions of this subpart
apply to each affected facility identified
in paragraph (a) of this section that
commenced construction, modification,
or reconstruction after October 21, 1974,
and on or before August 17, 1983, where
a modification is any physical change
in, or change in the method of operation
of, an existing facility which increases
the amount of any air pollutant (to
which this standard applies) emitted
into the atmosphere by that facility or
which results in the emission of any air
pollutant (to which this standard
applies) into the atmosphere not
previously emitted.
■ 4. Section 60.271 is amended by:
■ a. Revising paragraphs (a), (d) through
(f), (i) through (k), (m), and (n); and
■ b. Adding new paragraphs (p) through
(r).
The revisions and additions read as
follows:
§ 60.271
*
E:\FR\FM\25AUR2.SGM
*
Definitions.
*
25AUR2
*
*
ddrumheller on DSK120RN23PROD with RULES2
58476
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
(a) Electric arc furnace (EAF) means a
furnace that produces molten steel and
heats the charge materials with
electricity using carbon electrodes.
Furnaces that continuously feed directreduced iron ore pellets as the primary
source of iron are not affected facilities
within the scope of this definition.
*
*
*
*
*
(d) Capture system means the
equipment (including ducts, hoods,
fans, dampers, etc.) used to capture
particulate matter generated by the
operation of an EAF and transport
captured particulate matter to the air
pollution control device.
(e) Charge means the addition of iron
and steel scrap or other materials into
the shell of an electric arc furnace.
(f) Charging period means the time
period when iron and steel scrap or
other materials are added into the top of
an EAF until the melting and refining
period commences.
*
*
*
*
*
(i) Melting and refining means that
phase of the steel production cycle
when charge material is melted and
undesirable elements are removed from
the metal.
(j) Melting and refining period means
the time period commencing at the
initial energizing of the electrode to
begin the melting process and ending at
the initiation of the tapping period,
excluding any intermediate times when
the electrodes are not energized as part
of the melting process.
(k) Shop opacity means the arithmetic
average of 24 or more opacity
observations of any EAF emissions
emanating from, and not within, the
shop, taken in accordance with EPA
Method 9 of appendix A of this part.
Alternatively, ASTM D7520–16
(incorporated by reference, see § 60.17),
may be used with the following five
conditions: (1) During the digital camera
opacity technique (DCOT) certification
procedure outlined in Section 9.2 of
ASTM D7520–16 (incorporated by
reference, see § 60.17), the owner or
operator or the DCOT vendor must
present the plumes in front of various
backgrounds of color and contrast
representing conditions anticipated
during field use such as blue sky, trees,
and mixed backgrounds (clouds and/or
a sparse tree stand);
(2) The owner or operator must also
have standard operating procedures in
place including daily or other frequency
quality checks to ensure the equipment
is within manufacturing specifications
as outlined in Section 8.1 of ASTM
D7520–16 (incorporated by reference,
see § 60.17);
(3) The owner or operator must follow
the recordkeeping procedures outlined
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
in § 60.7(f) for the DCOT certification,
compliance report, data sheets, and all
raw unaltered JPEGs used for opacity
and certification determination;
(4) The owner or operator or the
DCOT vendor must have a minimum of
four independent technology users
apply the software to determine the
visible opacity of the 300 certification
plumes. For each set of 25 plumes, the
user may not exceed 15 percent opacity
of anyone reading and the average error
must not exceed 7.5 percent opacity;
(5) Use of this approved alternative
does not provide or imply a certification
or validation of any vendor’s hardware
or software. The onus to maintain and
verify the certification and/or training of
the DCOT camera, software, and
operator in accordance with ASTM
D7520–16 (incorporated by reference,
see § 60.17) and these requirements is
on the facility, DCOT operator, and
DCOT vendor.
*
*
*
*
*
(m) Shop means the building that
houses one or more EAF’s and serves as
the point from which compliance with
§ 60.272(a)(3), ‘‘Standard for Particulate
Matter,’’ is measured.
(n) Direct shell evacuation system
means any system that creates and
maintains a negative pressure within the
EAF shell during melting and refining,
and transports emissions to the control
device.
*
*
*
*
*
(p) Damper means any device used to
open, close or throttle a DEC system or
hood designed to capture emissions
from an EAF and route them to the
associated control device(s). It does not
include isolation dampers used to
isolate a fan or baghouse compartment
for repair or cleaning, or dampers
controlling collection of emissions from
equipment other than an EAF.
(q) Negative-pressure fabric filter
means a fabric filter with the fans on the
downstream side of the filter bags.
(r) Positive-pressure fabric filter
means a fabric filter with the fans on the
upstream side of the filter bags.
■ 5. Section 60.272 is amended by
revising paragraphs (a)(2), (a)(3)
introductory text, and (b) to read as
follows:
§ 60.272
Standard for particulate matter.
(a) * * *
(2) Exit from a control device and
exhibit three percent opacity or greater,
as measured in accordance with EPA
Method 9 of appendix A of this part, or,
as an alternative, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271.
PO 00000
Frm 00036
Fmt 4701
Sfmt 4700
(3) Exit from a shop and, due solely
to operations of any EAF(s), exhibit 6
percent opacity or greater, as measured
in accordance with EPA Method 9 of
appendix A of this part, or, as an
alternative, according to ASTM D7520–
16 (incorporated by reference, see
§ 60.17), with the caveats described
under Shop opacity in § 60.271. Shop
opacity shall be recorded for any
point(s) where visible emissions are
observed. Where it is possible to
determine that a number of visible
emission sites relate to only one
incident of visible emissions, only one
observation of shop opacity will be
required. In this case, the shop opacity
observations must be made for the site
of highest opacity that directly relates to
the cause (or location) of visible
emissions observed during a single
incident, except:
*
*
*
*
*
(b) On and after the date on which the
performance test required to be
conducted by § 60.8 is completed, no
owner or operator subject to the
provisions of this subpart shall cause to
be discharged into the atmosphere from
dust-handling equipment any gases
which exhibit 10 percent opacity or
greater, as measured in accordance with
EPA Method 9 of appendix A of this
part, or, as an alternative, according to
ASTM D7520–16 (incorporated by
reference, see § 60.17), with the caveats
described under Shop opacity in
§ 60.271.
■ 6. Section 60.273 is amended by:
■ a. Revising paragraphs (c), (d), (e)
introductory text and (e)(3);
■ b. In paragraph (e)(4) introductory
text, remove the text ‘‘the U.S.
Environmental Protection Agency
guidance document ‘‘Fabric Filter Bag
Leak Detection Guidance’’ (EPA–454/R–
98–015)’’ and add, in its place, the text
‘‘EPA–454/R–98–015, Fabric Filter Bag
Leak Detection Guidance (incorporated
by reference, see § 60.17)’’;
■ c. Revising paragraphs (e)(6)(ii), and
(7), (f) introductory text, and (f)(1) and
(5);
■ d. Redesignating paragraph (f)(6) as
paragraph (f)(7);
■ e. Adding new paragraph (f)(6); and
■ f. Revising paragraph (g).
The revisions and addition read as
follows:
§ 60.273
Emission monitoring.
*
*
*
*
*
(c) A continuous monitoring system
for the measurement of the opacity of
emissions discharged into the
atmosphere from the control device(s) is
not required on any modular, multistack, negative-pressure or positive-
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
pressure fabric filter or on any singlestack fabric filter if observations of the
opacity of the visible emissions from the
control device are performed by a
certified visible emission observer and
the owner installs and operates a bag
leak detection system according to
paragraph (e) of this section whenever
the control device is being used to
remove particulate matter from the EAF.
Visible emission observations shall be
conducted at least once per day of the
control device for at least three 6-minute
periods when the furnace is operating in
the melting and refining period. All
visible emissions observations shall be
conducted in accordance with EPA
Method 9 of appendix A to this part, or,
as an alternative, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271. If
visible emissions occur from more than
one point, the opacity shall be recorded
for any points where visible emissions
are observed. Where it is possible to
determine that a number of visible
emission points relate to only one
incident of the visible emission, only
one set of three 6-minute observations
will be required. In that case, the EPA
Method 9 observations must be made for
the point of highest opacity that directly
relates to the cause (or location) of
visible emissions observed during a
single incident. Records shall be
maintained of any 6-minute average that
is in excess of the emission limit
specified in § 60.272(a)(2).
(d) A furnace static pressure
monitoring device is not required on
any EAF equipped with a DEC system
if observations of shop opacity are
performed by a certified visible
emission observer as follows:
(1) At least once per day when the
furnace is operating.
(2) No less than once per week,
commencing from the tap of one EAF
heat cycle to the tap of the following
heat cycle. A melt shop with more than
one EAF shall conduct these readings
while both EAFs are in operation. Both
EAFs are not required to be on the same
schedule for tapping.
(3) Shop opacity shall be determined
as the arithmetic average of 24 or more
consecutive 15-second opacity
observations of emissions from the shop
taken in accordance with EPA Method
9, or, as an alternative, according to
ASTM D7520–16 (incorporated by
reference, see § 60.17), with the caveats
described under Shop opacity in
§ 60.271. Shop opacity shall be recorded
for any point(s) where visible emissions
are observed in proximity to an affected
EAF. Where it is possible to determine
that a number of visible emission points
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
relate to only one incident of visible
emissions, only one observation of shop
opacity will be required. In this case,
the shop opacity observations must be
made for the point of highest opacity
that directly relates to the cause (or
location) of visible emissions observed
during a single incident.
(e) A bag leak detection system must
be installed on all single-stack fabric
filters and operated whenever the
control device is being used to remove
particulate matter from the EAF if the
owner or operator elects not to install
and operate a continuous opacity
monitoring system as provided for
under paragraph (c) of this section. In
addition, the owner or operator shall
meet the visible emissions observation
requirements in paragraph (c) of this
section. The bag leak detection system
must meet the specifications and
requirements of paragraphs (e)(1)
through (8) of this section.
*
*
*
*
*
(3) The bag leak detection system
must be equipped with an alarm system
that will activate when an increase in
relative particulate loading is detected
over the alarm set point established
according to paragraph (e)(4) of this
section, and the alarm must be located
such that it can be identified by the
appropriate plant personnel.
*
*
*
*
*
(6) * * *
(ii) If opacities greater than zero
percent are observed over four
consecutive 15-second observations
during the daily opacity observations
required under paragraph (c) of this
section and the alarm on the bag leak
detection system alarm is not activated,
the owner or operator shall lower the
alarm set point on the bag leak detection
system to a point where the alarm
would have been activated during the
period when the opacity observations
were made.
(7) For negative pressure, induced air
baghouses, and positive pressure
baghouses that are discharged to the
atmosphere through a stack, the bag leak
detection sensor must be installed
downstream of the baghouse or
upstream of any wet scrubber.
*
*
*
*
*
(f) For each bag leak detection system
installed according to paragraph (e) of
this section, the owner or operator shall
initiate procedures to determine the
cause of all alarms within 1 hour of an
alarm. The cause of the alarm must be
alleviated within 24 hours of the time
the alarm occurred by taking whatever
response action(s) are necessary.
Response actions may include, but are
not limited to the following:
PO 00000
Frm 00037
Fmt 4701
Sfmt 4700
58477
(1) Inspecting the baghouse for air
leaks, torn or broken bags or filter
media, or any other condition that may
have caused an increase in particulate
emissions;
*
*
*
*
*
(5) Cleaning the bag leak detection
system probe or otherwise repairing the
bag leak detection system;
(6) Establishing to the extent
acceptable by the delegated authority
that the alarm was a false alarm and not
caused by a bag leak or other
malfunction that could reasonably result
in excess particulate emissions; or
*
*
*
*
*
(g) In approving the site-specific
monitoring plan required in paragraph
(e)(4) of this section, the Administrator
or delegated authority may allow
owners or operators more than 24 hours
to alleviate specific conditions that
cause an alarm if the owner or operator
identifies the condition that could lead
to an alarm in the monitoring plan,
adequately explains why it is not
feasible to alleviate the condition within
24 hours of the time the alarm occurred,
and demonstrates that the requested
additional time will ensure alleviation
of the condition as expeditiously as
practicable.
■ 7. Section 60.274 is amended by
revising paragraphs (b) through (g), and
(i) to read as follows:
§ 60.274
Monitoring of operations.
*
*
*
*
*
(b) Except as provided under
paragraph (d) of this section, the owner
or operator subject to the provisions of
this subpart shall:
(1) Monitor and record on a
continuous basis the rolling 15-minute
average furnace static pressure (if a DEC
system is in use, and a furnace static
pressure gauge is installed according to
paragraph (f) of this section) and either:
(i) Install, calibrate, and maintain a
monitoring device that continuously
records the capture system fan motor
amperes and damper position(s);
(ii) Install, calibrate, and maintain a
monitoring device that continuously
records on a rolling 15-minute average
basis either the volumetric flow rate
through each separately ducted hood; or
(iii) Install, calibrate, and maintain a
monitoring device that continuously
records the volumetric flow rate at the
control device inlet and continuously
record damper position(s).
(2) The volumetric flow monitoring
device(s) may be installed in any
appropriate location in the capture
system such that reproducible flow rate
monitoring will result. The flow rate
monitoring device(s) shall have an
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
58478
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
accuracy of ±10 percent over its normal
operating range and shall be calibrated
according to the manufacturer’s
instructions. The Administrator may
require the owner or operator to
demonstrate the accuracy of the
monitoring device(s) relative to EPA
Methods 1 and 2 of appendix A of this
part.
(3) Parameters monitored pursuant to
this paragraph, excluding damper
position, shall be recorded on a rolling
averaging period not to exceed 15
minutes.
(c) When the owner or operator of an
affected facility is required to
demonstrate compliance with the
standards under § 60.272(a)(3) and at
any other time that the Administrator
may require (under section 114 of the
CAA, as amended), the owner or
operator shall determine during periods
in which a hood is operated for the
purpose of capturing emissions from the
affected facility subject to paragraph (b)
of this section, either:
(1) Monitor and record the fan motor
amperes at each damper position, and
damper position consistent with
paragraph (i)(5) of this section;
(2) install, calibrate, and maintain a
monitoring device that continuously
records the volumetric flow rate through
each separately ducted hood; or
(3) install, calibrate, and maintain a
monitoring device that continuously
records the volumetric flow rate at the
control device inlet and monitor and
record the damper position consistent
with paragraph (i)(5) of this section.
(4) Parameters monitored pursuant to
this paragraph, excluding damper
position, shall be recorded on a rolling
averaging period not to exceed 15
minutes.
(5) The owner or operator may
petition the Administrator or delegated
authority for reestablishment of these
parameters whenever the owner or
operator can demonstrate to the
Administrator’s or delegated authority’s
satisfaction that the EAF operating
conditions upon which the parameters
were previously established are no
longer applicable. The values of the
parameters as determined during the
most recent demonstration of
compliance shall be the appropriate
operational range or control set point
throughout each applicable period.
Operation at values beyond the accepted
operational range or control set point
may be subject to the requirements of
§ 60.276(a).
(d) The owner or operator may
petition the Administrator or delegated
authority to approve any alternative
method that will provide a continuous
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
record of operation of each emission
capture system.
(e) The owner or operator shall
perform monthly operational status
inspections of the equipment that is
important to the performance of the
total capture system (i.e., pressure
sensors, dampers, and damper
switches). This inspection shall include
observations of the physical appearance
of the equipment (e.g., presence of hole
in ductwork or hoods, flow
constrictions caused by dents or excess
accumulations of dust in ductwork, and
fan erosion) and building inspections to
ensure that the building does not have
any holes or other openings for
particulate matter laden air to escape.
Any deficiencies that are determined by
the operator to materially impact the
efficacy of the capture system shall be
noted and proper maintenance
performed.
(f) Except as provided for under
§ 60.273(d), where emissions during any
phase of the heat time are controlled by
use of a direct shell evacuation system,
the owner or operator shall install,
calibrate, and maintain a monitoring
device that continuously records the
pressure in the free space inside the
EAF. The pressure shall be recorded as
no greater than 15-minute integrated
block averages. The monitoring device
may be installed in any appropriate
location in the EAF or DEC duct prior
to the introduction of ambient air such
that reproducible results will be
obtained. The pressure monitoring
device shall have an accuracy of ±5 mm
of water gauge over its normal operating
range and shall be calibrated according
to the manufacturer’s instructions.
(g) Except as provided for under
§ 60.273(d), when the owner or operator
of an EAF is required to demonstrate
compliance with the standard under
§ 60.272(a)(3) and at any other time the
Administrator may require (under
section 114 of the Act, as amended), the
pressure in the free space inside the
furnace shall be determined during the
melting and refining period(s) using the
monitoring device under paragraph (f)
of this section. The owner or operator
may petition the Administrator or
delegated authority for reestablishment
of the 15-minute integrated average
pressure whenever the owner or
operator can demonstrate to the
Administrator’s or delegated authority’s
satisfaction that the EAF operating
conditions upon which the pressures
were previously established are no
longer applicable. The pressure range or
control setting during the most recent
demonstration of compliance shall be
maintained at all times the EAF is
operating in a melting and refining
PO 00000
Frm 00038
Fmt 4701
Sfmt 4700
period. Continuous operation at
pressures higher than the operational
range or control setting may be
considered by the Administrator or
delegated authority to be unacceptable
operation and maintenance of the
affected facility.
*
*
*
*
*
(i) During any performance test
required under § 60.8, and for any report
thereof required by § 60.276(c) of this
subpart or to determine compliance
with § 60.272(a)(3) of this subpart, the
owner or operator shall monitor the
following information for all heats
covered by the test:
(1) Charge weights and materials, and
tap weights and materials;
(2) Heat times, including start and
stop times, and a log of process
operation, including periods of no
operation during testing and, if a
furnace static pressure monitoring
device is operated pursuant to
paragraph (f) of this section, the
pressure inside the furnace when DEC
systems are used;
(3) Control device operation log;
(4) Continuous opacity monitor or
EPA Method 9 data, or, as an alternative
to EPA Method 9, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271;
(5) All damper positions, no less
frequently than performed in the latest
melt shop opacity compliance test for a
full heat, if selected as a method to
demonstrate compliance under
paragraph (b) of this section;
(6) Fan motor amperes at each damper
position, if selected as a method to
demonstrate compliance under
paragraph (b) of this section;
(7) Volumetric air flow rate through
each separately ducted hood, if selected
as a method to demonstrate compliance
under paragraph (b) of this section; and
(8) Static pressure at each separately
ducted hood, if selected as a method to
demonstrate compliance under
paragraph (b) of this section.
(9) Parameters monitored pursuant to
paragraphs (i)(6)–(8) of this section shall
be recorded on a rolling averaging
period not to exceed 15 minutes.
■ 8. Section 60.275 is amended by:
■ a. Revising paragraphs (a) and (b)(2);
■ b. Adding paragraph (b)(3);
■ c. Revising paragraphs (c), (e)(1), (3),
and (4);
■ d. Removing paragraph (g);
■ e. Redesignating existing paragraphs
(h) through (j) as paragraphs (g) through
(i), respectively; and
■ f. Revising newly redesignated
paragraphs (g) introductory text, (g)(3),
and (h).
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
The revisions and additions read as
follows:
ddrumheller on DSK120RN23PROD with RULES2
§ 60.275
Test methods and procedures.
(a) During performance tests required
in § 60.8, the owner or operator shall not
add gaseous diluent to the effluent gas
after the fabric filter in any pressurized
fabric collector, unless the amount of
dilution is separately determined and
considered in the determination of
emissions.
(b) * * *
(2) Use a method that is acceptable to
the Administrator or delegated authority
and that compensates for the emissions
from the facilities not subject to the
provisions of this subpart.
(3) Any combination of the criteria of
paragraphs (b)(1) and (b)(2) of this
section.
(c) When emissions from any EAF(s)
are combined with emissions from
facilities not subject to the provisions of
this subpart, compliance with
§ 60.272(a)(3) will be based on
emissions from only the affected
facility(ies). The owner or operator may
use operational knowledge to determine
the facilities that are the sources, in
whole or in part, of any emissions
observed in demonstrations of
compliance with § 60.272(a)(3).
*
*
*
*
*
(e) * * *
(1) EPA Method 5 (and referenced
EPA Methods 1, 2, 3, 3A, 3B, and 4)
shall be used for negative-pressure
fabric filters and other types of control
devices and EPA Method 5D (and
referenced EPA Method 5) shall be used
for positive-pressure fabric filters to
determine the particulate matter
concentration and, if applicable, the
volumetric flow rate of the effluent gas.
The sampling time and sample volume
for each run shall be at least 4 hours and
4.5 dscm (160 dscf) and, when a single
EAF is sampled, the sampling time shall
include an integral number of heats. The
manual portions only and not the
instrumental portion of the voluntary
consensus standard ANSI/ASME PTC
19.10–1981 (incorporated by reference,
see § 60.17) is an acceptable alternative
to EPA Methods 3, 3A, and 3B.
*
*
*
*
*
(3) EPA Method 9 or, as an
alternative, ASTM D7520–16
(incorporated by reference, see § 60.17),
with the caveats described under Shop
opacity in § 60.271, and the procedures
of § 60.11 shall be used to determine
opacity.
(4) To demonstrate compliance with
§ 60.272(a)(1), (2), and (3), the EPA
Method 9 test runs shall be conducted
concurrently with the particulate matter
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
test runs, unless inclement weather
interferes.
*
*
*
*
*
(g) Where emissions from any EAF(s)
are combined with emissions from
facilities not subject to the provisions of
this subpart, the owner or operator may
use any of the following procedures for
demonstrating compliance with
§ 60.272(a)(3), except if the combined
emissions are controlled by a common
capture system and control device, in
which case the owner or operator may
use any of the following procedures
during an opacity performance test and
during shop opacity observations:
*
*
*
*
*
(3) Any combination of the criteria of
paragraphs (g)(1) and (2) of this section.
(h) If visible emissions observations
are made in lieu of using a continuous
opacity monitoring system, as allowed
for by § 60.273(c), visible emission
observations shall be conducted at least
once per day for at least three 6-minute
periods when the furnace is operating in
the melting and refining period. All
visible emissions observations shall be
conducted in accordance with EPA
Method 9. If visible emissions occur
from more than one point, the opacity
shall be recorded for any points where
visible emissions are observed. Where it
is possible to determine that a number
of visible emission sites relate to only
one incident of the visible emission,
only one set of three 6-minute
observations will be required. In that
case, the EPA Method 9 observations
must be made for the site of highest
opacity that directly relates to the cause
(or location) of visible emissions
observed during a single incident.
Records shall be maintained of any 6minute average that is in excess of the
emission limit specified in § 60.272(a).
*
*
*
*
*
■ 9. Section 60.276 is amended by:
■ a. Revising paragraphs (a), (b), (c)
introductory text, (c)(3), (4), (6)(iv), (10),
(d), and (e)(3); and
■ b. Adding paragraphs (f) through (k).
The revisions and additions read as
follows:
§ 60.276 Recordkeeping and reporting
requirements.
(a) Continuous operation at a furnace
static pressure that exceeds the
operational range or control setting
under § 60.274(g), for owners and
operators that elect to install a furnace
static pressure monitoring device under
§ 60.274(f) or operation at flow rates
lower than those established under
§ 60.274(c) may be considered by the
Administrator or delegated authority to
be unacceptable operation and
PO 00000
Frm 00039
Fmt 4701
Sfmt 4700
58479
maintenance of the affected facility.
Operation at such values shall be
reported to the Administrator or
delegated authority semiannually.
(b) When the owner or operator of an
EAF is required to demonstrate
compliance with the standard under
§ 60.275(b)(2) or a combination of (b)(1)
and (b)(2), the owner or operator shall
provide notice to the Administrator or
delegated authority of the procedure(s)
that will be used to determine
compliance. Notification of the
procedure(s) to be used must be
postmarked at least 30 days prior to the
performance test.
(c) For the purpose of this subpart, the
owner or operator shall conduct the
demonstration of compliance with
§ 60.272(a) of this subpart and furnish
the Administrator or delegated authority
with a written report of the results of the
test. This report shall include the
following information:
*
*
*
*
*
(3) Make and model of the control
device, and continuous opacity
monitoring equipment, if applicable;
(4) Flow diagram of process and
emission capture system including other
equipment or process(es) ducted to the
same control device;
*
*
*
*
*
(6) * * *
(iv) Continuous opacity monitor or
EPA Method 9 data, or, as an alternative
to EPA Method 9, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271.
*
*
*
*
*
(10) Test observers from any outside
agency;
*
*
*
*
*
(d) The owner or operator shall
maintain records of all shop opacity
observations made in accordance with
§ 60.273(d). All shop opacity
observations in excess of the emission
limit specified in § 60.272(a)(3) of this
subpart shall indicate a period of excess
emissions, and shall be reported to the
Administrator or delegated authority
semi-annually, according to § 60.7(c)
and submitted according to paragraph
(h) of this section. In addition to the
information required at § 60.7(c), the
report shall include the following
information:
(1) The company name and address of
the affected facility.
(2) An identification of each affected
facility being included in the report.
(3) Beginning and ending dates of the
reporting period.
(4) A certification by a certifying
official of truth, accuracy, and
completeness. This certification shall
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
58480
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
state that, based on information and
belief formed after reasonable inquiry,
the statements and information in the
document are true, accurate, and
complete.
(e) * * *
(3) An identification of the date and
time of all bag leak detection system
alarms, the time that procedures to
determine the cause of the alarm were
initiated, if procedures were initiated
within 1 hour of the alarm, the cause of
the alarm, an explanation of the actions
taken, the date and time the cause of the
alarm was alleviated, and if the alarm
was alleviated within 24 hours of the
alarm.
(f) Records of the measurements
required in § 60.274 must be retained for
at least 5 years following the date of the
measurement.
(g) Within 60 days after the date of
completing each performance test or
demonstration of compliance required
by this subpart, you must submit the
results of the performance test following
the procedures specified in paragraphs
(g)(1) through (3) of this section.
(1) Data collected using test methods
supported by the EPA’s Electronic
Reporting Tool (ERT) as listed on the
EPA’s ERT website (https://
www.epa.gov/electronic-reporting-airemissions/electronic-reporting-tool-ert)
at the time of the test. Submit the results
of the performance test to the EPA via
the Compliance and Emissions Data
Reporting Interface (CEDRI), which can
be accessed through the EPA’s Central
Data Exchange (CDX) (https://
cdx.epa.gov/). The data must be
submitted in a file format generated
using the EPA’s ERT. Alternatively, you
may submit an electronic file consistent
with the extensible markup language
(XML) schema listed on the EPA’s ERT
website.
(2) Data collected using test methods
that are not supported by the EPA’s ERT
as listed on the EPA’s ERT website at
the time of the test. The results of the
performance test must be included as an
attachment in the ERT or an alternate
electronic file consistent with the XML
schema listed on the EPA’s ERT
website. Submit the ERT generated
package or alternative file to the EPA via
CEDRI.
(3) Confidential business information
(CBI). Do not use CEDRI to submit
information you claim as CBI. Anything
submitted using CEDRI cannot later be
claimed CBI. Although we do not expect
persons to assert a claim of CBI, if you
wish to assert a CBI claim for some of
the information submitted under
paragraph (g)(1) or (2) of this section,
you must submit a complete file,
including information claimed to be
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
CBI, to the EPA. The file must be
generated using the EPA’s ERT or an
alternate electronic file consistent with
the XML schema listed on the EPA’s
ERT website. The preferred method to
submit CBI is for it to be transmitted
electronically using email attachments,
File Transfer Protocol (FTP), or other
online file sharing services (e.g.,
Dropbox, OneDrive, Google Drive).
Electronic submissions must be
transmitted directly to the OAQPS CBI
Office at the email address oaqpscbi@
epa.gov, and should include clear CBI
markings and note the docket ID. If
assistance is needed with submitting
large electronic files that exceed the file
size limit for email attachments, and if
you do not have your own file sharing
service, please email oaqpscbi@epa.gov
to request a file transfer link. If sending
CBI information through the postal
service, submit the file on a compact
disc, flash drive, or other commonly
used electronic storage medium and
clearly mark the medium as CBI. Mail
the electronic medium to U.S. EPA/
OAQPS/CORE CBI Office, Attention:
Group Leader, Measurement Policy
Group, MD C404–02, 4930 Old Page Rd.,
Durham, NC 27703. The same file with
the CBI omitted must be submitted to
the EPA via the EPA’s CDX as described
in paragraphs (g)(1) and (2) of this
section. All CBI claims must be asserted
at the time of submission. Furthermore,
under CAA section 114(c), emissions
data is not entitled to confidential
treatment, and the EPA is required to
make emissions data available to the
public. Thus, emissions data will not be
protected as CBI and will be made
publicly available.
(h) You must submit a report of excess
emissions and monitoring systems
performance report according to
§ 60.7(c) to the Administrator
semiannually. Submit all reports to the
EPA via CEDRI, which can be accessed
through the EPA’s CDX (https://
cdx.epa.gov/). The EPA will make all
the information submitted through
CEDRI available to the public without
further notice to you. Do not use CEDRI
to submit information you claim as CBI.
Anything submitted using CEDRI cannot
later be claimed CBI. You must use the
appropriate electronic report template
on the CEDRI website (https://
www.epa.gov/electronic-reporting-airemissions/cedri) for this subpart. The
date report templates become available
will be listed on the CEDRI website. The
report must be submitted by the
deadline specified in this subpart,
regardless of the method in which the
report is submitted. Although we do not
expect persons to assert a claim of CBI,
PO 00000
Frm 00040
Fmt 4701
Sfmt 4700
if you wish to assert a CBI claim, follow
paragraph (g)(3) of this section except
send to the attention of the Electric Arc
Furnace Sector Lead. The same file with
the CBI omitted must be submitted to
the EPA via the EPA’s CDX as described
earlier in this paragraph (h). All CBI
claims must be asserted at the time of
submission. Furthermore, under CAA
section 114(c), emissions data is not
entitled to confidential treatment, and
the EPA is required to make emissions
data available to the public. Thus,
emissions data will not be protected as
CBI and will be made publicly available.
(i) If you are required to electronically
submit a report through CEDRI in the
EPA’s CDX, you may assert a claim of
EPA system outage for failure to timely
comply with that reporting requirement.
To assert a claim of EPA system outage,
you must meet the requirements
outlined in paragraphs (i)(1) through (7)
of this section.
(1) You must have been or will be
precluded from accessing CEDRI and
submitting a required report within the
time prescribed due to an outage of
either the EPA’s CEDRI or CDX systems.
(2) The outage must have occurred
within the period of time beginning five
business days prior to the date that the
submission is due.
(3) The outage may be planned or
unplanned.
(4) You must submit notification to
the Administrator in writing as soon as
possible following the date you first
knew, or through due diligence should
have known, that the event may cause
or has caused a delay in reporting.
(5) You must provide to the
Administrator a written description
identifying:
(i) The date(s) and time(s) when CDX
or CEDRI was accessed, and the system
was unavailable;
(ii) A rationale for attributing the
delay in reporting beyond the regulatory
deadline to EPA system outage;
(iii) A description of measures taken
or to be taken to minimize the delay in
reporting; and
(iv) The date by which you propose to
report, or if you have already met the
reporting requirement at the time of the
notification, the date you reported.
(6) The decision to accept the claim
of EPA system outage and allow an
extension to the reporting deadline is
solely within the discretion of the
Administrator.
(7) In any circumstance, the report
must be submitted electronically as
soon as possible after the outage is
resolved.
(j) If you are required to electronically
submit a report through CEDRI in the
EPA’s CDX, you may assert a claim of
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
force majeure for failure to timely
comply with that reporting requirement.
To assert a claim of force majeure, you
must meet the requirements outlined in
paragraphs (j)(1) through (5) of this
section.
(1) You may submit a claim if a force
majeure event is about to occur, occurs,
or has occurred or there are lingering
effects from such an event within the
period of time beginning five business
days prior to the date the submission is
due. For the purposes of this section, a
force majeure event is defined as an
event that will be or has been caused by
circumstances beyond the control of the
affected facility, its contractors, or any
entity controlled by the affected facility
that prevents you from complying with
the requirement to submit a report
electronically within the time period
prescribed. Examples of such events are
acts of nature (e.g., hurricanes,
earthquakes, or floods), acts of war or
terrorism, or equipment failure or safety
hazard beyond the control of the
affected facility (e.g., large scale power
outage).
(2) You must submit notification to
the Administrator in writing as soon as
possible following the date you first
knew, or through due diligence should
have known, that the event may cause
or has caused a delay in reporting.
(3) You must provide to the
Administrator:
(i) A written description of the force
majeure event;
(ii) A rationale for attributing the
delay in reporting beyond the regulatory
deadline to the force majeure event;
(iii) A description of measures taken
or to be taken to minimize the delay in
reporting; and
(iv) The date by which you propose to
report, or if you have already met the
reporting requirement at the time of the
notification, the date you reported.
(4) The decision to accept the claim
of force majeure and allow an extension
to the reporting deadline is solely
within the discretion of the
Administrator.
(5) In any circumstance, the reporting
must occur as soon as possible after the
force majeure event occurs.
(k) Any records required to be
maintained by this subpart that are
submitted electronically via the EPA’s
CEDRI may be maintained in electronic
format. This ability to maintain
electronic copies does not affect the
requirement for facilities to make
records, data, and reports available
upon request to a delegated air agency
or the EPA as part of an on-site
compliance evaluation.
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
Subpart AAa—Standards of
Performance for Steel Plants: Electric
Arc Furnaces and Argon-Oxygen
Decarbonization Vessels Constructed
After August 17, 1983 and On or Before
May 16, 2022
10. Section 60.270a is amended by
revising paragraph (b) to read as follows:
■
§ 60.270a Applicability and designation of
affected facility.
*
*
*
*
*
(b) The provisions of this subpart
apply to each affected facility identified
in paragraph (a) of this section that
commences construction, modification,
or reconstruction after August 17, 1983
and on or before May 16, 2022, where
a modification is any physical change
in, or change in the method of operation
of, an existing facility which increases
the amount of any air pollutant (to
which this standard applies) emitted
into the atmosphere by that facility or
which results in the emission of any air
pollutant (to which this standard
applies) into the atmosphere not
previously emitted.
■ 11. Section 60.271a is amended by:
■ a. Revising definitions for ‘‘capture
system’’ and ‘‘charge’’;
■ b. Adding in alphabetical order the
definition for ‘‘Charging period’’ and
‘‘Damper’’;
■ c. Revising the definitions for ‘‘Directshell evacuation control system (DEC
system),’’ ‘‘Dust-handling system’’,
‘‘Electric arc furnace (EAF)’’, ‘‘Heat
cycle’’, ‘‘Meltdown and refining
period’’, ‘‘Refining’’, ‘‘Shop’’, and ‘‘Shop
opacity’’.
The revisions and additions read as
follows:
§ 60.271a
Definitions.
*
*
*
*
*
Capture system means the equipment
(including ducts, hoods, fans, dampers,
etc.) used to capture particulate matter
generated by the operation of an electric
arc furnace or AOD vessel and transport
captured particulate matter to the air
pollution control device.
Charge means the addition of iron and
steel scrap or other materials into the
shell of an electric arc furnace or the
addition of molten steel or other
materials into the top of an AOD vessel.
Charging period means the time
period when iron and steel scrap or
other materials are added into the top of
an electric arc furnace until the melting
and refining period commences.
*
*
*
*
*
Damper means any device used to
open, close or throttle a DEC system or
hood designed to capture emissions
from an EAF or AOD vessel and route
PO 00000
Frm 00041
Fmt 4701
Sfmt 4700
58481
them to the associated control device(s).
It does not include isolation dampers
used to isolate a fan or baghouse
compartment for repair or cleaning, or
dampers controlling collection of
emissions from equipment other than an
EAF or AOD vessel.
Direct-shell evacuation control system
(DEC system) means a system that
creates and maintains a negative
pressure within the electric arc furnace
shell during melting and refining, and
transports emissions to the control
device.
Dust-handling system means
equipment used to handle particulate
matter collected by the control device
for an electric arc furnace or AOD vessel
subject to this subpart. For the purposes
of this subpart, the dust-handling
system shall consist of the control
device dust hoppers, the dust-conveying
equipment, any silo, dust storage
equipment, the dust-treating equipment
(e.g., pug mill, pelletizer), dust transfer
equipment (including, but not limited to
transfers from a silo to a truck or rail
car), and any secondary control devices
used with the dust transfer equipment.
Electric arc furnace (EAF) means a
furnace that produces molten steel and
heats the charge materials with
electricity using-carbon electrodes. For
the purposes of this subpart, an EAF
shall consist of the furnace shell and
roof and the transformer. Furnaces that
continuously feed direct-reduced iron
ore pellets as the primary source of iron
are not affected facilities within the
scope of this definition.
Heat cycle means the period
beginning when scrap is charged to an
EAF shell and ending when the EAF tap
is completed or beginning when molten
steel is charged to an AOD vessel and
ending when the AOD vessel tap is
completed.
Melting and refining period means the
time period commencing at the initial
energizing of the electrode to begin the
melting process and ending at the
initiation of the tapping period,
excluding any intermediate times when
the electrodes are not energized as part
of the melting process.
*
*
*
*
*
Refining means that phase of the steel
production cycle during which
impurities are removed from the molten
steel and alloys are added to reach the
final metal chemistry.
Shop means the building that houses
one or more EAF’s or AOD vessels and
serves as the point from which
compliance with § 60.272a(a)(3),
‘‘Standard for Particulate Matter,’’ is
measured.
Shop opacity means the arithmetic
average of 24 observations of the opacity
E:\FR\FM\25AUR2.SGM
25AUR2
58482
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
of any EAF or AOD emissions
emanating from, and not within, the
shop, taken in accordance with EPA
Method 9 of appendix A of this part.
Alternatively, ASTM D7520–16
(incorporated by reference, see § 60.17),
may be used with the following five
conditions:
(1) During the digital camera opacity
technique (DCOT) certification
procedure outlined in Section 9.2 of
ASTM D7520–16 (incorporated by
reference, see § 60.17), the owner or
operator or the DCOT vendor must
present the plumes in front of various
backgrounds of color and contrast
representing conditions anticipated
during field use such as blue sky, trees,
and mixed backgrounds (clouds and/or
a sparse tree stand);
(2) The owner or operator must also
have standard operating procedures in
place including daily or other frequency
quality checks to ensure the equipment
is within manufacturing specifications
as outlined in Section 8.1 of ASTM
D7520–16 (incorporated by reference,
see § 60.17);
(3) The owner or operator must follow
the recordkeeping procedures outlined
in § 60.7(f) for the DCOT certification,
compliance report, data sheets, and all
raw unaltered JPEGs used for opacity
and certification determination;
(4) The owner or operator or the
DCOT vendor must have a minimum of
four independent technology users
apply the software to determine the
visible opacity of the 300 certification
plumes. For each set of 25 plumes, the
user may not exceed 15 percent opacity
of anyone reading and the average error
must not exceed 7.5 percent opacity;
(5) Use of this approved alternative
does not provide or imply a certification
or validation of any vendor’s hardware
or software. The onus to maintain and
verify the certification and/or training of
the DCOT camera, software, and
operator in accordance with ASTM
D7520–16 (incorporated by reference,
see § 60.17) and these requirements is
on the facility, DCOT operator, and
DCOT vendor.
*
*
*
*
*
■ 12. Revise § 60.272a to read as
follows:
ddrumheller on DSK120RN23PROD with RULES2
§ 60.272a
Standard for particulate matter.
(a) On and after the date of which the
performance test required to be
conducted by § 60.8 is completed, no
owner or operator subject to the
provisions of this subpart shall cause to
be discharged into the atmosphere from
an EAF or an AOD vessel any gases
which:
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
(1) Exit from a control device and
contain particulate matter in excess of
12 mg/dscm (0.0052 gr/dscf);
(2) Exit from a control device and
exhibit 3 percent opacity or greater, as
measured in accordance with EPA
Method 9 of appendix A of this part, or,
as an alternative, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271; and
(3) Exit from a shop and, due solely
to the operations of any affected EAF(s)
or AOD vessel(s), exhibit 6 percent
opacity or greater, as measured in
accordance with EPA Method 9 of
appendix A of this part, or, as an
alternative, according to ASTM D7520–
16 (incorporated by reference, see
§ 60.17), with the caveats described
under Shop opacity in § 60.271. Shop
opacity shall be recorded for any
point(s) where visible emissions are
observed. Where it is possible to
determine that a number of visible
emission sites relate to only one
incident of visible emissions, only one
observation of shop opacity will be
required. In this case, the shop opacity
observations must be made for the site
of highest opacity that directly relates to
the cause (or location) of visible
emissions observed during a single
incident.
(b) On and after the date on which the
performance test required to be
conducted by § 60.8 is completed, no
owner or operator subject to the
provisions of this subpart shall cause to
be discharged into the atmosphere from
the dust-handling system any gases that
exhibit 10 percent opacity or greater, as
measured in accordance with EPA
Method 9 of appendix A of this part, or,
as an alternative, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271.
■ 13. Section 60.273a is amended by:
■ a. Revising paragraphs (c), (d), (e)
introductory text, (e)(3);
■ b. In paragraph (e)(4) introductory
text, remove the text ‘‘the U.S.
Environmental Protection Agency
guidance document ‘‘Fabric Filter Bag
Leak Detection Guidance’’ (EPA–454/R–
98–015)’’ and add, in its place, the text
‘‘EPA–454/R–98–015, Fabric Filter Bag
Leak Detection Guidance (incorporated
by reference, see § 60.17)’’;
■ c. Revising paragraphs (e)(6)(i) and
(ii), (e)(7), (f) introductory text, (f)(1)
and(5);
■ d. Redesignating paragraph (f)(6) as
paragraph (f)(7);
■ e. Adding new paragraph (f)(6); and
■ f. Revising paragraph (g).
The revisions and addition read as
follows:
PO 00000
Frm 00042
Fmt 4701
Sfmt 4700
§ 60.273a
Emission monitoring.
*
*
*
*
*
(c) A continuous monitoring system
for the measurement of the opacity of
emissions discharged into the
atmosphere from the control device(s) is
not required on any modular, multistack, negative-pressure or positivepressure fabric filter or on any singlestack fabric filter if observations of the
opacity of the visible emissions from the
control device are performed by a
certified visible emission observer and
the owner installs and operates a bag
leak detection system according to
paragraph (e) of this section whenever
the control device is being used to
remove particulate matter from the EAF
or AOD. Visible emission observations
shall be conducted at least once per day
of the control device for at least three 6minute periods when the furnace is
operating in the melting and refining
period. All visible emissions
observations shall be conducted in
accordance with EPA Method 9, or, as
an alternative, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271. If
visible emissions occur from more than
one point, the opacity shall be recorded
for any points where visible emissions
are observed. Where it is possible to
determine that a number of visible
emission points relate to only one
incident of the visible emission, only
one set of three 6-minute observations
will be required. In that case, the EPA
Method 9 observations must be made for
the point of highest opacity that directly
relates to the cause (or location) of
visible emissions observed during a
single incident. Records shall be
maintained of any 6-minute average that
is in excess of the emission limit
specified in § 60.272a(a)(2).
(d) A furnace static pressure
monitoring device is not required on
any EAF equipped with a DEC system
if observations of shop opacity are
performed by a certified visible
emission observer as follows:
(1) At least once per day when the
furnace is operating.
(2) No less than once per week,
commencing from the tap of one EAF
heat cycle to the tap of the following
heat cycle. A melt shop with more than
one EAF shall conduct these readings
while both EAFs are in operation. Both
EAFs are not required to be on the same
schedule for tapping.
(3) Shop opacity shall be determined
as the arithmetic average of 24
consecutive 15-second opacity
observations of emissions from the shop
taken in accordance with EPA Method
9, or, as an alternative, according to
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ASTM D7520–16 (incorporated by
reference, see § 60.17), with the caveats
described under Shop opacity in
§ 60.271. Shop opacity shall be recorded
for any point(s) where visible emissions
are observed. Where it is possible to
determine that a number of visible
emission points relate to only one
incident of visible emissions, only one
observation of shop opacity will be
required. In this case, the shop opacity
observations must be made for the point
of highest opacity that directly relates to
the cause (or location) of visible
emissions observed during a single
incident.
(e) A bag leak detection system must
be installed on all single-stack fabric
filters and operated whenever the
control device is being used to remove
particulate matter from the EAF or AOD
vessel if the owner or operator elects not
to install and operate a continuous
opacity monitoring system as provided
for under paragraph (c) of this section.
In addition, the owner or operator shall
meet the visible emissions observation
requirements in paragraph (c) of this
section. The bag leak detection system
must meet the specifications and
requirements of paragraphs (e)(1)
through (8) of this section.
*
*
*
*
*
(3) The bag leak detection system
must be equipped with an alarm system
that will activate when an increase in
relative particulate loading is detected
over the alarm set point established
according to paragraph (e)(4) of this
section, and the alarm must be located
such that it can be identified by the
appropriate plant personnel.
*
*
*
*
*
(6) * * *
(i) Once per quarter, the owner or
operator may adjust the sensitivity of
the bag leak detection system to account
for seasonal effects including
temperature and humidity according to
the procedures identified in the sitespecific monitoring plan required under
paragraph (e)(4) of this section.
(ii) If opacities greater than zero
percent are observed over four
consecutive 15-second observations
during the daily opacity observations
required under paragraph (c) of this
section and the alarm on the bag leak
detection system alarm is not activated,
the owner or operator shall lower the
alarm set point on the bag leak detection
system to a point where the alarm
would have been activated during the
period when the opacity observations
were made.
(7) For negative pressure, induced air
baghouses, and positive pressure
baghouses that are discharged to the
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
atmosphere through a stack, the bag leak
detection sensor must be installed
downstream of the baghouse or
upstream of any wet scrubber.
*
*
*
*
*
(f) For each bag leak detection system
installed according to paragraph (e) of
this section, the owner or operator shall
initiate procedures to determine the
cause of all alarms within 1 hour of an
alarm. The cause of the alarm must be
alleviated within 24 hours of the time
the alarm occurred by taking whatever
response action(s) are necessary.
Response actions may include, but are
not limited to, the following:
(1) Inspecting the baghouse for air
leaks, torn or broken bags or filter
media, or any other condition that may
have caused an increase in particulate
emissions;
*
*
*
*
*
(5) Cleaning the bag leak detection
system probe or otherwise repairing the
bag leak detection system;
(6) Establishing to the extent
acceptable by the delegated authority
that the alarm was a false alarm and not
caused by a bag leak or other
malfunction that could reasonably result
in excess particulate emissions; and
*
*
*
*
*
(g) In approving the site-specific
monitoring plan required in paragraph
(e)(4) of this section, the Administrator
or delegated authority may allow
owners or operators more than 24 hours
to alleviate specific conditions that
cause an alarm if the owner or operator
identifies the condition that could lead
to an alarm in the monitoring plan,
adequately explains why it is not
feasible to alleviate the condition within
24 hours of the time the alarm occurred,
and demonstrates that the requested
additional time will ensure alleviation
of the condition as expeditiously as
practicable.
■ 14. Section 60.274a is amended by
revising paragraphs (b) through (h) to
read as follows:
§ 60.274a
Monitoring of operations.
*
*
*
*
*
(b) Except as provided under
paragraph (e) of this section, the owner
or operator subject to the provisions of
this subpart shall:
(1) Monitor and record on a
continuous basis the rolling 15-minute
average furnace static pressure (if a DEC
system is in use, and a furnace static
pressure gauge is installed according to
paragraph (f) of this section) and either:
(i) Install, calibrate, and maintain a
monitoring device that continuously
records the capture system fan motor
amperes and damper position(s);
PO 00000
Frm 00043
Fmt 4701
Sfmt 4700
58483
(ii) Install, calibrate, and maintain a
monitoring device that continuously
records on a rolling 15-minute average
basis either the volumetric flow rate
through each separately ducted hood; or
(iii) Install, calibrate, and maintain a
monitoring device that continuously
records the volumetric flow rate at the
control device inlet continuously record
damper positions(s).
(2) The volumetric flow monitoring
device(s) may be installed in any
appropriate location in the capture
system such that reproducible flow rate
monitoring will result. The flow rate
monitoring device(s) shall have an
accuracy of ±10 percent over its normal
operating range and shall be calibrated
according to the manufacturer’s
instructions. The Administrator may
require the owner or operator to
demonstrate the accuracy of the
monitoring device(s) relative to EPA
Methods 1 and 2 of appendix A of this
part.
(3) Parameters monitored pursuant to
this paragraph, excluding damper
position, shall be recorded on a rolling
averaging period not to exceed 15
minutes.
(c) When the owner or operator of an
affected facility is required to
demonstrate compliance with the
standards under § 60.272a(a)(3) and at
any other time that the Administrator
may require (under section 114 of the
CAA, as amended), the owner or
operator shall determine during periods
in which a hood is operated for the
purpose of capturing emissions from the
affected facility subject to paragraph (b)
of this section, all damper positions and
either the:
(1) Monitor and record the fan motor
amperes at each damper position, and
damper position consistent with
paragraph (h)(5) of this section;
(2) Install, calibrate, and maintain a
monitoring device that continuously
records the volumetric flow rate through
each separately ducted hood; or
(3) Install, calibrate, and maintain a
monitoring device that continuously
records the volumetric flow rate at the
control device inlet and monitor and
record the damper position consistent
with paragraph (h)(5) of this section.
(4) Parameters monitored pursuant to
this paragraph, excluding damper
position, shall be recorded on a rolling
averaging period not to exceed 15
minutes.
(5) The owner or operator may
petition the Administrator or delegated
authority for reestablishment of these
parameters whenever the owner or
operator can demonstrate to the
Administrator’s or delegated authority’s
satisfaction that the affected facility
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
58484
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
operating conditions upon which the
parameters were previously established
are no longer applicable. The values of
the parameters as determined during the
most recent demonstration of
compliance shall be the appropriate
operational range or control set point
throughout each applicable period.
Operation at values beyond the accepted
operational range or control set point
may be subject to the requirements of
§ 60.276a(c).
(d) Except as provided under
paragraph (e) of this section, the owner
or operator shall perform monthly
operational status inspections of the
equipment that is important to the
performance of the capture system (i.e.,
pressure sensors, dampers, and damper
switches). This inspection shall include
observations of the physical appearance
of the equipment (e.g., presence of holes
in ductwork or hoods, flow
constrictions caused by dents or excess
accumulations of dust in ductwork, and
fan erosion) and building inspections to
ensure that the building does not have
any holes or other openings for
particulate matter laden air to escape.
Any deficiencies that are determined by
the operator to materially impact the
efficacy of the capture system shall be
noted and proper maintenance
performed.
(e) The owner or operator may
petition the Administrator or delegated
authority to approve any alternative to
either the monitoring requirements
specified in paragraph (b) of this section
or the monthly operational status
inspections specified in paragraph (d) of
this section if the alternative will
provide a continuous record of
operation of each emission capture
system.
(f) Except as provided for under
§ 60.273a(d), if emissions during any
phase of the heat cycle are controlled by
the use of a DEC system, the owner or
operator shall install, calibrate, and
maintain a monitoring device that
allows the pressure in the free space
inside the EAF to be monitored. The
pressure shall be recorded as no greater
than 15-minute integrated block
averages. The monitoring device may be
installed in any appropriate location in
the EAF or DEC duct prior to the
introduction of ambient air such that
reproducible results will be obtained.
The pressure monitoring device shall
have an accuracy of ±5 mm of water
gauge over its normal operating range
and shall be calibrated according to the
manufacturer’s instructions.
(g) Except as provided for under
§ 60.273a(d), when the owner or
operator of an EAF controlled by a DEC
is required to demonstrate compliance
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
with the standard under § 60.272a(a)(3),
and at any other time the Administrator
may require (under section 114 of the
Clean Air Act, as amended), the
pressure in the free space inside the
furnace shall be determined during the
melting and refining period(s) using the
monitoring device required under
paragraph (f) of this section. The owner
or operator may petition the
Administrator or delegated authority for
reestablishment of the pressure
whenever the owner or operator can
demonstrate to the Administrator’s or
delegated authority’s satisfaction that
the EAF operating conditions upon
which the pressures were previously
established are no longer applicable.
The pressure range or control setting
during the most recent demonstration of
compliance shall be maintained at all
times when the EAF is operating in a
melting and refining period. Continuous
operation at pressures higher than the
operational range or control setting may
be considered by the Administrator or
delegated authority to be unacceptable
operation and maintenance of the
affected facility.
(h) During any performance test
required under § 60.8, and for any report
thereof required by § 60.276a(f) of this
subpart, or to determine compliance
with § 60.272a(a)(3) of this subpart, the
owner or operator shall monitor the
following information for all heats
covered by the test:
(1) Charge weights and materials, and
tap weights and materials;
(2) Heat times, including start and
stop times, and a log of process
operation, including periods of no
operation during testing and, if a
furnace static pressure monitoring
device is operated pursuant to
paragraph (f) of this section, the
pressure inside an EAF when DEC
systems are used;
(3) Control device operation log;
(4) Continuous opacity monitor or
EPA Method 9 data, or, as an alternative
to EPA Method 9, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271;
(5) All damper positions, no less
frequently than performed in the latest
melt shop opacity compliance test for a
full heat, if selected as a method to
demonstrate compliance under
paragraph (b) of this section;
(6) Fan motor amperes at each damper
position, if selected as a method to
demonstrate compliance under
paragraph (b) of this section;
(7) Volumetric air flow rate through
each separately ducted hood, if selected
as a method to demonstrate compliance
under paragraph (b) of this section; and
PO 00000
Frm 00044
Fmt 4701
Sfmt 4700
(8) Static pressure at each separately
ducted hood, if selected as a method to
demonstrate compliance under
paragraph (b) of this section.
(9) Parameters monitored pursuant to
paragraphs (h)(6) through (8) of this
section shall be recorded on a rolling
averaging period not to exceed 15
minutes.
■ 15. Section 60.275a is amended by:
■ a. Revising paragraphs (a) and (b)(2);
■ b. Adding paragraph (b)(3);
■ c. Revising paragraphs (c) and (e);
■ d. Removing paragraph (h);
■ e. Redesignating paragraphs (i) and (j)
as paragraphs (h) and (i) and revising
the newly redesignated paragraph (h).
The revisions and addition read as
follows:
§ 60.275a
Test methods and procedures.
(a) During performance tests required
in § 60.8, the owner or operator shall not
add gaseous diluents to the effluent gas
stream after the fabric filter in any
pressurized fabric filter collector, unless
the amount of dilution is separately
determined and considered in the
determination of emissions.
(b) * * *
(2) Use a method that is acceptable to
the Administrator or delegated authority
and that compensates for the emissions
from the facilities not subject to the
provisions of this subpart.
(3) Any combination of the criteria of
paragraphs (b)(1) and (b)(2) of this
section.
(c) When emission from any EAF(s) or
AOD vessel(s) are combined with
emissions from facilities not subject to
the provisions of this subpart,
compliance with § 60.272a(a)(3) will be
based on emissions from only the
affected facility(ies). The owner or
operator may use operational knowledge
to determine the facilities that are the
sources, in whole or in part, of any
emissions observed in demonstrations
of compliance with § 60.272a(a)(3).
*
*
*
*
*
(e) The owner or operator shall
determine compliance with the
particulate matter standards in § 60.272a
as follows:
(1) EPA Method 5 (and referenced
EPA Methods 1, 2, 3, 3A, 3B, and 4)
shall be used for negative-pressure
fabric filters and other types of control
devices and EPA Method 5D (and
referenced EPA Method 5) shall be used
for positive-pressure fabric filters to
determine the particulate matter
concentration and volumetric flow rate
of the effluent gas. The sampling time
and sample volume for each run shall be
at least 4 hours and 4.50 dscm (160 dscf)
and, when a single EAF or AOD vessel
E:\FR\FM\25AUR2.SGM
25AUR2
is sampled, the sampling time shall
include an integral number of heats. The
manual portions only and not the
instrumental portion of the voluntary
consensus standard ANSI/ASME PTC
19.10–1981 (incorporated by reference,
see § 60.17) is an acceptable alternative
to EPA Methods 3, 3A, and 3B.
(2) When more than one control
device serves the EAF(s) being tested,
the concentration of particulate matter
shall be determined using the following
equation:
ddrumheller on DSK120RN23PROD with RULES2
Where:
cst = average concentration of particulate
matter, mg/dscm (gr/dscf).
csi = concentration of particulate matter from
control device ‘‘i’’, mg/dscm (gr/dscf).
n = total number of control devices tested.
Qsdi = volumetric flow rate of stack gas from
control device ‘‘i’’, dscm/hr (dscf/hr).
(3) EPA Method 9 or, as an
alternative, ASTM D7520–16
(incorporated by reference, see § 60.17),
with the caveats described under Shop
opacity in § 60.271, and the procedures
of § 60.11 shall be used to determine
opacity.
(4) To demonstrate compliance with
§ 60.272a(a) (1), (2), and (3), the EPA
Method 9 test runs shall be conducted
concurrently with the particulate matter
test runs, unless inclement weather
interferes.
*
*
*
*
*
(h) Where emissions from any EAF(s)
or AOD vessel(s) are combined with
emissions from facilities not subject to
the provisions of this subpart,
determinations of compliance with
§ 60.272a(a)(3) will only be based upon
emissions originating from the affected
facility(ies), except if the combined
emissions are controlled by a common
capture system and control device, in
which case the owner or operator may
use any of the following procedures
during an opacity performance test and
during shop opacity observations:
(1) Base compliance on control of the
combined emissions; or
(2) Utilize a method acceptable to the
Administrator that compensates for the
emissions from the facilities not subject
to the provisions of this subpart.
(i) Unless the presence of inclement
weather makes concurrent testing
infeasible, the owner or operator shall
conduct concurrently the performance
tests required under § 60.8 to
demonstrate compliance with
§ 60.272a(a) (1), (2), and (3) of this
subpart.
■ 16. Section 60.276a is amended by:
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
a. Revising paragraphs (a) through (c),
(e), (f) introductory text, (f)(3) and (4),
(6)(iv), (10), (g), and (h)(3); and
■ b. Adding new paragraphs (i) through
(m).
The revisions and additions read as
follows:
■
§ 60.276a Recordkeeping and reporting
requirements.
(a) Records of the measurements
required in § 60.274a must be retained
for at least 5 years following the date of
the measurement.
(b) Each owner or operator shall
submit a written report of exceedances
of the control device opacity to the
Administrator or delegated authority
semi-annually. For the purposes of these
reports, exceedances are defined as all
6-minute periods during which the
average opacity of emissions from the
control device is 3 percent or greater.
(c) Continuous operation at a furnace
static pressure that exceeds the
operational range or control setting
under § 60.274a(g), for owners and
operators that elect to install a furnace
static pressure monitoring device under
§ 60.274a(f) or operation at flow rates
lower than those established under
§ 60.274a(c) may be considered by the
Administrator or delegated authority to
be unacceptable operation and
maintenance of the affected facility.
Operation at such values shall be
reported to the Administrator or
delegated authority semiannually.
*
*
*
*
*
(e) When the owner or operator of an
EAF or AOD is required to demonstrate
compliance with the standard under
§ 60.275a(b)(2) or a combination of
§ 60.275a(b)(1) and (b)(2) the owner or
operator shall provide notice to the
Administrator or delegated authority of
the procedure(s) that will be used to
determine compliance. Notification of
the procedure(s) to be used must be
postmarked at least 30 days prior to the
performance test.
(f) For the purpose of this subpart, the
owner or operator shall conduct the
demonstration of compliance with
§ 60.272a(a) of this subpart and furnish
the Administrator or delegated authority
with a written report of the results of the
test. This report shall include the
following information:
*
*
*
*
*
(3) Make and model of the control
device, and continuous opacity
monitoring equipment, if applicable;
(4) Flow diagram of process and
emission capture system including other
equipment or process(es) ducted to the
same control device;
*
*
*
*
*
PO 00000
Frm 00045
Fmt 4701
Sfmt 4700
58485
(6) * * *
(iv) Continuous opacity monitor or
EPA Method 9 data, or, as an alternative
to EPA Method 9, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271.
*
*
*
*
*
(10) Test observers from any outside
agency;
*
*
*
*
*
(g) The owner or operator shall
maintain records of all shop opacity
observations made in accordance with
§ 60.273a(d). All shop opacity
observations in excess of the emission
limit specified in § 60.272a(a)(3) of this
subpart shall indicate a period of excess
emissions and shall be reported to the
Administrator or delegated authority
semi-annually, according to § 60.7(c)
and submitted according to paragraph (j)
of this section. In addition to the
information required at § 60.7(c), the
report shall include the following
information:
(1) The company name and address of
the affected facility.
(2) An identification of each affected
facility being included in the report.
(3) Beginning and ending dates of the
reporting period.
(4) A certification by a certifying
official of truth, accuracy, and
completeness. This certification shall
state that, based on information and
belief formed after reasonable inquiry,
the statements and information in the
document are true, accurate, and
complete.
(h) * * *
(3) An identification of the date and
time of all bag leak detection system
alarms, the time that procedures to
determine the cause of the alarm were
initiated, if procedures were initiated
within 1 hour of the alarm, the cause of
the alarm, an explanation of the actions
taken, the date and time the cause of the
alarm was alleviated, and if the alarm
was alleviated within 24 hours of the
alarm.
(i) Within 60 days after the date of
completing each performance test or
demonstration of compliance required
by this subpart, you must submit the
results of the performance test following
the procedures specified in paragraphs
(i)(1) through (3) of this section.
(1) Data collected using test methods
supported by the EPA’s Electronic
Reporting Tool (ERT) as listed on the
EPA’s ERT website (https://
www.epa.gov/electronic-reporting-airemissions/electronic-reporting-tool-ert)
at the time of the test. Submit the results
of the performance test to the EPA via
the Compliance and Emissions Data
E:\FR\FM\25AUR2.SGM
25AUR2
ER25AU23.002
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ddrumheller on DSK120RN23PROD with RULES2
58486
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
Reporting Interface (CEDRI), which can
be accessed through the EPA’s Central
Data Exchange (CDX) (https://
cdx.epa.gov/). The data must be
submitted in a file format generated
using the EPA’s ERT. Alternatively, you
may submit an electronic file consistent
with the extensible markup language
(XML) schema listed on the EPA’s ERT
website.
(2) Data collected using test methods
that are not supported by the EPA’s ERT
as listed on the EPA’s ERT website at
the time of the test. The results of the
performance test must be included as an
attachment in the ERT or an alternate
electronic file consistent with the XML
schema listed on the EPA’s ERT
website. Submit the ERT generated
package or alternative file to the EPA via
CEDRI.
(3) Confidential business information
(CBI). Do not use CEDRI to submit
information you claim as CBI. Anything
submitted using CEDRI cannot later be
claimed CBI. Although we do not expect
persons to assert a claim of CBI, if you
wish to assert a CBI claim for some of
the information submitted under
paragraph (i)(1) or (2) of this section,
you must submit a complete file,
including information claimed to be
CBI, to the EPA. The file must be
generated using the EPA’s ERT or an
alternate electronic file consistent with
the XML schema listed on the EPA’s
ERT website. The preferred method to
submit CBI is for it to be transmitted
electronically using email attachments,
File Transfer Protocol (FTP), or other
online file sharing services (e.g.,
Dropbox, OneDrive, Google Drive).
Electronic submissions must be
transmitted directly to the OAQPS CBI
Office at the email address oaqpscbi@
epa.gov, and should include clear CBI
markings and note the docket ID. If
assistance is needed with submitting
large electronic files that exceed the file
size limit for email attachments, and if
you do not have your own file sharing
service, please email oaqpscbi@epa.gov
to request a file transfer link. If sending
CBI information through the postal
service, submit the file on a compact
disc, flash drive, or other commonly
used electronic storage medium and
clearly mark the medium as CBI. Mail
the electronic medium to U.S. EPA/
OAQPS/CORE CBI Office, Attention:
Group Leader, Measurement Policy
Group, MD C404–02, 4930 Old Page Rd.,
Durham, NC 27703. The same file with
the CBI omitted must be submitted to
the EPA via the EPA’s CDX as described
in paragraphs (i)(1) and (2) of this
section. All CBI claims must be asserted
at the time of submission. Furthermore,
under CAA section 114(c), emissions
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
data is not entitled to confidential
treatment, and the EPA is required to
make emissions data available to the
public. Thus, emissions data will not be
protected as CBI and will be made
publicly available.
(j) You must submit a report of excess
emissions and monitoring systems
performance report according to
§ 60.7(c) to the Administrator
semiannually. Submit all reports to the
EPA via CEDRI, which can be accessed
through the EPA’s CDX (https://
cdx.epa.gov/). The EPA will make all
the information submitted through
CEDRI available to the public without
further notice to you. Do not use CEDRI
to submit information you claim as CBI.
Anything submitted using CEDRI cannot
later be claimed CBI. You must use the
appropriate electronic report template
on the CEDRI website (https://
www.epa.gov/electronic-reporting-airemissions/cedri) for this subpart. The
date report templates become available
will be listed on the CEDRI website. The
report must be submitted by the
deadline specified in this subpart,
regardless of the method in which the
report is submitted. Although we do not
expect persons to assert a claim of CBI,
if you wish to assert a CBI claim, follow
paragraph (i)(3) of this section except
send to the attention of the Electric Arc
Furnace Sector Lead. The same file with
the CBI omitted must be submitted to
the EPA via the EPA’s CDX as described
earlier in this paragraph (j). All CBI
claims must be asserted at the time of
submission. Furthermore, under CAA
section 114(c), emissions data is not
entitled to confidential treatment, and
the EPA is required to make emissions
data available to the public. Thus,
emissions data will not be protected as
CBI and will be made publicly available.
(k) If you are required to
electronically submit a report through
CEDRI in the EPA’s CDX, you may
assert a claim of EPA system outage for
failure to timely comply with that
reporting requirement. To assert a claim
of EPA system outage, you must meet
the requirements outlined in paragraphs
(k)(1) through (7) of this section.
(1) You must have been or will be
precluded from accessing CEDRI and
submitting a required report within the
time prescribed due to an outage of
either the EPA’s CEDRI or CDX systems.
(2) The outage must have occurred
within the period of time beginning five
business days prior to the date that the
submission is due.
(3) The outage may be planned or
unplanned.
(4) You must submit notification to
the Administrator in writing as soon as
possible following the date you first
PO 00000
Frm 00046
Fmt 4701
Sfmt 4700
knew, or through due diligence should
have known, that the event may cause
or has caused a delay in reporting.
(5) You must provide to the
Administrator a written description
identifying:
(i) The date(s) and time(s) when CDX
or CEDRI was accessed and the system
was unavailable;
(ii) A rationale for attributing the
delay in reporting beyond the regulatory
deadline to EPA system outage;
(iii) A description of measures taken
or to be taken to minimize the delay in
reporting; and
(iv) The date by which you propose to
report, or if you have already met the
reporting requirement at the time of the
notification, the date you reported.
(6) The decision to accept the claim
of EPA system outage and allow an
extension to the reporting deadline is
solely within the discretion of the
Administrator.
(7) In any circumstance, the report
must be submitted electronically as
soon as possible after the outage is
resolved.
(l) If you are required to electronically
submit a report through CEDRI in the
EPA’s CDX, you may assert a claim of
force majeure for failure to timely
comply with that reporting requirement.
To assert a claim of force majeure, you
must meet the requirements outlined in
paragraphs (l)(1) through (5) of this
section.
(1) You may submit a claim if a force
majeure event is about to occur, occurs,
or has occurred or there are lingering
effects from such an event within the
period of time beginning five business
days prior to the date the submission is
due. For the purposes of this section, a
force majeure event is defined as an
event that will be or has been caused by
circumstances beyond the control of the
affected facility, its contractors, or any
entity controlled by the affected facility
that prevents you from complying with
the requirement to submit a report
electronically within the time period
prescribed. Examples of such events are
acts of nature (e.g., hurricanes,
earthquakes, or floods), acts of war or
terrorism, or equipment failure or safety
hazard beyond the control of the
affected facility (e.g., large scale power
outage).
(2) You must submit notification to
the Administrator in writing as soon as
possible following the date you first
knew, or through due diligence should
have known, that the event may cause
or has caused a delay in reporting.
(3) You must provide to the
Administrator:
(i) A written description of the force
majeure event;
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
(ii) A rationale for attributing the
delay in reporting beyond the regulatory
deadline to the force majeure event;
(iii) A description of measures taken
or to be taken to minimize the delay in
reporting; and
(iv) The date by which you propose to
report, or if you have already met the
reporting requirement at the time of the
notification, the date you reported.
(4) The decision to accept the claim
of force majeure and allow an extension
to the reporting deadline is solely
within the discretion of the
Administrator.
(5) In any circumstance, the reporting
must occur as soon as possible after the
force majeure event occurs.
(m) Any records required to be
maintained by this subpart that are
submitted electronically via the EPA’s
CEDRI may be maintained in electronic
format. This ability to maintain
electronic copies does not affect the
requirement for facilities to make
records, data, and reports available
upon request to a delegated air agency
or the EPA as part of an on-site
compliance evaluation.
■ 17. Add subpart AAb to part 60 to
read as follows:
Subpart AAb—Standards of
Performance for Steel Plants: Electric
Arc Furnaces and Argon-Oxygen
Decarbonization Vessels Constructed
After May 16, 2022
Sec.
§ 60.270b Applicability and designation of
affected facility.
§ 60.271b Definitions
§ 60.272b Standard for particulate matter.
§ 60.273b Emission monitoring
§ 60.274b Monitoring of operations
§ 60.275b Test methods and procedures.
§ 60.276b Recordkeeping and reporting
requirements.
ddrumheller on DSK120RN23PROD with RULES2
§ 60.270b Applicability and designation of
affected facility.
(a) The provisions of this subpart are
applicable to the following affected
facilities in steel plants that produce
carbon, alloy, or specialty steels: electric
arc furnaces (EAF), argon-oxygen
decarburization (AOD) vessels, and
dust-handling systems.
(b) The provisions of this subpart
apply to each affected facility identified
in paragraph (a) of this section that
commences construction, modification,
or reconstruction after May 16, 2022.
§ 60.271b
Definitions
As used in this subpart, all terms not
defined herein shall have the meaning
given them in the Act and in subpart A
of this part.
Argon-oxygen decarburization vessel
(AOD vessel) means any closed-bottom,
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
refractory-lined converter vessel with
submerged tuyeres through which
gaseous mixtures containing argon and
oxygen or nitrogen may be blown into
molten steel for further refining.
Bag leak detection system means a
system that is capable of continuously
monitoring relative particulate matter
(dust) loadings in the exhaust of a
baghouse to detect bag leaks and other
conditions that result in increases in
particulate loadings. A bag leak
detection system includes, but is not
limited to, an instrument that operates
on triboelectric, electrodynamic, light
scattering, light transmittance, or other
effect to continuously monitor relative
particulate matter loadings.
Capture system means the equipment
(including ducts, hoods, fans, dampers,
etc.) used to capture particulate matter
generated by the operation of an electric
arc furnace (EAF) or AOD vessel and
transport captured particulate matter to
the air pollution control device.
Charge means the addition of iron and
steel scrap or other materials into the
shell of an EAF or the addition of
molten steel or other materials into the
top of an AOD vessel.
Charging period means the time
period when iron and steel scrap or
other materials are added into the top of
an EAF until the melting and refining
period commences.
Control device means the air pollution
control equipment used to remove
particulate matter from the effluent gas
stream generated by an EAF or AOD
vessel.
Damper means any device used to
open, close or throttle a DEC system or
hood designed to capture emissions
from an EAF or AOD vessel and route
them to the associated control device(s).
It does not include isolation dampers
used to isolate a fan or baghouse
compartment for repair or cleaning, or
dampers controlling collection of
emissions from equipment other than an
EAF or AOD vessel.
Direct-shell evacuation control system
(DEC system) means a system that
designed to create and maintain a
negative pressure within the EAF shell
during melting and refining, and
transports emissions to the control
device.
Dust-handling system means
equipment used to handle particulate
matter collected by the control device
for an EAF or AOD vessel subject to this
subpart. For the purposes of this
subpart, the dust-handling system shall
consist of the control device dust
hoppers, the dust-conveying equipment,
any silo, dust storage equipment, the
dust-treating equipment (e.g., pug mill,
pelletizer), dust transfer equipment
PO 00000
Frm 00047
Fmt 4701
Sfmt 4700
58487
(including, but not limited to transfers
from a silo to a truck or rail car), and
any secondary control devices used
with the dust transfer equipment.
Electric arc furnace (EAF) means a
furnace that produces molten steel and
heats the charge materials with
electricity using-carbon electrodes. For
the purposes of this subpart, an EAF
shall consist of the furnace shell and
roof and the transformer. Furnaces that
continuously feed direct-reduced iron
ore pellets as the primary source of iron
are not affected facilities within the
scope of this definition.
Electric arc furnace facility means the
EAF(s) or AOD(s) subject to this rule
and the air pollution control equipment
used to remove particulate matter from
the effluent gas stream generated by the
EAF(s) or AOD(s).
Furnace static pressure means the
pressure exerted by the flow of air at the
walls of the furnace, perpendicular to
the flow, measured using a manometer
or equivalent device to determine
pressure inside an EAF when DEC
systems are used or pressure in the free
space inside the EAF.
Heat cycle means the period
beginning when scrap is charged to an
EAF shell and ending when the EAF tap
is completed or beginning when molten
steel is charged to an AOD vessel and
ending when the AOD vessel tap is
completed.
Melting means that phase of steel
production cycle during which the iron
and steel scrap is heated to the molten
state.
Melting and refining period means the
time period commencing at the initial
energizing of the electrode to begin the
melting process and ending at the
initiation of the tapping period,
excluding any intermediate times when
the electrodes are not energized as part
of the melting process.
Modified facility means any physical
or operational change to an existing
facility which results in an increase in
the emission rate (in kilograms per
hour) to the atmosphere of any pollutant
to which a standard applies. Upon
modification, an existing facility shall
become an affected facility for each
pollutant to which a standard applies
and for which there is an increase in the
emission rate to the atmosphere. See
§ 60.14.
Negative-pressure fabric filter means a
fabric filter with the fans on the
downstream side of the filter bags.
Positive-pressure fabric filter means a
fabric filter with the fans on the
upstream side of the filter bags.
Reconstructed facility means an
existing facility which upon
reconstruction becomes an affected
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
58488
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
facility, irrespective of any change in
emission rate, due to the replacement of
components of an existing facility to
such an extent that the fixed capital cost
of the new components exceeds 50
percent of the fixed capital cost that
would be required to construct a
comparable entirely new facility, where
‘‘fixed capital cost’’ means the capital
needed to provide all the depreciable
components, and it is technologically
and economically feasible to meet the
applicable standards set forth in this
subpart after reconstruction.
Refining means that phase of the steel
production cycle during which
impurities are removed from the molten
steel and alloys are added to reach the
final metal chemistry.
Shop means the building that houses
one or more EAF’s or AOD vessels and
serves as the point from which
compliance with § 60.272b(a)(3),
‘‘Standard for Particulate Matter,’’ is
measured.
Shop opacity means the arithmetic
average of 24 observations of the opacity
of any EAF or AOD emissions
emanating from, and not within, the
shop, during melting and refining, and
during tapping, taken in accordance
with EPA Method 9 of appendix A of
this part, and during charging,
according to the procedures in section
2.5 of Method 9 in appendix A to part
60 of this chapter, with the modification
to determine the 3-minute block average
opacity from the average of 12
consecutive observations recorded at 15second intervals. For the daily opacity
observation during melting and refining,
during charging, and during tapping,
facilities may measure opacity by EPA
Method 22 of appendix A of this part,
modified to require the recording of the
aggregate duration of visible emissions
at 15 second intervals. Alternatively,
ASTM D7520–16 (incorporated by
reference, see § 60.17), may be used
with the following five conditions:
(1) During the digital camera opacity
technique (DCOT) certification
procedure outlined in Section 9.2 of
ASTM D7520–16 (incorporated by
reference, see § 60.17), the owner or
operator or the DCOT vendor must
present the plumes in front of various
backgrounds of color and contrast
representing conditions anticipated
during field use such as blue sky, trees,
and mixed backgrounds (clouds and/or
a sparse tree stand);
(2) The owner or operator must also
have standard operating procedures in
place including daily or other frequency
quality checks to ensure the equipment
is within manufacturing specifications
as outlined in Section 8.1 of ASTM
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
D7520–16 (incorporated by reference,
see § 60.17);
(3) The owner or operator must follow
the recordkeeping procedures outlined
in § 60.7(f) for the DCOT certification,
compliance report, data sheets, and all
raw unaltered JPEGs used for opacity
and certification determination;
(4) The owner or operator or the
DCOT vendor must have a minimum of
four independent technology users
apply the software to determine the
visible opacity of the 300 certification
plumes. For each set of 25 plumes, the
user may not exceed 15 percent opacity
of anyone reading and the average error
must not exceed 7.5 percent opacity;
(5) Use of this approved alternative
does not provide or imply a certification
or validation of any vendor’s hardware
or software. The onus to maintain and
verify the certification and/or training of
the DCOT camera, software, and
operator in accordance with ASTM
D7520–16 (incorporated by reference,
see § 60.17) and these requirements is
on the facility, DCOT operator, and
DCOT vendor.
Static pressure means the pressure
exerted by the flow of air at the furnace
walls, perpendicular to the flow,
measured using a manometer or
equivalent device. This refers to either
furnace static pressure, or static
pressure in air ducts, or pressure in the
EAF capture system, i.e., static pressure
at each separately ducted hood]
Tap means the pouring of molten
steel from an EAF or AOD vessel.
Tapping period means the time period
commencing at the moment an EAF
begins to pour molten steel and ending
either three minutes after steel ceases to
flow from an EAF, or six minutes after
steel begins to flow, whichever is
longer.
§ 60.272b
Standard for particulate matter.
(a) On and after the date of which the
performance tests required to be
conducted by § 60.8 or § 60.272b(d) are
completed, no owner or operator subject
to the provisions of this subpart shall
cause to be discharged into the
atmosphere from an EAF or an AOD
vessel any gases which:
(1) Exit from control devices at the
facility and contain particulate matter as
a total for the facility in excess of 79 mg/
kg steel produced (0.16 lb/ton steel
produced) for the facility;
(2) Exit from a control device and
exhibit 3 percent opacity or greater, as
measured in accordance with EPA
Method 9 of appendix A of this part, or,
as an alternative, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271; and
PO 00000
Frm 00048
Fmt 4701
Sfmt 4700
(3) Exit from a shop and, due solely
to the operations of any affected EAF(s)
or AOD vessel(s) during melting and
refining exhibit greater than 0 percent
opacity, and during charging exhibit
greater than 6 percent opacity, as
measured in accordance with EPA
Method 9 of appendix A of this part,
and during charging, exhibit greater
than 6 percent opacity, as measured
according to the procedures in section
2.5 of Method 9 in appendix A to part
60 of this chapter, with the modification
of this section of Method 9 to determine
the 3-minute block average opacity from
the average of 12 consecutive
observations recorded at 15-second
intervals; or, as an alternative, according
to ASTM D7520–16 (incorporated by
reference, see § 60.17), with the caveats
described under Shop opacity in
§ 60.271 or, for the daily opacity
observations, exhibit 0 seconds of
visible emissions as measured by EPA
Method 22 of appendix A of this part,
modified to require the recording of the
aggregate duration of visible emissions
at 15 second intervals. Shop opacity
shall be recorded for any point(s) during
melting and refining, during charging,
and during tapping where visible
emissions are observed. Where it is
possible to determine that a number of
visible emission sites relate to only one
incident of visible emissions during
melting and refining, during charging,
or during tapping, only one observation
of shop opacity or visible emissions will
be required during melting and refining,
during charging, or during tapping. In
this case, the shop opacity or visible
emissions observations must be made
for the point of highest emissions during
melting and refining, during charging,
or during tapping that directly relates to
the cause (or location) of visible
emissions observed during a single
incident.
(b) On and after the date on which the
performance tests required to be
conducted by § 60.8 or § 60.272b(d) are
completed, no owner or operator subject
to the provisions of this subpart shall
cause to be discharged into the
atmosphere from the dust-handling
system any gases that exhibit 10 percent
opacity or greater, as measured in
accordance with EPA Method 9 of
appendix A of this part, or, as an
alternative, according to ASTM D7520–
16 (incorporated by reference, see
§ 60.17), with the caveats described
under Shop opacity in § 60.271.
(c) The standards in paragraphs (a)
and (b) apply at all times. The
exemptions to opacity standards under
§ 60.11(c) do not apply to this subpart.
As provided in § 60.11(f), this provision
supersedes the exemptions for periods
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
of startup, shutdown and malfunction in
the Part 60 general provisions in
Subpart A.
(d) Performance tests required to be
conducted to show compliance with the
standards in paragraph (a) of this
section shall be repeated at least every
5 years after the performance tests
required by § 60.8 are conducted.
ddrumheller on DSK120RN23PROD with RULES2
§ 60.273b
Emission monitoring
(a) Except as provided under
paragraphs (b) and (c) of this section, a
continuous monitoring system for the
measurement of the opacity of
emissions discharged into the
atmosphere from the control device(s)
shall be installed, calibrated,
maintained, and operated by the owner
or operator subject to the provisions of
this subpart.
(b) No continuous monitoring system
shall be required on any control device
serving the dust-handling system.
(c) A continuous monitoring system
for the measurement of the opacity of
emissions discharged into the
atmosphere from the control device(s) is
not required on any modular, multistack, negative-pressure or positivepressure fabric filter or on any singlestack fabric filter if observations of the
opacity of the visible emissions from the
control device are performed by a
certified visible emission observer and
the owner installs and operates a bag
leak detection system according to
paragraph (e) of this section whenever
the control device is being used to
remove particulate matter from the EAF
or AOD. Visible emission observations
shall be conducted at least once per day
on the control device for at least three
6-minute periods when the furnace is
operating in the melting and refining
period. All visible emissions
observations shall be conducted in
accordance with EPA Method 9, or, as
an alternative, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271. If
visible emissions occur from more than
one point, the opacity shall be recorded
for any points where visible emissions
are observed. Where it is possible to
determine that a number of visible
emission points relate to only one
incident of the visible emission, only
one set of three 6-minute observations
will be required. In that case, the EPA
Method 9 observations must be made for
the point of highest opacity that directly
relates to the cause (or location) of
visible emissions observed during a
single incident. Records shall be
maintained of any 6-minute average that
is in excess of the emission limit
specified in § 60.272b(a)(2).
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
(d) A furnace static pressure
monitoring device is not required on
any EAF equipped with a DEC system
if observations of shop opacity are
performed by a certified visible
emission observer as follows:
(1) At least once per day when the
furnace is operating.
(2) No less than once per week,
commencing from the tap of one EAF
heat cycle to the tap of the following
heat cycle. A melt shop with more than
one EAF shall conduct these readings
while both EAFs are in operation. Both
EAFs are not required to be on the same
schedule for tapping.
(3) Shop opacity shall be determined
as the arithmetic average of 24
consecutive 15-second opacity
observations of emissions from the shop
taken in accordance with EPA Method
9 during melting and refining and
during tapping; and during charging
determined according to the procedures
in section 2.5 of Method 9 in appendix
A to part 60 of this chapter, with the
modification to determine the 3-minute
block average opacity from the average
of 12 consecutive observations recorded
at 15-second intervals; or, as an
alternative, according to ASTM D7520–
16 (incorporated by reference, see
§ 60.17), with the caveats described
under Shop opacity in § 60.271, or as
the total duration of visible emissions
measured according to EPA Method 22
over a six minute period, modified to
require the recording of the aggregate
duration of visible emissions at 15
second intervals. Shop opacity shall be
recorded for any point(s) where visible
emissions are observed. Where it is
possible to determine that a number of
visible emission points relate to only
one incident of visible emissions, only
one observation of shop opacity will be
required. In this case, the shop opacity
observations must be made for the point
of highest opacity that directly relates to
the cause (or location) of visible
emissions observed during a single
incident. Shop opacity shall be
determined daily during melting and
refining, during charging, and during
tapping.
(e) A bag leak detection system must
be installed on all fabric filters and
operated on all single-stack fabric filters
whenever the control device is being
used to remove particulate matter from
the EAF or AOD vessel if the owner or
operator elects not to install and operate
a continuous opacity monitoring system
as provided for under paragraph (c) of
this section. In addition, the owner or
operator shall meet the visible
emissions observation requirements in
paragraph (c) of this section. The bag
leak detection system must meet the
PO 00000
Frm 00049
Fmt 4701
Sfmt 4700
58489
specifications and requirements of
paragraphs (e)(1) through (8) of this
section.
(1) The bag leak detection system
must be certified by the manufacturer to
be capable of detecting particulate
matter emissions at a concentrations of
1 milligram per actual cubic meter
(0.00044 grains per actual cubic foot) or
less.
(2) The bag leak detection system
sensor must provide output of relative
particulate matter loadings and the
owner or operator shall continuously
record the output from the bag leak
detection system using electronic or
other means (e.g., using a strip chart
recorder or a data logger.)
(3) The bag leak detection system
must be equipped with an alarm system
that will activate when an increase in
relative particulate loading is detected
over the alarm set point established
according to paragraph (e)(4) of this
section, and the alarm must be located
such that it can be identified by the
appropriate plant personnel.
(4) For each bag leak detection system
required by paragraph (e) of this section,
the owner or operator shall develop and
submit to the Administrator or
delegated authority, for approval, a sitespecific monitoring plan that addresses
the items identified in paragraphs (i)
through (v) of this paragraph (e)(4). For
each bag leak detection system that
operates based on the triboelectric
effect, the monitoring plan shall be
consistent with the recommendations
contained in EPA–454/R–98–015,
‘‘Fabric Filter Bag Leak Detection
Guidance’’ (incorporated by reference,
see § 60.17). The owner or operator shall
operate and maintain the bag leak
detection system according to the sitespecific monitoring plan at all times.
The plan shall describe the following:
(i) Installation of the bag leak
detection system;
(ii) Initial and periodic adjustment of
the bag leak detection system including
how the alarm set-point will be
established;
(iii) Operation of the bag leak
detection system including quality
assurance procedures;
(iv) How the bag leak detection
system will be maintained including a
routine maintenance schedule and spare
parts inventory list; and
(v) How the bag leak detection system
output shall be recorded and stored.
(5) The initial adjustment of the
system shall, at a minimum, consist of
establishing the baseline output by
adjusting the sensitivity (range) and the
averaging period of the device, and
establishing the alarm set points and the
alarm delay time (if applicable).
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
58490
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
(6) Following initial adjustment, the
owner or operator shall not adjust the
averaging period, alarm set point, or
alarm delay time without approval from
the Administrator or delegated authority
except as provided for in paragraphs
(e)(6)(i) and (ii) of this section.
(i) Once per quarter, the owner or
operator may adjust the sensitivity of
the bag leak detection system to account
for seasonal effects including
temperature and humidity according to
the procedures identified in the sitespecific monitoring plan required under
paragraph (e)(4) of this section.
(ii) If opacities greater than 0 percent
are observed over four consecutive 15second observations during the daily
opacity observations required under
paragraph (c) of this section and the
alarm on the bag leak detection system
alarm is not activated, the owner or
operator shall lower the alarm set point
on the bag leak detection system to a
point where the alarm would have been
activated during the period when the
opacity observations were made.
(7) For negative pressure, induced air
baghouses, and positive pressure
baghouses that are discharged to the
atmosphere through a stack, the bag leak
detection sensor must be installed
downstream of the baghouse or
upstream of any wet scrubber.
(8) Where multiple detectors are
required, the system’s instrumentation
and alarm may be shared among
detectors.
(f) For each bag leak detection system
installed according to paragraph (e) of
this section, the owner or operator shall
initiate procedures to determine the
cause of all alarms within 1 hour of an
alarm. The cause of the alarm must be
alleviated within 24 hours of the time
the alarm occurred by taking whatever
response action(s) are necessary.
Response actions may include, but are
not limited to, the following:
(1) Inspecting the baghouse for air
leaks, torn or broken bags or filter
media, or any other condition that may
have caused an increase in particulate
emissions;
(2) Sealing off defective bags or filter
media;
(3) Replacing defective bags or filter
media or otherwise repairing the control
device;
(4) Sealing off a defective baghouse
compartment;
(5) Cleaning the bag leak detection
system probe or otherwise repairing the
bag leak detection system;
(6) Establishing to the extent
acceptable by the delegated authority
that the alarm was a false alarm and not
caused by a bag leak or other
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
malfunction that could reasonably result
in excess particulate emissions; and
(7) Shutting down the process
producing the particulate emissions.
(g) In approving the site-specific
monitoring plan required in paragraph
(e)(4) of this section, the Administrator
or delegated authority may allow
owners or operators more than 24 hours
to alleviate specific conditions that
cause an alarm if the owner or operator
identifies the condition that could lead
to an alarm in the monitoring plan,
adequately explains why it is not
feasible to alleviate the condition within
24 hours of the time the alarm occurred,
and demonstrates that the requested
additional time will ensure alleviation
of the condition as expeditiously as
practicable.
§ 60.274b
Monitoring of operations.
(a) The owner or operator subject to
the provisions of this subpart shall
maintain records of the following
information:
(1) All data obtained under paragraph
(b) of this section; and
(2) All monthly operational status
inspections performed under paragraph
(c) of this section.
(b) Except as provided under
paragraph (e) of this section, the owner
or operator subject to the provisions of
this subpart shall conduct the following
monitoring of the capture system to
demonstrate continuous compliance:
(1) If a DEC system is in use,
according to paragraph (f) of this
section, monitor and record on a
continuous basis the furnace static
pressure and any one of (2) through (4)
in this paragraph:
(2) Monitor and record the fan motor
amperes at each damper position, and
damper position consistent with
paragraph (h)(5) of this section;
(3) Install, calibrate, and maintain a
monitoring device that continuously
records the volumetric air flow rate or
static pressure at each separately ducted
hood; or
(4) Install, calibrate, and maintain a
monitoring device that continuously
records the volumetric flow rate at the
control device inlet and monitor and
record the damper position consistent
with paragraph (h)(5) of this section.
(5) The static pressure monitoring
device(s) shall be installed in an EAF or
DEC duct prior to combining with other
ducts and prior to the introduction of
ambient air, at a location that has no
flow disturbance due to the junctions.
(6) The volumetric flow monitoring
device(s) may be installed in any
appropriate location in the capture
system such that reproducible flow rate
monitoring will result. The flow rate
PO 00000
Frm 00050
Fmt 4701
Sfmt 4700
monitoring device(s) shall have an
accuracy of ±10 percent over its normal
operating range and shall be calibrated
according to the manufacturer’s
instructions. The Administrator may
require the owner or operator to
demonstrate the accuracy of the
monitoring device(s) relative to EPA
Methods 1 and 2 of appendix A of this
part.
(7) Parameters monitored pursuant to
this paragraph, excluding damper
position, shall be recorded on a rolling
averaging period not to exceed 15
minutes.
(c) When the owner or operator of an
affected facility is required to
demonstrate compliance with the
standards under § 60.272b(a)(3) and at
any other time that the Administrator
may require (under section 114 of the
CAA, as amended), the owner or
operator shall determine during all
periods in which a hood is operated for
the purpose of capturing emissions from
the affected facility subject to paragraph
(b) of this section, either:
(1) Monitor and record the fan motor
amperes at each damper position, and
damper position consistent with
paragraph (h)(5) of this section;
(2) install, calibrate, and maintain a
monitoring device that continuously
records the volumetric flow rate through
each separately ducted hood; or
(3) install, calibrate, and maintain a
monitoring device that continuously
records the volumetric flow rate at the
control device inlet and monitor and
record the damper position consistent
with paragraph (h)(5) of this section.
(4) Parameters monitored pursuant to
this paragraph, excluding damper
position, shall be recorded on a rolling
averaging period not to exceed 15
minutes.
(5) The owner or operator may
petition the Administrator or delegated
authority for reestablishment of these
parameters whenever the owner or
operator can demonstrate to the
Administrator’s or delegated authority’s
satisfaction that the affected facility
operating conditions upon which the
parameters were previously established
are no longer applicable. The values of
the parameters as determined during the
most recent demonstration of
compliance shall be the appropriate
operational range or control set point
throughout each applicable period.
Operation at values beyond the accepted
operational range or control set point
may be subject to the requirements of
§ 60.276b(c).
(d) Except as provided under
paragraph (e) of this section, the owner
or operator shall perform monthly
operational status inspections of the
E:\FR\FM\25AUR2.SGM
25AUR2
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
equipment that is important to the
performance of the capture system (i.e.,
pressure sensors, dampers, and damper
switches). This inspection shall include
observations of the physical appearance
of the equipment (e.g., presence of holes
in ductwork or hoods, flow
constrictions caused by dents or excess
accumulations of dust in ductwork, and
fan erosion) and building inspections to
ensure that the building does not have
any holes or other openings for
particulate matter laden air to escape.
Any deficiencies that are determined by
the operator to materially impact the
efficacy of the capture system shall be
noted and proper maintenance
performed.
(e) The owner or operator may
petition the Administrator or delegated
authority to approve any alternative to
either the monitoring requirements
specified in paragraph (b) of this section
or the monthly operational status
inspections specified in paragraph (d) of
this section if the alternative will
provide a continuous record of
operation of each emission capture
system.
(f) Except as provided under
§ 60.273b(d), if emissions during any
phase of the heat cycle are controlled by
the use of a DEC system, the owner or
operator shall install, calibrate, and
maintain a monitoring device that
allows the pressure in the free space
inside the EAF to be monitored. The
pressure shall be recorded as no greater
than 15-minute integrated block
averages. The monitoring device may be
installed in any appropriate location in
the EAF or DEC duct prior to the
introduction of ambient air such that
reproducible results will be obtained.
The pressure monitoring device shall
have an accuracy of ±5 mm of water
gauge over its normal operating range
and shall be calibrated according to the
manufacturer’s instructions.
(g) When the owner or operator of an
EAF controlled by a DEC is required to
demonstrate compliance with the
standard under § 60.272b(a)(3), and at
any other time the Administrator may
require (under section 114 of the Clean
Air Act, as amended), the pressure in
the free space inside the furnace shall be
determined during the melting and
refining period(s) using the monitoring
device required under paragraph (f) of
this section. The owner or operator may
petition the Administrator or delegated
authority for reestablishment of the
pressure whenever the owner or
operator can demonstrate to the
Administrator’s or delegated authority’s
satisfaction that the EAF operating
conditions upon which the pressures
were previously established are no
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
longer applicable. The pressure range or
control setting during the most recent
demonstration of compliance shall be
maintained at all times when the EAF
is operating in a melting and refining
period. Continuous operation at
pressures higher than the operational
range or control setting may be
considered by the Administrator or
delegated authority to be unacceptable
operation and maintenance of the
affected facility.
(h) During any performance test
required under § 60.8 or § 60.272b(d),
and for any report thereof required by
§ 60.276b(f) of this subpart, or to
determine compliance with
§ 60.272b(a)(3) of this subpart, the
owner or operator shall monitor the
following information for all heats
covered by the test:
(1) Charge weights and materials, and
tap weights and materials;
(2) Heat times, including start and
stop times, and a log of process
operation, including periods of no
operation during testing and, if a
furnace static pressure monitoring
device is operated pursuant to
paragraph (f) of this section, the
pressure inside an EAF when DEC
systems are used;
(3) Control device operation log;
(4) Continuous opacity monitor
(COM) or EPA Method 9 data, or, as an
alternative to EPA Method 9, according
to ASTM D7520–16 (incorporated by
reference, see § 60.17), with the caveats
described under Shop opacity in
§ 60.271;
(5) All damper positions, no less
frequently than performed in the latest
melt shop opacity compliance test for a
full heat, if selected as a method to
demonstrate compliance under
paragraph (b) of this section;
(6) Fan motor amperes at each damper
position, if selected as a method to
demonstrate compliance under
paragraph (b) of this section;
(7) Volumetric air flow rate through
each separately ducted hood, if selected
as a method to demonstrate compliance
under paragraph (b) of this section; and
(8) Static pressure at each separately
ducted hood, if selected as a method to
demonstrate compliance under
paragraph (b) of this section.
(9) Parameters monitored pursuant to
paragraphs (h)(6)–(8) of this section
shall be recorded on a rolling averaging
period not to exceed 15 minutes.
§ 60.275b
Test methods and procedures.
(a) During performance tests required
in §§ 60.8 and 60.272b(d), the owner or
operator shall not add gaseous diluents
to the effluent gas stream after the fabric
filter in any pressurized fabric filter
PO 00000
Frm 00051
Fmt 4701
Sfmt 4700
58491
collector, unless the amount of dilution
is separately determined and considered
in the determination of emissions.
(b) When emissions from any EAF(s)
or AOD vessel(s) are combined with
emissions from facilities not subject to
the provisions of this subpart but
controlled by a common capture system
and control device, the owner or
operator shall use any one of the
following procedures during a
performance test (see also § 60.276b(e)):
(1) Determine compliance using the
combined emissions.
(2) Use a method that is acceptable to
the Administrator or delegated authority
and that compensates for the emissions
from the facilities not subject to the
provisions of this subpart.
(3) Any combination of the criteria of
paragraphs (b)(1) and (2) of this section.
(c) When emission from any EAF(s) or
AOD vessel(s) are combined with
emissions from facilities not subject to
the provisions of this subpart,
compliance with § 60.272b(a)(3) will be
based on emissions from only the
affected facility(ies). The owner or
operator may use operational knowledge
to determine the facilities that are the
sources, in whole or in part, of any
emissions observed in demonstrations
of compliance with § 60.272b(a)(3).
(d) In conducting the performance
tests required in §§ 60.8 and 60.272b(d),
the owner or operator shall use as
reference methods and procedures the
test methods in appendix A of this part
or other methods and procedures as
specified in this section, except as
provided in § 60.8(b).
(e) The owner or operator shall
determine compliance with the
particulate matter standards in
§ 60.272b as follows:
(1) EPA Method 5 (and referenced
EPA Methods 1, 2, 3, 3A, 3B, and 4)
shall be used for negative-pressure
fabric filters and other types of control
devices and EPA Method 5D (and
referenced EPA Method 5) shall be used
for positive-pressure fabric filters to
determine the particulate matter
concentration and volumetric flow rate
of the effluent gas. The sampling time
and sample volume for each run shall be
at least 4 hours and 4.50 dry standard
cubic meter (160 dry standard cubic
feet) and, when a single EAF or AOD
vessel is sampled, the sampling time
shall include an integral number of
heats. The manual portions only (not
the instrumental portion) of the
voluntary consensus standard ANSI/
ASME PTC 19.10–1981 (incorporated by
reference, see § 60.17) are acceptable
alternatives to EPA Methods 3, 3A, and
3B.
E:\FR\FM\25AUR2.SGM
25AUR2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
(2) When more than one control
device serves the EAF(s) being tested,
the concentration of particulate matter
shall be determined using the following
equation:
ddrumheller on DSK120RN23PROD with RULES2
where:
Esf = average emission rate of particulate
matter, mg/kg (lb/ton).
Rsi = emission rate of particulate matter from
control device ‘‘i’’, mg/hr (lb/hr).
n = total number of control devices at the
facility.
Pi = steel production rate during testing of
control device ‘‘i’’, kg/hr (ton/hr).
(3) EPA Method 9 or, as an
alternative, ASTM D7520–16
(incorporated by reference, see § 60.17),
with the caveats described under Shop
opacity in § 60.271, and the procedures
of § 60.11 shall be used to determine
opacity.
(4) To demonstrate compliance with
§ 60.272b(a) (1), (2), and (3), the EPA
Method 9 test runs shall be conducted
concurrently with the particulate matter
test runs, unless inclement weather
interferes.
(f) To comply with § 60.274b(c), (f),
(g), and (h), the owner or operator shall
obtain the information required in these
paragraphs during the particulate matter
runs.
(g) Any control device subject to the
provisions of the subpart shall be
designed and constructed to allow
measurement of emissions using
applicable test methods and procedures.
(h) Where emissions from any EAF(s)
or AOD vessel(s) are combined with
emissions from facilities not subject to
the provisions of this subpart,
determinations of compliance with
§ 60.272b(a)(1), (2), and (3) will only be
based upon emissions originating from
the affected facility(ies), except if the
combined emissions are controlled by a
common capture system and control
device, in which case the owner or
operator may use any of the following
procedures during an opacity
performance test and during shop
opacity observations:
(1) Base compliance on control of the
combined emissions; or
(2) Utilize a method acceptable to the
Administrator that compensates for the
emissions from the facilities not subject
to the provisions of this subpart.
(3) Any combination of the criteria of
paragraphs (h)(1) and (2) of this section.
(i) Unless the presence of inclement
weather makes concurrent testing
infeasible, the owner or operator shall
conduct concurrently the performance
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
tests required under § 60.8 or
§ 60.272b(d) to demonstrate compliance
with § 60.272b(a)(1), (2), and (3) of this
subpart.
§ 60.276b Recordkeeping and reporting
requirements.
(a) Records of the measurements
required in § 60.274b must be retained
for at least 5 years following the date of
the measurement.
(b) Each owner or operator shall
submit a written report of exceedances
of the control device opacity to the
Administrator or delegated authority
semi-annually. For the purposes of these
reports, exceedances are defined as all
6-minute periods during which the
average opacity of emissions from the
control device is 3 percent or greater or,
where the daily shop opacity visible
emissions were measured according to
EPA Method 22 and exceeded 0
seconds.
(c) Operation at a furnace static
pressure that exceeds the operational
range or control setting under
§ 60.274b(g), for owners and operators
that elect to install a furnace static
pressure monitoring device under
60.274b(f) or operation ranges or control
settings outside of those established
under § 60.274b(c) may be considered
by the Administrator or delegated
authority to be unacceptable operation
and maintenance of the affected facility.
Operation at such values shall be
reported to the Administrator or
delegated authority semiannually.
(d) The requirements of this section
remain in force until and unless EPA, in
delegating enforcement authority to a
State under section 111(c) of the Act,
approves reporting requirements or an
alternative means of compliance
surveillance adopted by such State. In
that event, affected sources within the
State will be relieved of the obligation
to comply with this section, provided
that they comply with the requirements
established by the State.
(e) When the owner or operator of an
EAF or AOD is required to demonstrate
compliance with the standard under
§ 60.275b(b)(2) or a combination of
(b)(1) and (b)(2) the owner or operator
provide notice to the Administrator or
delegated authority of the procedure(s)
that will be used to determine
compliance. Notification of the
procedure(s) to be used must be
postmarked at least 30 days prior to the
performance test.
(f) For the purpose of this subpart, the
owner or operator shall conduct the
demonstration of compliance with
§ 60.272b(a) of this subpart and furnish
the Administrator or delegated authority
with a report of the results of the test
PO 00000
Frm 00052
Fmt 4701
Sfmt 4700
according to paragraph (i) of this
section. This report shall include the
following information:
(1) Facility name and address;
(2) Plant representative;
(3) Make and model of the control
device, and continuous opacity
monitoring equipment, if applicable;
(4) Flow diagram of process and
emission capture system including other
equipment or process(es) ducted to the
same control device;
(5) Rated (design) capacity of process
equipment;
(6) Those data required under
§ 60.274b(h) of this subpart;
(i) List of charge and tap weights and
materials;
(ii) Heat times and process log;
(iii) Control device operation log; and
(iv) Continuous opacity monitor or
EPA Method 9 data, or, as an alternative
to EPA Method 9, according to ASTM
D7520–16 (incorporated by reference,
see § 60.17), with the caveats described
under Shop opacity in § 60.271.
(7) Test dates and test times;
(8) Test company;
(9) Test company representative;
(10) Test observers from any outside
agency;
(11) Description of test methodology
used, including any deviation from
standard reference methods;
(12) Schematic of sampling location;
(13) Number of sampling points;
(14) Description of sampling
equipment;
(15) Listing of sampling equipment
calibrations and procedures;
(16) Field and laboratory data sheets;
(17) Description of sample recovery
procedures;
(18) Sampling equipment leak check
results;
(19) Description of quality assurance
procedures;
(20) Description of analytical
procedures;
(21) Notation of sample blank
corrections; and
(22) Sample emission calculations.
(g) The owner or operator shall
maintain records of all shop opacity
observations made in accordance with
§ 60.273b(d). All shop opacity
observations in excess of the emission
limit specified in § 60.272b(a)(3) of this
subpart shall indicate a period of excess
emissions and shall be reported to the
Administrator or delegated authority
semi-annually, according to § 60.7(c)
and submitted according to paragraph (j)
of this section. In addition to the
information required at § 60.7(c), the
report shall include the following
information:
(1) The company name and address of
the affected facility.
E:\FR\FM\25AUR2.SGM
25AUR2
ER25AU23.003
58492
ddrumheller on DSK120RN23PROD with RULES2
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
(2) An identification of each affected
facility being included in the report.
(3) Beginning and ending dates of the
reporting period.
(4) A certification by a certifying
official of truth, accuracy, and
completeness. This certification shall
state that, based on information and
belief formed after reasonable inquiry,
the statements and information in the
document are true, accurate, and
complete.
(h) The owner or operator shall
maintain the following records for each
bag leak detection system required
under § 60.273b(e):
(1) Records of the bag leak detection
system output;
(2) Records of bag leak detection
system adjustments, including the date
and time of the adjustment, the initial
bag leak detection system settings, and
the final bag leak detection system
settings; and
(3) An identification of the date and
time of all bag leak detection system
alarms, the time that procedures to
determine the cause of the alarm were
initiated, if procedures were initiated
within 1 hour of the alarm, the cause of
the alarm, an explanation of the actions
taken, the date and time the cause of the
alarm was alleviated, and if the alarm
was alleviated within 24 hours of the
alarm.
(i) Within 60 days after the date of
completing each performance test or
demonstration of compliance required
by this subpart, you must submit the
results of the performance test following
the procedures specified in paragraphs
(i)(1) through (3) of this section.
(1) Data collected using test methods
supported by the EPA’s Electronic
Reporting Tool (ERT) as listed on the
EPA’s ERT website (https://
www.epa.gov/electronic-reporting-airemissions/electronic-reporting-tool-ert)
at the time of the test. Submit the results
of the performance test to the EPA via
the Compliance and Emissions Data
Reporting Interface (CEDRI), which can
be accessed through the EPA’s Central
Data Exchange (CDX) (https://
cdx.epa.gov/). The data must be
submitted in a file format generated
using the EPA’s ERT. Alternatively, you
may submit an electronic file consistent
with the extensible markup language
(XML) schema listed on the EPA’s ERT
website.
(2) Data collected using test methods
that are not supported by the EPA’s ERT
as listed on the EPA’s ERT website at
the time of the test. The results of the
performance test must be included as an
attachment in the ERT or an alternate
electronic file consistent with the XML
schema listed on the EPA’s ERT
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
website. Submit the ERT generated
package or alternative file to the EPA via
CEDRI.
(3) Confidential business information
(CBI). Do not use CEDRI to submit
information you claim as CBI. Anything
submitted using CEDRI cannot later be
claimed CBI. Although we do not expect
persons to assert a claim of CBI, if you
wish to assert a CBI claim for some of
the information submitted under
paragraph (i)(1) or (2) of this section,
you must submit a complete file,
including information claimed to be
CBI, to the EPA. The file must be
generated using the EPA’s ERT or an
alternate electronic file consistent with
the XML schema listed on the EPA’s
ERT website. The preferred method to
submit CBI is for it to be transmitted
electronically using email attachments,
File Transfer Protocol (FTP), or other
online file sharing services (e.g.,
Dropbox, OneDrive, Google Drive).
Electronic submissions must be
transmitted directly to the OAQPS CBI
Office at the email address oaqpscbi@
epa.gov, and should include clear CBI
markings and note the docket ID. If
assistance is needed with submitting
large electronic files that exceed the file
size limit for email attachments, and if
you do not have your own file sharing
service, please email oaqpscbi@epa.gov
to request a file transfer link. If sending
CBI information through the postal
service, submit the file on a compact
disc, flash drive, or other commonly
used electronic storage medium and
clearly mark the medium as CBI. Mail
the electronic medium to U.S. EPA/
OAQPS/CORE CBI Office, Attention:
Group Leader, Measurement Policy
Group, MD C404–02, 4930 Old Page Rd.,
Durham, NC 27703. The same file with
the CBI omitted must be submitted to
the EPA via the EPA’s CDX as described
in paragraphs (i)(1) and (2) of this
section. All CBI claims must be asserted
at the time of submission. Furthermore,
under CAA section 114(c), emissions
data is not entitled to confidential
treatment, and the EPA is required to
make emissions data available to the
public. Thus, emissions data will not be
protected as CBI and will be made
publicly available.
(j) You must submit a report of excess
emissions and monitoring systems
performance report according to
§ 60.7(c) to the Administrator
semiannually. Submit all reports to the
EPA via CEDRI, which can be accessed
through the EPA’s CDX (https://
cdx.epa.gov/). The EPA will make all
the information submitted through
CEDRI available to the public without
further notice to you. Do not use CEDRI
to submit information you claim as CBI.
PO 00000
Frm 00053
Fmt 4701
Sfmt 4700
58493
Anything submitted using CEDRI cannot
later be claimed CBI. You must use the
appropriate electronic report template
on the CEDRI website (https://
www.epa.gov/electronic-reporting-airemissions/cedri) for this subpart. The
date report templates become available
will be listed on the CEDRI website. The
report must be submitted by the
deadline specified in this subpart,
regardless of the method in which the
report is submitted. Although we do not
expect persons to assert a claim of CBI,
if you wish to assert a CBI claim, follow
paragraph (i)(3) of this section except
send to the attention of the Electric Arc
Furnace Sector Lead. The same file with
the CBI omitted must be submitted to
the EPA via the EPA’s CDX as described
earlier in this paragraph (j). All CBI
claims must be asserted at the time of
submission. Furthermore, under CAA
section 114(c), emissions data is not
entitled to confidential treatment, and
the EPA is required to make emissions
data available to the public. Thus,
emissions data will not be protected as
CBI and will be made publicly available.
(k) If you are required to
electronically submit a report through
CEDRI in the EPA’s CDX, you may
assert a claim of EPA system outage for
failure to timely comply with that
reporting requirement. To assert a claim
of EPA system outage, you must meet
the requirements outlined in paragraphs
(k)(1) through (7) of this section.
(1) You must have been or will be
precluded from accessing CEDRI and
submitting a required report within the
time prescribed due to an outage of
either the EPA’s CEDRI or CDX systems.
(2) The outage must have occurred
within the period of time beginning five
business days prior to the date that the
submission is due.
(3) The outage may be planned or
unplanned.
(4) You must submit notification to
the Administrator in writing as soon as
possible following the date you first
knew, or through due diligence should
have known, that the event may cause
or has caused a delay in reporting.
(5) You must provide to the
Administrator a written description
identifying:
(i) The date(s) and time(s) when CDX
or CEDRI was accessed and the system
was unavailable;
(ii) A rationale for attributing the
delay in reporting beyond the regulatory
deadline to EPA system outage;
(iii) A description of measures taken
or to be taken to minimize the delay in
reporting; and
(iv) The date by which you propose to
report, or if you have already met the
E:\FR\FM\25AUR2.SGM
25AUR2
58494
Federal Register / Vol. 88, No. 164 / Friday, August 25, 2023 / Rules and Regulations
ddrumheller on DSK120RN23PROD with RULES2
reporting requirement at the time of the
notification, the date you reported.
(6) The decision to accept the claim
of EPA system outage and allow an
extension to the reporting deadline is
solely within the discretion of the
Administrator.
(7) In any circumstance, the report
must be submitted electronically as
soon as possible after the outage is
resolved.
(l) If you are required to electronically
submit a report through CEDRI in the
EPA’s CDX, you may assert a claim of
force majeure for failure to timely
comply with that reporting requirement.
To assert a claim of force majeure, you
must meet the requirements outlined in
paragraphs (l)(1) through (5) of this
section.
(1) You may submit a claim if a force
majeure event is about to occur, occurs,
or has occurred or there are lingering
effects from such an event within the
period of time beginning five business
days prior to the date the submission is
due. For the purposes of this section, a
force majeure event is defined as an
VerDate Sep<11>2014
19:14 Aug 24, 2023
Jkt 259001
event that will be or has been caused by
circumstances beyond the control of the
affected facility, its contractors, or any
entity controlled by the affected facility
that prevents you from complying with
the requirement to submit a report
electronically within the time period
prescribed. Examples of such events are
acts of nature (e.g., hurricanes,
earthquakes, or floods), acts of war or
terrorism, or equipment failure or safety
hazard beyond the control of the
affected facility (e.g., large scale power
outage).
(2) You must submit notification to
the Administrator in writing as soon as
possible following the date you first
knew, or through due diligence should
have known, that the event may cause
or has caused a delay in reporting.
(3) You must provide to the
Administrator:
(i) A written description of the force
majeure event;
(ii) A rationale for attributing the
delay in reporting beyond the regulatory
deadline to the force majeure event;
PO 00000
Frm 00054
Fmt 4701
Sfmt 9990
(iii) A description of measures taken
or to be taken to minimize the delay in
reporting; and
(iv) The date by which you propose to
report, or if you have already met the
reporting requirement at the time of the
notification, the date you reported.
(4) The decision to accept the claim
of force majeure and allow an extension
to the reporting deadline is solely
within the discretion of the
Administrator.
(5) In any circumstance, the reporting
must occur as soon as possible after the
force majeure event occurs.
(m) Any records required to be
maintained by this subpart that are
submitted electronically via the EPA’s
CEDRI may be maintained in electronic
format. This ability to maintain
electronic copies does not affect the
requirement for facilities to make
records, data, and reports available
upon request to a delegated air agency
or the EPA as part of an on-site
compliance evaluation.
[FR Doc. 2023–16747 Filed 8–24–23; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\25AUR2.SGM
25AUR2
Agencies
[Federal Register Volume 88, Number 164 (Friday, August 25, 2023)]
[Rules and Regulations]
[Pages 58442-58494]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-16747]
[[Page 58441]]
Vol. 88
Friday,
No. 164
August 25, 2023
Part II
Environmental Protection Agency
-----------------------------------------------------------------------
40 CFR Part 60
New Source Performance Standards Review for Steel Plants: Electric Arc
Furnaces and Argon-Oxygen Decarburization Vessels; Final Rule
Federal Register / Vol. 88 , No. 164 / Friday, August 25, 2023 /
Rules and Regulations
[[Page 58442]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 60
[EPA-HQ-OAR-2002-0049; FRL-8150-01-OAR]
RIN 2060-AU96
New Source Performance Standards Review for Steel Plants:
Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is finalizing
amendments to the new source performance standards (NSPS) for electric
arc furnaces (EAF) and argon-oxygen decarburization (AOD) vessels in
the steel industry pursuant to the review required by the Clean Air
Act.
DATES:
Effective date: This final rule is effective August 25, 2023. The
incorporation by reference of certain publications listed in the rule
is approved by the Director of the Federal Register as of August 25,
2023.
Compliance dates: Affected sources that commence construction,
reconstruction, or modification after May16, 2022, must comply with all
requirements of 40 CFR part 60, subpart AAb no later than August 25,
2023 or upon startup, whichever is later. The date for complying with
the changes in the current rules, 40 CFR part 60, subparts AA and AAa
is February 21, 2024 publication of the final rule. The date for
complying with the ERT submission requirements is February 21, 2024.
ADDRESSES: The EPA has established a docket for this action under
Docket ID No. EPA-HQ-OAR-2002-0049. All documents in the docket are
listed on the https://www.regulations.gov website. Although listed,
some information is not publicly available, e.g., Confidential Business
Information (CBI) or other information whose disclosure is restricted
by statute. Certain other material, such as copyrighted material, is
not placed on the internet and will be publicly available only in hard
copy form. Publicly available docket materials are available
electronically through https://www.regulations.gov.
FOR FURTHER INFORMATION CONTACT: Donna Lee Jones, Sector Policies and
Programs Division (D243-02), P.O. Box 12055, Office of Air Quality
Planning and Standards, U.S. Environmental Protection Agency, Research
Triangle Park, North Carolina 27711; telephone number: (919) 541-5251;
and email address: [email protected].
SUPPLEMENTARY INFORMATION:
Preamble acronyms and abbreviations. Throughout this document the
use of ``we,'' ``us,'' or ``our'' is intended to refer to the EPA. We
use multiple acronyms and terms in this preamble. While this list may
not be exhaustive, to ease the reading of this preamble and for
reference purposes, the EPA defines the following terms and acronyms
here:
A/C air-to-cloth
ANSI American National Standards Institute
AOD argon-oxygen decarburization
ASME American Society of Mechanical Engineers
BACT best available control technology
BID background information document
BLDS bag leak detection systems
BPT benefits per ton
BSER best system of emissions reduction
CAA Clean Air Act
CBI confidential business information
CDX Central Data Exchange
CEDRI Compliance and Emissions Data Reporting Interface
CEMS continuous emission monitoring systems
CFR Code of Federal Regulations
CO carbon monoxide
COMS continuous opacity monitoring systems
DCOT digital camera opacity technique
DEC direct shell evacuation control
EAF electric arc furnace
EIA economic impact assessment
EJ environmental justice
E.O. executive order
EPA Environmental Protection Agency
ERT electronic reporting tool
FR Federal Register
FRED Federal Reserve Economic Data
GASP Group Against Smog and Pollution
gr grains
gr/dscf grans per dry standard cubic feet
HAP hazardous air pollutants
ICR information collection request
II&S integrated iron and steel industry
ISA Integrated Science Assessment for Particulate Matter
LAER Lowest Achievable Emission Rate
lb pounds
lb/ton pounds per ton
mg/dscm milligrams per dry standard cubic meters
NAICS North American Industry Classification System
NAPCTAC National Air Pollution Control Technical Advisory Committee
NOX nitrogen oxides
NSPS new source performance standards
NTTAA National Technology Transfer and Advancement
OAQPS Office of Air Quality Planning and Standards
OMB Office of Management and Budget
PDF portable document format
PM particulate matter
PM2.5 particulate matter less than 2.5 micrometers
PRA Paperwork Reduction Act
PS performance specification
RACT reasonably available control technology
RFA Regulatory Flexibility Act
RIN regulatory information number
SMA Steel Manufacturers Association
SSM startup, shutdown, and malfunction
tpy tons per year
UMRA Unfunded Mandates Reform Act of 1995
U.S. United States
U.S.C. United States Code
VCS voluntary consensus standard
VE visible emissions
Organization of this document. The information in this preamble is
organized as follows:
I. General Information
A. Does this action apply to me?
B. Where can I get a copy of this document and other related
information?
C. Judicial Review and Administrative Review
II. Background
A. What is the statutory authority for this final action?
B. How does the EPA perform the NSPS review?
C. What is the source category regulated in this final action?
D. What outreach and engagement did the EPA conduct?
III. What changes did we propose for the steel plants: Electric Arc
Furnaces (EAF) and argon-oxygen decarburization vessels NSPS?
A. Standards of Performance for Steel Plants: Electric Arc
Furnaces and Argon-Oxygen Decarburization Vessels Constructed,
Reconstructed, or Modified After May 16, 2022
B. Proposed Changes to Current NSPS, 40 CFR Part 60, Subparts AA
and AAa
IV. What actions are we finalizing, and what is our rationale for
such decisions?
A. NSPS Requirements for PM Emissions From Control Devices for
Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels
Constructed After May 16, 2022
B. NSPS Requirements for Opacity From Melt Shops for Electric
Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed
After May 16, 2022
C. NSPS Requirements for Opacity From Control Devices and Dust
Handling for Electric Arc Furnaces and Argon-Oxygen Decarburization
Vessels Constructed After May 16, 2022
D. Startup, Shutdown, Malfunctions Requirements for Electric Arc
Furnaces and Argon-Oxygen Decarburization Vessels Modified,
Reconstructed, or Constructed After May 16, 2022
E. Testing and Monitoring Requirements for Electric Arc Furnaces
and Argon-Oxygen Decarburization Vessels
F. Electronic Reporting
G. Effective Date and Compliance Dates
V. Summary of Cost, Environmental, and Economic Impacts
A. What are the air quality impacts?
B. What are the secondary impacts?
C. What are the cost impacts?
[[Page 58443]]
D. What are the economic impacts?
E. What are the benefits?
F. What analysis of environmental justice did we conduct?
VI. Statutory and Executive Order Reviews
A. Executive Order 12866: Regulatory Planning and Review and
Executive Order 14094: Modernizing Regulatory Review
B. Paperwork Reduction Act (PRA)
C. Regulatory Flexibility Act (RFA)
D. Unfunded Mandates Reform Act (UMRA)
E. Executive Order 13132: Federalism
F. Executive Order 13175: Consultation and Coordination With
Indian Tribal Governments
G. Executive Order 13045: Protection of Children From
Environmental Health Risks and Safety Risks
H. Executive Order 13211: Actions Concerning Regulations That
Significantly Affect Energy Supply, Distribution, or Use
I. National Technology Transfer and Advancement Act (NTTAA) and
1 CFR Part 51
J. Executive Order 12898: Federal Actions To Address
Environmental Justice in Minority Populations and Low-Income
Populations
K. Congressional Review Act (CRA)
I. General Information
A. Does this action apply to me?
The source category that is the subject of this final action is
composed of steel manufacturing facilities that operate electric arc
furnaces (EAF) and argon-oxygen decarburization (AOD) vessels regulated
under CAA section 111 New Source Performance Standards (NSPS). The 2022
North American Industry Classification System (NAICS) code for the
source category is 331110 for ``Iron and Steel Mills and Ferroalloy
Manufacturing'' processes. The NAICS code serves as a guide for readers
outlining the type of entities that this final action is likely to
affect. The NSPS codified in 40 CFR part 60, subpart AAb are directly
applicable to affected facilities that begin construction,
reconstruction, or modification after May 16, 2022. Final amendments to
40 CFR part 60, subpart AA are applicable to affected EAF and AOD
facilities that begin construction, reconstruction, or modification
after October 21, 1974, and on or before August 17, 1983. Final
amendments to 40 CFR part 60, subpart AAa are applicable to affected
EAF and AOD vessels facilities that begin construction, reconstruction,
or modification after August 17, 1983, and on or before May 16, 2022.
Federal, state, local and Tribal government entities would not be
affected by this action. If you have any questions regarding the
applicability of this action to a particular entity, you should
carefully examine the applicability criteria found in 40 CFR part 60,
subparts AA, AAa, and AAb, and consult the person listed in the FOR
FURTHER INFORMATION CONTACT section of this preamble, your state air
pollution control agency with delegated authority for NSPS, or your EPA
Regional Office.
B. Where can I get a copy of this document and other related
information?
In addition to being available in the docket, an electronic copy of
this final action is available on the internet at https://www.epa.gov/stationary-sources-air-pollution/electric-arc-furnaces-eafs-and-argon-oxygen-decarburization. Following publication in the Federal Register,
the EPA will post the Federal Register version of the final rule and
key technical documents at this same website.
C. Judicial Review and Administrative Review
Under Clean Air Act (CAA) section 307(b)(1), judicial review of
this final action is available only by filing a petition for review in
the United States Court of Appeals for the District of Columbia Circuit
by October 24, 2023. Under CAA section 307(b)(2), the requirements
established by this final rule may not be challenged separately in any
civil or criminal proceedings brought by the EPA to enforce the
requirements.
Section 307(d)(7)(B) of the CAA further provides that ``[o]nly an
objection to a rule or procedure which was raised with reasonable
specificity during the period for public comment (including any public
hearing) may be raised during judicial review.'' This section also
provides a mechanism for the EPA to convene a proceeding for
reconsideration, ``[i]f the person raising an objection can demonstrate
to the EPA that it was impracticable to raise such objection within
[the period for public comment] or if the grounds for such objection
arose after the period for public comment, (but within the time
specified for judicial review) and if such objection is of central
relevance to the outcome of the rule.'' Any person seeking to make such
a demonstration to us should submit a Petition for Reconsideration to
the Office of the Administrator, U.S. Environmental Protection Agency,
Room 3000, WJC West Building, 1200 Pennsylvania Ave. NW, Washington, DC
20460, with a copy to both the person(s) listed in the preceding FOR
FURTHER INFORMATION CONTACT section, and the Associate General Counsel
for the Air and Radiation Law Office, Office of General Counsel (Mail
Code 2344A), U.S. Environmental Protection Agency, 1200 Pennsylvania
Ave. NW, Washington, DC 20460.
II. Background
A. What is the statutory authority for this final action?
The EPA's authority for this final rule is CAA section 111, which
governs the establishment of standards of performance for stationary
sources. Section 111(b)(1)(A) of the CAA requires the EPA Administrator
to list categories of stationary sources that in the Administrator's
judgment cause or contribute significantly to air pollution that may
reasonably be anticipated to endanger public health or welfare. The EPA
must then issue performance standards for new (and modified or
reconstructed) sources in each source category pursuant to CAA section
111(b)(1)(B). These standards are referred to as NSPS. The EPA has the
authority to define the scope of the source categories, determine the
pollutants for which standards should be developed, set the emission
level of the standards, and distinguish among classes, types, and sizes
within categories in establishing the standards.
CAA section 111(b)(1)(B) requires the EPA to ``at least every 8
years review and, if appropriate, revise'' NSPS. However, the
Administrator need not review any such standard if the ``Administrator
determines that such review is not appropriate in light of readily
available information on the efficacy'' of the standard. When
conducting a review of an existing performance standard, the EPA has
the discretion and authority to add emission limits for pollutants or
emission sources not currently regulated for that source category.
In setting or revising a performance standard, CAA section
111(a)(1) provides that performance standards are to reflect ``the
degree of emission limitation achievable through the application of the
best system of emission reduction which (taking into account the cost
of achieving such reduction and any nonair quality health and
environmental impact and energy requirements) the Administrator
determines has been adequately demonstrated.'' The term ``standard of
performance'' in CAA section 111(a)(1) makes clear that the EPA is to
determine both the best system of emission reduction (BSER) for the
regulated sources in the source category and the degree of emission
limitation achievable through application of the BSER. The EPA must
then, under CAA section
[[Page 58444]]
111(b)(1)(B), promulgate standards of performance for new sources that
reflect that level of stringency. CAA section 111(b)(5) generally
precludes the EPA from prescribing a particular technological system
that must be used to comply with a standard of performance. Rather,
sources can select any measure or combination of measures that will
achieve the standard. CAA section 111(h)(1) authorizes the
Administrator to promulgate ``a design, equipment, work practice, or
operational standard, or combination thereof'' if in his or her
judgment, ``it is not feasible to prescribe or enforce a standard of
performance.'' CAA section 111(h)(2) provides the circumstances under
which prescribing or enforcing a standard of performance is ``not
feasible,'' such as, when the pollutant cannot be emitted through a
conveyance designed to emit or capture the pollutant, or when there is
no practicable measurement methodology for the particular class of
sources.
Pursuant to the definition of new source in CAA section 111(a)(2),
standards of performance apply to facilities that begin construction,
reconstruction, or modification after the date of publication of the
proposed standards in the Federal Register. Under CAA section
111(a)(4), ``modification'' means any physical change in, or change in
the method of operation of, a stationary source which increases the
amount of any air pollutant emitted by such source or which results in
the emission of any air pollutant not previously emitted. Changes to an
existing facility that do not result in an increase in emissions are
not considered modifications. Under the provisions in 40 CFR 60.15,
reconstruction means the replacement of components of an existing
facility such that: (1) The fixed capital cost of the new components
exceeds 50 percent of the fixed capital cost that would be required to
construct a comparable entirely new facility; and (2) it is
technologically and economically feasible to meet the applicable
standards. Pursuant to CAA section 111(b)(1)(B), the standards of
performance or revisions thereof shall become effective upon
promulgation.
B. How does the EPA perform the NSPS review?
As noted in section II. A of this preamble, CAA section 111
requires the EPA to, at least every 8 years review and, if appropriate,
revise the standards of performance applicable to new, modified, and
reconstructed sources. If the EPA revises the standards of performance,
they must reflect the degree of emission limitation achievable through
the application of the BSER considering the cost of achieving such
reduction and any nonair quality health and environmental impact and
energy requirements. CAA section 111(a)(1).
In reviewing an NSPS to determine whether it is ``appropriate'' to
revise the standards of performance, the EPA evaluates the statutory
factors, which may include consideration of the following information:
Expected growth for the source category, including how
many new facilities, reconstructions, and modifications may trigger
NSPS in the future.
Pollution control measures, including advances in control
technologies, process operations, design or efficiency improvements, or
other systems of emission reduction, that are ``adequately
demonstrated'' in the regulated industry.
Available information from the implementation and
enforcement of current requirements indicates that emission limitations
and percent reductions beyond those required by the current standards
are achieved in practice.
Costs (including capital and annual costs) associated with
implementation of the available pollution control measures.
The amount of emission reductions achievable through
application of such pollution control measures.
Any nonair quality health and environmental impact and
energy requirements associated with those control measures.
In evaluating whether the cost of a particular system of emission
reduction is reasonable, the EPA considers various costs associated
with the particular air pollution control measure or a level of
control, including capital costs and operating costs, and the emission
reductions that the control measure or particular level of control can
achieve. The Agency considers these costs in the context of the
industry's overall capital expenditures and revenues. The Agency also
considers cost-effectiveness analysis as a useful metric, and a means
of evaluating whether a given control achieves emission reduction at a
reasonable cost. A cost-effectiveness analysis allows comparisons of
relative costs and outcomes (effects) of 2 or more options. In general,
cost effectiveness is a measure of the outcomes produced by resources
spent. In the context of air pollution control options, cost
effectiveness typically refers to the annualized cost of implementing
an air pollution control option divided by the amount of pollutant
reductions realized annually.
After the EPA evaluates the statutory factors, the EPA compares the
various systems of emission reductions and determines which system is
``best,'' and therefore represents the BSER. The EPA then establishes a
standard of performance that reflects the degree of emission limitation
achievable through the implementation of the BSER. In doing this
analysis, the EPA can determine whether subcategorization is
appropriate based on classes, types, and sizes of sources, and may
identify a different BSER and establish different performance standards
for each subcategory. The result of the analysis and BSER determination
leads to standards of performance that apply to facilities that begin
construction, reconstruction, or modification after the date of
publication of the proposed standards in the Federal Register. Because
the NSPS reflect the best system of emission reduction under conditions
of proper operation and maintenance, in doing its review, the EPA also
evaluates and determines the proper testing, monitoring, recordkeeping
and reporting requirements needed to ensure compliance with the
emission standards.
C. What is the source category regulated in this final action?
The EPA first promulgated NSPS under CAA section 111 for EAF at
steel plants source category on September 23, 1975 (40 FR 43850). These
standards of performance are codified in 40 CFR part 60, subpart AA and
are applicable to sources that commence construction, modification, or
reconstruction after October 21, 1974, and on or before August 17,
1983. These standards of performance regulate emissions of particulate
matter (PM) from EAF capture systems and control devices with a PM
concentration limit of 12 milligrams per dry standard cubic meter (mg/
dscm) [0.0052 grains per dry standard cubic feet (gr/dscf)] and set
opacity limits for using capture technology controlling EAF melt shop
emissions, which include, but are not limited to, emissions via roof
vents, doors, and cracks in walls of 6 percent opacity, with 20 percent
and 40 percent opacity allowed during charging and tapping,
respectively; control device exhaust at 3 percent opacity due to proper
operation of control devices; and dust handling procedures due to
proper handling of captured PM at 10 percent opacity.
In 1984, the NSPS rule, 40 CFR part 60, subpart AA (for EAF
constructed
[[Page 58445]]
after October 21, 1974, and on or before August 17, 1983) was reviewed
and revised as part of NSPS statutory review (49 FR 43838; October 31,
1984). The 1984 action amended 40 CFR part 60, subpart AA to include
AOD and raise the melt shop opacity from 0 percent to 6 percent
opacity, keeping the exceptions for charging (20 percent opacity) and
tapping (40 percent opacity). The 1984 action also codified a new NSPS
subpart, 40 CFR part 60, subpart AAa, to regulate EAF and AOD vessels
that commenced construction after August 17, 1983 (49 FR 43843). The
NSPS codified at 40 CFR part 60, subpart AAa set requirements for melt
shop opacity at 6 percent with no exceptions. Finally, the 1984 action
promulgated requirements to include EPA Method 5D (Appendix A to 40 CFR
part 60) for the determination of PM emissions from positive-pressure
fabric filters, which are common control devices for EAF and AOD
vessels for both 40 CFR part 60, subparts AA and AAa.
On February 14, 1989, 40 CFR part 60, subparts AA and AAa (and
Appendix A to 40 CFR part 60) were amended to consolidate the EPA test
methods and delete repetitions of methods already referenced (54 FR
6672). Then, on May 17, 1989, minor clarifications and corrections were
made to the February 1989 revisions (54 FR 21344). On March 2, 1999, as
a result of recommendations made by the EPA's sector policy established
in 1994,\1\ called the ``Common Sense Initiative,'' 40 CFR part 60,
subparts AA and AAa were amended to add an option to monitor furnace
static pressure instead of melt shop opacity and to monitor baghouse
(fabric filter) fan amperage instead of baghouse flowrate (64 FR
10109). On October 17, 2000, amendments were made to 40 CFR part 60,
subparts AA and AAa to promulgate Performance Specification (PS) 15 for
certifying continuous emission monitoring systems (CEMS) with Fourier
transform infrared spectroscopy (FTIR); to reformat various methods as
per recommendations by the Environmental Monitoring Management Council;
and to make miscellaneous clarifications and technical and editorial
corrections (65 FR 61758). On February 22, 2005, 40 CFR part 60,
subparts AA and AAa were amended in response to a petition by the
American Iron and Steel Institute, Steel Manufacturers Association
(SMA), and Specialty Steel Industry of North America to add bag leak
detection systems (BLDS) as an alternative monitoring method to the
continuous opacity monitoring systems currently cited in the rules (70
FR 8523).
---------------------------------------------------------------------------
\1\ See Analysis and Evaluation of the EPA Common Sense
Initiative. Prepared by: Kerr Greiner, Andersen, and April, Inc.
Funded by the U.S. Environmental Protection Agency under PO No. No.
9W-0753-NTSA. 1999. Available at https://NEPIS.epa.gov.
---------------------------------------------------------------------------
An EAF is a metallurgical furnace used to produce carbon and alloy
steels. The input material to an EAF is typically almost 100 percent
scrap steel. Cylindrical, refractory-lined EAF are equipped with carbon
electrodes to be raised or lowered through the furnace roof. With
electrodes retracted, the furnace roof can be rotated to permit
charging scrap steel into the EAF by overhead crane. Alloying agents
and fluxing materials usually are added through doors on the side of
the furnace. Electric current is passed between the electrodes and
through the scrap, producing an arc and generating enough heat to melt
the scrap steel charge. After the melting and refining periods,
impurities (in the form of slag \2\) and the refined steel are poured
from the furnace, in a process called ``tapping.'' If AOD vessels are
present, they follow the EAF in the production sequence and are used to
oxidize carbon, silicon, and impurities, such as sulfur. For these
reasons, the AOD vessels reduce additions of alloying material compared
to an EAF alone. Use of AOD vessels also reduce EAF heat times, improve
quality control, and increase daily steel production. AOD vessels are
primarily used in stainless steel making.
---------------------------------------------------------------------------
\2\ Slag is the molten metal oxides and other impurities that
float to the surface of the molten steel product.
---------------------------------------------------------------------------
The production of steel in an EAF is a batch process. Cycles, also
called heats, range from about 1.5 to 5 hours to produce carbon steel
and from 5 to 10 hours to produce alloy steel. Scrap steel is charged
to begin a cycle, with alloying agents and slag forming materials added
later in the process for refining purposes. The stages of each cycle
normally include charging, melting, refining (which also usually
includes oxygen blowing), and tapping, all of which generate PM
emissions.
Air emission control techniques typically involve an air emission
capture system and a gas cleaning system. The air emission capture
systems used in the EAF industry include direct shell evacuation
control (DEC) systems, side draft hoods, combination hoods, canopy
hoods, scavenger ducts, and furnace enclosures. The DEC system consists
of ductwork attached to a separate opening, or ``fourth hole,'' in the
furnace roof (top) that draws emissions from the furnace to a gas
cleaner and which works only when the furnace is up-right and the roof
is in place. Side draft hoods collect furnace exhaust gases from around
the electrode holes and work doors after the gases leave the furnace.
Combination hoods incorporate elements from the side draft and direct
shell evacuation systems. Canopy hoods and scavenger ducts are used to
address charging and tapping emissions. Baghouses, also called fabric
filters, are typically used as gas cleaning systems (i.e., emissions
control devices).
There are approximately 88 EAF in the United States (U.S.), with
most (>95 percent) EAF subject to one of the EAF NSPS subparts. Thirty-
one states have one or more EAF facilities, with most of the EAF
facilities east of the Mississippi River. Pennsylvania (15), Ohio (10),
Alabama (7), and Indiana (7) have the most EAF facilities per state
(approximate number of EAF facilities in each state).
The EPA proposed amendments to the NSPS subparts AA and AAa, and a
new subpart AAb, based on the current review on May 16, 2022 (87 FR
29710). We received 11 comments from industry, environmental groups,
state environmental agencies, and others during the comment period. A
summary of the more significant comments we timely received regarding
the proposed rule and our responses are provided in this preamble. A
summary of all other public comments on the proposal and the EPA's
responses to those comments is available in the document Summary of
Public Comments and Responses for Standards of Performance for Steel
Plants: Electric Arc Furnaces Constructed After October 21, 1974, and
On or Before August 17, 1983; and Standards of Performance for Steel
Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels,
Docket ID No. EPA-HQ-OAR-2002-0049 located in the docket for this rule.
In this action, the EPA is finalizing decisions and revisions pursuant
to CAA section 111(b)(1)(B) review for Steel Plants: Electric Arc
Furnaces (EAF) and Argon-Oxygen Decarburization Vessels NSPS (40 CFR
part 60, subpart AAa) after our considerations of all the comments
received.
D. What outreach and engagement did the EPA conduct?
As part of this rulemaking, and pursuant to multiple Executive
Orders addressing environmental justice, the EPA engaged and consulted
with the public, including populations of overburdened communities and
low-income populations, through interactions, such as a letter sent on
[[Page 58446]]
May 17, 2022, to 40 leaders of Tribal nations (see Docket ID No. EPA-
HQ-OAR-2002-0049). The EPA received comments from the following
environmental groups during the comment period: Group Against Smog and
Pollution (GASP), Fairfield Environmental Justice Action Coalition
(FEJA), Sierra Club, California Communities Against Toxics, and Greater
Birmingham Alliance to Stop Pollution, et al. These opportunities gave
the EPA a chance to hear from the public, especially communities
potentially impacted by this final action.
Some of the key issues raised by environmental justice stakeholders
included a specific area of the country where there are PM problems and
where there are 2 EAF facilities; and regulating other pollutants, such
as sulfur dioxide (SO2) and greenhouse gases (GHG). Section
V of the preamble provides a description of how the Agency considered
these comments in the context of regulatory development.
III. What changes did we propose for the Steel Plants: Electric Arc
Furnaces (EAF) and Argon-Oxygen Decarburization Vessels NSPS?
On May 16, 2022, the EPA proposed the results of the review of the
EAF and AOD source category standards of performance to determine if
revisions were warranted pursuant to CAA section 111(b)(1)(B).
Pursuant to this review, we proposed to revise the NSPS for EAF and
AOD vessels. We also proposed several clarifications and corrections to
existing NSPS rules (40 CFR part 60, subparts AA and AAa). These
proposed actions are discussed below in sections III.A and III.B. We
also proposed: periodic compliance testing at least once every 5 years;
results of the review of opacity from control device exhaust and from
dust handling systems to keep same BSER and limits as in 40 CFR part 6,
subpart AAa of 3 percent and 10 percent, respectively; that the
emission limits would apply at all times; and electronic reporting.
A. Standards of Performance for Steel Plants: Electric Arc Furnaces and
Argon-Oxygen Decarburization Vessels Constructed, Reconstructed, or
Modified After May 16, 2022
1. Analyses To Determine BSER for Melt Shop Opacity and PM Emissions
From Control Devices
The EPA proposed to determine that the use of a baghouse with a
fabric filter is the BSER for EAF and AOD vessels. The EPA proposed
that a limit of at 0.16 pounds (lb) PM emitted per ton steel produced
(lb/ton) reflects the degree of emission limitation achievable through
application of the BSER. The EPA also proposed to determine using a
partial roof canopy to control visible fugitive emissions (VE) from EAF
and AOD in the melt shop is BSER. The EPA proposed that a limit of 0
percent opacity during all phases of EAF operation reflects the degree
of emission limitation achievable through application of the BSER.
The BSER and proposed standards of performance for PM emissions
from capture systems and fabric filters, and for capture of emissions
from melt shops was developed from an analysis of EAF PM test reports
from 2005 through 2017 obtained by the EPA. The PM data contained in
these reports reflected 33 facilities, 46 EAF, 5 AOD, and 54 baghouses
in 154 emission and opacity tests (hereafter referred to as the ``EAF
dataset''). The EAF dataset showed a substantial improvement in EAF,
AOD, and baghouse performance beyond the current NSPS PM standards (40
CFR part 60, subparts AA, AAa) for control devices as well as for melt
shop opacity. The costs of control, emissions reductions, and other
factors were used in the determination of BSER, as explained in next
sections.
a. BSER for Melt Shop Opacity
From the EAF dataset described earlier in this preamble, the EPA
identified 15 EAF facilities, approximately half of the EAF dataset,
that reported 0 percent melt shop opacity. To determine BSER and its
costs to reduce melt shop opacity at EAF facilities from 6 percent to 0
percent opacity, the costs for an addition of a partition roof canopy
(above the crane rails) were estimated for the proposal. Canopy hoods
are a common method of controlling fugitive EAF emissions. In the
proposal cost analysis, we estimated that the annual costs would be
$800,000 ($2020 \3\) for a medium-sized steelmaking EAF with
installation of a partition roof canopy (above the crane rails). With
an estimated PM reduction of 730 tpy to achieve 0 percent melt shop
opacity down from the current 6 percent opacity (in 40 CFR part 60,
subparts AA, AAa), the cost effectiveness in $2020 was estimated to be
$1,100 per ton PM removed ($2020). Similar results were obtained for
both small and large EAF. Based on the BSER analysis as explained at
proposal, the EPA proposed that BSER for melt shop is a partition roof
canopy (above the crane rails) and proposed in 40 CFR part 60, subpart
AAb to revise the opacity limit to 0 percent to limit visible emissions
from EAF and AOD that exit from the melt shop during all phases of
operation.
---------------------------------------------------------------------------
\3\ The cost analyses for the 2022 proposal used a 3.25 percent
interest rate. Federal Reserve Economic Data (FRED). Bank Prime Loan
Rate Changes: Historical Dates of Changes and Rates. Available at:
https://fred.stlouisfed.org/series/PRIME. Accessed 11/6/2020.
---------------------------------------------------------------------------
b. Capture System, Baghouse, and Facility-Wide Total PM Control Device
Emission Limit
The EPA proposed as the BSER a capture system and fabric filter.
For the standard, we proposed a facility-wide mass-based PM limit from
all EAF and AOD capture systems and control devices of 0.16 lb total PM
per ton steel instead of a PM concentration limit that applies to each
capture system and control device, which is the format of the current
standards in 40 CFR part 60, subparts AA, AAa. As explained in the
proposal, the EPA proposed a facility-wide mass-based PM limit because
this form of standard was thought to result in better overall PM
control and provide greater assurance of limiting PM emissions from the
facility. Most importantly, if EAF emissions can be divided up into
separate baghouses, for practical purposes or otherwise, with each
device falling under the same NSPS PM limit based on air flow in gr/
dscf, there is no accounting for the total PM emissions from the
facility. A facility-wide total control device PM emissions limit in
units of lb PM/ton of steel produced was expected to eliminate the
disparity in control device emissions between low- and high-PM
concentration exhaust, such as that for control devices for primary
emissions (i.e., directly from the EAF or AOD) v. secondary emissions
(i.e., from fugitive emissions), as well as the disparity between well-
operated v. inefficiently-operated control devices in the cases where
both types of control devices operate below the current individual
baghouse limit in 40 CFR part 60, subparts AA, AAa.
To evaluate the BSER to reduce emissions from EAF and AOD capture
systems and control devices, the EPA evaluated the baghouse air-to-
cloth (A/C) ratio, expressed in units of volume of air flow per unit
bag area (i.e., cloth), using EAF facility baghouse model plants
developed from the EPA dataset describe earlier in this preamble (87 FR
29718-29720). This was done to evaluate BSER, of which cost is a
factor. The A/C ratio is generally accepted as the most important
design parameter between baghouses of different performance levels,
where a low A/C
[[Page 58447]]
ratio is considered to be the best level of control (less air and more
baghouse filter cloth) and a high A/C ratio is a low or poor level
control (high air volume and low baghouse filter area).
Using model plants developed from the EAF dataset and the EPA cost-
estimating procedures,\4\ an A/C ratio of 2.2 m/min (7.2 ft/min)
leading to a value of 0.16 lb total PM per ton steel produced was
determined to be cost effective (87 FR29710). For a medium-sized model
plant consisting of an EAF and all its baghouses, i.e., EAF facility,
emitting 0.16 lb PM/ton steel produced, the cost effectiveness at this
lb/ton level was approximately $1,800 per ton PM removed $2020, an
acceptable cost effectiveness, with an incremental cost effectiveness
compared to a model plant at the next higher level of control (A/C
ratio of 4.9 ft/min) at $8,500/ton $2020, which was not considered
reasonable. Similar results were obtained for small and large EAF.
Therefore, a facility-wide total 0.16 lb PM/ton steel produced limit
from capture systems and control devices was proposed to represent
performance level for the BSER for EAF and AOD capture systems and
fabric filters for 40 CFR part 60, subpart AAb.
---------------------------------------------------------------------------
\4\ Cost Analyses to Determine BSER for PM Emissions and Opacity
from EAF Facilities. D.L. Jones, U.S. Environmental Protection
Agency, Office of Air Quality Planning and Standards, Research
Triangle Park, North Carolina, and G.E. Raymond, RTI International,
Research Triangle Park, North Carolina. May 1, 2023 (Docket ID No.
EPA-OAR-2002-0049).
---------------------------------------------------------------------------
2. Requirement for Compliance Testing Every Five Years
We proposed that sources complying with 40 CFR part 60, subpart AAb
would be required to perform compliance testing every 5 years after the
initial testing performed upon startup, as required under 40 CFR part
60.8. This requirement already is required in many of the permits for
existing EAF in the EAF dataset and in the industry, and also is a
standard requirement for testing for other sources of PM emissions for
many other industrial sectors.
3. Review of EAF NSPS Standards for Opacity From EAF Control Devices
and Dust Handling Systems
The current NSPS standards for EAF in 40 CFR part 60, subparts AA
and AAa, require less than 3 percent opacity from control device
(baghouse) exhaust and less than 10 percent for dust handling
procedures. We proposed to retain these limits in 40 CFR part 60,
subpart AAb. (87 FR 29720-29721). In reviewing the EAF dataset, the EPA
based these limits on the fact that no facilities reported lower levels
of opacity for these sources, nor were lower levels required in any
permits for these or any other EAF facilities. In addition,
commensurate with determinations reported in the RACT/BACT/LAER
Clearinghouse,\5\ the current levels for baghouse exhaust (9
facilities) and dust handling systems (3 facilities) in 40 CFR part 60,
subparts AA, AAa were considered BACT. Therefore, we concluded in the
proposal that the opacity standards for control device exhaust and dust
handling systems would remain the same.
---------------------------------------------------------------------------
\5\ See https://www.epa.gov/catc/ractbactlaerclearinghouse-rblc-basic-information for more information. RACT, or reasonably
available control technology, is required on existing sources in
areas that are not meeting national ambient air quality standards
(i.e., nonattainment areas); BACT, or best available control
technology, is required on major new or modified sources in clean
areas (i.e., attainment areas); and LAER, or lowest achievable
emission rate, is required on major new or modified sources in
nonattainment areas. See the RACT/BACT/LAER determinations made for
EAF in the cost memorandum prepared for proposal (03-01-22); Docket
ID No. EPA-HQ-OAR-2002-0049-0060.
---------------------------------------------------------------------------
4. Startup, Shutdown, Malfunction Exemption Removal From 40 CFR Part
60, Subpart AAb
The NSPS general provisions (40 CFR 60.11(c)) currently exclude
opacity requirements during periods of startup, shutdown and
malfunction (SSM). We proposed that opacity limits in 40 CFR part 60,
subpart AAb would apply at all times along with all other emissions
limits and standards, as provided in 40 CFR 60.11(f), because we
concluded in the proposal that there were no technical limitations
known to prevent new, reconstructed, or modified facilities from
meeting all standards at all times. The language overriding the general
provisions SSM opacity exemption was proposed for 40 CFR part 60,
subpart AAb at 40 CFR 60.272b(c).
In its 2008 decision in Sierra Club v. EPA, 551 F.3d 1019 (D.C.
Cir. 2008), the United States Court of Appeals for the District of
Columbia Circuit vacated portions of two provisions in the EPA's CAA
section 112 regulations governing the emissions of HAP during periods
of SSM. Specifically, the court vacated the SSM exemption contained in
40 CFR 63.6(f)(1) and 40 CFR 63.6(h)(1), holding that under section
302(k) of the CAA, emissions standards or limitations must be
continuous in nature and that the SSM exemption violates the CAA's
requirement that some CAA section 112 standards apply continuously. The
EPA has determined the reasoning in the court's decision in Sierra Club
applies equally to CAA section 111 because the definition of emission
or standard in CAA section 302(k), and the embedded requirement for
continuous standards, also applies to the NSPS. Therefore, consistent
with Sierra Club, we proposed the NSPS standards in the 40 CFR part 60,
subpart AAb would apply at all times.
5. Electronic Reporting for 40 CFR Part 60, Subparts AA, AAa, and AAb
The EPA proposed the requirement that owners and operators of EAF
and AOD subject to the current and new NSPS at 40 CFR part 60, subparts
AA, AAa, and AAb submit electronic copies of required performance test
reports and any semiannual excess emissions and continuous monitoring
system performance and summary reports, through the EPA's Central Data
Exchange (CDX) using the Compliance and Emissions Data Reporting
Interface (CEDRI). The proposed rule required that performance test/
demonstration of compliance results collected using test methods that
are supported by the EPA's Electronic Reporting Tool (ERT) as listed on
the ERT website \6\ at the time of the test be submitted in the format
generated through the use of the ERT or an electronic file consistent
with the xml schema on the ERT website, and other performance test/
demonstration of compliance results be submitted in portable document
format (PDF) using the attachment module of the ERT.
---------------------------------------------------------------------------
\6\ https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert.
---------------------------------------------------------------------------
For semiannual reports, the proposed rule required that owners and
operators use the appropriate spreadsheet template to submit
information to CEDRI. The final versions of the templates for these
reports are included in the docket for this action.\7\ Additionally,
the EPA identified the circumstances in which electronic reporting
extensions may be provided.
---------------------------------------------------------------------------
\7\ See 40 CFR part 60, subpart AA, AAa, and AAb, Standards of
Performance for Steel Plants: Electric Arc Furnaces and Argon-Oxygen
Decarburization Vessels, 40 CFR part 60.276(g) Semiannual Compliance
Report Spreadsheet Template, available at Docket ID No. EPA-HQ-OAR-
2002-0049-0064.
---------------------------------------------------------------------------
B. Proposed Changes to Current NSPS, 40 CFR Part 60, Subparts AA and
AAa
We proposed the following amendments and requested comments on the
existing NSPS rules for EAF, 40 CFR part 60, subpart AA, and EAF and
AOD, 40 CFR part 60, subpart AAa, to update, correct, or clarify these
rules to enhance compliance and enforcement.
Amendments to clarify and refine the rule requirements in
40 CFR part 60, sections 60.271 and 60.271a ``Definitions'', 60.272 and
60.272a
[[Page 58448]]
``Standard for particulate matter'', 60.273 and 60.273a ``Emission
monitoring'', 60.274a ``Monitoring of operations'', 60.275a ``Test
methods and procedures'', and 60.276a ``Recordkeeping and reporting
requirements''.
Minor revisions to clarify the rule and enhance compliance
and enforcement.
Solicited comments, data, and other information on whether
the EPA should change the time to both find and fix the cause of a BLDS
alarm from 3 hours to a longer timeframe (e.g., 24 hours as in other
rules), or some other duration.
Requirement that owners and operators of EAF facilities
submit electronic copies of required performance test/demonstration of
compliance reports and semiannual reports through the EPA's CDX using
the CEDRI and ERT.
Requirement that performance test/demonstration of
compliance results collected using test methods that are supported by
the EPA's ERT as listed on the ERT website \8\ at the time of the test
be submitted in the format generated through the use of the ERT or an
electronic file consistent with the xml schema on the ERT website, and
other performance test/demonstration of compliance results be submitted
in PDF using the attachment module of the ERT.
---------------------------------------------------------------------------
\8\ https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert.
---------------------------------------------------------------------------
For semiannual reports, requirement that owners and
operators use the appropriate spreadsheet template to submit
information to CEDRI.
IV. What actions are we finalizing, and what is our rationale for such
decisions?
The EPA is finalizing revisions to the NSPS for EAF and AOD at
steel plants pursuant the CAA section 111(b)(1)(B) review. The EPA is
promulgating the NSPS revisions in a new subpart, 40 CFR part 60,
subpart AAb that are applicable to affected facilities constructed,
modified, or reconstructed after May 16, 2022. The new subpart reflects
a BSER for a PM capture system and fabric filter, and a total facility
limit for PM from control devices in units of lb PM/ton steel produced,
and a canopy hood to capture melt shop VE, and a 0 percent opacity
limit during melting and refining.
We also are finalizing results of the review of opacity from
control device exhaust and from dust handling systems to keep same BSER
and limits as in 40 CFR part 60, subpart AAa of 3 percent and 10
percent, respectively; that the emission limits would apply at all
times; periodic compliance testing at least once every 5 years; and
electronic reporting.
The facility-wide PM limit of 0.16 lb/ton as finalized will apply
to all EAF and AOD control devices subject to 40 CFR part 60, subpart
AAb and also all the air pollution control equipment used to remove
particulate matter from the effluent gas stream generated by the EAF
and AOD. The melt shop opacity standard of 0 percent as finalized will
apply during the melting and refining period, and a 6 percent opacity
limit will apply during the charging period and during the tapping
period, with daily opacity or VE testing required during all 3 periods.
We are finalizing that the PM limit of 0.16 lb/ton standard apply at
all times, including during SSM, and that an opacity limit will also
apply at all times (i.e., 6 percent opacity during charging and tapping
and 0 percent opacity at all other times). We are finalizing the
requirement to submit the required compliance test reports through CDX
using CEDRI and the ERT.
We also are finalizing clarifications and corrections to the 2
existing EAF rules: 40 CFR 60 subpart AA, Standards of Performance for
Steel Plants: Electric Arc Furnaces Constructed After 10/21/74 & On or
Before 8/17/83; and 40 CFR 60 subpart AAa, Standards of Performance for
Steel Plants: Electric Arc Furnaces & Argon-Oxygen Decarburization
Constructed After 8/17/83 and On or Before May 16, 2022. For these
rules, we are finalizing amendments to certain parts of the current
NSPS standards and to allow 24 hours for owners and operators a find
and fix the cause of a BLDS alarm.
A. NSPS Requirements for PM Emissions From Control Devices for Electric
Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed After
May 16, 2022
1. What did we propose as the BSER determination and standard of
performance for PM emissions from EAF control devices?
We proposed that BSER for new, modified, and reconstructed EAF and
AOD sources is a capture system and fabric filter. We proposed that the
PM limit that reflects BSER is a total facility emission rate of 0.16
lb PM/ton of steel from control devices at an affected facility. The
EPA proposed a facility-wide mass-based PM limit from all EAF and AOD
control devices per ton of steel produced instead of a PM concentration
limit based on mass of PM per control device air flow that applies to
each control device, which is the format of the standards in 40 CFR
part 60, subparts AA, AAa.
2. What significant comments did we receive and what are our responses?
Comment: One commenter asserted that the form of the standard
should not be changed from the original form of the standard in NSPS
subpart AAa. The commenter stated for the NSPS subpart AAa rulemaking,
the EPA rejected a production-based (or mass-based) standard in favor
of a concentration-based limit in a NSPS proposed rule that was
published on August 17, 1983. The commenter notes that, in that 1983 FR
document, the EPA stated:
``A process weight format is based on a direct relationship between
the quantity of pollutant emitted and the amount of input material
consumed or product produced. Because of wide differences between EAF
and AOD shops in operating procedures, such as the length of the steel
production cycle, grade of steel produced, control technologies, vessel
capacities, and other operating parameters, a simple direct
relationship between mass emissions and steel production does not
exist. Therefore, a process weight format was not selected for control
devices regulated by the proposed standards.''
``Methodology to measure the concentration of emissions discharged
to the atmosphere from control devices is readily available and well
demonstrated. Concentration measurements are obtained directly from the
stack emission test data. A concentration standard can be met equally
well by a large or a small shop and by carbon and specialty steel
shops. Consequently, a concentration format (i.e., mass emissions per
unit volume of gas) was selected for control devices regulated by the
proposed standards to ensure control of captured process and fugitive
emissions.'' (48 FR 37347)
The commenter continued that the EPA provides no explanation for
the change in its position and fails to address the rationale the
Agency provided in 1983 for adopting the current grain-loading
standards in NSPS subpart AA and NSPS subpart AAa.
Another commenter added that the EPA's failure to justify this
``depart[ure] from a prior policy'' would render abandonment of the
current concentration-based standard ``arbitrary and capricious,''
citing to FCC v. Fox Television Stations, Inc., 556 U.S. 502, 515-16
(2009).
EPA Response: The EPA disagrees with the comment that the EPA did
not provide an adequate explanation for changing the form of the
standard from
[[Page 58449]]
concentration-based to a production-based limit. The new format of the
EAF NSPS subpart AAb, in units of lb/ton, ensures compliance as well as
ensures that every facility is accountable for the total PM
contribution from its EAF to the environment in the nearby community
for every unit of steel produced. The EPA fully explained its
justification for use of lb/ton format in the 2022 proposal, as follows
here.
In the 2022 proposal, we explained that the emissions, and, hence,
collected PM, from baghouses that control only secondary emissions can
be much lower than the other two types of baghouses, as seen in the EAF
dataset where the baghouse with the lowest PM emissions controlled only
secondary emissions (87 FR 29715). We also explained that because of
the inherent lower baghouse PM input (loading), secondary baghouses can
be operated inefficiently without exceeding the current NSPS limit,
which is expressed in the units of mass PM per unit of control device
exhaust air. In addition, where there is a standard in terms of mass PM
per unit of total exhaust air, baghouse dilution air (added to EAF
exhaust air) can be increased with the effect of lowering measured
baghouse PM emission concentration and disguising the true performance
of the baghouse.
Further, at 87 FR 29715, the EPA proposed to set a facility-wide PM
limit instead of a limit that applies to each control device (the
format of the current standard) because we think this form of standard
will result in better control and provide greater assurance of
compliance. Most importantly, if EAF emissions can be divided up into
separate baghouses, for practical purposes or otherwise, with each
device falling under the same NSPS PM limit, there is no accounting for
the total PM emissions from the facility. A facility-wide total control
device PM emissions limit in units of lb of PM per ton of steel
produced also would alleviate the potential disparity in control device
emissions between low-and high-loading control devices, such as that
for control devices for primary v. secondary emissions, as well as for
well-operated v. inefficiently-operated control devices that both
operate below the individual baghouse limit (87 FR 29715). Therefore,
we did adequately explain our change in position at the proposal and
also explained why we now think a facility-wide limit is more
protective than a concentration-based limit, thereby satisfying the
standard in Fox Television. See 556 U.S. at 515-16 (when the Agency
acknowledges change in position, ``it suffices that the new policy is
permissible under the statute, that there are good reasons for it, and
that the Agency believes it to be better, which the conscious change of
course adequately indicates'').
The commenter did not include any current data showing the lack of
a direct relationship between mass emissions and steel production. The
graphs in Figure 1 from the memorandum titled Particulate Matter
Emissions from Electric Arc Furnace Facilities,\9\ hereafter called the
``Emissions Memorandum,'' show a similar curve shape when data for the
total EAF facility average concentration of PM in gr/dscf from the 2010
EPA/EAF data set \10\ are plotted compared to the same PM data
expressed as lb/ton PM emissions.
---------------------------------------------------------------------------
\9\ Particulate Matter Emissions from Electric Arc Furnace
Facilities. D.L. Jones, U.S. Environmental Protection Agency, Office
of Air Quality Planning and Standards, Research Triangle Park, North
Carolina, and G.E. Raymond, RTI International, Research Triangle
Park, North Carolina. May 1, 2023. (Docket ID No. EPA-OAR-2002-0049-
0061).
\10\ In 2010, the EPA acquired EAF data from approximately 30
EAF facilities via a CAA section 114 test and information request.
These data are located in the docket for the EAF NESHAP, 40 CFR part
63, subpart YYYYY at https://www.regulations.gov/docket/EPA-HQ-OAR-2004-0083 and incorporated by reference into the docket for the EAF
NSPS at https://www.regulations.gov/docket/EPA-HQ-OAR-2002-0049.
[GRAPHIC] [TIFF OMITTED] TR25AU23.000
In 1973, the EPA originally presented a NSPS standard in units of
lb/hr-ton during the National Air Pollution Control Technical Advisory
Committee (NAPTAC) meeting when the EAF NSPS was first being developed,
as described in the 1974 Background Information for Standards of
Performance \11\ (BID). On February 22, 1973, the Agency presented to
the National Air Pollution Control Techniques Advisory Committee
(NAPCTAC) a draft standard PM limitation of 0.06 lb/hr-ton. However,
this standard was ultimately not used by the EPA for the NSPS because
of the industry objections with the lb/ton format and interest in the
concentration-based limit.
---------------------------------------------------------------------------
\11\ Background Information for Standards of Performance:
Electric Arc Furnaces in the Steel Industry, Volume 1: Proposed
Standards. Publication No. EPA-450/2-74-017a. U.S. Environmental
Protection Agency, Office of Air Quality Planning and Standards,
Research Triangle Park, North Carolina (October 1974).
---------------------------------------------------------------------------
It should be noted that the first promulgated NSPS limit, at 0.0052
gr/dscf, was based on test data from only
[[Page 58450]]
one facility, as described in the 1974 BID \12\ for EAF under 40 CFR
part 60, subpart AA, the original EAF NSPS.
---------------------------------------------------------------------------
\12\ Background Information for Standards of Performance:
Electric Arc Furnaces in the Steel Industry, Volume 1: Proposed
Standards. Chapter V. Summary of the Procedure For Developing
Standards, Section D, Plant Inspections. Publication No. EPA-450/2-
74-017a. U.S. Environmental Protection Agency, Office of Air Quality
Planning and Standards, Research Triangle Park, North Carolina
(October 1974. pg. 63 (pdf pg. 88)).
---------------------------------------------------------------------------
Preliminary investigations for the NSPS identified 30 plants from a
review of the literature and contacts with industry, a described in the
1974 BID, discussed earlier in this section. From these 30 plants, 11
plants were identified that reportedly were well-controlled for PM
emissions. Ten of the 11 facilities were visited, their visible
emissions evaluated, and information obtained on the process and
control equipment. Although many of the 11 plants practiced good
control techniques, the facilities at only 3 plants (Plants A, I and J)
were amenable to testing with EPA Method 5. Other facilities were not
suitable for emission measurements because they use positive pressure
baghouses, which have no stacks. Although development work was in
progress, sampling methodology for this type of installation had not
been standardized. These 3 plants were nearly identical except for
size. They all produced alloy steels and controlled PM emissions with a
building evacuation system. Each had a fabric filter control device
that exhausted through multiple stacks. Rather than spread the test
program effort over 3 tests at nearly identical plants, it was decided
a more comprehensive test of one plant would provide more information.
The middle-sized plant offered the best possibilities for this
comprehensive test. Its size was typical of the mid-range for the
industry, and the fabric filter did not have an inordinately large
number of exhaust stacks.
To show that a mass-based limit has been considered by the EPA
previously, the chronological history of the EAF NSPS subpart AA and
AAa standards for PM from control devices, as taken from the 1974 BID,
discussed earlier in this section, is as follows:
In 1972, 299 EAF's in the United States were operated by
99 companies at 121 locations. On February 22, 1973, the Agency
presented to the NAPCTAC a draft standard PM limitation of 0.06 pound
per hour-ton (lb/hr-ton). Steel industry representatives attending the
meeting suggested that the PM standard should be 0.244 lb/hr-ton.
On May 30 and 31, 1973, at another NAPCTAC meeting, the
EPA presented a revised draft technical report and standard. The PM
standard presented by the EPA was changed from 0.06 lb/hr-ton to 0.10
lb/hr-ton. The industry representatives at the meeting suggested that
the standard be expressed on a concentration basis and be set at 0.008
grains per dry standard cubic feet (gr/dscf) for a dry collector (e.g.,
baghouse or fabric filter) and 0.02 gr/dscf for a wet collector
(scrubber).
At the January 9, 1974, NAPCTAC meeting, available
emission data indicated that a 0.0039 gr/dscf PM standard could be
easily achieved. These data were supported by a vendor guarantee of
0.004 gr/dscf on fabric filters at 3 building evacuation systems at 3
similar shops. These shops, owned by one company at one location,
produced alloy steel. Another vendor also signed a statement that they
would guarantee 0.004 gr/dscf on a system planned for the capture of
charging and tapping emissions at a plant which produced carbon steel.
Two other vendors stated that although 0.004 gr/dscf was achievable for
fabric filters designed to treat large volumes of exhaust gas with low
concentrations of PM, it could not be guaranteed, but 0.004 gr/actual
cubic feet (acf), approximately equivalent to 0.005 gr/dscf, could be
guaranteed. Further, industry representatives at the meeting commented
that the 0.0039 gr/dscf level was too stringent for the industry to
meet at all times. Therefore, the industry representatives suggested
the limitation be 0.008 gr/dscf.
After the January 9, 1974, NAPCTAC meeting, a vendor
stated that, for a fabric filter controlling a direct shell evacuation
(DEC) system with a relatively high inlet concentration of PM, 0.005
gr/dscf was a reasonable level to guarantee.
In the October 21, 1974 proposal (39 FR 37466), the Agency
proposed a PM standard to be no more than 0.0052 gr/dscf of PM from the
control device, which relaxed the previous presented value of 0.0039
gr/dscf for the limit for the PM concentration emitted from an EAF
control device.
In summary, this history of discussions around the first PM limit
for EAF control devices in the NSPS is as follows: the EPA originally
put forward an EAF control device standard in the form of lb/hr-ton in
1973. The following year, industry suggested a PM limit of 0.008 gr/
dscf and vendors presented a guaranteed fabric filter limit of 0.005
gr/dscf. Subsequently, in 1974, the EPA proposed a standard of 0.0039
gr/dscf, which was based on ``available emission data'' from one
facility, as noted in the 1974 BID. However, after NAPCTAC discussions
with industry and vendors, a limit of 0.0052 gr/dscf was promulgated by
the EPA in 1975 in the EAF NSPS subpart AA and confirmed again in 1984
in the EAF NSPS subpart AAa.
Regardless of the EPA's discussions during prior rulemakings, as
detailed in the proposed rule and in this final action, we now have a
strong basis to find a direct relationship between mass emissions and
steel production that justifies our facility-wide PM limit in units of
lb/ton. We show in our analyses of 2010 data from 30 facilities
discussed in this preamble (see Figure 1), as well as in data from more
facilities from 2005, as discussed in another EPA response in this
preamble section, that there is a direct relationship. As explained
earlier in section IV.A.1 and in other comments in this section, and in
the proposal, the EPA analyzed the total facility PM mass emissions
versus production at a number of EAF facilities and found that a
correlation exists, and that promulgating a PM standard for NSPS
subpart AAb in this form would enhance compliance and may reduce
emissions. As noted earlier in this EPA response, the new format of the
EAF NSPS subpart AAb, in units of lb/ton ensures that every facility is
accountable for the total PM contribution from its EAF and AOD to the
environment in the nearby community for every unit of steel produced.
As an example of similar thoughts on the value of EAF standards in lb/
ton, we note a 2017 facility construction permit for prevention of
significant deterioration that included a lb/ton PM limit (0.19 lb/
ton), as well as a ``no visible emissions'' limit for the EAF.\13\
---------------------------------------------------------------------------
\13\ Finkl & Sons Co. DBA Finkl Steel--Chicago. 1355 East 93rd
Street, Chicago, Illinois 60619. State of Illinois Clean Air Act
Permit Program (CAAPP) Permit. ID No. 031600GUC. Permit No.
14030029. Permitting Authority, Illinois Environmental Protection
Agency Bureau of Air, Permit Section 217/785-1705. Final issue date
July 5, 2018. pp. 21 and 23 of 129.
---------------------------------------------------------------------------
Comment: The commenter asserted that the EPA conducted evaluation
on a concentration basis and not in the form of the proposed standard
(lb/ton). A commenter stated the EPA in its proposal performed cost
analyses based upon the air flowrates to the air pollution control
device, and rather than establishing a standard of performance for the
air pollution control device (baghouse), the EPA proposed the PM
emissions standard in terms of lb/ton steel produced on a facility-wide
basis. The EPA analyzed the performance of emissions controls from EAF
on a concentration basis (milligram per dry standard cubic meters (mg/
[[Page 58451]]
dscm)--grain per dry standard cubic feet (gr/dscf))--and not in the
form of the proposed standard. The EPA must be consistent with the
basis of its evaluation and establish a standard measuring compliance
as a concentration exiting the control device.
EPA Response: The commenter correctly notes that, rather than
establishing a concentration standard of performance for each
individual air pollution control device (baghouse), the EPA in 2022
proposed to set the PM emissions standard in terms of lb/ton steel
produced on a facility-wide basis from all control devices at the EAF
facility. However, the EPA disagrees that we analyzed the performance
of emissions controls from EAF on a concentration basis (gr/dscf)--and
not in the form of the proposed standard. The EPA's analysis in the
``Emissions Memorandum'' discussed earlier in this section clearly
demonstrates that the EPA evaluated costs and emission reductions on a
facility-wide basis in lb/ton format. [See figures and tables in the
``Emissions Memorandum'' discussed earlier in this section: Figure 3
(EAF baghouse data in mass PM per mass of steel produced (lb/ton));
Figure 4 (EAF facility total baghouse mass PM per mass of steel
produced (lb/ton)); Table 3 (EAF Baghouse Information and Average PM
Emissions (lb/ton)); and Table 5 (Facility Total EAF Baghouse Average
PM Emissions (lb/ton))]. Further, the EPA outlined in multiple
locations in the proposal that the performance of emissions controls
from EAF were done on a facility-wide basis.
For example, at 87 FR 29716, the EPA described the PM and opacity
test data that was used in the BSER analysis. At 87 FR 29715-29716, the
EPA explained how the opacity limit was developed considering facility-
wide emissions. To determine the PM limit for control device PM
emissions under the BSER, the EPA only used data from EAF facilities
with 0 percent melt shop opacity. This was because facilities that
control their melt shop opacity to 0 percent are collecting more PM
(specifically from the melt shop) than facilities that have a nonzero
melt shop opacity and, as a result, are sending more PM to their
control devices. Consequently, EAF facilities with 0 percent melt shop
opacity are expected to have a slightly higher control device PM
emission rate on average compared to EAF facilities with greater than 0
percent melt shop opacity, as evidenced by the EAF dataset of 33 EAF
facilities. As a corollary, at EAF facilities with 6 percent melt shop
opacity, some of the PM generated by the EAF is not captured, avoids
the control device, and can exit through the melt shop roof, thus
raising the melt shop opacity to above 0 percent. In turn, facilities
with 6 percent melt shop opacity collect less PM and, therefore, less
PM is sent to control device, which results in (slightly) lower PM
emissions in the control device exhaust.
Overall, because of the large amount of PM emission differential
between 6 percent and 0 percent melt shop opacity, much less PM is
emitted to the environment with 0 percent melt shop opacity than with 6
percent opacity, despite the higher level of control device emissions
with 0 percent melt shop opacity. This effect is described
quantitatively in the proposal preamble (87 FR 29720). Of the 15 EAF
facilities in the EPA dataset with 0 percent melt shop opacity, control
device PM emissions data and steel production values needed to develop
an emission standard in mass of PM per mass of steel production were
available for 13 of the 15 facilities; these data included 51
individual tests from 23 baghouses and 21 EAF. The 13 EAF facilities
and their PM emissions were used to demonstrate that 0 percent melt
shop opacity is BSER and to develop a facility-wide total PM control
device emission standard in lb/ton under the BSER for new, modified,
and reconstructed EAF or AOD.
As explained earlier in section IV.A.1 and other comments in this
section, and in the proposal, the EPA analyzed the total facility PM
mass emissions versus production at a number of EAF facilities and
found that a correlation exists, and that promulgating a PM standard
for NSPS subpart AAb in this form would enhance compliance and may
reduce emissions. As noted earlier in this EPA response, the new format
of the EAF NSPS subpart AAb, in units of pound per ton (lb/ton),
ensures that every facility is accountable for the total PM
contribution from its EAF to the environment in the nearby community
for every unit of steel produced.
Comment: A commenter asserted that a lb/ton steel limit does not
consider the different types of EAF mills. A commenter stated the EPA
does not acknowledge nor address the fundamental fact that a
``facility-wide lb/ton'' production, or mass-based standard, ignores
the substantial differences among EAF steel mills that directly bear on
the PM emissions per ton of steel produced. The commenter claims it is
both unfair and inconsistent with the BSER to hold a small specialty
steel EAF facility, with low tonnages and more time-intensive steel
refining requirements, to the same production-based standard as a
facility that produces 10-times or more steel with much shorter heat
times (i.e., 2 facilities with vastly different production rates).
The commenter stated a compliance method based on PM per ton of
steel produced does not take into consideration the various
subcategories of EAF operations, differences in steel products, and
variation in heat times and tonnages produced, which vary considerably
depending on the product grade of steel and the mix of such products at
various mills. Some carbon EAF mills produce high tonnages in
relatively short heat times, while specialty EAF steel facilities
produce much smaller tonnages over heat times that can be 2 to 3 times
as long.
The commenter continued, as the EPA noted in developing the NSPS
subpart AAa standards in 1984, the production of steel in an EAF is a
batch process where `heats' or cycles range from 1 to 5 hours,
depending upon the size and quality of the charge, the power input to
the furnace, and the desired quality of the steel produced. The
commenter added, the EPA's statement in the proposal that ``[t]he
production of steel in an EAF is a batch process'' (87 FR 29713), is
not accurate and fails to acknowledge ``Endless Charging Systems'' and
Consteel[supreg] continuous feed systems (i.e., continuous charging
systems). The commenter added that, to determine appropriate standards
of performance, the EPA should conduct a comprehensive evaluation of
the different types of EAF mills (such as bar, sheet, and plate) and
consider establishing different limitations and requirements for each
subcategory. Another commenter encourages the EPA to evaluate current
designs and applications of baghouses for the control of PM.
EPA Response: We disagree with the commenter on the relevance of
lb/ton standard to the variation in EAF operations. The lb/ton limit
being promulgated (0.16 lb/ton) reflects the highest emitting facility
in the EPA dataset, which is a stainless steel facility. Therefore, we
expect both EAF carbon and stainless steel facilities, continuous or
batch, that modify or reconstruct and then are subject to the NSPS
subpart AAb will be able to meet the new PM limit. Moreover, future
new, reconstructed, and modified facilities will be in an even better
position to meet this limit because they can plan their construction,
reconstruction, or modification accordingly. For these reasons, and
because the facility which represents the PM limit, at 0.16 lb/ton
total facility PM control device emissions, is the highest emitting
facility in the dataset
[[Page 58452]]
(and 1 of only a total of 4 steel facilities in the industry that
produce only stainless steel), we do not think a subcategory is
warranted.
The commenter is correct that the lb/ton limit does not take into
account the different types of EAF mills, but the various types of
steel and production have all been meeting the single concentration
standard in subpart AAa (and AA) without issue in the many years since
this limit was first set in 1975. Therefore, meeting a lb/ton standard
based on the emissions of one third of the facilities in the industry
that also are meeting the current standard will not be a problem.
Whether a mill is batch or continuous, slow or fast, will not affect
the total amount of PM emitted per amount of steel produced for each
facility. When a batch process stops producing steel (i.e., stops
tapping steel), it typically also will stop emitting PM from the EAF.
If PM emissions continue after the EAF has stopped processing scrap, or
steel has stopped being tapped in a batch process, any ``trailing'' PM
emitted is still a result of the steel that has just been produced.
Therefore, this ``trailing'' PM should be included in the total PM
catch for the test run.
Similarly, a continuous EAF process will emit PM as it continues to
produce steel. And a relatively large amount of steel produced in a
short time will also produce a relatively large amount of PM in a short
period. The effect of dividing the PM emitted by the tons of steel
produced normalizes the different processes to a common lb/ton term.
Comment: Air-to-cloth (A/C) ratios from integrated iron and steel
(II&S) industry were used instead of EAF data. The commenter asserted
that the EPA offers no explanation why using II&S baghouse data was
relevant to EAF baghouse controls in the first place or why the EPA
presumed that relative rank placement of 5 facilities along a ranking
of II&S baghouse A/C ratios allowed the EPA to presume those
facilities' PM emissions were based on control through a baghouse with
the same A/C ratios. Moreover, the commenter asserts that the use of
II&S data is inexplicable because the EPA has in its possession the A/C
ratios for many plants with EAF. This information was available to the
EPA in the rulemaking docket for the 40 CFR part 63, subpart YYYYY
NESHAP for EAF, and the EPA even summarized the A/C ratios for the EAF
baghouses that were operated during these performance tests.
The commenter continued to assert that the EPA's derived average,
median, minimum, and maximum A/C ratios are all incorrect. The derived
A/C ratios misstate the actual A/C ratios reported by the 3 model
facilities for which the EPA had actual performance test data (Model
Plants A, B, and E). For instance, Model Plant E is the North American
Stainless facility in Ghent, Kentucky (NAS-KY), which operates 4
baghouses. For those 4 baghouses, the facility reported to the EPA A/C
ratios of 4.1, 4.5, 4.5, and 5.0 ft/min--none of which are close to the
EPA's erroneously derived A/C ratio of 7.2 ft/min.
EPA Response: The EPA disagrees with the commenter's assertion that
the use of II&S data in lieu of the A/C ratios for plants with EAF is
inappropriate. The EPA stated in the EAF NSPS proposal (87 FR 29718)
that the reason for using more recent 2011 II&S baghouse data was
because no A/C ratio data were available in the EAF PM test reports
from 2010. Therefore, values for A/C ratios from CAA section 114
responses submitted in 2011 by the II&S industry for the risk and
technology review for 40 CFR part 63, subpart FFFFF (85 FR 42074) were
used in the EAF BSER PM cost analysis. The baghouses used for emissions
from furnaces in the II&S industry are expected to be similar in
operation as the baghouses used at EAF/AOD for the purposes of this
analysis.
The baghouse A/C ratios from in the NSPS proposal based on II&S
data submitted in 2011 for a CAA section 114 request were similar to
those submitted in 2005 for another CAA section 114 request for the EAF
NESHAP (40 CFR part 63, subpart YYYYY),\14\ as shown in Table 1. A
quantitative comparison of the A/C ratios from the 2005 EAF NESHAP data
to the II&S 2011 data is also shown in Table 1.
---------------------------------------------------------------------------
\14\ Docket ID No. EPA-HQ-OAR-2004-0083.
Table 1--Comparing A/C Ratios for 2011 II&S Data v. 2005 EAF NESHAP
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Model plant A/C ratio (ft/min)
Comparing 2011 II&S A/C data to 2005 NESHAP data
--------------------------------------------------
2011 II&S 2005 EAF NESHAP
----------------------------------------------------------------------------------------------------------------
A........................... 1.3 1.4 -7 percent..... II&S lower.
B........................... 2.9 2.2 32 percent..... II&S higher.
C........................... 4.0 3.0 33 percent..... II&S higher.
D........................... 4.9 4.5 9 percent...... II&S higher.
E........................... 7.2 6 20 percent..... II&S higher.
----------------------------------------------------------------------------------------------------------------
Average 17 percent..... II&S higher.
----------------------------------------------------------------------------------------------------------------
As the commenter points out, the 2005 EAF data does not include all
of the facilities from the 2010 dataset. In addition, the 2005 data did
not have A/C data for all the facilities' baghouses, where there were
multiple baghouses, and for some facilities the number of baghouses for
each facility changed from 2005 to 2010.
In response to this comment, for the final rule, we re-examined the
BSER analysis of total facility PM lb/ton steel from capture systems
and fabric filters using A/C ratios from the EAF 2005 CAA section 114
request that ranged from 1.4 to 6.0 ft/min. For Model Plant A,
corresponding to Timken-Faircrest-OH, the A/C ratio in the 2005 CAA
section 114 request (3.4 A/C) was higher than the 2011 II&S data point
(at 1.3 A/C), but the A/C ratio derived using a regression analysis
that produced the line of best fit from the 2005 CAA section 114
request data (at 1.4 A/C), is very similar to the II&S datapoint (1.3
A/C).
For Model Plant B, based on Timken-Harrison-OH, the A/C ratio from
the 2005 CAA section 114 request (at 2.7 A/C) is very similar to the
II&S data point (2.9 A/C) and also from a regression analysis that
produced the line of best fit from 2005 (2.7 A/C).
For Model Plant E, based on NAS-KY, an average A/C ratio of 4.5 ft/
min A/C was derived from the data reported to the EPA in 2010 (and also
provided by the commenter). However, the A/C ratio of 6.0 assigned to
the same emissions as
[[Page 58453]]
NAS-KY (0.16 lb/ton) derived from the curve of 2005 CAA section 114
data is not much different than what was used in the EAF proposal (at
7.2 A/C) based on II&S data. These values are shown in Table 2.
Table 2--Comparing A/C Ratio Data Between 2005 and 2010 EAF Data and 2011 II&S Data
--------------------------------------------------------------------------------------------------------------------------------------------------------
A/C ratio (ft/min)
Comparing 2005 to 2010 ---------------------------------------------------------------
Facility data Model plant Curve using
2011 II&S data 2005 EPA data 2010 EPA data 2005 data
--------------------------------------------------------------------------------------------------------------------------------------------------------
Timken-Faircrest-OH................. Different baghouses.... A 1.3 3.4 NA 1.4
Timken-Harrison-OH.................. Same baghouses......... B 2.9 2.7 NA 2.2
NAS-Ghent-KY........................ Same baghouses......... E 7.2 NA 4.5 6.0
--------------------------------------------------------------------------------------------------------------------------------------------------------
In addition, the EPA used the data from the 2005 CAA section 114
request for the EAF NESHAP to add to the 2010 CAA section 114 request
data used for the lb/ton BSER PM limit analyses for capture systems and
fabric filters reported in the proposal in order to re-evaluate the
proposed lb/ton BSER standard for capture system and fabric filter PM
emissions. The 2005 EAF emission data that was able to be converted to
lb/ton values and also had A/C ratio data were used along with 2010 CAA
114 request data used to develop BSER for the proposal. A similar trend
in PM lb/ton data was seen in the 2005 data as compared to 2010 data,
as shown in Figure 2 below, with a lower maximum PM lb/ton value in the
2005 data.
The 2010 CAA section 114 request data used to develop the PM lb/ton
standard for the proposal were matched to the A/C ratios in the 2005
CAA section 114 data for the NAS-Ghent-KY facility, to provide a total
of 18 facilities in the dataset for PM lb/ton standard for capture
systems and fabric filters for the final rule. See the memorandum
titled Cost Analyses to
[GRAPHIC] [TIFF OMITTED] TR25AU23.001
Determine BSER for PM Emissions and Opacity from EAF Facilities,\15\ as
updated for the final rule, hereafter referred to as the ``Cost
Memorandum,'' located in the docket for this rule. The results of the
analyses of a PM limit that reflects BSER were similar between proposal
and final producing the same PM 0.16 lb/ton limit for the BSER capture
system and fabric filter. See Table 3 for the combined 2005 and 2011
lb/ton data set using EAF A/C ratios and both 2005 and 2011 EAF
submitted emissions data. Table 4 shows the results from the model
plant analyses comparing the results for the 2 approaches. Note Model
Plants E and F are both the highest emitting model plant in the
proposal (using 2011 II&S A/C ratios) and final rule (Using 2005 EAF A/
C ratios) analyses, respectively. Because Model Plants E and F are the
highest emitting model plants, the EPA does not have a baseline with
which to compare the costs and emission reductions in order to develop
average cost effectiveness values. However, the EPA's determination of
the BSER in this review is consistent with its determination of the
BSER in the prior 40 CFR 60, subpart AAa rulemaking. And as noted
elsewhere in this preamble, a third of the industry is already
achieving the PM 0.16 lb/ton limit through application of that BSER,
which demonstrates that the costs of meeting that limit are reasonable,
and not exorbitant or excessive. See Lignite Energy Council v. EPA, 198
F.3d 930, 933 (D.C. Cir. 1999) (``EPA's choice will be sustained unless
the environmental
[[Page 58454]]
or economic costs of using the technology are exorbitant.''); Sierra
Club v. Costle, 657 F.2d 298, 343 (D.C. Cir. 1981) (the court is not
inclined to ``quarrel'' with the EPA's judgment that ``forecasted cost
was not excessive and did not make the cost of compliance with the
standard unreasonable''); Portland Cement Association v. Train, 513
F.2d 506, 508 (D.C. Cir. 1975) (the inquiry is whether the costs of the
standard are ``greater than the industry could bear and survive'').
Moreover, the capital costs and annual costs associated with compliance
with the PM 0.16 lb/ton limit are similar to, and in some cases lower
than, the costs that the EPA found to be reasonable for implementing
the BSER to meet the final opacity standard, discussed in section IV.B.
See the ``Cost Memorandum,'' discussed earlier in this section, for
details of both the canopy costs for the opacity limit and fabric
filter costs for the PM limit. This further demonstrates that the costs
of meeting the PM 0.16 lb/ton limit are also reasonable for this
industry, for all facility sizes. However, as shown in Table 4, the EPA
does not find the incremental costs of achieving the more stringent
standards evaluated through application of the BSER to be cost
effective for any facility size. Accordingly, the EPA concludes that PM
0.16 lb/ton limit reflects the degree of emission limitation achievable
through application of the BSER.
---------------------------------------------------------------------------
\15\ Cost Analyses to Determine BSER for PM Emissions and
Opacity from EAF Facilities. D.L. Jones, U.S. Environmental
Protection Agency, Office of Air Quality Planning and Standards,
Research Triangle Park, North Carolina, and G.E. Raymond, RTI
International, Research Triangle Park, North Carolina. May 1, 2023;
Docket ID No. EPA-OAR-2002-0049-0061.
Table 3--Combined 2005 and 2010 lb/ton EAF Datasets With 2005 EAF A/C Ratios
----------------------------------------------------------------------------------------------------------------
2005 facility A/C
Count 2010 Zero opacity facilities 2010 lb/ton (weighted average)
----------------------------------------------------------------------------------------------------------------
1................................... Timken-Faircrest-OH......... 1.3E-02............... 3.4
2................................... Nucor-Crawfordsville-IN..... 1.6E-02............... 3.2
3................................... Gerdau-Charlotte-NC......... 2.3E-02............... 2.2
4................................... Timken-Harrison-OH.......... 3.6E-02............... 2.6
5................................... Nucor-Huger-SC.............. 5.2E-02............... 2.6
6................................... CMC-Birmingham-AL........... 5.5E-02............... 3.7
7................................... CMC-Cayce-SC................ 6.4E-02............... 3.3
8................................... NAS-Ghent-KY................ 1.6E-01............... 4.5 (2010)
----------------------------------------------------------------------------------------------------------------
Count 2005 Facilities with P/S 2005 lb/ton 2005 Facility A/C
Baghouses (weighted average)
----------------------------------------------------------------------------------------------------------------
1................................... Nucor-Norfolk-NE............ 8.7E-03............... 2.8
2................................... Nucor-Cofield-NC............ 1.3E-02............... 3.0
3................................... Nucor-Blytheville-AR........ 1.4E-02............... 3.0
4................................... Nucor Bar Mill-Plymouth-UT.. 1.8E-02............... 2.1
5................................... North Star Steel-St. Paul-MN 1.9E-02............... 2.0
6................................... Nucor Berkeley-Huger-SC..... 2.2E-02............... 2.6
7................................... IPSCO Steel-Axis-AL......... 3.2E-02............... 2.6
8................................... SMI Steel-Cayce-SC.......... 5.8E-02............... 3.3
9................................... CMC/Struct Metals/SMI-Sequin- 8.5E-02............... 6.0
TX.
10.................................. IPSCO Steel-Muscatine-IA.... 8.7E-02............... 5.1
----------------------------------------------------------------------------------------------------------------
Table 4--Comparison of BSER Model Plants for Small, Medium, and Large EAF Facilities Using Two Datasets: 2005 EAF A/C Ratios and 2010 II&S A/C Ratios,
Both With 2010 EAF lb/ton Data
--------------------------------------------------------------------------------------------------------------------------------------------------------
Total EAF facility A/C ratio (ft/min) Cost for new baghouse Incremental
controlled EAF average ---------------------------------------------------------------------- cost
PM emissions production effectiveness
-------------------------------- compared to
Model plant \a\ next lower-
Value Basis Capital $ Annual costs $/ emitting model
lb/ton tpy yr plant \b\
---------------
delta$/ton PM
--------------------------------------------------------------------------------------------------------------------------------------------------------
Small Facility
--------------------------------------------------------------------------------------------------------------------------------------------------------
E................................. 0.16 50,000 7.2 2011 II&S........... $796,912 $341,981 $13,340
F................................. 0.16 50,000 8.0 2005 EAF............ 767,439 338,610 7,196
--------------------------------------------------------------------------------------------------------------------------------------------------------
Medium Facility
--------------------------------------------------------------------------------------------------------------------------------------------------------
E................................. 0.16 775,000 7.2 2011 II&S........... 4,778,920 2,045,443 12,197
F................................. 0.16 775,000 8.0 2005 EAF............ 4,361,224 1,997,701 6,575
--------------------------------------------------------------------------------------------------------------------------------------------------------
Large Facility
--------------------------------------------------------------------------------------------------------------------------------------------------------
E................................. 0.16 3,450,000 7.2 2011 II&S........... 21,929,003 8,598,613 13,708
F................................. 0.16 3,450,000 8.0 2005 EAF............ 19,839,154 8,359,718 7,390
--------------------------------------------------------------------------------------------------------------------------------------------------------
\a\ Model Plants E and F are both the highest emitting model plants in the two datasets, where the A/C data for Model E is from II&S A/C data and for
Model F the 2005 CAA section 114 responses are used for A/C data. Cost analysis values for Model E are the same as from proposal, with updates to
reflect $2022 for the final rule v. $2020 that were used for the proposed rule.
\b\ The incremental cost effectiveness from Model Plant E to D in $2022, at $12,200/ton for medium-sized facility, is higher than the same comparison of
the same model plants in $2020, at $8,500/ton, because of the increase in the values used in the cost estimate as a result of inflation and increase
in interest rate from 3.5 percent to 7.5 percent from 2020 to 2022.
[[Page 58455]]
Comment: The commenter asserted that the change from a
concentration to lb/ton limit complicates compliance and does not
result in better control or greater assurance of compliance. The
commenter stated the EPA's assertion that switching to a lb/ton
standard will ``result in better control and greater assurance of
compliance'' is incorrect. Under the current standards in NSPS subparts
AA and AAa, compliance is readily demonstrated through EPA Method 5
monitoring of the stack on the primary control device/baghouse. This is
a direct measurement of the filtering ability of the baghouse and
evidence of compliance with concentration limits without all of the
unnecessary variables the new rule introduces which are not directly
related to emissions. Under the proposal, facilities subject to NSPS
subpart AAb would be required to track tonnages produced during stack
tests and match those to emissions data.
EPA Response: The commenter is correct that with a lb/ton standard,
facilities subject to NSPS subpart AAb will be required to track
tonnages produced during stack tests and match those to emissions data.
However, this is already required in the current EAF NSPS (compare 40
CFR 60.274(i)(1), 60.274a(h)(1) with proposed and final 40 CFR
60.274b(h)(1)). The 31 facilities in the 2010 EPA/EAF data set were
able to report steel produced during the testing. Therefore, we expect
the entire industry to be able to do so.
The baghouse PM emission data in gr/dscf do not address the total
emissions generated by a facility. The gr/dscf data can be influenced
by increasing dilution air to the baghouse and is not directly related
to steel production as PM emissions logically should be. Using
concentration in gr/dscf to assess the filtering ability of baghouses
can still be done at any time but it doesn't necessarily reflect the
contribution of PM by the facility's steel production to the
environment. In order to assess a facility's impact to the local
environment, the general public would need to know the exhaust rates of
every baghouse at a facility to determine the facility's PM emissions,
whereas from lb/ton facility-wide data, the maximum amount of PM being
emitted can be easily ascertained with only one steel production value
and one facility-wide PM limit.
Comment: The commenter asserted that the lb/ton limit does not
consider vendor guarantees on control systems. The commenter stated it
is critical to obtain vendor guarantees from suppliers when
constructing new facilities or EAF and associated control systems, to
ensure that the purchased equipment can comply with applicable
standards. Vendors can guarantee that the filters/control device have a
specific removal rate (i.e., vendors can only guarantee the difference
between the clean and dirty side of the bag). Obtaining such guarantees
is what gives facilities comfort that the equipment they purchase will
perform such that compliance is assured. The commenter stated that such
comfort is not possible with the Agency's proposed ``facility-wide'' PM
limit, because vendors do not offer lb/ton guarantees for specific
equipment and certainly not on a facility-wide basis. This is
understandable given a supplier's ability to design equipment to a
given concentration or control specification, but lack of ability to
control the many factors that influence lb/ton efficiency, especially
where a vendor may not be the sole facility-wide designer. Vendors have
no control over the tonnage of steel produced or how the steel tonnage
estimate comports with the duration of the PM measurement. The
commenter concluded the EPA should take this into account by setting a
concentration-based emission standard and noted that the EPA has
previously acknowledged the importance of being able to obtain vendor
guarantees when setting the NSPS subpart AAa limits in 1984 (49 FR
43840). The commenter stated that it would thus be arbitrary and
impermissible for the EPA to ignore that consideration here.
EPA Response: Vendors can continue to use gr/dscf to assess the
filtering ability of a baghouse, especially since the NESHAP for EAF
(40 CFR part 63, subpart YYYYY) still requires gr/dscf determinations.
In addition, the calculation of PM concentration in gr PM/dscf is an
intermediate step in the calculation of lb PM/ton steel emission rate:
concentration (gr/dscf) * flow rate (dscf) = emission rate, as PM in
lb/hr; then divide by tons per hour steel for lb PM/ton steel format.
Moreover, evaluating the impact of a new facility (or reconstructed or
modified facility) under the NSPS subpart AAb, in terms of PM emissions
on the surrounding communities, is more easily determined from a lb/ton
limit and overall facility steel production. With a lb/ton limit, not
only must a new facility determine that their baghouses are working
properly, but they must also determine whether the facility is being
efficient in its generation of PM at the desired production level
compared to the best facilities operating at the same production level.
Comment: A commenter noted that EAF National Emission Standards for
Hazardous Air Pollutants (NESHAP) 40 CFR part 63 subpart YYYYY requires
concentration limits. The commenter stated the maximum achievable
control technology (MACT) standard in the NESHAP for EAF (40 CFR part
63, subpart YYYYY) independently limits PM emissions from each EAF to
0.0052 gr/dscf. The proposed NSPS would thus have the result of
subjecting facilities to both a lb/ton limit (via NSPS) and a
concentration limit (via NESHAP). Since facilities will still have to
track gr/dscf anyway to comply with NESHAP limits, it would be
inefficient and unreasonable to also require a lb/ton limit.
EPA Response: The applicability between the NSPS and NESHAP are
different. All existing EAF facilities will continue to meet the gr/
dscf PM limit in the NESHAP. Only new, reconstructed, or modified EAF
or AOD units and their control devices need to meet both the lb/ton PM
total facility limit that is being finalized in NSPS subpart AAb along
with the NESHAP's individual baghouse limit. As discussed in previous
responses to comments in this section, the data needed to show
compliance with both standards are obtained in the same test. The
combination of the two standards results in the public and regulators
being able to more accurately evaluate EAF operation and the potential
impact of new facilities on surrounding communities because the rules
together limit total facility PM emissions impacts while checking
individual control device operation. Facilities subject to the NSPS
subpart AAb, and their vendors can continue use the gr/dscf limit to
troubleshoot baghouse operation just as facilities have done in the
past.
For facilities that modify or reconstruct after May 16, 2022, only
the EAF(s) or AOD(s) and the air pollution control equipment that were
modified or reconstructed after May 16, 2022, must comply with NSPS
subpart AAb. This provision has been added to the rule at in 40 CFR
60.271b under the definition of ``Electric arc furnace facility.'' If
there are capture systems and control devices that capture PM emissions
from sources subject to NSPS subparts AA or AAa at the same site where
there are also sources subject to NSPS subpart AAb, the procedures
described in the rule at 40 CFR 60.275b(b) include any one of the
following options (see also 40 CFR 60.276bI) to determine compliance:
use the combined emissions; use a method that is acceptable to the
Administrator or delegated authority and that compensates for the
emissions from the facilities not subject to the provisions of
[[Page 58456]]
this subpart; or any combination of the above methods.
3. What is the rationale for the final BSER determination and what is
the final standard of performance?
The EPA is finalizing the proposed determination that the BSER for
EAF and AOD is capture and control of PM with a fabric filer. The EPA
is further finalizing the proposed determination that limit based on
the BSER at 0.16 lb/ton total facility PM is achievable for any new,
modified, or reconstructed facility because it is based on the EPA's
data from approximately one third of the industry. The format of the
limit based on BSER (total facility lb PM/ton steel produced from all
affected capture systems and fabric filters) provides complete
information on the performance of the facility and their EAF rather
than that of just the individual baghouse(s) and individual EAF via a
concentration based standard, and enables the public and regulators to
know the total pollutant impact of the facility's EAF operation on the
surrounding community. The current concentration-based limit in NSPS
subparts AA and AAa is influenced by the amount of dilution air in the
exhaust going through the baghouse, which can be adjusted to some
extent by the facility without significant detriment to baghouse
operation. Evaluating the impact of PM emissions from a new EAF
facility (or reconstructed or modified facility) on the surrounding
communities is more easily determined from a facility-wide lb/ton
limit. With a lb/ton limit, not only must a new facility determine that
their baghouses are working properly, but they must also determine
whether the facility is being efficient in its generation of PM at the
desired production level compared to the best facilities operating at
the same production level. In addition, the total facility lb/ton PM
limit provides an overall assessment of emissions from the facility in
a format that scales emissions to production, which is based on
fundamental engineering principles. The current concentration-based
limits in NSPS subparts AA and AAa do not limit the air flow or the
number of baghouses that could be used to comply with the standard.
Based on data from 31 EAF facilities (more than one third of the
industry), all 31 facilities' baghouse emissions are 40 percent or
lower than the current concentration-based limit in 40 CFR part 60,
subparts AA, AAa. Therefore, the 0.16 lb/ton production-based limit
based on these same data is a significant improvement in emissions
control compared to the current standard. Moreover, because the lb/ton
limit is the highest level in the EPA data set that includes one third
of the industry, the standard that the EPA has determined to reflect
the application of the BSER technology is achievable.
Lastly, we used both 2005 EAF PM data with EAF 2005 A/C data, and
2010 EAF PM data with 2005 EAF A/C data for the cost analysis to
determine BSER for the EAF lb/ton PM standard, and reached the same
conclusion as we did for proposal with 2010 EAF PM data and 2010 II&S
A/C data. Therefore, in this final rule, the use of a capture system
and fabric filter was determined as the BSER. The PM limit based on
BSER of 0.16 lb PM/ton steel facility-wide was derived from the data
available to the EPA, which comprised approximately one third of the
industry, and also where the EPA considered costs, nonair quality
health and environmental impacts, and energy requirements (described
below in sections V.A and V.B).
4. Are there any relevant energy impacts or nonair quality health and
environmental impacts of the selection of the final BSER and, if so,
how were the final emission limitations based on BSER affected?
The EPA did not identify any relevant energy impacts or nonair
quality health and environmental impacts of the proposed or final
standards for PM emissions from EAF and AOD control devices
(baghouses). See sections V.A and V.B. of this preamble for details. No
comments were received on these issues.
B. NSPS Requirements for Opacity From Melt Shops for Electric Arc
Furnaces and Argon-Oxygen Decarburization Vessels Constructed After May
16, 2022
1. What did we propose as the BSER determination and standard of
performance?
We proposed that VE from EAF and AOD that exit from the melt shop
would be limited to an opacity of 0 percent during all phases of
operation, based on the determination of BSER as the addition of a
partial roof canopy to capture and control melt shop fugitive
emissions.
2. What significant comments did we receive and what are our responses?
Comment: One commenter asserted that the proposed 0 percent melt
shop opacity limit disregards workers' safety by requiring the closure
of roof and buildings. Specifically, the commenter stated the proposed
0 percent melt shop opacity limit disregarded workers' safety related
to heat stress and material handling activities and that, therefore,
the EPA should reconsider the 0 percent opacity limit. The commenter
stated the proposal did not include an analysis of impacts for closure
of building openings. A review of the impacts on worker heat stress
would be necessary and that the EPA had provided no justification for
requiring melt shops to close all openings.
The commenter noted the current proposed rule did not address heat
stress concerns, which was in conflict with OSHA's current Heat Stress
Initiative and National Enforcement Program that identified ``iron and
steel mills'' specifically as a high hazard industry for heat stress.
The commenter stated that safe melt shop operation requires air flow to
minimize potential heat stress on workers and equipment. The commenter
claimed that negative pressure alone was not sufficient to maintain
proper airflow through the melt shop and that cross drafts were
necessary and doors and other access points needed to be open. The
commenter also had significant concerns about employee health impacts
from the proposed totally enclosed melt shop, particularly for its
Mobile, Alabama facility, which is located in an extreme climate area,
as the proposed changes could cause greater heat stress on employees
and would necessitate design and structural changes that the EPA failed
to consider in its proposal. The commenter stated that 100 percent
capture and 0 percent opacity may not be safe. The commenter noted when
evaluating 2 different control systems, the EPA may not simply choose
the most cost-effective air pollution control system if it potentially
has adverse impacts on the health and safety of workers within the melt
shop. The commenter stated that facilities need to allow air changes to
protect worker health and safety.
The commenter referenced the 1984 amendments, which dismissed the
option for a closed roof configuration to achieve 0 percent opacity due
to the impacts of heat stress on worker safety and equipment
functioning. A commenter said that statements made by the EPA in the
1984 40 CFR part 60, subpart AAa rulemaking (49 FR 43841) that ``the
visible emission limits were selected-based on the performance of the
capture and control technologies that served as the basis for
Regulatory Alternative B (partially open roof monitor)'' and that
``Regulatory Alternative C (closed roof) was not considered suitable as
the basis for national standards of performance because it is based on
a closed roof
[[Page 58457]]
configuration which may aggravate worker and equipment heat stress
problems.''
EPA Response: The proposed rule 40 CFR part 60, subpart AAb did not
require a closed roof nor a totally enclosed melt shop. In addition,
the 0 percent shop opacity limit does not restrict air flow from
exiting or entering the shop. Rather, the 0 percent opacity limit
merely necessitates that no visible particles be emitted from the shop
(as reflected by either no VE observations via EPA Method 22 or opacity
of 0 percent using EPA Method 9 or the DCOT method). Canopy hoods have
the benefit of being able to collect a large volume of emissions,
especially those during charging and tapping and route the PM to
control devices. Therefore, the basis for the addition of a partial
roof canopy with a canopy hood used in the proposed and final cost
estimates is to ensure facilities clean the air of particles before
allowing the air to exit the shop opening(s). We believe a capture
device such as a canopy hood, as opposed to a closed roof, can be used
to meet the opacity limit based on BSER and does not endanger worker
safety.
Comment: The commenter asserted that the EPA used a limited data
set that was not indicative of continuous long-term performance and did
not support a finding that 0 percent opacity was adequately
demonstrated. The commenter stated the EPA's dataset for EAF steel
mills is selective and not representative of the full scope of
operations at these facilities. The commenter stated that the EPA
purported to have based the proposed 40 CFR part 60, subpart AAb shop
opacity limit on individual performance testing reports from a total of
13 of 31 EAF steel mills, which was less than half. The commenter noted
that most facilities (16 out of 31) were unable to maintain 0 percent
shop opacity throughout the duration of the performance tests. Thus, as
the majority of facilities in the EPA's database did not maintain 0
percent opacity, the short duration of performance testing plainly
demonstrated that 0 percent shop opacity was not adequately
demonstrated.
Another commenter stated the EPA's proposal of 0 percent opacity
from the melt shop was based on limited information from opacity tests
conducted at 31 facilities, of which less than half achieved the 0
percent melt shop opacity requirement. The commenter stated that the
short-term observations conducted during a stack test were taken for a
few hours under a specific set of conditions and were not
representative of long-term compliance capability and, as such, could
not account for routine operating variability and the full range of
operating conditions that may affect opacity. The commenter stated that
the subset of data the EPA relied upon did not include longer-term
operating performance of the identified mills; yet NSPS, as defined by
BSER, must account for what was achievable and adequately demonstrated
by a wide variety of facilities operating under a wide variety of
conditions, not simply show that the standard was achieved at a model
plant for a short period of time. The commenter also noted that the
data collected by the EPA generally showed that the more years of
opacity data reviewed for a given facility, the higher the maximum melt
shop opacity.
EPA Response: Thirteen facilities out of the 31 EAF facilities in
the EPA data set had 0.00 percent shop opacity during the tests which
were reported to the EPA. Two additional facilities in the EPA data set
achieved 0.00 percent shop opacity as shown in the submitted test
reports and another 4 facilities achieved 0.0 percent as shown in the
submitted test reports, for a total of 19 facilities appearing to
already be complying with a 0 percent shop standard (1 significant
figure) based on tests in the submitted reports, and which were
performed using the same test method that would be required to show
compliance with the NSPS. Out of the total 31 facilities in the EPA EAF
data, only 1 facility had shop opacity greater than 1 percent as an
average of all runs in the test, with the overall average among the 31
facilities in the EPA data set at 0.14 percent opacity. See the list of
31 EAF facilities and the opacity test results from reports submitted
to the EPA in the 2010 EPA/EAF data set, as shown in Table 5. None of
the opacity data submitted to the EPA in 2010 should be construed as
being from a ``model plant.'' The opacity data was taken from
facilities responding to the CAA section 114 information request with
the primary purposes to obtain mercury emissions data and were real
facilities, comprising a third of the industry. Data for PM and opacity
were collected as part of the CAA section 114 information request only
for purposes of showing that the reported mercury data were taken
during the time the facility was complying with both the NESHAP (40 CFR
part 63, subpart YYYYY) and NSPS (40 CFR part 60, subparts AA and AAa).
Table 5--Range of Melt Shop Opacity in 31 EAF Test Reports (2005-2011)
From the 2010 CAA Section 114 Request
[2010 EPA/EAF Data Set]
------------------------------------------------------------------------
Melt shop opacity
Count Facility ID (percent)
------------------------------------------------------------------------
1............................. AKS-Butler-PA........ 0.000
2............................. AKS-Mansfield-OH..... 0.000
3............................. CMC-Birmingham-AL.... 0.000
4............................. CMC-Cayce-SC......... 0.000
5............................. CMC-Mesa-AZ.......... 0.000
6............................. Ger-Charlotte-NC..... 0.000
7............................. Ger-Jackson-MI....... 0.000
8............................. NAS-Ghent-KY......... 0.000
9............................. Nuc-Crawfordsville-IN 0.000
10............................ Nuc-Huger-SC......... 0.000
11............................ Nuc-Jewett-TX........ 0.000
12............................ Nuc-Marion-OH........ 0.000
13............................ SSAB-Axis-AL......... 0.000
14............................ Tim-Faircrest-OH..... 0.000
15............................ Tim-Harrison-OH...... 0.000
16............................ Nuc-Darlington-SC.... 0.001
17............................ Ger-Knoxville-TN..... 0.01
18............................ Ger-StPaul-MN........ 0.02
[[Page 58458]]
19............................ Nuc-Plymouth-UT...... 0.05
20............................ CMC-Seguin-TX........ 0.10
21............................ Ger-Wilton-IA........ 0.10
22............................ Ger-Jacksonville-FL.. 0.10
23............................ Ger-Jackson-TN....... 0.20
24............................ Alle-Brackenridge-PA. 0.20
25............................ Nuc-Cofield-NC....... 0.20
26............................ Alle-Latrobe-PA...... 0.30
27............................ Nuc-Blytheville-AR... 0.30
28............................ Nuc-Norfolk-NE....... 0.30
29............................ Ger-Beaumont-TX...... 0.50
30............................ Ger-Cartersville-GA.. 0.80
31............................ Ster-Sterling-IL..... 1.2
Overall average...... 0.14
------------------------------------------------------------------------
It would be exorbitantly expensive to the industry (as well as the
EPA) for the EPA to request and analyze round-the-clock opacity testing
throughout the course of years at a number of facilities in order to
obtain data during a ``wide variety of conditions and wide variety of
facilities.'' None of the opacity requirements in previously
promulgated rules (40 CFR part 60, subparts AA and AAa) have
differentiated conditions or facility types for the opacity
requirements in those rules. The commenter does not provide any
information showing that the need for these data is justified, except
for alluding to the fact that facilities improved their control of
opacity in more recent years.
The goal of determining BSER is that it is the ``best'' system of
emission reduction (considering costs and other factors), not the
system used by the majority of the industry nor the top facilities when
ranked or any other ranking method. However, the EPA acknowledges that
the data obtained through CAA section 114 requests consisted of data
collected during melting and refining, which is the time period
required to test opacity in the current EAF NSPS rules in 40 CFR part
60, subparts AA, AAa. Therefore, in light of comments provided by the
industry that reducing opacity during charging and tapping is difficult
to achieve because of the physical structure of equipment and because
of the much higher PM emissions during charging and tapping than during
melting and refining, in the final rule for 40 FCR part 60, subpart AAb
we are maintaining the current rule limit in 40 CFR part 60, subparts
AA, AAa of 6 percent opacity to apply during charging and tapping, and
retaining the proposed 0 percent melt shop opacity for melting and
refining. We estimate that the period of charging and tapping is
approximately 15 percent of the total EAF operating time period.
Comment: The commenter asserted that the EPA's limited data set is
not representative of performance during ``charging and tapping''; 0
percent opacity should not apply to charging and tapping. The commenter
stated the EPA's opacity data set did not adequately demonstrate that a
0 percent opacity limit could be consistently achievable across the
full spectrum of expected operating conditions. The commenter said the
vast majority of the opacity measurements in the data set were based on
measurements taken during the melting and refining stage of production
(as required under 40 CFR part 60, subpart AAa), and thus did not
demonstrate that 0 percent opacity had been consistently achieved
during charging or tapping, which was the established period with the
greatest potential for uncaptured emissions to escape the melt shop.
The commenter noted that most EAF steel mills were designed such that
the primary emission controls (DEC) could not be engaged while the
furnace roof was off during charging and tapping.
A commenter referenced previous rulemaking to corroborate their
statements that the EPA did not consider its own historical
information. One commenter referred to background documents for earlier
NSPS rulings stating that in those documents, the EPA concluded that
facilities utilizing DEC were likely to have a visible plume during
charging and tapping and could not meet 0 percent opacity on a
continuous basis. One commenter referenced the 1983 rulemaking docket
stating it included only 7 hours of shop opacity data from some portion
of the charging and tapping phase, and that such limited data from 4
decades ago was not representative of, or sufficient to, characterize
current melt shop operations. The commenter said these previous
findings by the EPA contradict the current proposal that 0 percent
opacity was achievable on a continuous basis.
A commenter provided confidential summaries of long-term shop
opacity data from the 13 facilities identified by the EPA as achieving
the 0 percent standard, and noted that most of the opacity data was
collected only during melting and refining, and not during charging and
tapping. The commenter stated their summaries demonstrated that 0
percent melt shop opacity was not continuously achieved by the 13 mills
cited as exemplars. The commenter noted in a reference that they would
readily provide the confidential data to the EPA upon request.
A commenter stated that the current design at their facilities
included DEC and a baghouse with a canopy, which under the proposed
rule was considered the optimal design, yet it appeared the EPA did not
include opacity data from their facilities in the limited data set. The
commenter noted they fully complied with current limits in 40 CFR part
60, subparts AA, AAa, including opacity; but their facility data showed
that compliance with a 0 percent opacity limit at all times per the
proposed standard could not be met continuously due to the production
process variability and the raw material inputs. The commenter stated
it was possible for the melt shop to experience an opacity greater than
0 percent during charging and tapping when the DEC
[[Page 58459]]
system was disengaged, and there were other sources of opacity from
concurrent operations (e.g., vacuum tank degasser operations, the LMF,
and the Caster).
A commenter said the EPA in the proposed rule stated 0 percent
opacity could be achieved utilizing a canopy over the furnace with an
open roof monitor elsewhere. The commenter operated its facilities
under such a configuration and did not meet 0 percent opacity on a
continuous basis; thus, the EPA's data set was flawed and not
representative of the steel manufacturing operation.
EPA Response: The EPA reviewed the summary data provided by the
commenter, where for three facilities, the opacity summary data shown
in Table 6 were provided.
Table 6--SMA Data on Opacity From Three Facilities
----------------------------------------------------------------------------------------------------------------
Number
readings >0 Total number Percent >0
SMA facility No. percent opacity percent out of Year of data
opacity readings all readings
----------------------------------------------------------------------------------------------------------------
1............................................... 3 349 0.9 2021
0 296 None 2020
11 294 3.7 2019
2............................................... 21 1,482 1.4 2021-2022
3............................................... 61 2,488 2.5 2021-2022
----------------------------------------------------------------------------------------------------------------
Although the commenter presented these data attempting to
contradict 0 percent opacity as BSER, the data actually support the
preponderance of opacity data at 0 percent, since the number of
readings greater than 0 percent were low, ranging from none (i.e., no
readings greater than 0 percent) to a high of 3.7 percent, out of a
total number of readings ranging from 300 to 2,500.
The EPA's evaluation of the degree of emission limitation
achievable with the BSER is not based on an average of all facility
data nor an average of the best facilities. Rather, the BSER is the
best system of control that the EPA determines is adequately
demonstrated for EAF in the industry, and the EPA's charge under CAA
111(a)(1) and (b)(1)(B) is to establish a standard of performance that
reflects the degree of emission limitation achievable by application of
that BSER.
The EPA EAF data, taken mostly from the 2010 CAA section 114
request, required ``an aggregate total of 180 minutes of opacity
observation concurrent with PM and/or PM less than 2.5 micrometers
(PM2.5) testing of EAF primary control devices.'' The
commenter stated that charging time is less than 1 minute to 3 minutes
per charge, and tapping is 4 to 6 minutes, so it is not surprising that
most of the time opacity was measured during melting and refining.
However, we agree with the commenter that because the current EAF
NSPS rules in 40 CFR part 60, subparts AA and AAa only require opacity
measurements during melting and refining, the data obtained by the EPA
can be assumed to reflect only operation during melting and refining.
Therefore, while we are retaining 0 percent opacity during melting and
refining in the final rule as in the proposal, we are reverting back to
the opacity limit of 6 percent opacity for charging and tapping as in
the current rules in 40 CFR part 60, subparts AA, AAa.
Additionally, opacity testing during charging, tapping, and
melting, and refining periods is required in the final rule. Opacity
tests during tapping, and melting and refining periods should be able
meet the minimum 6 minutes of total opacity testing required under EPA
Method 9 in 24 consecutive tests for 15 seconds each. However, we are
allowing a modification of EPA Method 9 for testing during charging
because of the potentially shorter time period that charging occurs. In
the final rule, we are allowing the EPA Method 9 testing during
charging to be determined from the average of 12 consecutive
observations recorded at 15-second intervals for a total of 3 minutes
of opacity testing.
Comment: The commenter asserted that the EPA did not properly
evaluate the cost of compliance with 0 percent opacity for a source as
a result of modification.
EPA Response: The commenter was not specific as to what type of
modification needed to be evaluated for its costs to comply with the
proposed opacity standards. A modification that triggers applicability
of an NSPS is a modification that increases emissions and meets the
requirements in 40 CFR 60.14. Without knowing which type of
modification is in question, it is difficult to compare the costs of
compliance and address the commenter's concern. A facility may be
adding another baghouse to accommodate increased production of the EAF.
In this case, the modification (additional baghouse) is outside of the
melt shop and, therefore, is not affected by the melt shop standard. If
a facility is modifying an EAF to increase production, pursuant to 40
CFR 60.14 (e), an increase in production rate of the existing EAF is
not considered a modification if that increase can be accomplished
without a capital expenditure on that facility. The partial roof canopy
determined to be BSER for the melt shop is a type of capture device
that can be added to any melt shop. However, the final rule does not
require that a partial roof canopy be installed to be in compliance
with the opacity standard. Affected sources can seek other methods to
achieve the melt shop opacity.
Comment: In regard to canopy hood control costs, a commenter stated
the EPA did not examine advances in control technologies, process
operations, design or efficiency improvements, or other systems of
emission reduction, that are ``adequately demonstrated.'' Rather, the
EPA looked to a decades-old BID, concluded that ``[c]anopy hoods are a
common method of controlling fugitive EAF emissions,'' and assessed
costs for: adding a partial roof canopy (segmented canopy hood, closed
roof over furnace, open roof monitor elsewhere) to collect PM emissions
that might otherwise escape through the shops to achieve complete
control of melt shop fugitives.
The commenter stated the EPA did not analyze whether canopy hoods
were used by the 19 facilities that recorded 0 percent opacity during
performance testing or were absent from the 9 facilities that recorded
the highest opacity during performance tests. The commenter claims that
this information was available to the EPA in the docket for the 40 CFR
part 63, subpart YYYYY NESHAP for EAF--the same docket that supplied
the majority of the performance test data the EPA used in this rule.
The commenter further asserted that the EPA's own review of
[[Page 58460]]
the survey responses in the 40 CFR part 60, subpart YYYYY docket in
June 2005 shows that the EPA knows that canopy hoods were used to
capture fugitive emissions from 32 of the 38 EAF described in the CAA
section 114 survey responses, and that the presence or absence of a
partial roof canopy did not determine whether the facilities responding
to the survey could achieve 0 percent opacity. Therefore, the EPA has
no basis to now conclude for purposes of demonstrating achievability
and cost effectiveness that the singular act of installing a partial
roof canopy will ``achieve complete control of melt shop fugitives.''
A commenter stated the EPA's conclusion is also contradicted within
the Agency's cost analysis. In order to estimate how much PM is emitted
from a facility that emits 6 percent opacity, the EPA used the 1982 BID
[Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels in
Steel Industry--Background Information for Proposed Standards.
Preliminary Draft. June 1982, Table 3-7 at 3-37; and the 1983 BID
(Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels in
Steel Industry--Background Information for Proposed Standards. (EPA-
450/3-82-020a) July 1983; Table 3-7 at 3-37] to estimate that EAF emit
an average of 29 lb/ton of uncontrolled PM emissions. The EPA then
relied on the 1982 [and 1983] BID again to estimate that facilities
emitting 6 percent opacity captured 90 percent of those emissions using
a ``segmented canopy hood, closed roof over furnace, open roof monitor
elsewhere.'' This is the exact fugitive emission capture technology
that the EPA's Cost Analysis presumes facilities with greater than 0
percent opacity can install to achieve 0 percent opacity. In other
words, the EPA's Cost Analysis assumes that facilities with a
``segmented canopy hood, closed roof over furnace, open roof monitor
elsewhere'' are emitting 6 percent opacity and if those facilities
install a ``segmented canopy hood, closed roof over furnace, open roof
monitor elsewhere'' they will achieve 0 percent opacity. Commenter
stated because it is arbitrary and unreasonable to assume that
facilities will be able to achieve 0 percent opacity by doing nothing
more than install the same systems that facilities already have
installed without reaching 0 percent opacity, the EPA has failed to
provide a cost estimate rationally related to reduction of opacity from
6 percent to 0 percent.
EPA Response: Canopy hoods have been in use for many years in many
industries and are still in use today. The costs to install a partial
roof canopy to enhance control of EAF melt shop fugitives was taken
from relatively recent rulemakings (2011 through 2018 \16\) for the
Ferroalloys industry, which also uses EAF. The 1984 EAF BID was used
only to estimate uncontrolled EAF shop emissions in the proposal
because there is no estimate available of uncontrolled emissions due to
the fact that most, if not all, EAF facilities, especially those
subject to the EAF NSPS subparts AA and AAa, have some type of control
of shop emissions, e.g., DEC systems; canopy hoods, side draft hoods,
and tapping hoods; partial or total enclosures; scavenger duct systems;
and building evacuation systems (72 FR 53818). Even if a total
uncontrolled melt shop could be found, it is not a typical source test
to measure emissions from a large opening such as a roof vent or an
industrial door, nor does the EPA generally have the resources to
perform such a test.
---------------------------------------------------------------------------
\16\ See https://www.epa.gov/stationary-sources-air-pollution/ferromanganese-and-silicomanganese-production-national-emission for
information regarding Ferroalloys rules.
---------------------------------------------------------------------------
If some EAF facilities with canopy hoods are not achieving 0
percent opacity, as the commenter alleges, it is likely because both
the NESHAP (40 CFR part 63, subpart YYYYY) and NSPS standards (40 CFR
part 60, subparts AA, AAa) currently only require 6 percent opacity
limits for EAF and AOD, and because the standard is higher, they are
only being designed to meet that standard. Regardless of the fact that
some EAF and AOD facilities may have been designed this way, they still
can be designed or modified to achieve 100 percent capture to ensure 0
percent opacity. The fact that some hoods have not been achieving 100
percent capture at some facilities is not proof that canopy hoods
cannot be used to do so for new, modified, or reconstructed sources.
The commenter fails to provide a technical basis for why canopy hoods
cannot be designed to achieve 0 percent melt shop opacity.
Out of 31 EAF facilities in the EPA EAF dataset with opacity data,
13 facilities achieved 0.000 percent shop opacity. Two additional
facilities achieved 0.00 percent shop opacity, and another 4 facilities
achieved 0.0 percent, for a total of 19 facilities able to comply with
a 0 percent shop standard. Out of the total 31 facilities in the EPA
EAF data, only 1 facility had shop opacity greater than 1 percent as an
average of all runs in the test, with the average of all 31 facilities
at 0.14 percent opacity (a value that would round down to 0 percent
under the NSPS). See the ``Emissions Memorandum,'' discussed earlier in
this section, for more information about these data.
The addition of a canopy hood or alteration of existing hoods to
achieve slightly better capture is within reach by a facility achieving
less than 1 percent opacity but greater than 0 percent. The scenario of
installation of a canopy hood in the melt shop is used in the cost
analysis to represent one method that is lower in cost and can be used
to achieve the standard of performance if an existing source that is
not currently achieving 0 percent melt shop opacity were to modify or
reconstruct and become an affected facility under 40 CFR 60, subpart
AAb.
Comment: A commenter stated melt shop partitions of the size
necessary to meaningfully contain EAF emissions within the melt shop
are not feasible in many mills given other equipment and shop design,
including cranes. In particular, sizable partition walls are not
feasible at many EAF steel mills because they will interfere with
overhead cranes that transport scrap metal to the furnace. Similarly,
transfer ladles that are carried by crane to and from the furnace for
tapping molten metal would be blocked by partition walls.
The commenter said for existing facilities that may trigger an NSPS
modification in the future, achieving 0 percent shop opacity would
require extensive re-engineering that would be costly and introduce
practical and worker safety concerns as well. For example, one [trade]
association member stated that 0 percent shop opacity could only be
achieved, if at all, with near total enclosure of the EAF and doubling
the flow rate of the emission control system. The commenter stated that
only very short (and therefore marginally effective) partition walls
could be installed above the crane because of the lack of space between
the crane and the roof. They also noted that such short partitions
deteriorated quickly due to the heat and other elements. Thus, to
increase the size and collection efficiency to meet a 0 percent opacity
requirement, the facility would have to raise the roof of the structure
at an undetermined cost (a cost that likely would trigger a ``major
modification''), and potentially enclose the entire monovent, which
would likely create worker safety and heat stress issues.
The commenter added, facilities would have to increase the number
and volume of fans to the baghouse, as well as require new or
additional fans in the shop and additional baghouses because the
facility's current baghouses are operating at close to maximum
capacity. Moreover, for servicing, cranes have to
[[Page 58461]]
be moved to a different part of the melt shop due to the partitions
being so close to the top of the cranes. To achieve compliance,
existing facilities such as these also would have to enclose the large
openings in the casting area to prevent winds from blowing through the
shop or wall off the EAF operations. Neither option is feasible; melt
shops are typically long buildings with EAF, LMS, and casting in the
same structure.
EPA Response: The cost analysis for new, modified, or reconstructed
EAF to achieve 0 percent opacity is based on a ``partial'' canopy hood
and not ``partition walls,'' as the commenter suggests, that would
interfere with overhead cranes. In regard to the comment that ``costly
and impractical re-engineering to achieve 0 percent shop opacity that
could only be achieved, if at all, with near total enclosure of the EAF
that doubles the flow rate of the emission control system,'' there are
19 EAF facilities in the EPA EAF dataset that demonstrated with data
from 2010 that they were capable of complying with a 0 percent melt
shop opacity standard (which we assumed was during melting and
refining) and, therefore, belie this concern. And because only 1
facility among the 31 facilities in the EPA EAF dataset had shop
opacity greater than 1 percent as an average of all runs in the test,
the addition of a canopy hood may be unnecessary and only alteration of
the operation of existing hoods may be needed to achieve slightly
better capture to achieve 0 percent melt shop opacity during melting
and refining. This shows that meeting a new NSPS standard of 0 percent
melt shop opacity during melting and refining is within reach by most
if not all existing EAF facilities, so is even more likely achievable
in any new facility.
In actuality, it is not likely that all current EAF facilities in
the industry will need to comply with 40 CFR part 60, subpart AAb,
which would only be applicable to new EAF facilities or, for existing
facilities, if the result of any future modifications or reconstruction
increased emissions and met the provisions in 40 CFR 60.14 for
modifications and 40 CFR 60.15 for reconstruction, respectively.\17\
Whether or not the modification or reconstruction planned at the
facility would also trigger permitting requirements because it is a
``major'' modification under the permitting regulations is not relevant
to the EPA's determination of the BSER. Moreover, the EPA does not
agree that it is likely that the construction of the canopy will itself
be considered a major modification that triggers permitting
requirements. The issue here is whether to meet the revised limit an
existing source that modifies needs to raise the roof structure to
install equipment to meet the standard. The EPA response to this issue
is that it is not required to raise the roof structure so as to be able
to install equipment, and we have no knowledge (and the commenter has
not provided information showing) that raising the melt shop roof has
ever having been done to meet a lower opacity, such as 0 percent.
---------------------------------------------------------------------------
\17\ Note that modifications pursuant to CAA section 111 need
not be ``major'' to trigger application of the NSPS. Rather, a
modification under CAA section 111(a)(4) is defined as a physical
change in, or change in the method of operation of, a stationary
source which results in any increase in emissions. See also 40 CFR
60.14.
---------------------------------------------------------------------------
3. What is the rationale for the final BSER determination and what is
the final standard of performance?
We established in the proposal (87 FR 29717-29718) that the use of
a canopy hood above the crane rails, while not required to achieve 0
percent melt shop opacity during melting and refining, is a cost-
effective method that can be used to do so, with cost effectiveness
estimated at $1,700 per ton PM removed in $2022 for a medium-sized
facility, annual costs of the canopy, at $1.1 million per year, and
with PM reduction of 684 tpy at a medium facility achieving 0 percent
melt shop opacity during melting and refining and 6 percent during
charging and tapping, as compared to 6 percent opacity at all times.
Analyses performed for small and large EAF melt shops produced similar
cost-effectiveness values, at $1,800 per ton PM removed and $1,700 per
ton PM removed, respectively. The values of $1,800 per ton or less are
considered cost effective and, therefore, the use of additional canopy
hoods above the crane rails is considered BSER for melt shop opacity
for new EAF/AOD using this approach. (See section III.A.1.a of this
preamble).
The performance data obtained by the EPA for 31 facilities show
that 13 facilities achieved 0 percent opacity during melting and
refining and the other 17 achieved very low values of opacity so that
the overall average melt shop opacity from all 31 facilities was 0.14
percent. Therefore, considering that the costs are achievable even
without the addition of a canopy hood, we conclude the 0 percent
opacity is the standard of performance that reflects the degree of
emission limitation achievable with application of the BSER for melting
and refining.
We also concluded that full enclosure is not needed to achieve 0
percent melt shop opacity during melting and refining. The EPA
acknowledges that facilities need sufficient capture ventilation to
collect melt shop PM emitted as fugitives, but this does not
necessarily require a fully enclosed melt shop, as seen in the data
from EAF facilities in 2010 test reports obtained by the EPA where 0
percent opacity was achieved.
Because we do not have sufficient data to show that 0 percent melt
shop opacity is achievable during charging and tapping to refute
industry's assertion that 0 percent melt shop opacity is not achievable
during charging and tapping, nor are these data likely available
anywhere else, the final rule retains the current 6 percent NSPS limit
for charging and tapping in 40 CFR part 60, subparts AA, AAa, and adds
to the final rule for 40 CFR part 60, subpart AAb a testing requirement
during these periods along with the requirement to test during melting
and refining that is already required for facilities in operation on or
before May 16, 2022. Note that the test method protocol for measuring
opacity during charging has been modified for the final rule, as
discussed in section V.B.1 of this preamble.
4. Are there any relevant energy impacts or nonair quality health and
environmental impacts of the selection of the final BSER for melt shop
opacity and, if so, how were the final emission limitations based on
the BSER affected?
There are no relevant energy impacts or nonair quality health and
significant environmental impacts of the final BSER for melt shop
opacity. These issues are discussed in detail in sections V.A and V.B
of this preamble. No comments were received on these issues.
C. NSPS Requirements for Opacity From Control Devices and Dust Handling
for Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels
Constructed After May 16, 2022
We proposed to retain the BSER determinations for proper operation
of control devices and proper dust handling procedures from NSPS
subpart AAa in NSPS subpart AAb as well as the limitations of 3 percent
and 10 percent opacity limits from control devices and dust handling,
respectively. No comments were received on this subject. Similarly, we
are finalizing the requirement for opacity from control devices and
dust handling in NSPS subpart AAb, as proposed.
[[Page 58462]]
D. Startup, Shutdown, Malfunction Requirements for Electric Arc
Furnaces and Argon-Oxygen Decarburization Vessels Modified,
Reconstructed, or Constructed After May 16, 2022
Consistent with Sierra Club v. EPA, 551 F.3d 1019 (D.C. Cir. 2008),
the EPA has established standards in 40 CFR 60 subpart AAb that apply
at all times. We also are finalizing in 40 CFR 60 subpart AAb specific
requirements at 40 CFR 60.272b(c) that override the general provisions
for SSM requirements. In finalizing the standards in this rule, the EPA
has taken into account startup and shutdown periods and, for the
reasons explained in section IV.D.2 of this preamble has not finalized
alternate standards for those periods.
Periods of startup, normal operations, and shutdown are all
predictable and routine aspects of a source's operations. Malfunctions,
in contrast, are neither predictable nor routine. Instead, they are, by
definition, sudden, infrequent, and not reasonably preventable failures
of emissions control, process, or monitoring equipment (40 CFR 60.2).
The EPA interprets CAA section 111 as not requiring emissions that
occur during periods of malfunction to be factored into development of
CAA section 111 standards. Nothing in CAA section 111 or in case law
requires that the EPA consider malfunctions when determining what
standards of performance reflect the degree of emission limitation
achievable through ``the application of the best system of emission
reduction'' that the EPA determines is adequately demonstrated. While
the EPA accounts for variability in setting emissions standards,
nothing in CAA section 111 requires the Agency to consider malfunctions
as part of that analysis. The EPA is not required to treat a
malfunction in the same manner as the type of variation in performance
that occurs during routine operations of a source. A malfunction is a
failure of the source to perform in a ``normal or usual manner'' and no
statutory language compels the EPA to consider such events in setting
CAA section 111 standards of performance. The EPA's approach to
malfunctions in the analogous circumstances (setting ``achievable''
standards under CAA section 112) has been upheld as reasonable by the
D.C. Circuit in U.S. Sugar Corp. v. EPA, 830 F.3d 579, 606-610 (2016).
1. What did we propose as the BSER determination and standard of
performance?
Consistent with Sierra Club v. EPA, 551 F.3d 1019 (D.C. Cir. 2008),
the EPA proposed that the PM and opacity standards in 40 CFR subpart
AAb apply at all times. We also proposed in 40 CFR part 60, subpart AAb
specific requirements at 40 CFR 60.272b(c) that override the general
provisions exemptions during SSM periods.
2. What significant comments did we receive and what are our responses?
Comment: A commenter asserted that the EPA must provide work
practice standards if the EPA removes SSM exemptions. Subjecting SSM
periods to the same limit as those during normal operations was not
adequately demonstrated as required per CAA section 111(a)(1) and was
not provided in the docket prior to promulgation as per CAA section
307(d). The dataset of stack tests from 33 facilities did not include
adequate testing to demonstrate that SSM periods consistently met the
limits proposed in 40 CFR part 60, subpart AAb. These stack tests were
not conducted during SSM periods, and as such could not provide a basis
for concluding that emissions during shutdown and startup could comply
with the proposed limits. The commenter asserts that, if the EPA cannot
show that compliance with a numerical limit was adequately demonstrated
during periods of SSM, and provide that data in the record, then the
EPA does not have the legal authority under CAA section 111 to subject
those emissions to such a standard.
EPA Response: Consistent with Sierra Club v. EPA, this action will
ensure that the PM and opacity standards in EAF NSPS 40 CFR 60, subpart
AAb apply at all times, including during periods of startup and
shutdown. Because Sierra Club v. EPA established that emissions
standards or limitations must be continuous in nature, the EPA must
determine what standard will apply during periods of SSM. Moreover, CAA
section 111(h)(1) provides that the EPA may only provide for work
practice standards when the Administrator determines that it is not
feasible to prescribe or enforce a numerical work practice standard. We
have determined that the numerical standards in EAF NSPS 40 CFR 60
subpart AAb are appropriate as EAF and AOD facilities can comply with
the standards during startup and shutdown because the control devices
are the same during startup and shutdown as in normal operation and
would provide the same protection to PM emissions, both for PM from the
control devices as well as opacity from melt shop, control devices, and
dust handling. In regard to the 0 percent melt shop opacity standard,
this standard in 40 CFR part 60, subpart AAb only applies during
melting and refining; startup or shutdown does not fall under the
operational description of melting and refining. A opacity standard of
6 percent would apply at all other times.
While commenters argue that the EPA must provide work practice
standards, the commenters have not provided information showing that
compliance with the numerical emission limitations is not possible
during startup and shutdown events and that, therefore, the EPA's
determination to apply the PM and opacity standards at all times would
be inappropriate. In addition to the standards applying at all times,
sources will need to comply with the CAA section 111 general
provisions, which include ``general duty'' requirements in 40 CFR
60.11(d) to operate ``in a manner consistent with good air pollution
control practice for minimizing emissions.'' These provisions apply at
all times, including during startup and shutdown, as well as during
malfunctions.
Comment: A commenter stated if a 0 percent opacity standard for
melt shop emissions at all times was implemented, the EPA must exclude
periods of malfunctions and upset conditions. The commenter explained
that malfunctions have occurred during the melting and casting
operations that required extraordinary measures for corrective action,
such as a ``breakout.'' In an extremely dangerous situation, breakouts
occurred when molten steel escaped from one or more mold strands at the
caster or during casting. The commenter stated after a breakout and
subsequent corrective action, emissions were generated and may exit the
melt shop, and those emissions should not be considered in determining
compliance with the 0 percent opacity melt shop requirement. The
commenter said the EPA's proposed approach lacked an understanding of
the significant dangers, risks, and related emissions associated with
``breakouts'' and other malfunction events that occur during the
steelmaking processes, and the EPA should reconsider the 0 percent melt
shop opacity standard.
EPA Response: The EPA disagrees with the commenter that emissions
during a malfunction are not appropriately subject to the standard.
Malfunctions that cause exceedances of any part of a rule are
considered a violation under the NSPS and are a compliance issue that
is relegated to the EPA's enforcement office. Facilities should
document the circumstances of the malfunction so as to be able to
discuss the special circumstances of the
[[Page 58463]]
event with the EPA's enforcement officer. It is not the purpose of the
BSER to take into account unpredictable, sudden, infrequent events such
as what is described by the commenter. We also note that casting is not
part of the EAF NSPS source category.
E. Testing and Monitoring Requirements for Electric Arc Furnaces and
Argon-Oxygen Decarburization Vessels
1. What did we propose for testing and monitoring?
From the EPA review of the current NSPS's testing and monitoring
requirements in 40 CFR part 60, subpart AAa, we evaluated and
determined the testing, monitoring, recordkeeping and reporting
requirements needed to be clarified and revised'' to ensure compliance
with the emission standards, considering that the NSPS reflect BSER
under conditions of proper operation and maintenance. Consequently, we
proposed changes to testing and monitoring in 40 CFR part 60, subparts
AA and AAa, and also incorporated some of these requirements along with
additional requirements into new 40 CFR part 60, subpart AAb.
Specifically, we proposed amendments to clarify, correct, or refine
the rule requirements to enhance compliance and enforcement with 40 CFR
part 60, sections 60.271 and 60.271a ``Definitions'', 60.272 and
60.272a ``Standard for particulate matter'', 60.273 and 60.273a
``Emission monitoring'', 60.274a ``Monitoring of operations'', 60.275a
``Test methods and procedures'', and 60.276a ``Recordkeeping and
reporting requirements.''
In addition, we proposed that sources complying with 40 CFR part
60, subpart AAb would be required to perform compliance testing every 5
years after the initial testing performed upon startup, as required
under 40 CFR 60.8. This requirement for periodic testing already is
required in many of the permits for existing EAF in both the EPA's EAF
dataset and in the industry, and is a standard requirement for testing
of other sources of PM emissions in many other industrial sectors.
We also solicited in the proposal for comments or data and other
relevant information on whether the EPA should change the allotted time
to both find and fix the cause of a BLDS alarm from 3 hours to a longer
timeframe (e.g., 24 hours as in other rules), or some other duration.
2. What significant comments did we receive on testing and monitoring
and what are our responses?
Comment: The commenter said facilities should be allowed 24 hours
to respond to BLDS alarms and to complete the response as soon as
practical in 40 CFR part 60, subparts AA, AAa, and AAb. The commenter
disagreed with the proposed 40 CFR part 60, subpart AAb provisions that
would require facilities to determine the cause of all BLDS alarms
within 1 hour and alleviate the cause of the alarm within 3 hours by
taking the necessary response action. The commenter recommended the EPA
adopt a 24-hour timeframe to initiate corrective action and to require
that response actions be completed as soon as practicable. This
approach would recognize the practical realities in identifying and
responding to BLDS alarms. The commenter added that this approach is
the same as that used in the Integrated Iron and Steel NESHAP, and is
consistent with 40 CFR part 63, subparts X (NESHAP for Secondary Lead
Smelting), DDD (NESHAP for Mineral Wool Production), EEE (NESHAP from
Hazardous Waste Combustors), MMM (NESHAP for Pesticide Active
Ingredient Production), RRR (NESHAP for Secondary Aluminum Production),
and TTT (NESHAP for Primary Lead Smelting). The commenter said there
was no justification for the proposal to be different from other
existing rules. The commenter added that the proposed 3-hour time
period was arbitrary and ignored the numerous scenarios in which it can
take longer than 3 hours to identify and fix the cause of an alarm.
Allowing facilities 24 hours to identify the cause and requiring
facilities to alleviate the cause of the alarm ``as soon as
practicable'' is more practical, particularly where many baghouse
compartments must be inspected to determine the cause of an alarm.
The commenter noted that there are situations in which more than 3
hours is needed to respond to a BLDS alarm and address its cause.
Because many mills calibrate their BLDS to be very sensitive, the
likelihood that a BLDS alarm will be falsely triggered is increased.
The commenter included the following examples of situations in which
false alarms can occur:
Weather. BLDS alarms will occasionally trigger during a
heavy downpour or when there are significant changes in temperature or
humidity.
Bag Cleaning Cycle. BLDS alarm may trigger at the end of
the baghouse cleaning cycle due to the temporary absence of dust in the
bags.
New Bag Start. BLDS alarms can be triggered following a
replacement of some or all of the bags in the baghouse.
Systems Checks/Testing. Some facilities may run systems
checks on their BLDS that cause the system to alarm. For example, a
facility may check the sensitivity of a BLDS by introducing a handful
of flour into a port upstream from the probe. Facilities also evaluate
and optimize their BLDS performance through drift checks, response
tests, calibration exercises, and other quality assurance procedures.
Some of these procedures require the alarm to be triggered in order to
test performance, but in other instances the BLDS alarm may be
inadvertently triggered during testing.
Electrical Malfunctions. As BLDS detection is based on
contact electrification, alarms can be triggered due to electrical
surges impacting the sensors, processing electronics, or the
connections between the sensor and processing electronics. These surges
can either be environmental (lightning) or from variations/malfunctions
in the BLDS system, its software, or its power source. Additionally,
the abrasive environment in the baghouse duct can deteriorate the BLDS
probe, probe housing, and housing insulation, which can cause an
increase in malfunctions. BLDS alarms may be triggered during temporary
power lapses or brief connectivity issues between the sensor and the
processing electrics, or between the processing electronics and the
system output/alarm. The BLDS can experience brief mechanical or
software glitches/errors, including with respect to the sensor's signal
amplification or with the configuration of the processing electronics.
Repair/Maintenance. Some baghouse repair and maintenance
activities may be conducted while the baghouse is in operation. In some
of these cases, proper inspection and repair requires the baghouse to
be operating in order to observe and repair malfunctions/maintenance
issues. Often these activities are coordinated with a baghouse operator
observing the BLDS readout in real time in order to identify the cause
of an earlier alarm or to proactively identify maintenance or
performance issues. Baghouse repair and maintenance activities
sometimes must be conducted when the baghouse is operating because the
repair/maintenance is urgently needed, and it is infeasible to quickly
shut down the baghouse. These activities will cause BLDS alarms to
trigger. Work on baghouse compartments and conveyances can introduce
particulates into the system or dislodge caked or
[[Page 58464]]
accumulated dust which triggers alarms. Sounding of BLDS alarms also
can be caused by maintenance and repair activities conducted when the
baghouse is not operating. These activities can introduce foreign
material or dislodge accumulations of material from ducts, conveyances,
access panels, joints, and other components of the system upstream from
the probe. Then when the baghouse is restarted, the newly introduced or
dislodged material can cause the BLDS alarm to be triggered.
The commenter pointed out that it is possible for a baghouse to
operate within its emission and opacity limits even if the cause of a
BLDS alarm is not identified and corrective measures taken. For
example, if a broken bag in a compartment causes an alarm, the
compartment can be isolated and shut down without affecting the rest of
the baghouse. The commenter noted that determining the cause of the
alarm often requires operators to undertake a multi-step
troubleshooting process of elimination requiring multiple rounds of
physical inspections and diagnostic efforts. This process of
elimination often requires more than 3 hours to complete. The process
can be very time-consuming, particularly when the BLDS alarm lasts only
a short time. Identifying the cause of a brief BLDS alarm, the
commenter said, can be very difficult and sometimes proves impossible.
Some baghouses in the EAF industry have 25 or more compartments housing
5,000 or more individual bags. Some mills do not have BLDS with
detection capability in each separate compartment because the baghouse
design does not allow for such monitoring (e.g., multiple compartments
sharing common exit plenum). In these instances, mills must continue
running and sequentially isolate compartments to determine which
compartment may have caused the BLDS alarm. Facilities must then
physically examine the compartment(s), which may contain 150 or more
individual bags. If a bag has a significant rupture or has been
dislodged, the cause of the alarm will likely be readily apparent.
However, some alarms can be triggered by extremely small holes in bags
and, in these cases, finding the leak by physical inspection can take a
long time.
The commenter said that EAF mills can have difficulty responding to
multiple, intermittent alarms of short duration. The commenter noted
that EAF facilities record the alarm as resolved where investigation
shows no evidence of a bag leak. While the facility may be able to
respond to each separate alarm in under 3 hours, the commenter said
they are aware of one instance in which an enforcement authority
determined the company was in violation of the 3-hour response
requirement because the total time the facility spent responding to
each of the separate intermittent alarms exceeded 3 hours. The
commenter said the enforcement authority misinterpreted the 3-hour
response requirement. This example was provided to show how a 3-hour
response requirement presents a compliance risk even when individual
responses are completed within the 3-hour window. The commenter
recommended the following additions be made to 40 CFR 60.273(f) in all
three rules in regard to the leak monitors to clarify false alarm
situations.
The commenter recommended adding to the requirements in 40 CFR
60.273(f)), 60.273a(f)), and 60.273b(f)) that begin with:
``Establishing to the extent acceptable by the delegated authority that
the alarm was a false alarm and not caused by a bag leak or other
malfunction that could reasonably result in excess PM emissions,'' the
phrase ``in which case alarms due to the monitor malfunctioning are not
subject to the [24-hour] response action requirement, as long as the
[leak] monitor malfunction is timely corrected.''
The commenter recommended adding to the requirements in 40 CFR
60.273(f)), 60.273a(f)), and 60.273b(f)) that begin with: ``Shutting
down the process producing the PM emissions,'' the phrase ``provided
that shutting down the process unit is not required if an operator
reasonably believes repetitive alarms are the result of a [leak]
monitor malfunction, and the monitor malfunction is timely repaired.''
EPA Response: We appreciate the details provided by the commenters
to explain the reasons why a 24-hour response to BLDS alarms is
warranted based on technical issues that EAF facility operators face
and also why a 24-hour response is justified based on other similar
rules that allow a 24-hour response. In light of the rationale
provided, we are including the 24-hour response in the revisions to 40
CFR part 60, subparts AA, AAa, and AAb, effective upon promulgation.
In regard to the specific language the commenter suggests including
in the rules in 40 CFR 60.273(f)), 60.273a(f)), and 60.273b(f)), the
list of potential response actions are not to be taken as exclusive,
i.e., the responses listed have the caveat that ``response actions may
include, but are not limited to, the following, etc.'' The commenter's
suggested changes for 40 CFR 60.273(f) in all 3 rules are redundant
within the existing and proposed rules because the phrase ``not caused
by . . . . . other malfunction that could reasonably result in excess
PM emissions'' already covers leak monitor malfunction. This is the
same issue for 40 CFR 60.273(f) in all 3 rules, where a shutdown is
just one option for a response action and not a required action. In all
3 rules in 40 CFR 60.273(f), fixing the leak monitor is the appropriate
response action if that is determined to be the cause of the alarm.
However, along with changing the response time to 24 hours, we have
added a specific item in all three EAF rules in 40 CFR 60.273(f) to
make it clear that leak monitor malfunction could be the cause, as
follows: ``Establishing to the extent acceptable by the delegated
authority that the alarm was a false alarm caused by a malfunctioning
monitor and not caused by excess PM emissions.''
Comment: A commenter asserted that the current compliance
demonstration requirements using the fan amperage and damper position
monitoring in 40 CFR part 60, subparts AA, AAa are the best methods for
assuring compliance with the melt shop NSPS standards. A commenter
asserted that the existing fan amperage and damper position monitoring
in combination with opacity observations are the best methods of
assuring compliance with the NSPS standards for the melt shop. The
commenter opposed the proposed new monitoring requirements for 40 CFR
part 60, subparts AA and AAa that included:
Installation of BLDS on all baghouses, including multi-
stack baghouses;
Monitoring and operational restriction for furnace static
pressure monitoring based on 15-minute averages on all EAF;
Monitoring and operational restriction for volumetric flow
rate or static pressure at each separately-ducted hood, based on 15-
minute averages on all EAF;
Removal of the option for monitoring and operational
restriction for fan amps;
Adding inspections and maintenance requirements for holes
or other openings in the melt shop building; and
Mandate for shop opacity observations to be made during
charging and tapping or during the period of the heat cycle that
generates the greatest uncaptured emissions.
The commenter considered these new monitoring requirements to be
unnecessary, expensive, and, in some cases, impractical. The commenter
said the existing monitoring requirements in 40 CFR part 60, subparts
AA and AAa
[[Page 58465]]
are adequate for demonstrating compliance with the standards. The
commenter stated that the existing fan amperage and damper position
monitoring have worked efficiently and effectively for many years and
the proposed new monitoring would be less effective and would impose
``. . . extreme technical and engineering complications'' on EAF
plants.
Similarly, the commenter urged the EPA to keep the current
requirement in 40 CFR part 60, subparts AA, AAa for monitoring fan
amperage in place, because they said this parameter directly correlates
to the air flow to the control device, via the fan curve, unique to
each site.
EPA Response: The responses to BLDS monitoring requirements, damper
position, fan amperage, furnace static pressure, melt shop inspection,
melt shop opacity, and volumetric flow and static pressure follow here.
BLDS Response. We proposed the BLDS monitoring requirement
for all baghouses in 40 CFR part 60, subparts AA, AAa, and AAb because
BLDS provides better information about EAF baghouse operation and
compliance assurance for the PM emission and stack opacity limits than
what is currently required in 40 CFR part 60, subparts AA and AAa, and
because BLDS monitoring at all baghouses is technically feasible.
Currently, as an alternative to COMs, single-stack baghouses are
required to install a BLDS and perform EPA Method 9 visible emissions
at the stack, whereas modular, multi-stack, negative-pressure or
positive-pressure fabric filters are only required to conduct EPA
Method 9 visible emissions monitoring. We agree with the commenter that
the proposed change to require all types of baghouses to have BLDS
should not be made as a correction in 40 CFR part 60, subparts AA and
AAa, nor included in 40 CFR part 60, subpart AAb for all types of
baghouses. Therefore, because using BLDS at all baghouses would involve
the purchase of equipment not currently installed at facilities not
using single-stack baghouses, this requirement is not included in the
final rules for 40 CFR part 60, subparts AA and AAa. For 40 CFR part
60, subpart AAb, because for existing facilities that modify or
reconstruct, requiring BLDS at baghouses other than those with single
stacks would involve the purchase of equipment not currently installed
at these facilities, the BLDS requirement is included in the final rule
for 40 CFR part 60, subpart AAb only for single stack baghouses. For
new sources, the BLDS requirement is included in the final rule for 40
CFR part 60, subpart AAb, only for single stack baghouses because using
BLDS on multi-stack baghouses is not demonstrated in the EAF industry
due to the high capital cost. Multi-stack baghouses in the EAF industry
have vents rather than stacks, are operated at positive pressure, and
not amenable to leak detection systems.
Damper Position Response. We proposed changes to the
monitoring frequency of damper position in 40 CFR part 60, subparts AA
and AAa, and included these proposed changes in 40 CFR part 60, subpart
AAb, because of the variability of this parameter during a furnace
cycle. As damper position is expected to change during the heat cycle,
a once-per-shift monitoring and recordkeeping event fails to provide
both the facility and regulatory agencies with the ability to determine
if the emissions capture system is being properly operated. Damper
position records are intended to be used as a way to evaluate how the
total flow (using amperage as surrogate for flow) is partitioned
between the separately ducted hoods. Therefore, increasing the
recording of damper position provides a more accurate assessment of the
capture system throughout a heat cycle. Facilities are already required
to record all damper positions during performance testing to
demonstrate compliance pursuant to 40 CFR 60.274(c) and 60.274a(c). We
disagree with the commenter that this change should not be made as a
correction. Therefore, for the reasons explained at proposal, the final
rules for 40 CFR part 60, subparts AA, AAa, and AAb include the
requirement for damper position recording and frequency during
operation in a manner and frequency consistent with damper position
records during the initial or most recent performance test
demonstrating compliance with applicable PM standards; and for 40 CFR
part 60, subpart AAb, only if damper position data were recorded
throughout a complete heat cycle. See 40 CFR 60.274(c)(1) and (i)(5),
60. 274a(c)(1) and (h)(5), and 60.274b(c)(1) and (h)(5). Compliance
with this clarified aspect of the rule is required 180 days from the
effective date of the final rule amendments for facilities complying
with 40 CFR part 60, subparts AA and AAa, the same as the requirement
for electronic reporting; and no later than the effective date of the
final rule or upon startup, whichever is later, for facilities subject
to 40 CFR part 60, subpart AAb.
Fan Amperage Response. The EPA proposed deleting the
monitoring of fan amps on a once-per-shift basis as a surrogate for
volumetric flow from at 40 CFR 60.274(b)/60.274a(b) for 40 CFR part 60,
subparts AA and AAa due to the increased use of variable speed fans in
the industry. Based on comments provided in response to the proposed
change, the EPA agrees with the commenter that fan amperage monitoring
should be able to be used as a surrogate for volumetric flow. However,
the EPA believes this surrogate can only be allowed under some
conditions. To maintain consistency with the original intent of the
requirement to record fan amperage in 40 CFR part 60, subpart AAa, in
the final rules for 40 CFR part 60, subparts AA, AAa, and AAb, fan
amperage monitoring can be used as a surrogate for volumetric flow when
recorded on a more frequent basis than once-per-shift. The EPA is
promulgating for 40 CFR part 60, subparts AA, AAa, and AAb, the
requirement for monitoring and recording of fan amperage as frequently
as damper position measurement, i.e., in a manner and frequency
consistent with damper position records during the initial or most
recent performance test demonstrating compliance with applicable PM
standards so that the amperage data provide information that is
proportional to volumetric flow in 40 CFR 60.274(c))1) and (i)(5);
60.274(c)(1) and (h)(5); and 60.274b(c)(1)(h)(5). Compliance with this
clarified aspect of the rule is required 180 days from the effective
date of the final rule amendments for facilities complying with 40 CFR
part 60, subparts AA and AAa, the same as the requirement for
electronic reporting and no later than the effective date of the final
rule or upon startup, whichever is later, for facilities subject to 40
CFR part 60, subpart AAb.
Furnace Static Pressure Response. We proposed the
requirement for monitoring and operational restriction for furnace
static pressure monitoring for 40 CFR part 60, subparts AA, AAa, and
AAb based on 15-minute averages on all EAF because it provides better
information about emissions capture at the EAF and compliance assurance
with melt shop opacity requirements at 40 CFR 60.272(a)(3),
60.272a(a)(3), and 40 CFR 60.272b(a)(3) than what is currently required
in 40 CFR part 60, subparts AA and AAa. Currently, a furnace static
pressure monitoring device is not required if the facility conducts
daily shop opacity readings. If a facility elects to use furnace static
pressure monitoring for compliance, furnace static pressure is only
monitored once per shift in 40 CFR part 60, subparts AA and AAa (see 40
CFR 60.273(d)/60.273a(d) and 40 CFR 60.273(d)/60.274a(b)). The EPA
proposed
[[Page 58466]]
requiring continuous monitoring of furnace static pressure because it
would provide information about capture at the EAF on a more frequent
basis and because many facilities already use this equipment. Because
using this monitoring method/compliance option would involve the
purchase of equipment not currently available or installed at all
subject facilities, we agree with the commenter that this change should
not be made as a correction nor included in 40 CFR part 60, subparts
AA, AAa, and AAb. Therefore, this requirement for 40 CFR part 60,
subparts AA, AAa, and AAb is not included in the final rules.
In response to comments regarding proposed averaging periods of 15
minutes for furnace static pressure, the EPA has modified the averaging
period language in the final rule for 40 CFR part 60, subparts AA, AAa,
and AAb (40 CFR 60.274(f), 60.274a(f), and 60.274b(f)) to be ``no
greater than 15 minutes.'' This modification allows greater flexibility
for establishing monitoring setpoints to capture the variability during
short periods that are much less than 15 minutes.
Melt Shop Inspection Response. We proposed a clarification
that the melt shop be inspected for holes or other openings that would
allow particulate matter to escape for 40 CFR part 60, subparts AA,
AAa, and included in 40 CFR part 60, AAb, because this procedure
provides compliance assurance with melt shop opacity requirements, and
is better than what is currently required at 40 CFR 60.272(a)(3)/
60.272a(a)(3). Currently, inspections are required for equipment
important to the performance of the capture system at 40 CFR 60.274(e)/
60.274a(d), which specifies that inspections must include observations
of physical appearance of the equipment. We disagree with the commenter
that changes to 40 CFR part 60, subparts AA and AAa, should not be made
as a correction because we understand that the melt shop building
itself acts as a portion of the capture system particularly during
charging and tapping. Since this inspection would not involve the
purchase of equipment not currently available or installed at the
facility and arguably is already addressed under the current
requirement for inspections, the clarification that inspection for
holes or other openings in the melt shop building is part of the
capture system inspection is included in the final rules for 40 CFR
part 60, subparts AA, AAa, and AAb. Compliance with this clarified
aspect of the rule is required 180 days from the effective date of the
final rule amendments for facilities complying with 40 CFR part 60,
subparts AA and AAa, the same as the requirement for electronic
reporting and no later than the effective date of the final rule or
upon startup, whichever is later, for facilities subject to 40 CFR part
60, subpart AAb.
Melt Shop Opacity Response. We proposed the clarification
that melt shop opacity observations for 40 CFR part 60, subparts AA and
AAa must be made during charging and tapping or during the period of
the heat cycle that generates the greatest uncaptured emissions for 40
CFR part 60, subparts AA and AAa because this requirement provides
better information about EAF and AOD capture system performance and
compliance assurance with melt shop opacity requirements at 40 CFR
60.272(a)(3)/60.272a(a)(3) beyond what is currently required. The NSPS
at 40 CFR part 60, subpart AA has a 6 percent opacity limit at the melt
shop except for during periods of charging and tapping, for which 20
percent and 40 percent are allowed, respectively (see 40 CFR
60.272(a)(3)). When 40 CFR part 60, subpart AAa was promulgated in
1984, the exceptions for periods of charging and tapping were removed,
and, instead, the opacity limit for the EAF melt shop was set at 6
percent at all times (see 40 CFR 60.272a(a)(3)). In 40 CFR part 60,
subpart AA, the EPA had allowed a higher opacity limit during charging
and tapping because those periods had greater potential for uncaptured
emissions than during melting and refining. Therefore, we agree with
the commenter that the clarification in the proposal that opacity
should be tested at the site with the greatest uncaptured emissions
should not be made for 40 CFR part 60, subpart AA. However, we disagree
with the commenter that the changes to 40 CFR part 60, subpart AAa
should not be made as clarifications or corrections because the
proposed rule edits clarify that the 6 percent opacity applies at all
times in all locations of the melt shop, as explained below. In 40 CFR
part 60, subpart, AAa, it was required that sources constructed,
modified, or reconstructed after 1983 achieve a greater level of
capture performance during charging and tapping than previously
required, and the exceptions during charging and tapping that were in
40 CFR part 60, subpart AA were removed. Therefore, the EPA is
including in the final rule for 40 CFR part 60, subpart AAa the
proposed clarification to the opacity testing option in 40 CFR
60.273a(d)(2), when a facility chooses to forgo using a furnace static
pressure monitoring device on an EAF equipped with a DEC system, to
test opacity no less than once per week from the tap of one EAF heat
cycle to the tap of the following heat cycle. This clarification along
with the test method and procedure requirements in 40 CFR 60.275a(e),
make it clear that the facility is required to demonstrate compliance
with melt shop opacity at all times, including the period of the
furnace cycle that provides the greatest challenge to the capture
system, which was originally intended when creating 40 CFR part 60,
subpart AAa. In addition, the proposed clarification in 40 CFR
60.272a(a)(3) is being finalized in this rulemaking for 40 CFR part 60,
subpart AAa, that where it is possible to determine that a number of
visible emission sites relate to only 1 incident of visible emissions,
only 1 observation of shop opacity is required, at the site of highest
opacity that directly relates to the cause (or location) of visible
emissions observed during the single incident. The comments concerning
the requirement in the proposed changes to 40 CFR part 60, subpart AAb,
for shop opacity observations to be made during charging and tapping or
during the period of the heat cycle that generates the greatest
uncaptured emissions, are no longer relevant due to changes made to the
proposed 40 CFR part 60, subpart AAb for the final rule, to allow 6
percent opacity during charging and tapping and to require testing
during all phases of operation, i.e., melting and refining, charging,
and tapping, Because monitoring opacity is already required in 40 CFR
part 60, subpart AAa in the various parts of the rule discussed in the
preceding paragraphs, the clarifications of measuring melt shop opacity
do not involve the purchase of equipment not currently used at the
facility and, therefore, are included in this final rule. Compliance
with these rule clarifications of 40 CFR part 60, subpart AAa are
required 180 days from the effective date of the final rule amendments,
the same as the requirement for electronic reporting.
Volumetric Flow and Static Pressure Response. We proposed
the requirement to continuously monitor and have operational
restrictions for either volumetric flow rate or static pressure at each
separately ducted hood for 40 CFR part 60, subpart AA, AAa, and AAb
because it provides better information about emissions capture at the
EAF and AOD and compliance assurance with melt shop opacity
requirements at 40 CFR 60.272(a)(3), 60.272a(a)(3), and 60.272b(a)(3)
than what is currently required in 40 CFR
[[Page 58467]]
part 60, subparts AA and AAa. In 40 CFR part 60, subpart AA, AAa, and
AAb, there are multiple options for monitoring operations at a facility
(40 CFR 60.274(b),60.274a(b), and 60.274b(b)), which may include
monitoring of volumetric flow and static pressure at each separately
ducted hood. Continuous monitoring of volumetric flow rate or static
pressure at each separately ducted hood would provide better
information about capture at each separately ducted hood and a more
direct measure of capture at each separately ducted hood. However, we
agree with the commenter that this change should not be made as a
correction because using this monitoring method/compliance option would
involve the purchase of equipment not currently available or installed
at facilities. Therefore, this requirement is not included in the final
rule for 40 CFR part 60, subparts AA, AAa, and AAb.
Comment: A commenter asserted that the CAA limits the EPA's NSPS
revision authority to only new sources. Commenter stated there is no
denying that the proposed monitoring and associated revisions to 40 CFR
part 60, subpart AA and AAa are materially substantive and are not
error corrections, clarifications, or clerical adjustments. These
changes far exceed the EPA's legal authority to revise a NSPS
applicable to existing sources. The commenter continued, the EPA's
legal authority under the CAA is very limited as it relates to
revisions to existing NSPSs. The 40 CFR part 60, subpart AA and AAa
proposed revisions (BLDS, furnace static pressure monitoring,
volumetric flow monitoring, etc.) all constitute an ``emission
limitation'' as defined by the CAA and, therefore, constitute a
``standard of performance.'' The EPA has no authority under the CAA to
make any such revisions to a ``standard of performance'' unless those
revisions are expressly applicable to ``new sources.'' The commenter
said the proposed changes to the melt shop monitoring requirements were
arbitrary and violate the basic premise of NSPS that revisions apply
only to facilities that qualify as new, modified, or reconstructed
after proposal of the NSPS requirements.
The commenter also said the EPA does not have the authority to add
new monitoring requirements for charging and tapping operations. The
existing shop opacity monitoring in 40 CFR part 60, subpart AAa
verifies efficiency of the DEC during normal operations. By expanding
monitoring requirements to cover tapping and charging (a time period
the furnace roof is rolled back, and the DEC control is not engaged),
the EPA was creating new monitoring requirements designed to monitor a
standard that was not included in the original rule. The proposed
monitoring during charging and tapping cannot evaluate DEC capture
efficiency, as the shop opacity observations were originally designed
to do. Hence, the addition of the new monitoring, the commenter said,
represents an unlawful revision to the existing NSPS standard.
The commenter was concerned the EPA was adding entirely new
installation, monitoring, and maintenance requirement for charging and
tapping furnace modes, including requirements for operators to install,
calibrate, and maintain monitoring devices that continuously record the
capture system damper position(s) and either the volumetric flow rate
through each separately ducted hood or the rolling 15-minute average
static pressure at each separately ducted hood. The commenter said
these requirements are unnecessary and that they ignore the 1999
rulemaking that provided alternative monitoring methods. The commenter
also argued the EPA failed to provide a reasonable explanation for
these changes, had not explained why the additional monitoring is
needed, had not explained the EPA's change in position from prior EAF
steel NSPS rulemakings, and had neglected to account for any costs
associated with the monitoring requirements.
EPA Response: General Monitoring Response: We proposed various
monitoring changes in 40 CFR part 60, subparts AA and AAa for purposes
of providing better information about EAF baghouse operation and
compliance assurance for the PM emission limit at 40 CFR 60.272(a)(1)/
60.272a(a)(1), and EAF capture system performance and compliance
assurance with melt shop opacity requirements at 40 CFR 60.272(a)(3)
and 60.272a(a)(3) than what is currently required.
We learned through public comments that some of the monitoring
changes would require significant capital investment through equipment
purchases; therefore, the changes requiring purchases of equipment are
not included in the final rule for 40 CFR part 60, subparts AA and AAa.
The requirements that we are finalizing do not make the standards more
stringent; therefore, these changes do not implicate the commenter's
concern that we have improperly revised the NSPS applicable to existing
sources. For these other monitoring changes that are included in the
final rule, either as proposed or with modification of proposed
requirement, the compliance date is 180 days from the effective date of
the final rule amendments for facilities complying with 40 CFR part 60,
subparts AA and AAa, which is the same as the requirement for
electronic reporting. This time period is to allow facilities to
prepare for any changes to reporting and recordkeeping.
The 4 proposed monitoring requirements that are not included in the
final rule are for BLDS for multi-stack baghouses for 40 CFR part 60,
subparts AA, AAa, and AAb; melt shop opacity for 40 CFR part 60,
subpart AA only; furnace static pressure monitoring and operation for
40 CFR part 60, subparts AA, AAa, and AAb; and volumetric flow and
static pressure monitoring and operation for 40 CFR part 60, subparts
AA, AAa, and AAb. The 2 proposed monitoring requirements that have been
retained in the final rule, as proposed, are melt shop inspection (for
40 CFR part 60, subparts AA, AAa, and AAb) and melt shop opacity (for
40 CFR part 60, subparts AAa and AAb). The 2 proposed monitoring
requirements that have been retained with modification are for damper
position and for fan amperage (for 40 CFR part 60, subparts AA, AAa,
and AAb), where we are finalizing the requirement for facilities to
record damper positions and fan amperage in a manner and frequency
consistent with records made during the initial or most recent
performance test demonstrating compliance with applicable PM standards.
For additional explanation and rationale behind the 7 proposed
requirements and their disposition in the final rule, refer to the
discussions in this preamble under the following section headings
(listed alphabetically): BLDS Response; Damper Position Response; Fan
Amperage Response; Furnace Static Pressure Response; Melt Shop
Inspection Response; Melt Shop Opacity Response; and Volumetric Flow
and Static Pressure Response.
Comment: A commenter asserted that the current compliance
demonstration requirements using the fan amperage and damper position
monitoring in 40 CFR part 60, subparts AA, AAa are the best methods for
assuring compliance with the melt shop NSPS standards and, therefore,
the commenter opposes the proposed new monitoring requirements for 40
CFR part 60 subpart AAb.
The commenter opposed the following proposed new monitoring
requirements for 40 CFR part 60 subpart AAb:
Installation of bag leak detection monitoring systems on
all baghouses, including multi-stack baghouses;
Monitoring and operational restriction for furnace static
pressure
[[Page 58468]]
monitoring based on 15-minute averages on all EAF;
Monitoring and operational restriction for volumetric flow
rate or static pressure at each separately-ducted hood, based on 15-
minute averages on all EAF;
Removal of the option for monitoring and operational
restriction for fan amps;
Adding inspections and maintenance requirements for holes
or other openings in the melt shop building; and
Mandate for shop opacity observations to be made during
charging and tapping or during the period of the heat cycle that
generates the greatest uncaptured emissions.
The commenter considered these new monitoring requirements to be
unnecessary, expensive, and, some cases, impractical. The commenter
said the existing monitoring requirements (in 40 CFR part 60, subparts
AA and AAa) are adequate for demonstrating compliance with the
standards. The commenter stated that the existing fan amperage and
damper position monitoring have worked efficiently and effectively for
many years and the proposed new monitoring would be less effective and
would impose extreme technical and engineering complications on EAF
plants. Similarly, a commenter urged the EPA to keep the current
requirement for monitoring fan amperage in place, because they said
this parameter directly correlates to the air flow to the control
device, via the fan curve, which is unique to each site.
A commenter stated the EPA should clarify how the proposed new
monitoring requirements improve compliance demonstration. The commenter
said it was unclear how the additional monitoring requirements in the
proposed [40 CFR part 60,subpart AAb] rule will improve data or
accuracy in demonstrating compliance with applicable requirements. The
proposed NSPS 40 CFR part 60, subpart AAb requires monitoring of
parameters that are not required to be monitored under the existing
NSPS 40 CFR part 60, subparts AA and AAa standards. The commenter
recommended the EPA explain the benefits of new monitoring techniques
and additional monitoring parameters. The monitoring requirements
should provide enough data to accurately demonstrate compliance with
applicable requirements. The commenter added that the EPA must consider
the cost to air agencies and facilities and associated benefits to
compliance before requiring additional monitoring. Additional
monitoring with no clear benefit is burdensome for both regulated
facilities and delegated authorities due to additional equipment,
maintenance, and operator costs.
EPA Response: We considered the comments submitted by the commenter
and have modified the final rule for 40 CFR part 60, subpart AAb for
certain proposed requirements to reflect this and other comments
received, and removed other requirements entirely. We included some
monitoring requirements in the final rules, as proposed. Our response
to each issue listed by the commenter are described in this section in
the EPA responses to the comments, as follows: BLDS Response; Damper
Position Response; Fan Amperage Response; Furnace Static Pressure
Response; Melt Shop Inspection Response (as well as the EPA's response
to the proposed requirements in 40 CFR 60.274b(d) for 40 CFR part 60,
subpart AAb in regard to allowing operators discretion in an inspection
as to what issues ``materially impact'' the capture system
performance); Melt Shop Opacity Response; Volumetric Flow and Static
Pressure Response; and General Monitoring Response.
The comment concerning a proposed requirement in 40 CFR part 60,
subpart AAb for shop opacity observations to be made during charging
and tapping or during the period of the heat cycle that generates the
greatest uncaptured emissions is no longer relevant due to changes made
to the proposed 40 CFR part 60, subpart AAb for the final rule, to
allow 6 percent opacity during charging and tapping and to require
testing during all phases of operation, i.e., melting and refining,
charging, and tapping.
Comment: A commenter asserted that the EPA should define the term
``material impact'' (40 CFR 60.274e, 60.274a(d), and 60.274b(d)) in
terms of opacity limits and only require repairs when holes result in
noncompliance with the opacity standards.
A commenter recommended the EPA better define a ``material impact''
on the capture system because they said the phrase was too vague. Any
airflow changes, they said, may theoretically impact capture efficiency
to some extent, but fluctuations that do not affect the compliance of
the facility with the substantive emission and opacity standards should
not be prohibited. The EPA should define material impacts in terms of
opacity limits by revising 40 CFR part 60, subparts AA, AAa, and AAb to
only require repairs to openings that lead to noncompliance with the
opacity standards.
EPA Response: The Melt Shop Inspection Response earlier in this
section provides part of the EPA response to this comment concerning
proposed requirements for 40 CFR part 60, subpart AAb (40 CFR
60.274b(d)), which is the same as the EPA response for the proposed
clarifications in 40 CFR part 60, subparts AA and AAa (40 CFR 60.274(e)
and 60.274a(d)) and explains why we disagree with the commenter and are
including the requirement to inspect for holes or other openings in the
melt shop in the final rules to ensure compliance with the opacity
standards in 40 CFR part 60, subparts AA, AAa, and AAb.
In addition, for 40 CFR part 60, subpart AAb, we proposed the
requirement for monthly inspections to include the language to address
issues that are ``determined by the operator to materially impact the
efficacy of the capture system'' in 40 CFR 60.274b(d). This allows for
a determination by the operator as to whether an identified issue is to
be considered a true deficiency that is expected to impact capture
system performance, as opposed to the language in 40 CFR part 60,
subpart AAa that requires maintenance for ``any deficiency.''
Therefore, we agree with this aspect of the comment and are including
the proposed rule language for monthly inspections that allow for
operator discretion as to what issues ``materially impact'' the capture
system performance in the final rule for 40 CFR part 60, subpart AAb
(40 CFR 60.274b(d)).
Comment: A commenter asserted that the EPA should clarify the
calculation for determining compliance with the opacity limits when
using EPA Method 9 for 40 CFR part 60, subpart AAb. The commenter asked
the EPA to clarify in the rule how facilities should determine
compliance with the opacity limits. The commenter noted that compliance
with the shop opacity limits will be determined based on the arithmetic
average of 24 consecutive 15-second opacity observations over a 6-
minute period. The commenter said that it is their understanding that
the proposed zero opacity standard does not require all 24 15-second
EPA Method 9 observation periods to be zero percent and that some of
the 24 readings may exceed 0 percent provided the arithmetic average
rounds down to 0. Similarly, in calculating compliance with the
existing 6 percent shop opacity standard, some readings can exceed 6
percent provided the arithmetic average rounded down is below 6
percent. The commenter asked the EPA to confirm their interpretation of
the rule is correct.
[[Page 58469]]
The commenter noted that this approach is consistent with prior
NSPS rulemakings, including 40 CFR part 60, subpart KK (Lead-Acid
Battery Manufacturing) and 40 CFR part 60, subpart NN (Phosphate Rock
Plants). However, the commenter said the EPA specified in 40 CFR part
60, subparts KK and NN that compliance with the opacity standard is
determined by taking the average opacity over a 6-minute period,
according to EPA Method 9, and rounding the average to the nearest
whole percentage (45 FR 2790 and 2794; January 14, 1980 and 47 FR
16564, 16566, 16582, and 16586; April 16, 1982). The commenter
recommended the EPA add the same explanation provided in these earlier
NSPS in the final shop opacity limit.
EPA Response: The method for calculating opacity has not changed
substantially for 40 CFR part 60, subpart AAb; the final rule
incorporates the current EPA Method 9 procedures for melting and
refining, and for tapping (see section IV.B.2 in this preamble for
changes to opacity measurement procedures with EPA Method 9 during
charging). When determining the final value for opacity in 40 CFR part
60, subpart AAb, facilities should round to the nearest whole number (0
percent). Therefore, an average opacity level calculated to be 0.49
percent would round (down) to 0 percent.
3. What is the rationale for the final requirements for testing and
monitoring?
We are finalizing the proposed requirement in 40 CFR part 60,
subparts AA, AAa, and AAb that the melt shop be inspected for holes or
other openings that would allow PM to escape because it clarifies the
building inspection requirement already in the current NSPS. We are
also incorporating into the final rules for 40 CFR part 60, subparts
AA, AAa, and AAb the allowance of up to 24 hours to find and fix
baghouse leaks following a BLDS alarm event because it is commensurate
with many other EPA rules and no evidence exists for the specific need
for limiting the tie period to 3 hours for EAF. The reasons that more
than 3 hours and up to 24 hours is needed to respond to BLDS alarms
provided by the commenter are valid. We are finalizing that sources
complying with 40 CFR part 60, subpart AAb will be required to perform
compliance testing every 5 years after the initial testing performed
upon startup, as required under 40 CFR part 60.8. This requirement is
already required in many of the permits for existing EAF in the EAF
dataset and in the industry, and is a standard requirement for testing
for other sources of PM emissions for many other industrial sectors.
We learned through public comments that some of the proposed
monitoring changes, BLDS monitoring, furnace static pressure monitoring
and operation, and volumetric flow and static pressure monitoring and
operation, would require significant capital investment through
equipment purchases. Therefore, these changes requiring purchases of
equipment are not being finalized for 40 CFR part 60, subparts AA, AAa,
and AAb.
We are finalizing 2 proposed monitoring requirements for 40 CFR
part 60, subparts AA, AAa, and AAb, which are the requirements for melt
shop inspection and stipulation that the melt shop opacity limits apply
at all times during the designated periods of applicability under the
rules. We are also finalizing the proposed damper position and fan
amperage monitoring requirements with modifications. Other
miscellaneous monitoring requirements also are being finalized with
modifications resulting from comments on the proposed requirements, as
described in in this section.
All testing and monitoring requirements proposed and finalized in
this action were evaluated to ensure compliance with the NSPS emission
standards under conditions of proper operation and maintenance.
However, because we learned through comments that some of the proposed
changes to monitoring in the existing NSPS rules would incur unintended
costs, these requirements were either not finalized in their entirety
or were finalized with modifications.
F. Electronic Reporting
The EPA is finalizing the proposed requirement that owners and
operators of EAF and AOD subject to the current and new NSPS at 40 CFR
part 60, subparts AA, AAa, and AAb submit electronic copies of required
performance test reports and any semiannual excess emissions and
continuous monitoring system performance and summary reports, through
the EPA's CDX using the CEDRI. A description of the electronic data
submission process is provided in the memorandum Electronic Reporting
Requirements for New Source Performance Standards (NSPS) and National
Emission Standards for Hazardous Air Pollutants (NESHAP) Rules,\18\
available in the docket for this action, and hereafter referred to as
the ``Electronic Reporting Memorandum.'' The finalized rule requires
that performance test/demonstration of compliance results collected
using test methods that are supported by the EPA's ERT as listed on the
ERT website \19\ at the time of the test be submitted in the format
generated through the use of the ERT or an electronic file consistent
with the xml schema on the ERT website, and other performance test/
demonstration of compliance results be submitted in PDF using the
attachment module of the ERT.
---------------------------------------------------------------------------
\18\ Electronic Reporting Requirements for New Source
Performance Standards (NSPS) and National Emission Standards for
Hazardous Air Pollutants (NESHAP) Rules. Memorandum, Measurement
Policy Group, U.S. Environmental Protection Agency, Research
Triangle Park, NC. August 19, 2020.
\19\ https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert.
---------------------------------------------------------------------------
For semiannual reports, the finalized rule requires that owners and
operators use the appropriate spreadsheet template to submit
information to CEDRI. The final versions of the templates for these
reports are included in the docket for this action.\20\
---------------------------------------------------------------------------
\20\ See 40 CFR part 60, subpart AA, AAa, and AAb, Standards of
Performance for Steel Plants: Electric Arc Furnaces and Argon-Oxygen
Decarburization Vessels, 40 CFR part 60.276(g) Semiannual Compliance
Report Spreadsheet Template, available at Docket ID No. EPA-HQ-OAR-
2002-0049-0064.
---------------------------------------------------------------------------
Additionally, the EPA has identified 2 broad circumstances in which
electronic reporting extensions may be provided. These circumstances
are: (1) Outages of the EPA's CDX or CEDRI which preclude an owner and
operator from accessing the system and submitting required reports; and
(2) force majeure events, which are defined as events that will be or
have been caused by circumstances beyond the control of the affected
facility, its contractors, or any entity controlled by the affected
facility that prevent an owner and operator from complying with the
requirement to submit a report electronically. Examples of force
majeure events are acts of nature, acts of war or terrorism, equipment
failure, or safety hazards beyond the control of the facility. The EPA
is providing these potential extensions to protect owners and operators
from noncompliance in cases where they cannot successfully submit a
report by the reporting deadline for reasons outside of their control.
In both circumstances, the decision to accept the claim of needing
additional time to report is within the discretion of the
Administrator, and reporting should occur as soon as possible.
The electronic submittal of the reports addressed in this final
rulemaking increase the usefulness of the data
[[Page 58470]]
contained in those reports and is keeping with current trends in data
availability and transparency. Electronic submittal would further
assist in the protection of public health and the environment by
improving compliance, facilitating the ability of regulated facilities
to demonstrate compliance with requirements, and by facilitating the
ability of delegated state, local, Tribal, and territorial air agencies
and the EPA to assess and determine compliance. Ultimately, electronic
reporting would reduce the burden on regulated facilities, delegated
air agencies, and the EPA by making the data easy to record and read.
Electronic reporting also eliminates paper waste and redundancies and
minimizes data reporting errors. The resulting electronic data are more
quickly and accurately accessible to the affected facilities, air
agencies, the EPA, and the public. Moreover, electronic reporting is
consistent with the EPA's plan \21\ to implement Executive Order 13563
and is in keeping with the EPA's agency-wide policy \22\ developed in
response to the White House's Digital Government Strategy.\23\ For more
information on the benefits of electronic reporting, see the
``Electronic Reporting Memorandum'' discussed earlier in this section.
---------------------------------------------------------------------------
\21\ EPA's Final Plan for Periodic Retrospective Reviews (August
2011). Available at: https://www.regulations.gov/document?D=EPA-HQ-OA-2011-0156-0154.
\22\ E-Reporting Policy Statement for EPA Regulations (September
2013). Available at: https://www.epa.gov/sites/default/files/2016-03/documents/epa-ereporting-policy-statement-2013-09-30.pdf.
\23\ Digital Government: Building a 21st Century Platform to
Better Serve the American People (May 2012). Available at: https://obamawhitehouse.archives.gov/sites/default/files/omb/egov/digital-government/digital-government.html.
---------------------------------------------------------------------------
No comments were received on electronic reporting. Therefore, we
are finalizing the requirements for electronic reporting as proposed.
G. Effective Date and Compliance Dates
Pursuant to CAA section 111(b)(1)(B), affected sources that
commence construction, reconstruction, or modification after May 16,
2022, must comply with all requirements of 40 CFR part 60, subpart AAb,
no later than August 25, 2023 or upon startup, whichever is later.
The date for complying with the ERT submission requirements is
February 21, 2024. The date for complying with the changes in the
current rules, 40 CFR part 60, subparts AA and AAa is February 21, 2024
publication of the final rule.
V. Summary of Cost, Environmental, and Economic Impacts
A. What are the air quality impacts?
For 40 CFR part 60, subpart AAb, reductions in PM and
PM2.5 potentially emitted from new, modified, and
reconstructed EAF compared to these emissions allowed under the current
NSPS subpart AAa with 6 percent melt shop opacity will have a
beneficial air impact.
Based on the actual emissions emitted by 31 facilities in the EAF
dataset, where the actual average opacity was 0.14 percent, the
emissions impact for PM from 9 new, modified, or reconstructed EAF
facilities projected in the next 10 years (estimated to reflect 3
small, 4 medium, and 2 large) is estimated to be an emissions reduction
of 134 tons PM that would otherwise be emitted in 2032. Using an
estimate of 0.218 \24\ for the ratio of PM2.5 to PM the
emissions impact for PM2.5 from nine new facilities
projected in the next 10 years, as above, there would be an emissions
reduction of 28 tons of PM2.5 in 2032. Details of these
emissions estimates can be found in the ``Emissions Memorandum''
discussed in section IV.A.2.
---------------------------------------------------------------------------
\24\ The PM2.5 to PM ratio is an average of similar
uncontrolled sources, as cited in Evaluation of PM2.5
Emissions and Controls at Two Michigan Steel Mills and a Coke Oven
Battery. Final Report. Work Assignment 4-12 under EPA Contract No.
68-D-01-073 by RTI International, Research Triangle Park, NC. U.S.
Environmental Protection Agency, Research Triangle Park, NC.
February 2006.
---------------------------------------------------------------------------
No actual PM emission reductions are estimated for the new PM limit
for facility-wide total baghouse emissions in lb/ton. The EPA did not
estimate PM emission reductions from new, modified, and reconstructed
sources under the facility-wide total baghouse limit because based the
2010 EAF dataset, all facilities in the dataset are already achieving
an emission level comparable to the limit being finalized in this
action.
B. What are the secondary impacts?
A secondary impact as a result of this rule is that solid wastes
may increase slightly, with an estimated 15 tons per facility per year
based on 2010 EAF performance, with the potential additional waste from
PM collected to meet the 0 percent melting and refining opacity limit
under NSPS subpart AAb. The small increase in solid wastes would be the
same for both the carbon and specialty steel shops. However, most PM
collected from EAF is recycled to reclaim zinc, which also defrays some
of the disposal costs.25 26
---------------------------------------------------------------------------
\25\ Proven Waelz Kiln Technology. Accessed 2/18/22. https://www.globalsteeldust.com/waelz_kiln_technology.
\26\ R[uuml]tten, J. Application of the Waelz Technology on
Resource Recycling of Steel Mill Dust. D[uuml]sseldorf: GmbH. D-
40225, 2006.
---------------------------------------------------------------------------
Additionally, a relatively small increase in energy may result from
the use of electricity to power fans that draw EAF and AOD exhaust air
into the canopy hood that captures the PM and sends PM-laden air to the
baghouse, at 66, 940, 4,700 MW-hr per year for small, medium, and large
facilities, respectively. However, if the A/C ratio of the fabric
filters is lowered to meet the facility baghouse standard due to an
increase in number of bags, some decrease in energy use may occur.
Finally, there will be no water or noise impacts with the
promulgated NSPS subpart AAb.
C. What are the cost impacts?
Costs were estimated for regular testing every 5 years for 9 new
facilities projected in the 10 years after May 16, 2022. The estimated
annual testing costs for each facility are $10,625 per year ($2022) for
conducting EPA Method 5 for PM emissions at each baghouse's exhaust
over a 5-year period, using an estimate of 1.64 baghouses per facility
based on the EAF data. While new, modified, or reconstructed sources
that start up after May 16, 2022, are subject to testing every 5 years
under the finalized NSPS subpart AAb, EPA Method 5 testing is required
upon initial startup under 40 CFR 60.8. Therefore, in the first 5 years
after startup, there will be no testing costs as a result of the
finalized rule. Then, in the sixth through the tenth year after initial
startup after May16, 2022, the estimated new, modified, or
reconstructed sources will incur costs of approximately $9,562 per year
($2022) per facility for testing, based on an estimate of 0.9 new,
modified, or reconstructed facilities per year (0.9 x $10,625). Due to
the estimated staggered startup of these new, modified, or
reconstructed facilities, with 0.9 new, modified, or reconstructed
facilities starting each year after the proposal (May 16, 2022), the
total costs for testing for all new, modified, or reconstructed
facilities under this rule after the initial testing required under 40
CFR part 60.8 will range from approximately $523,000 ($2022) in the
sixth year after May 16, 2022 (corresponding to 5.4 new facilities), to
a total of approximately $900,000 in the tenth year after May 16, 2022
(reflecting costs for 9 facilities, with testing costs of approximately
[[Page 58471]]
$100,000 per facility per year), where the testing costs that would
occur in years 6 through 10 are for the new, modified, or reconstructed
facilities that start up in years 1 through 5 after May 16, 2022.
Based on information from 2010 through 2017 obtained by the EPA for
31 EAF facilities, the EPA found the average opacity to be 0.14
percent, with about half of the units achieving 0 percent opacity in
the tests. Because opacity in the baseline is already low, the EPA
expects any new, modified, or reconstructed facility would be able to
meet the promulgated opacity and PM limits without any additional
control devices beyond those already required by the NSR program,
applicable state requirements or by minor process changes to improve
capture of exhaust flows or other process parameters, if needed. While
the actual cost impacts of the promulgated 0 percent opacity for
melting and refining and 6 percent opacity for charging and tapping
would likely be substantially lower, the EPA developed an upper bound
estimate of potential compliance costs based upon the assumption that
affected units would install a partial roof canopy above the crane
rails to ensure 0 percent opacity during melting and refining and 6
percent opacity during charging and tapping compared to a hypothetical
baseline model facility meeting 6 percent opacity at all times. These
costs to achieve the opacity requirements are estimated to be $86,000,
$1,140,000, $5,700,000 ($2022) per year per facility for small, medium,
and large model facilities, respectively.
Total annual costs for NSPS subpart AAb, based on nine new,
modified, or reconstructed facilities in the first 10 years after May
16, 2022, are $560,000 per year ($2022) for 3 small facilities, $4.9M
per year for 4 medium facilities, and $11.5M per year for 2 large
facilities, for a total of $17M per year ($2022) for 9 new facilities
in the tenth year after May 16, 2022, using the same staggered startup
rate described for testing costs. Details of the cost estimates for the
final rule can be found in the ``Cost Memorandum'' discussed in section
IV.A.2 (with proposal costs updated to 2022 \27\) which can be found in
the docket for this rule.
---------------------------------------------------------------------------
\27\ In the time since the proposal costs were assessed in 2020,
inflation has increased with a subsequent increase in the gross
national product (GNP), which is the basis for the U.S. dollars used
in the costs estimates. In addition, interest rates, which affect
capital costs, increased from 3.5 percent to 7.5 percent from
proposal cost preparation (in 2021) to final rule cost preparation
(in 2022).
---------------------------------------------------------------------------
For the promulgated mass-based PM standard in lb/ton for facility-
wide total baghouse PM emissions, we estimated the capital and annual
costs between a baseline scenario based on the current NSPS individual
baghouse concentration limit (in gr/dscf) in 40 CFR part 60, subparts
AA and AAa and a scenario based on a lower total facility-wide baghouse
PM emissions in a mass-based limit (in lb/ton), which is the format for
the standard of performance we are promulgating. Because data from the
31 existing EAF facilities in the 2010 dataset used by the EPA to
develop the facility-wide PM limit show these facilities could already
meet the 0.16 lb/ton total facility baghouse PM limit, we expect the
promulgated mass-based standard applied to future new, modified, and
reconstructed EAF facilities would be feasible and pose minimal cost
impacts, if any.
Additional cost analysis, including calculation of costs using the
upper bound cost estimates for the installation of partial roof
canopies, can be found in the Economic Impact Analysis (EIA) associated
with this final rule, which is available in the docket for this rule.
The EIA additionally presents costs in terms of the present value and
equivalent annual value of projected compliance costs over the 2023 to
2032 period discounted at 3 and 7 percent.
D. What are the economic impacts?
Economic impact analyses focus on changes in market prices and
output levels. If changes in market prices and output levels in the
primary markets are significant enough, impacts on other markets may
also be examined. Both the magnitude of costs associated with the
promulgated requirements and the distribution of these costs among
affected facilities can have a role in determining how the market will
change in response to a regulatory requirement. As discussed in section
IV.B. of this preamble, the cost analysis incorporates the assumption
that units affected by the new NSPS subpart AAb would install a partial
roof canopy above the crane rails to ensure 0 percent melt shop opacity
compared to a hypothetical baseline model facility meeting 6 percent
opacity. The costs should be viewed as upper bound estimates on the
potential compliance costs as the EPA expects any new, modified or
reconstructed facility would be able to meet the promulgated opacity
and PM limits without any additional control devices beyond those
already required by the NSR program, applicable state requirements, or
by minor process changes to improve capture of exhaust flows or other
process parameters, if needed. As discussed in the EIA, even under the
upper bound cost assumptions described, the EPA expects the potential
economic impacts of this final rule will be small.
As required by the Regulatory Flexibility Act (RFA), we performed
an analysis to determine if any small entities might be
disproportionately impacted by the promulgated requirements. The EPA
does not know what firms will construct new facilities in the future
and, as a result, cannot perform a cost-to-sales analysis with the same
confidence as we do with firms owning existing facilities. However,
based on an assessment of the new units built during the 2011 to 2020
period and the units that have been announced, which are all owned by
firms that are not considered to be small businesses, the EPA does not
believe it is likely that any future facilities will be built by a
small business. See the EIA in the docket for this action for
additional information on the analysis presented in this section.
E. What are the benefits?
The new requirements being finalized in 40 CFR subpart AAb are
expected to reduce PM emissions, including PM2.5. In
addition, the revisions to 40 CFR part 60, subparts AA and AAa will
clarify the rules, enhance compliance and enforcement, and is expected
to reduce PM emissions, including PM2.5. As explained in
section IV.A of this preamble, the requirements are projected to reduce
28 tons of PM2.5 in 2032. These emissions reductions are
expected to produce health benefits in the affected locations. The
Integrated Science Assessment for Particulate Matter (ISA) \28\
contains synthesized toxicological, clinical, and epidemiological
evidence that the EPA uses to determine whether each pollutant is
causally related to an array of adverse human health outcomes
associated with either acute (i.e., hours or days-long) or chronic
(i.e., years-long) exposure. For each outcome, the ISA includes the EPA
conclusions as to whether this relationship is causal, likely to be
causal, suggestive of a causal relationship, inadequate to infer a
causal relationship, or not likely to be a causal relationship.
---------------------------------------------------------------------------
\28\ Integrated Science Assessment for Particulate Matter (Final
Report, 2019). EPA/600/R19/188. U.S. Environmental Protection
Agency, Washington, DC. 2019.
---------------------------------------------------------------------------
In the ISA, it was found that acute exposure to PM2.5
was causally related to cardiovascular effects and mortality (i.e.,
premature death), and respiratory
[[Page 58472]]
effects as likely-to-be-causally related. Further, the EPA identified
cardiovascular effects and total mortality as causally related to long-
term exposure to PM2.5 and respiratory effects as likely-to-
be-causal; the evidence was suggestive of a causal relationship for
reproductive and developmental effects as well as cancer, mutagenicity,
and genotoxicity.
The benefits per ton (BPT) of the PM2.5 emissions
reductions cited earlier in this preamble for years 2025 and 2030 and
at 3 percent and 7 percent discount rates are presented in Table 7
below in 2022 dollars. The BPT of the PM2.5 emissions
reductions for year 2025, at a 3 percent discount rate translates to a
low projection of $417,000 per ton emission reduction, to a high
projection of $891,000 per ton emission reduction (in 2022 dollars).
Information regarding the process by which these BPTs were calculated
is available in the technical support document Estimating the Benefit
per Ton of Reducing Directly-Emitted PM2.5, PM2.5 Precursors, and Ozone
Precursors from 21 Sectors.
Table 7--Benefits per Ton of PM2.5 Reduced
----------------------------------------------------------------------------------------------------------------
$/ton PM2.5 emission reductions $2022
---------------------------------------------------------------
Year 3 Percent discount rate 7 Percent discount rate
---------------------------------------------------------------
Low High Low High
----------------------------------------------------------------------------------------------------------------
2025............................................ $417,000 $891,000 $375,000 $803,000
2030............................................ 451,000 933,000 405,000 839,000
----------------------------------------------------------------------------------------------------------------
Note: The range reported here reflects the use of risk estimates from two alternative long-term exposure PM-
mortality studies.\29\
F. What analysis of environmental justice did we conduct?
Executive Order 12898 directs the EPA to identify the populations
of concern that are most likely to experience unequal burdens from
environmental harms, which are specifically minority populations
(people of color), low-income populations, and Indigenous peoples (59
FR 7629; February 16, 1994). Additionally, Executive Order 13985 is
intended to advance racial equity and support underserved communities
through Federal government actions (86 FR 7009; January 20, 2021). The
EPA defines EJ as ``the fair treatment and meaningful involvement of
all people regardless of race, color, national origin, or income, with
respect to the development, implementation, and enforcement of
environmental laws, regulations, and policies.'' \30\ The EPA further
defines fair treatment to mean that ``no group of people should bear a
disproportionate burden of environmental harms and risks, including
those resulting from the negative environmental consequences of
industrial, governmental, and commercial operations or programs and
policies.'' In recognizing that people of color and low-income
populations often bear an unequal burden of environmental harms and
risks, the EPA continues to consider ways of protecting them from
adverse public health and environmental effects of air pollution. For
purposes of analyzing regulatory impacts, the EPA relies upon its June
2016 ``Technical Guidance for Assessing Environmental Justice in
Regulatory Analysis,'' \31\ which provides recommendations that
encourage analysts to conduct the highest quality analysis feasible,
recognizing that data limitations, time, resource constraints, and
analytical challenges will vary by media and circumstance. The
Technical Guidance states that a regulatory action may involve
potential EJ concerns if it could: (1) Create new disproportionate
impacts on minority populations, low-income populations, and/or
Indigenous peoples; (2) exacerbate existing disproportionate impacts on
minority populations, low-income populations, and/or Indigenous
peoples; or (3) present opportunities to address existing
disproportionate impacts on minority populations, low-income
populations, and/or Indigenous peoples through this action under
development.
---------------------------------------------------------------------------
\29\ Estimating the Benefit per Ton of Reducing Directly-emitted
PM2.5, PM2.5 Precursors and Ozone Precursors
from 21 Sectors. U.S. Environmental Protection Agency, Office of Air
and Radiation, Office of Air Quality Planning and Standards,
Research Triangle Park, NC 27711. 2022. Available at: https://www.epa.gov/system/files/documents/2021-10/source-apportionment-tsd-oct-2021_0.pdf.
\30\ See https://www.epa.gov/environmentaljustice.
\31\ See https://www.epa.gov/environmentaljustice/technical-guidance-assessing-environmental-justice-regulatory-analysis.
---------------------------------------------------------------------------
The Agency has conducted an analysis of the demographics of the
populations living near existing facilities in the EAF population in
the U.S. Because this action finalizes standards of performance for
new, modified, and reconstructed EAF sources that commence construction
after May 16, 2022, the locations of the construction of new EAF
facilities are not known. In addition, it is not known which of the
existing facilities will be modified or reconstructed in the future.
Therefore, the demographic analysis was conducted for the 88 existing
EAF facilities as a characterization of the demographics in areas where
these facilities are now located.
The full results of the demographic analysis can be found in
section E, ``What are the environmental justice impacts?,'' of the
preamble to the proposed rule (87 FR 29724). The analysis included an
assessment of individual demographic groups of the populations living
within 5 km and within 50 km of the existing facilities. We then
compared the data from the analysis to the national average for each of
the demographic groups. The results show that for populations within 5
km of the 87 existing EAF facilities (we identified one additional
existing facility since the proposed rule was published for a total of
88 facilities, but the overall results did not change). The percent of
the population that is African American is above the national average
(17 percent versus 12 percent). The percent of people living below the
poverty level is also above the national average (17 percent versus 13
percent). The percent of the population that is Native American,
Hispanic or Latino, or Other/Multiracial are below the national
averages. The percent of the population over 25 without a high school
diploma and the percent of the population in linguistic isolation are
similar to the national averages. The results of the analysis of
populations within 50 km of the 88 EAF facilities is similar to the 5
km analysis.
The methodology and the results of the demographic analysis for the
final rule are presented in a technical report, Analysis of Demographic
Factors for Populations Living Near Electric Arc Furnace Facilities,
available in the docket for this action (Docket ID No. EPA-HQ-OAR-2002-
0049).
[[Page 58473]]
The EPA expects that the Standards of Performance for Steel Plants:
Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels
Constructed after May 16, 2022, will ensure compliance via frequent
testing and reduce emissions via a lower opacity limit for melt shops
and with the standards at all times (including periods of SSM). The
rule will also increase data transparency through electronic reporting.
Therefore, effects of emissions on populations in proximity to any
future affected sources, including in communities potentially
overburdened by pollution, which are often people of color, and low-
income and Indigenous communities will be reduced due to compliance
with the standards of performance being finalized in this action.
VI. Statutory and Executive Order Reviews
Additional information about these statutes and Executive Orders
can be found at https://www.epa.gov/laws-regulations/laws-and-executive-orders.
A. Executive Order 12866: Regulatory Planning and Review and Executive
Order 14094: Modernizing Regulatory Review
This action is not a significant regulatory action as defined in
Executive Order 12866, as amended by Executive Order 14094, and was,
therefore, not subject to a requirement for Executive Order 12866
review.
B. Paperwork Reduction Act (PRA)
The information collection activities in this final rule have been
submitted for approval to OMB under the PRA. The information collection
request (ICR) document that the EPA prepared has been assigned the EPA
ICR number 1060.21. You can find a copy of the ICR in the docket for
this rule, and it is briefly summarized here. The information
collection requirements are not enforceable until OMB approves them.
These amendments to 40 CFR part 60, subparts AA and AAa to require
electronic reporting, and implement editorial and clarifying changes to
rule language are estimated to reduce time spent and paperwork for
rule. We are promulgating a new subpart for new, modified, or
reconstructed facilities that start up after May 16, 2022, under 40 CFR
part 60, subpart AAb with similar reporting, recordkeeping, and
compliance requirements as 40 CFR part 60, subparts AA and AAa.
Respondents/affected entities: EAF and AOD facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts AA; AAa; and AAb).
Estimated number of respondents: 90, includes 88 estimated current
facilities subject to 40 CFR part 60, subparts AA and AAa, and 3 new
facilities that would be subject to 40 CFR part 60, subpart AAb in the
3 years after proposal (May 16, 2022).
Frequency of Response: One time.
Total estimated burden: The annual recordkeeping and reporting
burden for facilities to comply with all the requirements in the NSPS
is estimated to be 57,100 hours (per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: The annual recordkeeping and reporting costs
for all facilities to comply with all of the requirements in the NSPS
is estimated to be $7,400,000 (per year), of which $65,686 (per year)
is for this final rule ($60,000 for EPA Method 5 compliance and $696
for electronic reporting), and $7,130,000 for other costs related to
continued compliance with the NSPS, including $198,000 for paperwork
associated with operation and maintenance requirements. The total rule
costs reflect an increase/decrease cost of $450,000 (per year) from the
previous ICR that reflects savings due to electronic reporting and an
increase to the labor rates.
An Agency may not conduct or sponsor, and a person is not required
to respond to, a collection of information unless it displays a
currently valid OMB control number. The OMB control numbers for the
EPA's regulations in 40 CFR are listed in 40 CFR part 9. When OMB
approves this ICR, the Agency will announce that approval in the
Federal Register and publish a technical amendment to 40 CFR part 9 to
display the OMB control number for the approved information collection
activities contained in this final rule.
C. Regulatory Flexibility Act (RFA)
I certify that this action will not have a significant economic
impact on a substantial number of small entities under the RFA. This
action will not impose any requirements on the three identified small
entities among the approximately 90 EAF facilities (36 companies),
because most facilities are likely to be performing regular compliance
tests as part of their permit renewal process. Additionally, no
facilities are expected to be built by small entities over the next 10
years based on past industry growth and small business starts. The 3
current facilities owned by small businesses were started in 1912,
1968, and 1994, respectively. Further discussion is included in the EIA
for this final rule.
D. Unfunded Mandates Reform Act (UMRA)
This action does not contain an unfunded mandate of $100 million or
more as described in UMRA, 2 U.S.C. 1531-1538, and does not
significantly or uniquely affect small governments. While this action
creates an enforceable duty on the private sector, the cost does not
exceed $100 million or more.
E. Executive Order 13132: Federalism
This action does not have federalism implications. It will not have
substantial direct effects on the states, on the relationship between
the national government and the states, or on the distribution of power
and responsibilities among the various levels of government.
F. Executive Order 13175: Consultation and Coordination With Indian
Tribal Governments
This action does not have Tribal implications as specified in
Executive Order 13175. This rule will implement improvements in air
quality due to new EAF in all locations of new EAF facilities,
including any new EAF which are in proximity to Tribal grounds. It
would not have substantial direct effects on Tribal governments, on the
relationship between the Federal government and Indian tribes, or on
the distribution of power and responsibilities between the Federal
government and Indian tribes. No Tribal governments own facilities that
are the subject of this rulemaking. Thus, Executive Order 13175 does
not apply to this action.
Consistent with the EPA Policy on Consultation and Coordination
with Indian Tribes, the EPA consulted with Tribal officials during the
development of this action. A copy of the memorandum dated May 17,
2022, sent to Tribal leaders concerning the EAF NSPS is provided in the
docket to this rule.
G. Executive Order 13045: Protection of Children From Environmental
Health Risks and Safety Risks
Executive Order 13045 (62 FR 19885; April 23, 1997) directs Federal
agencies to include an evaluation of the health and safety effects of
the planned regulation on children in Federal health and safety
standards and explain why the regulation is preferable to potentially
effective and reasonably feasible alternatives. This action is not
subject to Executive Order 13045 because it is not economically
[[Page 58474]]
significant as defined in Executive Order 12866, and because the EPA
does not believe the environmental health or safety risks addressed by
this action present a disproportionate risk to children. The EPA does
not believe there are disproportionate risks to children because the
new subpart AAb lowers emissions from the melt shop during melting and
refining, which will benefit children's health; and other changes made
to all subparts, AA, AAa, and AAb, increase compliance with emission
limits, which also benefits children's health. However, EPA's Policy on
Children's Health applies to this action. Information on how the Policy
was applied is available under ``Children's Environmental Health'' in
the Supplementary Information section of this preamble.
H. Executive Order 13211: Actions Concerning Regulations That
Significantly Affect Energy Supply, Distribution, or Use
This action is not subject to Executive Order 13211, because it is
not a significant regulatory action under Executive Order 12866.
I. National Technology Transfer and Advancement Act (NTTAA) and 1 CFR
Part 51
This action involves technical standards. Therefore, the EPA
conducted searches for the EAF NSPS through the Enhanced National
Standards Systems Network Database managed by the American National
Standards Institute (ANSI). We also contacted voluntary consensus
standards (VCS) organizations and accessed and searched their
databases. We conducted searches for EPA Methods 1, 2, 3, 3A, 3B, 4, 5,
5D, and 22 of 40 CFR part 60, appendix A. During the EPA's VCS search,
if the title or abstract (if provided) of the VCS described technical
sampling and analytical procedures that are similar to the EPA's
reference method, the EPA reviewed it as a potential equivalent method.
We reviewed all potential standards to determine the practicality of
the VCS for this rule. This review requires significant method
validation data that meet the requirements of EPA Method 301 for
accepting alternative methods or scientific, engineering and policy
equivalence to procedures in the EPA reference methods. The EPA may
reconsider determinations of impracticality when additional information
is available for a particular VCS. No applicable VCS were identified
for EPA Methods 5D and 22.
The EPA is incorporating by reference the VCS ANSI/ASME PTC 19.10-
1981, ``Flue and Exhaust Gas Analyses,'' to provide that the manual
procedures (but not instrumental procedures) of VCS ANSI/ASME PTC
19.10-1981--Part 10 may be used as an alternative to EPA Method 3B. The
manual procedures (but not instrumental procedures) of VCS ANSI/ASME
PTC 19.10-1981--Part 10 may be used as an alternative to EPA Method 3B
for measuring the oxygen or carbon dioxide content of the exhaust gas.
This standard is acceptable as an alternative to EPA Method 3B and is
available from ASME at www.asme.org; by mail at Three Park Avenue, New
York, NY 10016-5990; or by telephone at (800) 843-2763. This method
determines quantitatively the gaseous constituents of exhausts
resulting from stationary combustion sources. The gases covered in
ANSI/ASME PTC 19.10-1981 are oxygen, carbon dioxide, carbon monoxide,
nitrogen, sulfur dioxide, sulfur trioxide, nitric oxide, nitrogen
dioxide, hydrogen sulfide, and hydrocarbons. However, the use in this
rule is only applicable to oxygen and carbon dioxide.
In the final rule, the EPA is incorporating by reference the VCS
ASTM D7520-16, Standard Test Method for Determining the Opacity of a
Plume in the Outdoor Ambient Atmosphere, which is an instrumental
method to determine plume opacity in the outdoor ambient environment as
an alternative to visual measurements made by certified smoke readers
in accordance with EPA Method 9. The concept of ASTM D7520-16, also
known as the Digital Camera Opacity Technique or DCOT, is a test
protocol to determine the opacity of visible emissions using a digital
camera. It was based on previous method development using digital still
cameras and field testing of those methods. The purpose of ASTM D7520-
16 is to set a minimum level of performance for products that use DCOT
to determine plume opacity in ambient environments. The DCOT method is
an acceptable alternative to EPA Method 9 with the following caveats:
During the DCOT certification procedure outlined in
Section 9.2 of ASTM D7520-16, the facility or the DCOT vendor must
present the plumes in front of various backgrounds of color and
contrast representing conditions anticipated during field use such as
blue sky, trees, and mixed backgrounds (clouds or a sparse tree stand).
The facility must also have standard operating procedures
in place including daily or other frequency quality checks to ensure
the equipment is within manufacturing specifications as outlined in
Section 8.1 of ASTM D7520-16.
The facility must follow the recordkeeping procedures
outlined in 40 CFR 63.10(b)(1) for the DCOT certification, compliance
report, data sheets, and all raw unaltered JPEGs used for opacity and
certification determination.
The facility or the DCOT vendor must have a minimum of 4
independent technology users apply the software to determine the
visible opacity of the 300 certification plumes. For each set of 25
plumes, the user may not exceed 15 percent opacity of any one anyone
reading, and the average error must not exceed 7.5 percent opacity.
This approval does not provide or imply a certification or
validation of any vendor's hardware or software. The onus to maintain
and verify the certification or training of the DCOT camera, software,
and operator in accordance with ASTM D7520-16 is on the facility, DCOT
operator, and DCOT vendor. This method describes procedures to
determine the opacity of a plume, using digital imagery and associated
hardware and software, where opacity is caused by PM emitted from a
stationary point source in the outdoor ambient environment. The opacity
of emissions is determined by the application of a DCOT that consists
of a digital still camera, analysis software, and the output function's
content to obtain and interpret digital images to determine and report
plume opacity. The ASTM D7520-16 document is available from ASTM at
www.astm.org or 1100 Barr Harbor Drive, West Conshohocken, PA 19428-
2959, telephone number: (610) 832-9500, fax number: (610) 832-9555 at
[email protected].
The EPA is finalizing the use of the guidance document, Fabric
Filter Bag Leak Detection Guidance, EPA-454/R-98-015, Office of Air
Quality Planning and Standards (OAQPS), U.S. Environmental Protection
Agency, Research Triangle Park, North Carolina, September 1997. This
document provides guidance on the use of triboelectric monitors as
fabric filter bag leak detectors. The document includes fabric filter
and monitoring system descriptions; guidance on monitor selection,
installation, setup, adjustment, and operation; and quality assurance
procedures. The document is available at https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=2000D5T6.PDF.
Additional information for the VCS search and determinations can be
found in the three memoranda titled Voluntary Consensus Standard
Results for Standards of Performance for Steel Plants: Electric Arc
Furnaces Constructed After October 21, 1974, and
[[Page 58475]]
On or Before August 17, 1983; Voluntary Consensus Standard Results for
Standards of Performance for Steel Plants: Electric Arc Furnaces and
Argon-Oxygen Decarburization Vessels Constructed After August 17, 1983,
and On or Before May 16, 2022; and Voluntary Consensus Standard Results
for Standards of Performance for Steel Plants: Electric Arc Furnaces
and Argon-Oxygen Decarburization Vessels Constructed After May 16,
2022, available in the docket for this final rule.
J. Executive Order 12898: Federal Actions To Address Environmental
Justice in Minority Populations and Low-Income Populations
Executive Order 12898 (59 FR 7629; February 16, 1994) directs
Federal agencies, to the greatest extent practicable and permitted by
law, to make environmental justice part of their mission by identifying
and addressing, as appropriate, disproportionately high and adverse
human health or environmental effects of their programs, policies, and
activities on minority populations (people of color and/or Indigenous
peoples) and low-income populations.
The EPA believes that the human health and environmental conditions
that exist prior to this action do not result in disproportionate and
adverse effects on people of color, low-income populations, and/or
indigenous peoples if a modified or reconstructed EAF facility becomes
subject to the final rule for 40 CFR part 60, subpart AAb, considering
the demographics analysis for the existing EAF facilities described in
section V.F of this preamble. However, it is unknown where new EAF
facilities will be located so it is not possible to predict the impacts
of these facilities on people of color, low-income populations, and/or
indigenous peoples.
The EPA believes that this action is not likely to result in new
disproportionate and adverse effects on people of color, low-income
populations and/or indigenous peoples. The impacts of these final rules
are beneficial to all demographic groups, and include requirements to
clarify current rules in 40 CFR part 60, subparts AA, AAa and, for new
sources built after publication of this final rule (in 40 CFR part 60,
subpart AAb), to ensure compliance via frequent testing, to meet a
lower opacity limit for melt shops during melting and refining, to meet
a baghouse emissions limit as a facility-wide total in lb/ton, and to
meet all the promulgated standards at all times, including periods of
SSM.
The information supporting this Executive Order review is contained
in section V.F of this preamble and in a technical report, Analysis of
Demographic Factors For Populations Living Near Steel Plants Using
Electric Arc Furnaces, located in the docket for this rule. Because the
EPA does not know where new facilities will be located that will become
subject to this new 40 CFR part 60, subpart AAb, a demographic analysis
was performed on the existing EAF/AOD population, which could become
subject to 40 CFR part 60, subpart AAb if a modification or
reconstruction increases emissions.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and the EPA will submit a rule
report to each House of the Congress and to the Comptroller General of
the United States. This action is not a ``major rule'' as defined by 5
U.S.C. 804(2).
List of Subjects in 40 CFR Part 60
Environmental protection, Administrative practice and procedures,
Air pollution control, Incorporation by reference, Reporting and
recordkeeping requirements.
Michael S. Regan,
Administrator.
For the reasons set forth in the preamble, the EPA amends 40 CFR
part 60 as follows:
PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES
0
1. The authority citation for part 60 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart A--General Provisions.
0
2. Section 60.17 is amended by revising paragraphs (g)(14), (h)(206),
and (j)(2) to read as follows:
Sec. 60.17 Incorporation by reference.
* * * * *
(g) * * *
(14) ASME/ANSI PTC 19.10-1981, Flue and Exhaust Gas Analyses [Part
10, Instruments and Apparatus], (Issued August 31, 1981), IBR approved
for Sec. Sec. 60.56c(b); 60.63(f); 60.106(e); 60.104a(d), (h), (i),
and (j); 60.105a(b), (d), (f), and (g); 60.106a(a); 60.107a(a), (c),
and (d); 60.275(e); 60.275a(e); 60.275b(e); tables 1 and 3 to subpart
EEEE; tables 2 and 4 to subpart FFFF; table 2 to subpart JJJJ;
Sec. Sec. 60.285a(f); 60.396(a); 60.2145(s) and (t); 60.2710(s) and
(t); 60.2730(q); 60.4415(a); 60.4900(b); 60.5220(b); tables 1 and 2 to
subpart LLLL; tables 2 and 3 to subpart MMMM; Sec. Sec. 60.5406(c);
60.5406a(c); 60.5407a(g); 60.5413(b); 60.5413a(b); and (d).
* * * * *
(h) * * *
(206) ASTM D7520-16, Standard Test Method for Determining the
Opacity of a Plume in the Outdoor Ambient Atmosphere, approved April 1,
2016; IBR approved for Sec. Sec. 60.271(k); 60.272(a) and (b);
60.273(c) and (d); 60.274(h); 60.275(e); 60.276(c); 60.271a; 60.272a(a)
and (b); 60.273a(c) and (d); 60.274a(h); 60.275a(e); 60.276a(f);
60.271b; 60.272b(a) and (b); 60.273b(c) and (d); 60.274b(h);
60.275b(e); 60.276b(f); 60.374a(d).
* * * * *
(j) * * *
(2) EPA-454/R-98-015, Office of Air Quality Planning and Standards
(OAQPS), Fabric Filter Bag Leak Detection Guidance, September 1997,
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=2000D5T6.PDF; IBR approved
for Sec. Sec. 60.273(e); 60.273a(e); 60.273b(e); 60.373a(b);
60.2145(r); 60.2710(r); 60.4905(b); 60.5225(b).
* * * * *
Subpart AA--Standards of Performance for Steel Plants: Electric Arc
Furnaces Constructed After October 21, 1974, and On or Before
August 17, 1983
0
3. Section 60.270 is amended by revising paragraph (b) to read as
follows:
Sec. 60.270 Applicability and designation of affected facility.
* * * * *
(b) The provisions of this subpart apply to each affected facility
identified in paragraph (a) of this section that commenced
construction, modification, or reconstruction after October 21, 1974,
and on or before August 17, 1983, where a modification is any physical
change in, or change in the method of operation of, an existing
facility which increases the amount of any air pollutant (to which this
standard applies) emitted into the atmosphere by that facility or which
results in the emission of any air pollutant (to which this standard
applies) into the atmosphere not previously emitted.
0
4. Section 60.271 is amended by:
0
a. Revising paragraphs (a), (d) through (f), (i) through (k), (m), and
(n); and
0
b. Adding new paragraphs (p) through (r).
The revisions and additions read as follows:
Sec. 60.271 Definitions.
* * * * *
[[Page 58476]]
(a) Electric arc furnace (EAF) means a furnace that produces molten
steel and heats the charge materials with electricity using carbon
electrodes. Furnaces that continuously feed direct-reduced iron ore
pellets as the primary source of iron are not affected facilities
within the scope of this definition.
* * * * *
(d) Capture system means the equipment (including ducts, hoods,
fans, dampers, etc.) used to capture particulate matter generated by
the operation of an EAF and transport captured particulate matter to
the air pollution control device.
(e) Charge means the addition of iron and steel scrap or other
materials into the shell of an electric arc furnace.
(f) Charging period means the time period when iron and steel scrap
or other materials are added into the top of an EAF until the melting
and refining period commences.
* * * * *
(i) Melting and refining means that phase of the steel production
cycle when charge material is melted and undesirable elements are
removed from the metal.
(j) Melting and refining period means the time period commencing at
the initial energizing of the electrode to begin the melting process
and ending at the initiation of the tapping period, excluding any
intermediate times when the electrodes are not energized as part of the
melting process.
(k) Shop opacity means the arithmetic average of 24 or more opacity
observations of any EAF emissions emanating from, and not within, the
shop, taken in accordance with EPA Method 9 of appendix A of this part.
Alternatively, ASTM D7520-16 (incorporated by reference, see Sec.
60.17), may be used with the following five conditions: (1) During the
digital camera opacity technique (DCOT) certification procedure
outlined in Section 9.2 of ASTM D7520-16 (incorporated by reference,
see Sec. 60.17), the owner or operator or the DCOT vendor must present
the plumes in front of various backgrounds of color and contrast
representing conditions anticipated during field use such as blue sky,
trees, and mixed backgrounds (clouds and/or a sparse tree stand);
(2) The owner or operator must also have standard operating
procedures in place including daily or other frequency quality checks
to ensure the equipment is within manufacturing specifications as
outlined in Section 8.1 of ASTM D7520-16 (incorporated by reference,
see Sec. 60.17);
(3) The owner or operator must follow the recordkeeping procedures
outlined in Sec. 60.7(f) for the DCOT certification, compliance
report, data sheets, and all raw unaltered JPEGs used for opacity and
certification determination;
(4) The owner or operator or the DCOT vendor must have a minimum of
four independent technology users apply the software to determine the
visible opacity of the 300 certification plumes. For each set of 25
plumes, the user may not exceed 15 percent opacity of anyone reading
and the average error must not exceed 7.5 percent opacity;
(5) Use of this approved alternative does not provide or imply a
certification or validation of any vendor's hardware or software. The
onus to maintain and verify the certification and/or training of the
DCOT camera, software, and operator in accordance with ASTM D7520-16
(incorporated by reference, see Sec. 60.17) and these requirements is
on the facility, DCOT operator, and DCOT vendor.
* * * * *
(m) Shop means the building that houses one or more EAF's and
serves as the point from which compliance with Sec. 60.272(a)(3),
``Standard for Particulate Matter,'' is measured.
(n) Direct shell evacuation system means any system that creates
and maintains a negative pressure within the EAF shell during melting
and refining, and transports emissions to the control device.
* * * * *
(p) Damper means any device used to open, close or throttle a DEC
system or hood designed to capture emissions from an EAF and route them
to the associated control device(s). It does not include isolation
dampers used to isolate a fan or baghouse compartment for repair or
cleaning, or dampers controlling collection of emissions from equipment
other than an EAF.
(q) Negative-pressure fabric filter means a fabric filter with the
fans on the downstream side of the filter bags.
(r) Positive-pressure fabric filter means a fabric filter with the
fans on the upstream side of the filter bags.
0
5. Section 60.272 is amended by revising paragraphs (a)(2), (a)(3)
introductory text, and (b) to read as follows:
Sec. 60.272 Standard for particulate matter.
(a) * * *
(2) Exit from a control device and exhibit three percent opacity or
greater, as measured in accordance with EPA Method 9 of appendix A of
this part, or, as an alternative, according to ASTM D7520-16
(incorporated by reference, see Sec. 60.17), with the caveats
described under Shop opacity in Sec. 60.271.
(3) Exit from a shop and, due solely to operations of any EAF(s),
exhibit 6 percent opacity or greater, as measured in accordance with
EPA Method 9 of appendix A of this part, or, as an alternative,
according to ASTM D7520-16 (incorporated by reference, see Sec.
60.17), with the caveats described under Shop opacity in Sec. 60.271.
Shop opacity shall be recorded for any point(s) where visible emissions
are observed. Where it is possible to determine that a number of
visible emission sites relate to only one incident of visible
emissions, only one observation of shop opacity will be required. In
this case, the shop opacity observations must be made for the site of
highest opacity that directly relates to the cause (or location) of
visible emissions observed during a single incident, except:
* * * * *
(b) On and after the date on which the performance test required to
be conducted by Sec. 60.8 is completed, no owner or operator subject
to the provisions of this subpart shall cause to be discharged into the
atmosphere from dust-handling equipment any gases which exhibit 10
percent opacity or greater, as measured in accordance with EPA Method 9
of appendix A of this part, or, as an alternative, according to ASTM
D7520-16 (incorporated by reference, see Sec. 60.17), with the caveats
described under Shop opacity in Sec. 60.271.
0
6. Section 60.273 is amended by:
0
a. Revising paragraphs (c), (d), (e) introductory text and (e)(3);
0
b. In paragraph (e)(4) introductory text, remove the text ``the U.S.
Environmental Protection Agency guidance document ``Fabric Filter Bag
Leak Detection Guidance'' (EPA-454/R-98-015)'' and add, in its place,
the text ``EPA-454/R-98-015, Fabric Filter Bag Leak Detection Guidance
(incorporated by reference, see Sec. 60.17)'';
0
c. Revising paragraphs (e)(6)(ii), and (7), (f) introductory text, and
(f)(1) and (5);
0
d. Redesignating paragraph (f)(6) as paragraph (f)(7);
0
e. Adding new paragraph (f)(6); and
0
f. Revising paragraph (g).
The revisions and addition read as follows:
Sec. 60.273 Emission monitoring.
* * * * *
(c) A continuous monitoring system for the measurement of the
opacity of emissions discharged into the atmosphere from the control
device(s) is not required on any modular, multi-stack, negative-
pressure or positive-
[[Page 58477]]
pressure fabric filter or on any single-stack fabric filter if
observations of the opacity of the visible emissions from the control
device are performed by a certified visible emission observer and the
owner installs and operates a bag leak detection system according to
paragraph (e) of this section whenever the control device is being used
to remove particulate matter from the EAF. Visible emission
observations shall be conducted at least once per day of the control
device for at least three 6-minute periods when the furnace is
operating in the melting and refining period. All visible emissions
observations shall be conducted in accordance with EPA Method 9 of
appendix A to this part, or, as an alternative, according to ASTM
D7520-16 (incorporated by reference, see Sec. 60.17), with the caveats
described under Shop opacity in Sec. 60.271. If visible emissions
occur from more than one point, the opacity shall be recorded for any
points where visible emissions are observed. Where it is possible to
determine that a number of visible emission points relate to only one
incident of the visible emission, only one set of three 6-minute
observations will be required. In that case, the EPA Method 9
observations must be made for the point of highest opacity that
directly relates to the cause (or location) of visible emissions
observed during a single incident. Records shall be maintained of any
6-minute average that is in excess of the emission limit specified in
Sec. 60.272(a)(2).
(d) A furnace static pressure monitoring device is not required on
any EAF equipped with a DEC system if observations of shop opacity are
performed by a certified visible emission observer as follows:
(1) At least once per day when the furnace is operating.
(2) No less than once per week, commencing from the tap of one EAF
heat cycle to the tap of the following heat cycle. A melt shop with
more than one EAF shall conduct these readings while both EAFs are in
operation. Both EAFs are not required to be on the same schedule for
tapping.
(3) Shop opacity shall be determined as the arithmetic average of
24 or more consecutive 15-second opacity observations of emissions from
the shop taken in accordance with EPA Method 9, or, as an alternative,
according to ASTM D7520-16 (incorporated by reference, see Sec.
60.17), with the caveats described under Shop opacity in Sec. 60.271.
Shop opacity shall be recorded for any point(s) where visible emissions
are observed in proximity to an affected EAF. Where it is possible to
determine that a number of visible emission points relate to only one
incident of visible emissions, only one observation of shop opacity
will be required. In this case, the shop opacity observations must be
made for the point of highest opacity that directly relates to the
cause (or location) of visible emissions observed during a single
incident.
(e) A bag leak detection system must be installed on all single-
stack fabric filters and operated whenever the control device is being
used to remove particulate matter from the EAF if the owner or operator
elects not to install and operate a continuous opacity monitoring
system as provided for under paragraph (c) of this section. In
addition, the owner or operator shall meet the visible emissions
observation requirements in paragraph (c) of this section. The bag leak
detection system must meet the specifications and requirements of
paragraphs (e)(1) through (8) of this section.
* * * * *
(3) The bag leak detection system must be equipped with an alarm
system that will activate when an increase in relative particulate
loading is detected over the alarm set point established according to
paragraph (e)(4) of this section, and the alarm must be located such
that it can be identified by the appropriate plant personnel.
* * * * *
(6) * * *
(ii) If opacities greater than zero percent are observed over four
consecutive 15-second observations during the daily opacity
observations required under paragraph (c) of this section and the alarm
on the bag leak detection system alarm is not activated, the owner or
operator shall lower the alarm set point on the bag leak detection
system to a point where the alarm would have been activated during the
period when the opacity observations were made.
(7) For negative pressure, induced air baghouses, and positive
pressure baghouses that are discharged to the atmosphere through a
stack, the bag leak detection sensor must be installed downstream of
the baghouse or upstream of any wet scrubber.
* * * * *
(f) For each bag leak detection system installed according to
paragraph (e) of this section, the owner or operator shall initiate
procedures to determine the cause of all alarms within 1 hour of an
alarm. The cause of the alarm must be alleviated within 24 hours of the
time the alarm occurred by taking whatever response action(s) are
necessary. Response actions may include, but are not limited to the
following:
(1) Inspecting the baghouse for air leaks, torn or broken bags or
filter media, or any other condition that may have caused an increase
in particulate emissions;
* * * * *
(5) Cleaning the bag leak detection system probe or otherwise
repairing the bag leak detection system;
(6) Establishing to the extent acceptable by the delegated
authority that the alarm was a false alarm and not caused by a bag leak
or other malfunction that could reasonably result in excess particulate
emissions; or
* * * * *
(g) In approving the site-specific monitoring plan required in
paragraph (e)(4) of this section, the Administrator or delegated
authority may allow owners or operators more than 24 hours to alleviate
specific conditions that cause an alarm if the owner or operator
identifies the condition that could lead to an alarm in the monitoring
plan, adequately explains why it is not feasible to alleviate the
condition within 24 hours of the time the alarm occurred, and
demonstrates that the requested additional time will ensure alleviation
of the condition as expeditiously as practicable.
0
7. Section 60.274 is amended by revising paragraphs (b) through (g),
and (i) to read as follows:
Sec. 60.274 Monitoring of operations.
* * * * *
(b) Except as provided under paragraph (d) of this section, the
owner or operator subject to the provisions of this subpart shall:
(1) Monitor and record on a continuous basis the rolling 15-minute
average furnace static pressure (if a DEC system is in use, and a
furnace static pressure gauge is installed according to paragraph (f)
of this section) and either:
(i) Install, calibrate, and maintain a monitoring device that
continuously records the capture system fan motor amperes and damper
position(s);
(ii) Install, calibrate, and maintain a monitoring device that
continuously records on a rolling 15-minute average basis either the
volumetric flow rate through each separately ducted hood; or
(iii) Install, calibrate, and maintain a monitoring device that
continuously records the volumetric flow rate at the control device
inlet and continuously record damper position(s).
(2) The volumetric flow monitoring device(s) may be installed in
any appropriate location in the capture system such that reproducible
flow rate monitoring will result. The flow rate monitoring device(s)
shall have an
[[Page 58478]]
accuracy of 10 percent over its normal operating range and
shall be calibrated according to the manufacturer's instructions. The
Administrator may require the owner or operator to demonstrate the
accuracy of the monitoring device(s) relative to EPA Methods 1 and 2 of
appendix A of this part.
(3) Parameters monitored pursuant to this paragraph, excluding
damper position, shall be recorded on a rolling averaging period not to
exceed 15 minutes.
(c) When the owner or operator of an affected facility is required
to demonstrate compliance with the standards under Sec. 60.272(a)(3)
and at any other time that the Administrator may require (under section
114 of the CAA, as amended), the owner or operator shall determine
during periods in which a hood is operated for the purpose of capturing
emissions from the affected facility subject to paragraph (b) of this
section, either:
(1) Monitor and record the fan motor amperes at each damper
position, and damper position consistent with paragraph (i)(5) of this
section;
(2) install, calibrate, and maintain a monitoring device that
continuously records the volumetric flow rate through each separately
ducted hood; or
(3) install, calibrate, and maintain a monitoring device that
continuously records the volumetric flow rate at the control device
inlet and monitor and record the damper position consistent with
paragraph (i)(5) of this section.
(4) Parameters monitored pursuant to this paragraph, excluding
damper position, shall be recorded on a rolling averaging period not to
exceed 15 minutes.
(5) The owner or operator may petition the Administrator or
delegated authority for reestablishment of these parameters whenever
the owner or operator can demonstrate to the Administrator's or
delegated authority's satisfaction that the EAF operating conditions
upon which the parameters were previously established are no longer
applicable. The values of the parameters as determined during the most
recent demonstration of compliance shall be the appropriate operational
range or control set point throughout each applicable period. Operation
at values beyond the accepted operational range or control set point
may be subject to the requirements of Sec. 60.276(a).
(d) The owner or operator may petition the Administrator or
delegated authority to approve any alternative method that will provide
a continuous record of operation of each emission capture system.
(e) The owner or operator shall perform monthly operational status
inspections of the equipment that is important to the performance of
the total capture system (i.e., pressure sensors, dampers, and damper
switches). This inspection shall include observations of the physical
appearance of the equipment (e.g., presence of hole in ductwork or
hoods, flow constrictions caused by dents or excess accumulations of
dust in ductwork, and fan erosion) and building inspections to ensure
that the building does not have any holes or other openings for
particulate matter laden air to escape. Any deficiencies that are
determined by the operator to materially impact the efficacy of the
capture system shall be noted and proper maintenance performed.
(f) Except as provided for under Sec. 60.273(d), where emissions
during any phase of the heat time are controlled by use of a direct
shell evacuation system, the owner or operator shall install,
calibrate, and maintain a monitoring device that continuously records
the pressure in the free space inside the EAF. The pressure shall be
recorded as no greater than 15-minute integrated block averages. The
monitoring device may be installed in any appropriate location in the
EAF or DEC duct prior to the introduction of ambient air such that
reproducible results will be obtained. The pressure monitoring device
shall have an accuracy of 5 mm of water gauge over its
normal operating range and shall be calibrated according to the
manufacturer's instructions.
(g) Except as provided for under Sec. 60.273(d), when the owner or
operator of an EAF is required to demonstrate compliance with the
standard under Sec. 60.272(a)(3) and at any other time the
Administrator may require (under section 114 of the Act, as amended),
the pressure in the free space inside the furnace shall be determined
during the melting and refining period(s) using the monitoring device
under paragraph (f) of this section. The owner or operator may petition
the Administrator or delegated authority for reestablishment of the 15-
minute integrated average pressure whenever the owner or operator can
demonstrate to the Administrator's or delegated authority's
satisfaction that the EAF operating conditions upon which the pressures
were previously established are no longer applicable. The pressure
range or control setting during the most recent demonstration of
compliance shall be maintained at all times the EAF is operating in a
melting and refining period. Continuous operation at pressures higher
than the operational range or control setting may be considered by the
Administrator or delegated authority to be unacceptable operation and
maintenance of the affected facility.
* * * * *
(i) During any performance test required under Sec. 60.8, and for
any report thereof required by Sec. 60.276(c) of this subpart or to
determine compliance with Sec. 60.272(a)(3) of this subpart, the owner
or operator shall monitor the following information for all heats
covered by the test:
(1) Charge weights and materials, and tap weights and materials;
(2) Heat times, including start and stop times, and a log of
process operation, including periods of no operation during testing
and, if a furnace static pressure monitoring device is operated
pursuant to paragraph (f) of this section, the pressure inside the
furnace when DEC systems are used;
(3) Control device operation log;
(4) Continuous opacity monitor or EPA Method 9 data, or, as an
alternative to EPA Method 9, according to ASTM D7520-16 (incorporated
by reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271;
(5) All damper positions, no less frequently than performed in the
latest melt shop opacity compliance test for a full heat, if selected
as a method to demonstrate compliance under paragraph (b) of this
section;
(6) Fan motor amperes at each damper position, if selected as a
method to demonstrate compliance under paragraph (b) of this section;
(7) Volumetric air flow rate through each separately ducted hood,
if selected as a method to demonstrate compliance under paragraph (b)
of this section; and
(8) Static pressure at each separately ducted hood, if selected as
a method to demonstrate compliance under paragraph (b) of this section.
(9) Parameters monitored pursuant to paragraphs (i)(6)-(8) of this
section shall be recorded on a rolling averaging period not to exceed
15 minutes.
0
8. Section 60.275 is amended by:
0
a. Revising paragraphs (a) and (b)(2);
0
b. Adding paragraph (b)(3);
0
c. Revising paragraphs (c), (e)(1), (3), and (4);
0
d. Removing paragraph (g);
0
e. Redesignating existing paragraphs (h) through (j) as paragraphs (g)
through (i), respectively; and
0
f. Revising newly redesignated paragraphs (g) introductory text,
(g)(3), and (h).
[[Page 58479]]
The revisions and additions read as follows:
Sec. 60.275 Test methods and procedures.
(a) During performance tests required in Sec. 60.8, the owner or
operator shall not add gaseous diluent to the effluent gas after the
fabric filter in any pressurized fabric collector, unless the amount of
dilution is separately determined and considered in the determination
of emissions.
(b) * * *
(2) Use a method that is acceptable to the Administrator or
delegated authority and that compensates for the emissions from the
facilities not subject to the provisions of this subpart.
(3) Any combination of the criteria of paragraphs (b)(1) and (b)(2)
of this section.
(c) When emissions from any EAF(s) are combined with emissions from
facilities not subject to the provisions of this subpart, compliance
with Sec. 60.272(a)(3) will be based on emissions from only the
affected facility(ies). The owner or operator may use operational
knowledge to determine the facilities that are the sources, in whole or
in part, of any emissions observed in demonstrations of compliance with
Sec. 60.272(a)(3).
* * * * *
(e) * * *
(1) EPA Method 5 (and referenced EPA Methods 1, 2, 3, 3A, 3B, and
4) shall be used for negative-pressure fabric filters and other types
of control devices and EPA Method 5D (and referenced EPA Method 5)
shall be used for positive-pressure fabric filters to determine the
particulate matter concentration and, if applicable, the volumetric
flow rate of the effluent gas. The sampling time and sample volume for
each run shall be at least 4 hours and 4.5 dscm (160 dscf) and, when a
single EAF is sampled, the sampling time shall include an integral
number of heats. The manual portions only and not the instrumental
portion of the voluntary consensus standard ANSI/ASME PTC 19.10-1981
(incorporated by reference, see Sec. 60.17) is an acceptable
alternative to EPA Methods 3, 3A, and 3B.
* * * * *
(3) EPA Method 9 or, as an alternative, ASTM D7520-16 (incorporated
by reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271, and the procedures of Sec. 60.11 shall be
used to determine opacity.
(4) To demonstrate compliance with Sec. 60.272(a)(1), (2), and
(3), the EPA Method 9 test runs shall be conducted concurrently with
the particulate matter test runs, unless inclement weather interferes.
* * * * *
(g) Where emissions from any EAF(s) are combined with emissions
from facilities not subject to the provisions of this subpart, the
owner or operator may use any of the following procedures for
demonstrating compliance with Sec. 60.272(a)(3), except if the
combined emissions are controlled by a common capture system and
control device, in which case the owner or operator may use any of the
following procedures during an opacity performance test and during shop
opacity observations:
* * * * *
(3) Any combination of the criteria of paragraphs (g)(1) and (2) of
this section.
(h) If visible emissions observations are made in lieu of using a
continuous opacity monitoring system, as allowed for by Sec.
60.273(c), visible emission observations shall be conducted at least
once per day for at least three 6-minute periods when the furnace is
operating in the melting and refining period. All visible emissions
observations shall be conducted in accordance with EPA Method 9. If
visible emissions occur from more than one point, the opacity shall be
recorded for any points where visible emissions are observed. Where it
is possible to determine that a number of visible emission sites relate
to only one incident of the visible emission, only one set of three 6-
minute observations will be required. In that case, the EPA Method 9
observations must be made for the site of highest opacity that directly
relates to the cause (or location) of visible emissions observed during
a single incident. Records shall be maintained of any 6-minute average
that is in excess of the emission limit specified in Sec. 60.272(a).
* * * * *
0
9. Section 60.276 is amended by:
0
a. Revising paragraphs (a), (b), (c) introductory text, (c)(3), (4),
(6)(iv), (10), (d), and (e)(3); and
0
b. Adding paragraphs (f) through (k).
The revisions and additions read as follows:
Sec. 60.276 Recordkeeping and reporting requirements.
(a) Continuous operation at a furnace static pressure that exceeds
the operational range or control setting under Sec. 60.274(g), for
owners and operators that elect to install a furnace static pressure
monitoring device under Sec. 60.274(f) or operation at flow rates
lower than those established under Sec. 60.274(c) may be considered by
the Administrator or delegated authority to be unacceptable operation
and maintenance of the affected facility. Operation at such values
shall be reported to the Administrator or delegated authority
semiannually.
(b) When the owner or operator of an EAF is required to demonstrate
compliance with the standard under Sec. 60.275(b)(2) or a combination
of (b)(1) and (b)(2), the owner or operator shall provide notice to the
Administrator or delegated authority of the procedure(s) that will be
used to determine compliance. Notification of the procedure(s) to be
used must be postmarked at least 30 days prior to the performance test.
(c) For the purpose of this subpart, the owner or operator shall
conduct the demonstration of compliance with Sec. 60.272(a) of this
subpart and furnish the Administrator or delegated authority with a
written report of the results of the test. This report shall include
the following information:
* * * * *
(3) Make and model of the control device, and continuous opacity
monitoring equipment, if applicable;
(4) Flow diagram of process and emission capture system including
other equipment or process(es) ducted to the same control device;
* * * * *
(6) * * *
(iv) Continuous opacity monitor or EPA Method 9 data, or, as an
alternative to EPA Method 9, according to ASTM D7520-16 (incorporated
by reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271.
* * * * *
(10) Test observers from any outside agency;
* * * * *
(d) The owner or operator shall maintain records of all shop
opacity observations made in accordance with Sec. 60.273(d). All shop
opacity observations in excess of the emission limit specified in Sec.
60.272(a)(3) of this subpart shall indicate a period of excess
emissions, and shall be reported to the Administrator or delegated
authority semi-annually, according to Sec. 60.7(c) and submitted
according to paragraph (h) of this section. In addition to the
information required at Sec. 60.7(c), the report shall include the
following information:
(1) The company name and address of the affected facility.
(2) An identification of each affected facility being included in
the report.
(3) Beginning and ending dates of the reporting period.
(4) A certification by a certifying official of truth, accuracy,
and completeness. This certification shall
[[Page 58480]]
state that, based on information and belief formed after reasonable
inquiry, the statements and information in the document are true,
accurate, and complete.
(e) * * *
(3) An identification of the date and time of all bag leak
detection system alarms, the time that procedures to determine the
cause of the alarm were initiated, if procedures were initiated within
1 hour of the alarm, the cause of the alarm, an explanation of the
actions taken, the date and time the cause of the alarm was alleviated,
and if the alarm was alleviated within 24 hours of the alarm.
(f) Records of the measurements required in Sec. 60.274 must be
retained for at least 5 years following the date of the measurement.
(g) Within 60 days after the date of completing each performance
test or demonstration of compliance required by this subpart, you must
submit the results of the performance test following the procedures
specified in paragraphs (g)(1) through (3) of this section.
(1) Data collected using test methods supported by the EPA's
Electronic Reporting Tool (ERT) as listed on the EPA's ERT website
(https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test. Submit the results of the
performance test to the EPA via the Compliance and Emissions Data
Reporting Interface (CEDRI), which can be accessed through the EPA's
Central Data Exchange (CDX) (https://cdx.epa.gov/). The data must be
submitted in a file format generated using the EPA's ERT.
Alternatively, you may submit an electronic file consistent with the
extensible markup language (XML) schema listed on the EPA's ERT
website.
(2) Data collected using test methods that are not supported by the
EPA's ERT as listed on the EPA's ERT website at the time of the test.
The results of the performance test must be included as an attachment
in the ERT or an alternate electronic file consistent with the XML
schema listed on the EPA's ERT website. Submit the ERT generated
package or alternative file to the EPA via CEDRI.
(3) Confidential business information (CBI). Do not use CEDRI to
submit information you claim as CBI. Anything submitted using CEDRI
cannot later be claimed CBI. Although we do not expect persons to
assert a claim of CBI, if you wish to assert a CBI claim for some of
the information submitted under paragraph (g)(1) or (2) of this
section, you must submit a complete file, including information claimed
to be CBI, to the EPA. The file must be generated using the EPA's ERT
or an alternate electronic file consistent with the XML schema listed
on the EPA's ERT website. The preferred method to submit CBI is for it
to be transmitted electronically using email attachments, File Transfer
Protocol (FTP), or other online file sharing services (e.g., Dropbox,
OneDrive, Google Drive). Electronic submissions must be transmitted
directly to the OAQPS CBI Office at the email address [email protected],
and should include clear CBI markings and note the docket ID. If
assistance is needed with submitting large electronic files that exceed
the file size limit for email attachments, and if you do not have your
own file sharing service, please email [email protected] to request a
file transfer link. If sending CBI information through the postal
service, submit the file on a compact disc, flash drive, or other
commonly used electronic storage medium and clearly mark the medium as
CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office,
Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old
Page Rd., Durham, NC 27703. The same file with the CBI omitted must be
submitted to the EPA via the EPA's CDX as described in paragraphs
(g)(1) and (2) of this section. All CBI claims must be asserted at the
time of submission. Furthermore, under CAA section 114(c), emissions
data is not entitled to confidential treatment, and the EPA is required
to make emissions data available to the public. Thus, emissions data
will not be protected as CBI and will be made publicly available.
(h) You must submit a report of excess emissions and monitoring
systems performance report according to Sec. 60.7(c) to the
Administrator semiannually. Submit all reports to the EPA via CEDRI,
which can be accessed through the EPA's CDX (https://cdx.epa.gov/). The
EPA will make all the information submitted through CEDRI available to
the public without further notice to you. Do not use CEDRI to submit
information you claim as CBI. Anything submitted using CEDRI cannot
later be claimed CBI. You must use the appropriate electronic report
template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart. The date report
templates become available will be listed on the CEDRI website. The
report must be submitted by the deadline specified in this subpart,
regardless of the method in which the report is submitted. Although we
do not expect persons to assert a claim of CBI, if you wish to assert a
CBI claim, follow paragraph (g)(3) of this section except send to the
attention of the Electric Arc Furnace Sector Lead. The same file with
the CBI omitted must be submitted to the EPA via the EPA's CDX as
described earlier in this paragraph (h). All CBI claims must be
asserted at the time of submission. Furthermore, under CAA section
114(c), emissions data is not entitled to confidential treatment, and
the EPA is required to make emissions data available to the public.
Thus, emissions data will not be protected as CBI and will be made
publicly available.
(i) If you are required to electronically submit a report through
CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for
failure to timely comply with that reporting requirement. To assert a
claim of EPA system outage, you must meet the requirements outlined in
paragraphs (i)(1) through (7) of this section.
(1) You must have been or will be precluded from accessing CEDRI
and submitting a required report within the time prescribed due to an
outage of either the EPA's CEDRI or CDX systems.
(2) The outage must have occurred within the period of time
beginning five business days prior to the date that the submission is
due.
(3) The outage may be planned or unplanned.
(4) You must submit notification to the Administrator in writing as
soon as possible following the date you first knew, or through due
diligence should have known, that the event may cause or has caused a
delay in reporting.
(5) You must provide to the Administrator a written description
identifying:
(i) The date(s) and time(s) when CDX or CEDRI was accessed, and the
system was unavailable;
(ii) A rationale for attributing the delay in reporting beyond the
regulatory deadline to EPA system outage;
(iii) A description of measures taken or to be taken to minimize
the delay in reporting; and
(iv) The date by which you propose to report, or if you have
already met the reporting requirement at the time of the notification,
the date you reported.
(6) The decision to accept the claim of EPA system outage and allow
an extension to the reporting deadline is solely within the discretion
of the Administrator.
(7) In any circumstance, the report must be submitted
electronically as soon as possible after the outage is resolved.
(j) If you are required to electronically submit a report through
CEDRI in the EPA's CDX, you may assert a claim of
[[Page 58481]]
force majeure for failure to timely comply with that reporting
requirement. To assert a claim of force majeure, you must meet the
requirements outlined in paragraphs (j)(1) through (5) of this section.
(1) You may submit a claim if a force majeure event is about to
occur, occurs, or has occurred or there are lingering effects from such
an event within the period of time beginning five business days prior
to the date the submission is due. For the purposes of this section, a
force majeure event is defined as an event that will be or has been
caused by circumstances beyond the control of the affected facility,
its contractors, or any entity controlled by the affected facility that
prevents you from complying with the requirement to submit a report
electronically within the time period prescribed. Examples of such
events are acts of nature (e.g., hurricanes, earthquakes, or floods),
acts of war or terrorism, or equipment failure or safety hazard beyond
the control of the affected facility (e.g., large scale power outage).
(2) You must submit notification to the Administrator in writing as
soon as possible following the date you first knew, or through due
diligence should have known, that the event may cause or has caused a
delay in reporting.
(3) You must provide to the Administrator:
(i) A written description of the force majeure event;
(ii) A rationale for attributing the delay in reporting beyond the
regulatory deadline to the force majeure event;
(iii) A description of measures taken or to be taken to minimize
the delay in reporting; and
(iv) The date by which you propose to report, or if you have
already met the reporting requirement at the time of the notification,
the date you reported.
(4) The decision to accept the claim of force majeure and allow an
extension to the reporting deadline is solely within the discretion of
the Administrator.
(5) In any circumstance, the reporting must occur as soon as
possible after the force majeure event occurs.
(k) Any records required to be maintained by this subpart that are
submitted electronically via the EPA's CEDRI may be maintained in
electronic format. This ability to maintain electronic copies does not
affect the requirement for facilities to make records, data, and
reports available upon request to a delegated air agency or the EPA as
part of an on-site compliance evaluation.
Subpart AAa--Standards of Performance for Steel Plants: Electric
Arc Furnaces and Argon-Oxygen Decarbonization Vessels Constructed
After August 17, 1983 and On or Before May 16, 2022
0
10. Section 60.270a is amended by revising paragraph (b) to read as
follows:
Sec. 60.270a Applicability and designation of affected facility.
* * * * *
(b) The provisions of this subpart apply to each affected facility
identified in paragraph (a) of this section that commences
construction, modification, or reconstruction after August 17, 1983 and
on or before May 16, 2022, where a modification is any physical change
in, or change in the method of operation of, an existing facility which
increases the amount of any air pollutant (to which this standard
applies) emitted into the atmosphere by that facility or which results
in the emission of any air pollutant (to which this standard applies)
into the atmosphere not previously emitted.
0
11. Section 60.271a is amended by:
0
a. Revising definitions for ``capture system'' and ``charge'';
0
b. Adding in alphabetical order the definition for ``Charging period''
and ``Damper'';
0
c. Revising the definitions for ``Direct-shell evacuation control
system (DEC system),'' ``Dust-handling system'', ``Electric arc furnace
(EAF)'', ``Heat cycle'', ``Meltdown and refining period'',
``Refining'', ``Shop'', and ``Shop opacity''.
The revisions and additions read as follows:
Sec. 60.271a Definitions.
* * * * *
Capture system means the equipment (including ducts, hoods, fans,
dampers, etc.) used to capture particulate matter generated by the
operation of an electric arc furnace or AOD vessel and transport
captured particulate matter to the air pollution control device.
Charge means the addition of iron and steel scrap or other
materials into the shell of an electric arc furnace or the addition of
molten steel or other materials into the top of an AOD vessel.
Charging period means the time period when iron and steel scrap or
other materials are added into the top of an electric arc furnace until
the melting and refining period commences.
* * * * *
Damper means any device used to open, close or throttle a DEC
system or hood designed to capture emissions from an EAF or AOD vessel
and route them to the associated control device(s). It does not include
isolation dampers used to isolate a fan or baghouse compartment for
repair or cleaning, or dampers controlling collection of emissions from
equipment other than an EAF or AOD vessel.
Direct-shell evacuation control system (DEC system) means a system
that creates and maintains a negative pressure within the electric arc
furnace shell during melting and refining, and transports emissions to
the control device.
Dust-handling system means equipment used to handle particulate
matter collected by the control device for an electric arc furnace or
AOD vessel subject to this subpart. For the purposes of this subpart,
the dust-handling system shall consist of the control device dust
hoppers, the dust-conveying equipment, any silo, dust storage
equipment, the dust-treating equipment (e.g., pug mill, pelletizer),
dust transfer equipment (including, but not limited to transfers from a
silo to a truck or rail car), and any secondary control devices used
with the dust transfer equipment.
Electric arc furnace (EAF) means a furnace that produces molten
steel and heats the charge materials with electricity using-carbon
electrodes. For the purposes of this subpart, an EAF shall consist of
the furnace shell and roof and the transformer. Furnaces that
continuously feed direct-reduced iron ore pellets as the primary source
of iron are not affected facilities within the scope of this
definition.
Heat cycle means the period beginning when scrap is charged to an
EAF shell and ending when the EAF tap is completed or beginning when
molten steel is charged to an AOD vessel and ending when the AOD vessel
tap is completed.
Melting and refining period means the time period commencing at the
initial energizing of the electrode to begin the melting process and
ending at the initiation of the tapping period, excluding any
intermediate times when the electrodes are not energized as part of the
melting process.
* * * * *
Refining means that phase of the steel production cycle during
which impurities are removed from the molten steel and alloys are added
to reach the final metal chemistry.
Shop means the building that houses one or more EAF's or AOD
vessels and serves as the point from which compliance with Sec.
60.272a(a)(3), ``Standard for Particulate Matter,'' is measured.
Shop opacity means the arithmetic average of 24 observations of the
opacity
[[Page 58482]]
of any EAF or AOD emissions emanating from, and not within, the shop,
taken in accordance with EPA Method 9 of appendix A of this part.
Alternatively, ASTM D7520-16 (incorporated by reference, see Sec.
60.17), may be used with the following five conditions:
(1) During the digital camera opacity technique (DCOT)
certification procedure outlined in Section 9.2 of ASTM D7520-16
(incorporated by reference, see Sec. 60.17), the owner or operator or
the DCOT vendor must present the plumes in front of various backgrounds
of color and contrast representing conditions anticipated during field
use such as blue sky, trees, and mixed backgrounds (clouds and/or a
sparse tree stand);
(2) The owner or operator must also have standard operating
procedures in place including daily or other frequency quality checks
to ensure the equipment is within manufacturing specifications as
outlined in Section 8.1 of ASTM D7520-16 (incorporated by reference,
see Sec. 60.17);
(3) The owner or operator must follow the recordkeeping procedures
outlined in Sec. 60.7(f) for the DCOT certification, compliance
report, data sheets, and all raw unaltered JPEGs used for opacity and
certification determination;
(4) The owner or operator or the DCOT vendor must have a minimum of
four independent technology users apply the software to determine the
visible opacity of the 300 certification plumes. For each set of 25
plumes, the user may not exceed 15 percent opacity of anyone reading
and the average error must not exceed 7.5 percent opacity;
(5) Use of this approved alternative does not provide or imply a
certification or validation of any vendor's hardware or software. The
onus to maintain and verify the certification and/or training of the
DCOT camera, software, and operator in accordance with ASTM D7520-16
(incorporated by reference, see Sec. 60.17) and these requirements is
on the facility, DCOT operator, and DCOT vendor.
* * * * *
0
12. Revise Sec. 60.272a to read as follows:
Sec. 60.272a Standard for particulate matter.
(a) On and after the date of which the performance test required to
be conducted by Sec. 60.8 is completed, no owner or operator subject
to the provisions of this subpart shall cause to be discharged into the
atmosphere from an EAF or an AOD vessel any gases which:
(1) Exit from a control device and contain particulate matter in
excess of 12 mg/dscm (0.0052 gr/dscf);
(2) Exit from a control device and exhibit 3 percent opacity or
greater, as measured in accordance with EPA Method 9 of appendix A of
this part, or, as an alternative, according to ASTM D7520-16
(incorporated by reference, see Sec. 60.17), with the caveats
described under Shop opacity in Sec. 60.271; and
(3) Exit from a shop and, due solely to the operations of any
affected EAF(s) or AOD vessel(s), exhibit 6 percent opacity or greater,
as measured in accordance with EPA Method 9 of appendix A of this part,
or, as an alternative, according to ASTM D7520-16 (incorporated by
reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271. Shop opacity shall be recorded for any
point(s) where visible emissions are observed. Where it is possible to
determine that a number of visible emission sites relate to only one
incident of visible emissions, only one observation of shop opacity
will be required. In this case, the shop opacity observations must be
made for the site of highest opacity that directly relates to the cause
(or location) of visible emissions observed during a single incident.
(b) On and after the date on which the performance test required to
be conducted by Sec. 60.8 is completed, no owner or operator subject
to the provisions of this subpart shall cause to be discharged into the
atmosphere from the dust-handling system any gases that exhibit 10
percent opacity or greater, as measured in accordance with EPA Method 9
of appendix A of this part, or, as an alternative, according to ASTM
D7520-16 (incorporated by reference, see Sec. 60.17), with the caveats
described under Shop opacity in Sec. 60.271.
0
13. Section 60.273a is amended by:
0
a. Revising paragraphs (c), (d), (e) introductory text, (e)(3);
0
b. In paragraph (e)(4) introductory text, remove the text ``the U.S.
Environmental Protection Agency guidance document ``Fabric Filter Bag
Leak Detection Guidance'' (EPA-454/R-98-015)'' and add, in its place,
the text ``EPA-454/R-98-015, Fabric Filter Bag Leak Detection Guidance
(incorporated by reference, see Sec. 60.17)'';
0
c. Revising paragraphs (e)(6)(i) and (ii), (e)(7), (f) introductory
text, (f)(1) and(5);
0
d. Redesignating paragraph (f)(6) as paragraph (f)(7);
0
e. Adding new paragraph (f)(6); and
0
f. Revising paragraph (g).
The revisions and addition read as follows:
Sec. 60.273a Emission monitoring.
* * * * *
(c) A continuous monitoring system for the measurement of the
opacity of emissions discharged into the atmosphere from the control
device(s) is not required on any modular, multi-stack, negative-
pressure or positive-pressure fabric filter or on any single-stack
fabric filter if observations of the opacity of the visible emissions
from the control device are performed by a certified visible emission
observer and the owner installs and operates a bag leak detection
system according to paragraph (e) of this section whenever the control
device is being used to remove particulate matter from the EAF or AOD.
Visible emission observations shall be conducted at least once per day
of the control device for at least three 6-minute periods when the
furnace is operating in the melting and refining period. All visible
emissions observations shall be conducted in accordance with EPA Method
9, or, as an alternative, according to ASTM D7520-16 (incorporated by
reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271. If visible emissions occur from more than one
point, the opacity shall be recorded for any points where visible
emissions are observed. Where it is possible to determine that a number
of visible emission points relate to only one incident of the visible
emission, only one set of three 6-minute observations will be required.
In that case, the EPA Method 9 observations must be made for the point
of highest opacity that directly relates to the cause (or location) of
visible emissions observed during a single incident. Records shall be
maintained of any 6-minute average that is in excess of the emission
limit specified in Sec. 60.272a(a)(2).
(d) A furnace static pressure monitoring device is not required on
any EAF equipped with a DEC system if observations of shop opacity are
performed by a certified visible emission observer as follows:
(1) At least once per day when the furnace is operating.
(2) No less than once per week, commencing from the tap of one EAF
heat cycle to the tap of the following heat cycle. A melt shop with
more than one EAF shall conduct these readings while both EAFs are in
operation. Both EAFs are not required to be on the same schedule for
tapping.
(3) Shop opacity shall be determined as the arithmetic average of
24 consecutive 15-second opacity observations of emissions from the
shop taken in accordance with EPA Method 9, or, as an alternative,
according to
[[Page 58483]]
ASTM D7520-16 (incorporated by reference, see Sec. 60.17), with the
caveats described under Shop opacity in Sec. 60.271. Shop opacity
shall be recorded for any point(s) where visible emissions are
observed. Where it is possible to determine that a number of visible
emission points relate to only one incident of visible emissions, only
one observation of shop opacity will be required. In this case, the
shop opacity observations must be made for the point of highest opacity
that directly relates to the cause (or location) of visible emissions
observed during a single incident.
(e) A bag leak detection system must be installed on all single-
stack fabric filters and operated whenever the control device is being
used to remove particulate matter from the EAF or AOD vessel if the
owner or operator elects not to install and operate a continuous
opacity monitoring system as provided for under paragraph (c) of this
section. In addition, the owner or operator shall meet the visible
emissions observation requirements in paragraph (c) of this section.
The bag leak detection system must meet the specifications and
requirements of paragraphs (e)(1) through (8) of this section.
* * * * *
(3) The bag leak detection system must be equipped with an alarm
system that will activate when an increase in relative particulate
loading is detected over the alarm set point established according to
paragraph (e)(4) of this section, and the alarm must be located such
that it can be identified by the appropriate plant personnel.
* * * * *
(6) * * *
(i) Once per quarter, the owner or operator may adjust the
sensitivity of the bag leak detection system to account for seasonal
effects including temperature and humidity according to the procedures
identified in the site-specific monitoring plan required under
paragraph (e)(4) of this section.
(ii) If opacities greater than zero percent are observed over four
consecutive 15-second observations during the daily opacity
observations required under paragraph (c) of this section and the alarm
on the bag leak detection system alarm is not activated, the owner or
operator shall lower the alarm set point on the bag leak detection
system to a point where the alarm would have been activated during the
period when the opacity observations were made.
(7) For negative pressure, induced air baghouses, and positive
pressure baghouses that are discharged to the atmosphere through a
stack, the bag leak detection sensor must be installed downstream of
the baghouse or upstream of any wet scrubber.
* * * * *
(f) For each bag leak detection system installed according to
paragraph (e) of this section, the owner or operator shall initiate
procedures to determine the cause of all alarms within 1 hour of an
alarm. The cause of the alarm must be alleviated within 24 hours of the
time the alarm occurred by taking whatever response action(s) are
necessary. Response actions may include, but are not limited to, the
following:
(1) Inspecting the baghouse for air leaks, torn or broken bags or
filter media, or any other condition that may have caused an increase
in particulate emissions;
* * * * *
(5) Cleaning the bag leak detection system probe or otherwise
repairing the bag leak detection system;
(6) Establishing to the extent acceptable by the delegated
authority that the alarm was a false alarm and not caused by a bag leak
or other malfunction that could reasonably result in excess particulate
emissions; and
* * * * *
(g) In approving the site-specific monitoring plan required in
paragraph (e)(4) of this section, the Administrator or delegated
authority may allow owners or operators more than 24 hours to alleviate
specific conditions that cause an alarm if the owner or operator
identifies the condition that could lead to an alarm in the monitoring
plan, adequately explains why it is not feasible to alleviate the
condition within 24 hours of the time the alarm occurred, and
demonstrates that the requested additional time will ensure alleviation
of the condition as expeditiously as practicable.
0
14. Section 60.274a is amended by revising paragraphs (b) through (h)
to read as follows:
Sec. 60.274a Monitoring of operations.
* * * * *
(b) Except as provided under paragraph (e) of this section, the
owner or operator subject to the provisions of this subpart shall:
(1) Monitor and record on a continuous basis the rolling 15-minute
average furnace static pressure (if a DEC system is in use, and a
furnace static pressure gauge is installed according to paragraph (f)
of this section) and either:
(i) Install, calibrate, and maintain a monitoring device that
continuously records the capture system fan motor amperes and damper
position(s);
(ii) Install, calibrate, and maintain a monitoring device that
continuously records on a rolling 15-minute average basis either the
volumetric flow rate through each separately ducted hood; or
(iii) Install, calibrate, and maintain a monitoring device that
continuously records the volumetric flow rate at the control device
inlet continuously record damper positions(s).
(2) The volumetric flow monitoring device(s) may be installed in
any appropriate location in the capture system such that reproducible
flow rate monitoring will result. The flow rate monitoring device(s)
shall have an accuracy of 10 percent over its normal
operating range and shall be calibrated according to the manufacturer's
instructions. The Administrator may require the owner or operator to
demonstrate the accuracy of the monitoring device(s) relative to EPA
Methods 1 and 2 of appendix A of this part.
(3) Parameters monitored pursuant to this paragraph, excluding
damper position, shall be recorded on a rolling averaging period not to
exceed 15 minutes.
(c) When the owner or operator of an affected facility is required
to demonstrate compliance with the standards under Sec. 60.272a(a)(3)
and at any other time that the Administrator may require (under section
114 of the CAA, as amended), the owner or operator shall determine
during periods in which a hood is operated for the purpose of capturing
emissions from the affected facility subject to paragraph (b) of this
section, all damper positions and either the:
(1) Monitor and record the fan motor amperes at each damper
position, and damper position consistent with paragraph (h)(5) of this
section;
(2) Install, calibrate, and maintain a monitoring device that
continuously records the volumetric flow rate through each separately
ducted hood; or
(3) Install, calibrate, and maintain a monitoring device that
continuously records the volumetric flow rate at the control device
inlet and monitor and record the damper position consistent with
paragraph (h)(5) of this section.
(4) Parameters monitored pursuant to this paragraph, excluding
damper position, shall be recorded on a rolling averaging period not to
exceed 15 minutes.
(5) The owner or operator may petition the Administrator or
delegated authority for reestablishment of these parameters whenever
the owner or operator can demonstrate to the Administrator's or
delegated authority's satisfaction that the affected facility
[[Page 58484]]
operating conditions upon which the parameters were previously
established are no longer applicable. The values of the parameters as
determined during the most recent demonstration of compliance shall be
the appropriate operational range or control set point throughout each
applicable period. Operation at values beyond the accepted operational
range or control set point may be subject to the requirements of Sec.
60.276a(c).
(d) Except as provided under paragraph (e) of this section, the
owner or operator shall perform monthly operational status inspections
of the equipment that is important to the performance of the capture
system (i.e., pressure sensors, dampers, and damper switches). This
inspection shall include observations of the physical appearance of the
equipment (e.g., presence of holes in ductwork or hoods, flow
constrictions caused by dents or excess accumulations of dust in
ductwork, and fan erosion) and building inspections to ensure that the
building does not have any holes or other openings for particulate
matter laden air to escape. Any deficiencies that are determined by the
operator to materially impact the efficacy of the capture system shall
be noted and proper maintenance performed.
(e) The owner or operator may petition the Administrator or
delegated authority to approve any alternative to either the monitoring
requirements specified in paragraph (b) of this section or the monthly
operational status inspections specified in paragraph (d) of this
section if the alternative will provide a continuous record of
operation of each emission capture system.
(f) Except as provided for under Sec. 60.273a(d), if emissions
during any phase of the heat cycle are controlled by the use of a DEC
system, the owner or operator shall install, calibrate, and maintain a
monitoring device that allows the pressure in the free space inside the
EAF to be monitored. The pressure shall be recorded as no greater than
15-minute integrated block averages. The monitoring device may be
installed in any appropriate location in the EAF or DEC duct prior to
the introduction of ambient air such that reproducible results will be
obtained. The pressure monitoring device shall have an accuracy of
5 mm of water gauge over its normal operating range and
shall be calibrated according to the manufacturer's instructions.
(g) Except as provided for under Sec. 60.273a(d), when the owner
or operator of an EAF controlled by a DEC is required to demonstrate
compliance with the standard under Sec. 60.272a(a)(3), and at any
other time the Administrator may require (under section 114 of the
Clean Air Act, as amended), the pressure in the free space inside the
furnace shall be determined during the melting and refining period(s)
using the monitoring device required under paragraph (f) of this
section. The owner or operator may petition the Administrator or
delegated authority for reestablishment of the pressure whenever the
owner or operator can demonstrate to the Administrator's or delegated
authority's satisfaction that the EAF operating conditions upon which
the pressures were previously established are no longer applicable. The
pressure range or control setting during the most recent demonstration
of compliance shall be maintained at all times when the EAF is
operating in a melting and refining period. Continuous operation at
pressures higher than the operational range or control setting may be
considered by the Administrator or delegated authority to be
unacceptable operation and maintenance of the affected facility.
(h) During any performance test required under Sec. 60.8, and for
any report thereof required by Sec. 60.276a(f) of this subpart, or to
determine compliance with Sec. 60.272a(a)(3) of this subpart, the
owner or operator shall monitor the following information for all heats
covered by the test:
(1) Charge weights and materials, and tap weights and materials;
(2) Heat times, including start and stop times, and a log of
process operation, including periods of no operation during testing
and, if a furnace static pressure monitoring device is operated
pursuant to paragraph (f) of this section, the pressure inside an EAF
when DEC systems are used;
(3) Control device operation log;
(4) Continuous opacity monitor or EPA Method 9 data, or, as an
alternative to EPA Method 9, according to ASTM D7520-16 (incorporated
by reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271;
(5) All damper positions, no less frequently than performed in the
latest melt shop opacity compliance test for a full heat, if selected
as a method to demonstrate compliance under paragraph (b) of this
section;
(6) Fan motor amperes at each damper position, if selected as a
method to demonstrate compliance under paragraph (b) of this section;
(7) Volumetric air flow rate through each separately ducted hood,
if selected as a method to demonstrate compliance under paragraph (b)
of this section; and
(8) Static pressure at each separately ducted hood, if selected as
a method to demonstrate compliance under paragraph (b) of this section.
(9) Parameters monitored pursuant to paragraphs (h)(6) through (8)
of this section shall be recorded on a rolling averaging period not to
exceed 15 minutes.
0
15. Section 60.275a is amended by:
0
a. Revising paragraphs (a) and (b)(2);
0
b. Adding paragraph (b)(3);
0
c. Revising paragraphs (c) and (e);
0
d. Removing paragraph (h);
0
e. Redesignating paragraphs (i) and (j) as paragraphs (h) and (i) and
revising the newly redesignated paragraph (h).
The revisions and addition read as follows:
Sec. 60.275a Test methods and procedures.
(a) During performance tests required in Sec. 60.8, the owner or
operator shall not add gaseous diluents to the effluent gas stream
after the fabric filter in any pressurized fabric filter collector,
unless the amount of dilution is separately determined and considered
in the determination of emissions.
(b) * * *
(2) Use a method that is acceptable to the Administrator or
delegated authority and that compensates for the emissions from the
facilities not subject to the provisions of this subpart.
(3) Any combination of the criteria of paragraphs (b)(1) and (b)(2)
of this section.
(c) When emission from any EAF(s) or AOD vessel(s) are combined
with emissions from facilities not subject to the provisions of this
subpart, compliance with Sec. 60.272a(a)(3) will be based on emissions
from only the affected facility(ies). The owner or operator may use
operational knowledge to determine the facilities that are the sources,
in whole or in part, of any emissions observed in demonstrations of
compliance with Sec. 60.272a(a)(3).
* * * * *
(e) The owner or operator shall determine compliance with the
particulate matter standards in Sec. 60.272a as follows:
(1) EPA Method 5 (and referenced EPA Methods 1, 2, 3, 3A, 3B, and
4) shall be used for negative-pressure fabric filters and other types
of control devices and EPA Method 5D (and referenced EPA Method 5)
shall be used for positive-pressure fabric filters to determine the
particulate matter concentration and volumetric flow rate of the
effluent gas. The sampling time and sample volume for each run shall be
at least 4 hours and 4.50 dscm (160 dscf) and, when a single EAF or AOD
vessel
[[Page 58485]]
is sampled, the sampling time shall include an integral number of
heats. The manual portions only and not the instrumental portion of the
voluntary consensus standard ANSI/ASME PTC 19.10-1981 (incorporated by
reference, see Sec. 60.17) is an acceptable alternative to EPA Methods
3, 3A, and 3B.
(2) When more than one control device serves the EAF(s) being
tested, the concentration of particulate matter shall be determined
using the following equation:
[GRAPHIC] [TIFF OMITTED] TR25AU23.002
Where:
cst = average concentration of particulate matter, mg/
dscm (gr/dscf).
csi = concentration of particulate matter from control
device ``i'', mg/dscm (gr/dscf).
n = total number of control devices tested.
Qsdi = volumetric flow rate of stack gas from control
device ``i'', dscm/hr (dscf/hr).
(3) EPA Method 9 or, as an alternative, ASTM D7520-16 (incorporated
by reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271, and the procedures of Sec. 60.11 shall be
used to determine opacity.
(4) To demonstrate compliance with Sec. 60.272a(a) (1), (2), and
(3), the EPA Method 9 test runs shall be conducted concurrently with
the particulate matter test runs, unless inclement weather interferes.
* * * * *
(h) Where emissions from any EAF(s) or AOD vessel(s) are combined
with emissions from facilities not subject to the provisions of this
subpart, determinations of compliance with Sec. 60.272a(a)(3) will
only be based upon emissions originating from the affected
facility(ies), except if the combined emissions are controlled by a
common capture system and control device, in which case the owner or
operator may use any of the following procedures during an opacity
performance test and during shop opacity observations:
(1) Base compliance on control of the combined emissions; or
(2) Utilize a method acceptable to the Administrator that
compensates for the emissions from the facilities not subject to the
provisions of this subpart.
(i) Unless the presence of inclement weather makes concurrent
testing infeasible, the owner or operator shall conduct concurrently
the performance tests required under Sec. 60.8 to demonstrate
compliance with Sec. 60.272a(a) (1), (2), and (3) of this subpart.
0
16. Section 60.276a is amended by:
0
a. Revising paragraphs (a) through (c), (e), (f) introductory text,
(f)(3) and (4), (6)(iv), (10), (g), and (h)(3); and
0
b. Adding new paragraphs (i) through (m).
The revisions and additions read as follows:
Sec. 60.276a Recordkeeping and reporting requirements.
(a) Records of the measurements required in Sec. 60.274a must be
retained for at least 5 years following the date of the measurement.
(b) Each owner or operator shall submit a written report of
exceedances of the control device opacity to the Administrator or
delegated authority semi-annually. For the purposes of these reports,
exceedances are defined as all 6-minute periods during which the
average opacity of emissions from the control device is 3 percent or
greater.
(c) Continuous operation at a furnace static pressure that exceeds
the operational range or control setting under Sec. 60.274a(g), for
owners and operators that elect to install a furnace static pressure
monitoring device under Sec. 60.274a(f) or operation at flow rates
lower than those established under Sec. 60.274a(c) may be considered
by the Administrator or delegated authority to be unacceptable
operation and maintenance of the affected facility. Operation at such
values shall be reported to the Administrator or delegated authority
semiannually.
* * * * *
(e) When the owner or operator of an EAF or AOD is required to
demonstrate compliance with the standard under Sec. 60.275a(b)(2) or a
combination of Sec. 60.275a(b)(1) and (b)(2) the owner or operator
shall provide notice to the Administrator or delegated authority of the
procedure(s) that will be used to determine compliance. Notification of
the procedure(s) to be used must be postmarked at least 30 days prior
to the performance test.
(f) For the purpose of this subpart, the owner or operator shall
conduct the demonstration of compliance with Sec. 60.272a(a) of this
subpart and furnish the Administrator or delegated authority with a
written report of the results of the test. This report shall include
the following information:
* * * * *
(3) Make and model of the control device, and continuous opacity
monitoring equipment, if applicable;
(4) Flow diagram of process and emission capture system including
other equipment or process(es) ducted to the same control device;
* * * * *
(6) * * *
(iv) Continuous opacity monitor or EPA Method 9 data, or, as an
alternative to EPA Method 9, according to ASTM D7520-16 (incorporated
by reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271.
* * * * *
(10) Test observers from any outside agency;
* * * * *
(g) The owner or operator shall maintain records of all shop
opacity observations made in accordance with Sec. 60.273a(d). All shop
opacity observations in excess of the emission limit specified in Sec.
60.272a(a)(3) of this subpart shall indicate a period of excess
emissions and shall be reported to the Administrator or delegated
authority semi-annually, according to Sec. 60.7(c) and submitted
according to paragraph (j) of this section. In addition to the
information required at Sec. 60.7(c), the report shall include the
following information:
(1) The company name and address of the affected facility.
(2) An identification of each affected facility being included in
the report.
(3) Beginning and ending dates of the reporting period.
(4) A certification by a certifying official of truth, accuracy,
and completeness. This certification shall state that, based on
information and belief formed after reasonable inquiry, the statements
and information in the document are true, accurate, and complete.
(h) * * *
(3) An identification of the date and time of all bag leak
detection system alarms, the time that procedures to determine the
cause of the alarm were initiated, if procedures were initiated within
1 hour of the alarm, the cause of the alarm, an explanation of the
actions taken, the date and time the cause of the alarm was alleviated,
and if the alarm was alleviated within 24 hours of the alarm.
(i) Within 60 days after the date of completing each performance
test or demonstration of compliance required by this subpart, you must
submit the results of the performance test following the procedures
specified in paragraphs (i)(1) through (3) of this section.
(1) Data collected using test methods supported by the EPA's
Electronic Reporting Tool (ERT) as listed on the EPA's ERT website
(https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test. Submit the results of the
performance test to the EPA via the Compliance and Emissions Data
[[Page 58486]]
Reporting Interface (CEDRI), which can be accessed through the EPA's
Central Data Exchange (CDX) (https://cdx.epa.gov/). The data must be
submitted in a file format generated using the EPA's ERT.
Alternatively, you may submit an electronic file consistent with the
extensible markup language (XML) schema listed on the EPA's ERT
website.
(2) Data collected using test methods that are not supported by the
EPA's ERT as listed on the EPA's ERT website at the time of the test.
The results of the performance test must be included as an attachment
in the ERT or an alternate electronic file consistent with the XML
schema listed on the EPA's ERT website. Submit the ERT generated
package or alternative file to the EPA via CEDRI.
(3) Confidential business information (CBI). Do not use CEDRI to
submit information you claim as CBI. Anything submitted using CEDRI
cannot later be claimed CBI. Although we do not expect persons to
assert a claim of CBI, if you wish to assert a CBI claim for some of
the information submitted under paragraph (i)(1) or (2) of this
section, you must submit a complete file, including information claimed
to be CBI, to the EPA. The file must be generated using the EPA's ERT
or an alternate electronic file consistent with the XML schema listed
on the EPA's ERT website. The preferred method to submit CBI is for it
to be transmitted electronically using email attachments, File Transfer
Protocol (FTP), or other online file sharing services (e.g., Dropbox,
OneDrive, Google Drive). Electronic submissions must be transmitted
directly to the OAQPS CBI Office at the email address [email protected],
and should include clear CBI markings and note the docket ID. If
assistance is needed with submitting large electronic files that exceed
the file size limit for email attachments, and if you do not have your
own file sharing service, please email [email protected] to request a
file transfer link. If sending CBI information through the postal
service, submit the file on a compact disc, flash drive, or other
commonly used electronic storage medium and clearly mark the medium as
CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office,
Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old
Page Rd., Durham, NC 27703. The same file with the CBI omitted must be
submitted to the EPA via the EPA's CDX as described in paragraphs
(i)(1) and (2) of this section. All CBI claims must be asserted at the
time of submission. Furthermore, under CAA section 114(c), emissions
data is not entitled to confidential treatment, and the EPA is required
to make emissions data available to the public. Thus, emissions data
will not be protected as CBI and will be made publicly available.
(j) You must submit a report of excess emissions and monitoring
systems performance report according to Sec. 60.7(c) to the
Administrator semiannually. Submit all reports to the EPA via CEDRI,
which can be accessed through the EPA's CDX (https://cdx.epa.gov/). The
EPA will make all the information submitted through CEDRI available to
the public without further notice to you. Do not use CEDRI to submit
information you claim as CBI. Anything submitted using CEDRI cannot
later be claimed CBI. You must use the appropriate electronic report
template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart. The date report
templates become available will be listed on the CEDRI website. The
report must be submitted by the deadline specified in this subpart,
regardless of the method in which the report is submitted. Although we
do not expect persons to assert a claim of CBI, if you wish to assert a
CBI claim, follow paragraph (i)(3) of this section except send to the
attention of the Electric Arc Furnace Sector Lead. The same file with
the CBI omitted must be submitted to the EPA via the EPA's CDX as
described earlier in this paragraph (j). All CBI claims must be
asserted at the time of submission. Furthermore, under CAA section
114(c), emissions data is not entitled to confidential treatment, and
the EPA is required to make emissions data available to the public.
Thus, emissions data will not be protected as CBI and will be made
publicly available.
(k) If you are required to electronically submit a report through
CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for
failure to timely comply with that reporting requirement. To assert a
claim of EPA system outage, you must meet the requirements outlined in
paragraphs (k)(1) through (7) of this section.
(1) You must have been or will be precluded from accessing CEDRI
and submitting a required report within the time prescribed due to an
outage of either the EPA's CEDRI or CDX systems.
(2) The outage must have occurred within the period of time
beginning five business days prior to the date that the submission is
due.
(3) The outage may be planned or unplanned.
(4) You must submit notification to the Administrator in writing as
soon as possible following the date you first knew, or through due
diligence should have known, that the event may cause or has caused a
delay in reporting.
(5) You must provide to the Administrator a written description
identifying:
(i) The date(s) and time(s) when CDX or CEDRI was accessed and the
system was unavailable;
(ii) A rationale for attributing the delay in reporting beyond the
regulatory deadline to EPA system outage;
(iii) A description of measures taken or to be taken to minimize
the delay in reporting; and
(iv) The date by which you propose to report, or if you have
already met the reporting requirement at the time of the notification,
the date you reported.
(6) The decision to accept the claim of EPA system outage and allow
an extension to the reporting deadline is solely within the discretion
of the Administrator.
(7) In any circumstance, the report must be submitted
electronically as soon as possible after the outage is resolved.
(l) If you are required to electronically submit a report through
CEDRI in the EPA's CDX, you may assert a claim of force majeure for
failure to timely comply with that reporting requirement. To assert a
claim of force majeure, you must meet the requirements outlined in
paragraphs (l)(1) through (5) of this section.
(1) You may submit a claim if a force majeure event is about to
occur, occurs, or has occurred or there are lingering effects from such
an event within the period of time beginning five business days prior
to the date the submission is due. For the purposes of this section, a
force majeure event is defined as an event that will be or has been
caused by circumstances beyond the control of the affected facility,
its contractors, or any entity controlled by the affected facility that
prevents you from complying with the requirement to submit a report
electronically within the time period prescribed. Examples of such
events are acts of nature (e.g., hurricanes, earthquakes, or floods),
acts of war or terrorism, or equipment failure or safety hazard beyond
the control of the affected facility (e.g., large scale power outage).
(2) You must submit notification to the Administrator in writing as
soon as possible following the date you first knew, or through due
diligence should have known, that the event may cause or has caused a
delay in reporting.
(3) You must provide to the Administrator:
(i) A written description of the force majeure event;
[[Page 58487]]
(ii) A rationale for attributing the delay in reporting beyond the
regulatory deadline to the force majeure event;
(iii) A description of measures taken or to be taken to minimize
the delay in reporting; and
(iv) The date by which you propose to report, or if you have
already met the reporting requirement at the time of the notification,
the date you reported.
(4) The decision to accept the claim of force majeure and allow an
extension to the reporting deadline is solely within the discretion of
the Administrator.
(5) In any circumstance, the reporting must occur as soon as
possible after the force majeure event occurs.
(m) Any records required to be maintained by this subpart that are
submitted electronically via the EPA's CEDRI may be maintained in
electronic format. This ability to maintain electronic copies does not
affect the requirement for facilities to make records, data, and
reports available upon request to a delegated air agency or the EPA as
part of an on-site compliance evaluation.
0
17. Add subpart AAb to part 60 to read as follows:
Subpart AAb--Standards of Performance for Steel Plants: Electric
Arc Furnaces and Argon-Oxygen Decarbonization Vessels Constructed
After May 16, 2022
Sec.
Sec. 60.270b Applicability and designation of affected facility.
Sec. 60.271b Definitions
Sec. 60.272b Standard for particulate matter.
Sec. 60.273b Emission monitoring
Sec. 60.274b Monitoring of operations
Sec. 60.275b Test methods and procedures.
Sec. 60.276b Recordkeeping and reporting requirements.
Sec. 60.270b Applicability and designation of affected facility.
(a) The provisions of this subpart are applicable to the following
affected facilities in steel plants that produce carbon, alloy, or
specialty steels: electric arc furnaces (EAF), argon-oxygen
decarburization (AOD) vessels, and dust-handling systems.
(b) The provisions of this subpart apply to each affected facility
identified in paragraph (a) of this section that commences
construction, modification, or reconstruction after May 16, 2022.
Sec. 60.271b Definitions
As used in this subpart, all terms not defined herein shall have
the meaning given them in the Act and in subpart A of this part.
Argon-oxygen decarburization vessel (AOD vessel) means any closed-
bottom, refractory-lined converter vessel with submerged tuyeres
through which gaseous mixtures containing argon and oxygen or nitrogen
may be blown into molten steel for further refining.
Bag leak detection system means a system that is capable of
continuously monitoring relative particulate matter (dust) loadings in
the exhaust of a baghouse to detect bag leaks and other conditions that
result in increases in particulate loadings. A bag leak detection
system includes, but is not limited to, an instrument that operates on
triboelectric, electrodynamic, light scattering, light transmittance,
or other effect to continuously monitor relative particulate matter
loadings.
Capture system means the equipment (including ducts, hoods, fans,
dampers, etc.) used to capture particulate matter generated by the
operation of an electric arc furnace (EAF) or AOD vessel and transport
captured particulate matter to the air pollution control device.
Charge means the addition of iron and steel scrap or other
materials into the shell of an EAF or the addition of molten steel or
other materials into the top of an AOD vessel.
Charging period means the time period when iron and steel scrap or
other materials are added into the top of an EAF until the melting and
refining period commences.
Control device means the air pollution control equipment used to
remove particulate matter from the effluent gas stream generated by an
EAF or AOD vessel.
Damper means any device used to open, close or throttle a DEC
system or hood designed to capture emissions from an EAF or AOD vessel
and route them to the associated control device(s). It does not include
isolation dampers used to isolate a fan or baghouse compartment for
repair or cleaning, or dampers controlling collection of emissions from
equipment other than an EAF or AOD vessel.
Direct-shell evacuation control system (DEC system) means a system
that designed to create and maintain a negative pressure within the EAF
shell during melting and refining, and transports emissions to the
control device.
Dust-handling system means equipment used to handle particulate
matter collected by the control device for an EAF or AOD vessel subject
to this subpart. For the purposes of this subpart, the dust-handling
system shall consist of the control device dust hoppers, the dust-
conveying equipment, any silo, dust storage equipment, the dust-
treating equipment (e.g., pug mill, pelletizer), dust transfer
equipment (including, but not limited to transfers from a silo to a
truck or rail car), and any secondary control devices used with the
dust transfer equipment.
Electric arc furnace (EAF) means a furnace that produces molten
steel and heats the charge materials with electricity using-carbon
electrodes. For the purposes of this subpart, an EAF shall consist of
the furnace shell and roof and the transformer. Furnaces that
continuously feed direct-reduced iron ore pellets as the primary source
of iron are not affected facilities within the scope of this
definition.
Electric arc furnace facility means the EAF(s) or AOD(s) subject to
this rule and the air pollution control equipment used to remove
particulate matter from the effluent gas stream generated by the EAF(s)
or AOD(s).
Furnace static pressure means the pressure exerted by the flow of
air at the walls of the furnace, perpendicular to the flow, measured
using a manometer or equivalent device to determine pressure inside an
EAF when DEC systems are used or pressure in the free space inside the
EAF.
Heat cycle means the period beginning when scrap is charged to an
EAF shell and ending when the EAF tap is completed or beginning when
molten steel is charged to an AOD vessel and ending when the AOD vessel
tap is completed.
Melting means that phase of steel production cycle during which the
iron and steel scrap is heated to the molten state.
Melting and refining period means the time period commencing at the
initial energizing of the electrode to begin the melting process and
ending at the initiation of the tapping period, excluding any
intermediate times when the electrodes are not energized as part of the
melting process.
Modified facility means any physical or operational change to an
existing facility which results in an increase in the emission rate (in
kilograms per hour) to the atmosphere of any pollutant to which a
standard applies. Upon modification, an existing facility shall become
an affected facility for each pollutant to which a standard applies and
for which there is an increase in the emission rate to the atmosphere.
See Sec. 60.14.
Negative-pressure fabric filter means a fabric filter with the fans
on the downstream side of the filter bags.
Positive-pressure fabric filter means a fabric filter with the fans
on the upstream side of the filter bags.
Reconstructed facility means an existing facility which upon
reconstruction becomes an affected
[[Page 58488]]
facility, irrespective of any change in emission rate, due to the
replacement of components of an existing facility to such an extent
that the fixed capital cost of the new components exceeds 50 percent of
the fixed capital cost that would be required to construct a comparable
entirely new facility, where ``fixed capital cost'' means the capital
needed to provide all the depreciable components, and it is
technologically and economically feasible to meet the applicable
standards set forth in this subpart after reconstruction.
Refining means that phase of the steel production cycle during
which impurities are removed from the molten steel and alloys are added
to reach the final metal chemistry.
Shop means the building that houses one or more EAF's or AOD
vessels and serves as the point from which compliance with Sec.
60.272b(a)(3), ``Standard for Particulate Matter,'' is measured.
Shop opacity means the arithmetic average of 24 observations of the
opacity of any EAF or AOD emissions emanating from, and not within, the
shop, during melting and refining, and during tapping, taken in
accordance with EPA Method 9 of appendix A of this part, and during
charging, according to the procedures in section 2.5 of Method 9 in
appendix A to part 60 of this chapter, with the modification to
determine the 3-minute block average opacity from the average of 12
consecutive observations recorded at 15-second intervals. For the daily
opacity observation during melting and refining, during charging, and
during tapping, facilities may measure opacity by EPA Method 22 of
appendix A of this part, modified to require the recording of the
aggregate duration of visible emissions at 15 second intervals.
Alternatively, ASTM D7520-16 (incorporated by reference, see Sec.
60.17), may be used with the following five conditions:
(1) During the digital camera opacity technique (DCOT)
certification procedure outlined in Section 9.2 of ASTM D7520-16
(incorporated by reference, see Sec. 60.17), the owner or operator or
the DCOT vendor must present the plumes in front of various backgrounds
of color and contrast representing conditions anticipated during field
use such as blue sky, trees, and mixed backgrounds (clouds and/or a
sparse tree stand);
(2) The owner or operator must also have standard operating
procedures in place including daily or other frequency quality checks
to ensure the equipment is within manufacturing specifications as
outlined in Section 8.1 of ASTM D7520-16 (incorporated by reference,
see Sec. 60.17);
(3) The owner or operator must follow the recordkeeping procedures
outlined in Sec. 60.7(f) for the DCOT certification, compliance
report, data sheets, and all raw unaltered JPEGs used for opacity and
certification determination;
(4) The owner or operator or the DCOT vendor must have a minimum of
four independent technology users apply the software to determine the
visible opacity of the 300 certification plumes. For each set of 25
plumes, the user may not exceed 15 percent opacity of anyone reading
and the average error must not exceed 7.5 percent opacity;
(5) Use of this approved alternative does not provide or imply a
certification or validation of any vendor's hardware or software. The
onus to maintain and verify the certification and/or training of the
DCOT camera, software, and operator in accordance with ASTM D7520-16
(incorporated by reference, see Sec. 60.17) and these requirements is
on the facility, DCOT operator, and DCOT vendor.
Static pressure means the pressure exerted by the flow of air at
the furnace walls, perpendicular to the flow, measured using a
manometer or equivalent device. This refers to either furnace static
pressure, or static pressure in air ducts, or pressure in the EAF
capture system, i.e., static pressure at each separately ducted hood]
Tap means the pouring of molten steel from an EAF or AOD vessel.
Tapping period means the time period commencing at the moment an
EAF begins to pour molten steel and ending either three minutes after
steel ceases to flow from an EAF, or six minutes after steel begins to
flow, whichever is longer.
Sec. 60.272b Standard for particulate matter.
(a) On and after the date of which the performance tests required
to be conducted by Sec. 60.8 or Sec. 60.272b(d) are completed, no
owner or operator subject to the provisions of this subpart shall cause
to be discharged into the atmosphere from an EAF or an AOD vessel any
gases which:
(1) Exit from control devices at the facility and contain
particulate matter as a total for the facility in excess of 79 mg/kg
steel produced (0.16 lb/ton steel produced) for the facility;
(2) Exit from a control device and exhibit 3 percent opacity or
greater, as measured in accordance with EPA Method 9 of appendix A of
this part, or, as an alternative, according to ASTM D7520-16
(incorporated by reference, see Sec. 60.17), with the caveats
described under Shop opacity in Sec. 60.271; and
(3) Exit from a shop and, due solely to the operations of any
affected EAF(s) or AOD vessel(s) during melting and refining exhibit
greater than 0 percent opacity, and during charging exhibit greater
than 6 percent opacity, as measured in accordance with EPA Method 9 of
appendix A of this part, and during charging, exhibit greater than 6
percent opacity, as measured according to the procedures in section 2.5
of Method 9 in appendix A to part 60 of this chapter, with the
modification of this section of Method 9 to determine the 3-minute
block average opacity from the average of 12 consecutive observations
recorded at 15-second intervals; or, as an alternative, according to
ASTM D7520-16 (incorporated by reference, see Sec. 60.17), with the
caveats described under Shop opacity in Sec. 60.271 or, for the daily
opacity observations, exhibit 0 seconds of visible emissions as
measured by EPA Method 22 of appendix A of this part, modified to
require the recording of the aggregate duration of visible emissions at
15 second intervals. Shop opacity shall be recorded for any point(s)
during melting and refining, during charging, and during tapping where
visible emissions are observed. Where it is possible to determine that
a number of visible emission sites relate to only one incident of
visible emissions during melting and refining, during charging, or
during tapping, only one observation of shop opacity or visible
emissions will be required during melting and refining, during
charging, or during tapping. In this case, the shop opacity or visible
emissions observations must be made for the point of highest emissions
during melting and refining, during charging, or during tapping that
directly relates to the cause (or location) of visible emissions
observed during a single incident.
(b) On and after the date on which the performance tests required
to be conducted by Sec. 60.8 or Sec. 60.272b(d) are completed, no
owner or operator subject to the provisions of this subpart shall cause
to be discharged into the atmosphere from the dust-handling system any
gases that exhibit 10 percent opacity or greater, as measured in
accordance with EPA Method 9 of appendix A of this part, or, as an
alternative, according to ASTM D7520-16 (incorporated by reference, see
Sec. 60.17), with the caveats described under Shop opacity in Sec.
60.271.
(c) The standards in paragraphs (a) and (b) apply at all times. The
exemptions to opacity standards under Sec. 60.11(c) do not apply to
this subpart. As provided in Sec. 60.11(f), this provision supersedes
the exemptions for periods
[[Page 58489]]
of startup, shutdown and malfunction in the Part 60 general provisions
in Subpart A.
(d) Performance tests required to be conducted to show compliance
with the standards in paragraph (a) of this section shall be repeated
at least every 5 years after the performance tests required by Sec.
60.8 are conducted.
Sec. 60.273b Emission monitoring
(a) Except as provided under paragraphs (b) and (c) of this
section, a continuous monitoring system for the measurement of the
opacity of emissions discharged into the atmosphere from the control
device(s) shall be installed, calibrated, maintained, and operated by
the owner or operator subject to the provisions of this subpart.
(b) No continuous monitoring system shall be required on any
control device serving the dust-handling system.
(c) A continuous monitoring system for the measurement of the
opacity of emissions discharged into the atmosphere from the control
device(s) is not required on any modular, multi-stack, negative-
pressure or positive-pressure fabric filter or on any single-stack
fabric filter if observations of the opacity of the visible emissions
from the control device are performed by a certified visible emission
observer and the owner installs and operates a bag leak detection
system according to paragraph (e) of this section whenever the control
device is being used to remove particulate matter from the EAF or AOD.
Visible emission observations shall be conducted at least once per day
on the control device for at least three 6-minute periods when the
furnace is operating in the melting and refining period. All visible
emissions observations shall be conducted in accordance with EPA Method
9, or, as an alternative, according to ASTM D7520-16 (incorporated by
reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271. If visible emissions occur from more than one
point, the opacity shall be recorded for any points where visible
emissions are observed. Where it is possible to determine that a number
of visible emission points relate to only one incident of the visible
emission, only one set of three 6-minute observations will be required.
In that case, the EPA Method 9 observations must be made for the point
of highest opacity that directly relates to the cause (or location) of
visible emissions observed during a single incident. Records shall be
maintained of any 6-minute average that is in excess of the emission
limit specified in Sec. 60.272b(a)(2).
(d) A furnace static pressure monitoring device is not required on
any EAF equipped with a DEC system if observations of shop opacity are
performed by a certified visible emission observer as follows:
(1) At least once per day when the furnace is operating.
(2) No less than once per week, commencing from the tap of one EAF
heat cycle to the tap of the following heat cycle. A melt shop with
more than one EAF shall conduct these readings while both EAFs are in
operation. Both EAFs are not required to be on the same schedule for
tapping.
(3) Shop opacity shall be determined as the arithmetic average of
24 consecutive 15-second opacity observations of emissions from the
shop taken in accordance with EPA Method 9 during melting and refining
and during tapping; and during charging determined according to the
procedures in section 2.5 of Method 9 in appendix A to part 60 of this
chapter, with the modification to determine the 3-minute block average
opacity from the average of 12 consecutive observations recorded at 15-
second intervals; or, as an alternative, according to ASTM D7520-16
(incorporated by reference, see Sec. 60.17), with the caveats
described under Shop opacity in Sec. 60.271, or as the total duration
of visible emissions measured according to EPA Method 22 over a six
minute period, modified to require the recording of the aggregate
duration of visible emissions at 15 second intervals. Shop opacity
shall be recorded for any point(s) where visible emissions are
observed. Where it is possible to determine that a number of visible
emission points relate to only one incident of visible emissions, only
one observation of shop opacity will be required. In this case, the
shop opacity observations must be made for the point of highest opacity
that directly relates to the cause (or location) of visible emissions
observed during a single incident. Shop opacity shall be determined
daily during melting and refining, during charging, and during tapping.
(e) A bag leak detection system must be installed on all fabric
filters and operated on all single-stack fabric filters whenever the
control device is being used to remove particulate matter from the EAF
or AOD vessel if the owner or operator elects not to install and
operate a continuous opacity monitoring system as provided for under
paragraph (c) of this section. In addition, the owner or operator shall
meet the visible emissions observation requirements in paragraph (c) of
this section. The bag leak detection system must meet the
specifications and requirements of paragraphs (e)(1) through (8) of
this section.
(1) The bag leak detection system must be certified by the
manufacturer to be capable of detecting particulate matter emissions at
a concentrations of 1 milligram per actual cubic meter (0.00044 grains
per actual cubic foot) or less.
(2) The bag leak detection system sensor must provide output of
relative particulate matter loadings and the owner or operator shall
continuously record the output from the bag leak detection system using
electronic or other means (e.g., using a strip chart recorder or a data
logger.)
(3) The bag leak detection system must be equipped with an alarm
system that will activate when an increase in relative particulate
loading is detected over the alarm set point established according to
paragraph (e)(4) of this section, and the alarm must be located such
that it can be identified by the appropriate plant personnel.
(4) For each bag leak detection system required by paragraph (e) of
this section, the owner or operator shall develop and submit to the
Administrator or delegated authority, for approval, a site-specific
monitoring plan that addresses the items identified in paragraphs (i)
through (v) of this paragraph (e)(4). For each bag leak detection
system that operates based on the triboelectric effect, the monitoring
plan shall be consistent with the recommendations contained in EPA-454/
R-98-015, ``Fabric Filter Bag Leak Detection Guidance'' (incorporated
by reference, see Sec. 60.17). The owner or operator shall operate and
maintain the bag leak detection system according to the site-specific
monitoring plan at all times. The plan shall describe the following:
(i) Installation of the bag leak detection system;
(ii) Initial and periodic adjustment of the bag leak detection
system including how the alarm set-point will be established;
(iii) Operation of the bag leak detection system including quality
assurance procedures;
(iv) How the bag leak detection system will be maintained including
a routine maintenance schedule and spare parts inventory list; and
(v) How the bag leak detection system output shall be recorded and
stored.
(5) The initial adjustment of the system shall, at a minimum,
consist of establishing the baseline output by adjusting the
sensitivity (range) and the averaging period of the device, and
establishing the alarm set points and the alarm delay time (if
applicable).
[[Page 58490]]
(6) Following initial adjustment, the owner or operator shall not
adjust the averaging period, alarm set point, or alarm delay time
without approval from the Administrator or delegated authority except
as provided for in paragraphs (e)(6)(i) and (ii) of this section.
(i) Once per quarter, the owner or operator may adjust the
sensitivity of the bag leak detection system to account for seasonal
effects including temperature and humidity according to the procedures
identified in the site-specific monitoring plan required under
paragraph (e)(4) of this section.
(ii) If opacities greater than 0 percent are observed over four
consecutive 15-second observations during the daily opacity
observations required under paragraph (c) of this section and the alarm
on the bag leak detection system alarm is not activated, the owner or
operator shall lower the alarm set point on the bag leak detection
system to a point where the alarm would have been activated during the
period when the opacity observations were made.
(7) For negative pressure, induced air baghouses, and positive
pressure baghouses that are discharged to the atmosphere through a
stack, the bag leak detection sensor must be installed downstream of
the baghouse or upstream of any wet scrubber.
(8) Where multiple detectors are required, the system's
instrumentation and alarm may be shared among detectors.
(f) For each bag leak detection system installed according to
paragraph (e) of this section, the owner or operator shall initiate
procedures to determine the cause of all alarms within 1 hour of an
alarm. The cause of the alarm must be alleviated within 24 hours of the
time the alarm occurred by taking whatever response action(s) are
necessary. Response actions may include, but are not limited to, the
following:
(1) Inspecting the baghouse for air leaks, torn or broken bags or
filter media, or any other condition that may have caused an increase
in particulate emissions;
(2) Sealing off defective bags or filter media;
(3) Replacing defective bags or filter media or otherwise repairing
the control device;
(4) Sealing off a defective baghouse compartment;
(5) Cleaning the bag leak detection system probe or otherwise
repairing the bag leak detection system;
(6) Establishing to the extent acceptable by the delegated
authority that the alarm was a false alarm and not caused by a bag leak
or other malfunction that could reasonably result in excess particulate
emissions; and
(7) Shutting down the process producing the particulate emissions.
(g) In approving the site-specific monitoring plan required in
paragraph (e)(4) of this section, the Administrator or delegated
authority may allow owners or operators more than 24 hours to alleviate
specific conditions that cause an alarm if the owner or operator
identifies the condition that could lead to an alarm in the monitoring
plan, adequately explains why it is not feasible to alleviate the
condition within 24 hours of the time the alarm occurred, and
demonstrates that the requested additional time will ensure alleviation
of the condition as expeditiously as practicable.
Sec. 60.274b Monitoring of operations.
(a) The owner or operator subject to the provisions of this subpart
shall maintain records of the following information:
(1) All data obtained under paragraph (b) of this section; and
(2) All monthly operational status inspections performed under
paragraph (c) of this section.
(b) Except as provided under paragraph (e) of this section, the
owner or operator subject to the provisions of this subpart shall
conduct the following monitoring of the capture system to demonstrate
continuous compliance:
(1) If a DEC system is in use, according to paragraph (f) of this
section, monitor and record on a continuous basis the furnace static
pressure and any one of (2) through (4) in this paragraph:
(2) Monitor and record the fan motor amperes at each damper
position, and damper position consistent with paragraph (h)(5) of this
section;
(3) Install, calibrate, and maintain a monitoring device that
continuously records the volumetric air flow rate or static pressure at
each separately ducted hood; or
(4) Install, calibrate, and maintain a monitoring device that
continuously records the volumetric flow rate at the control device
inlet and monitor and record the damper position consistent with
paragraph (h)(5) of this section.
(5) The static pressure monitoring device(s) shall be installed in
an EAF or DEC duct prior to combining with other ducts and prior to the
introduction of ambient air, at a location that has no flow disturbance
due to the junctions.
(6) The volumetric flow monitoring device(s) may be installed in
any appropriate location in the capture system such that reproducible
flow rate monitoring will result. The flow rate monitoring device(s)
shall have an accuracy of 10 percent over its normal
operating range and shall be calibrated according to the manufacturer's
instructions. The Administrator may require the owner or operator to
demonstrate the accuracy of the monitoring device(s) relative to EPA
Methods 1 and 2 of appendix A of this part.
(7) Parameters monitored pursuant to this paragraph, excluding
damper position, shall be recorded on a rolling averaging period not to
exceed 15 minutes.
(c) When the owner or operator of an affected facility is required
to demonstrate compliance with the standards under Sec. 60.272b(a)(3)
and at any other time that the Administrator may require (under section
114 of the CAA, as amended), the owner or operator shall determine
during all periods in which a hood is operated for the purpose of
capturing emissions from the affected facility subject to paragraph (b)
of this section, either:
(1) Monitor and record the fan motor amperes at each damper
position, and damper position consistent with paragraph (h)(5) of this
section;
(2) install, calibrate, and maintain a monitoring device that
continuously records the volumetric flow rate through each separately
ducted hood; or
(3) install, calibrate, and maintain a monitoring device that
continuously records the volumetric flow rate at the control device
inlet and monitor and record the damper position consistent with
paragraph (h)(5) of this section.
(4) Parameters monitored pursuant to this paragraph, excluding
damper position, shall be recorded on a rolling averaging period not to
exceed 15 minutes.
(5) The owner or operator may petition the Administrator or
delegated authority for reestablishment of these parameters whenever
the owner or operator can demonstrate to the Administrator's or
delegated authority's satisfaction that the affected facility operating
conditions upon which the parameters were previously established are no
longer applicable. The values of the parameters as determined during
the most recent demonstration of compliance shall be the appropriate
operational range or control set point throughout each applicable
period. Operation at values beyond the accepted operational range or
control set point may be subject to the requirements of Sec.
60.276b(c).
(d) Except as provided under paragraph (e) of this section, the
owner or operator shall perform monthly operational status inspections
of the
[[Page 58491]]
equipment that is important to the performance of the capture system
(i.e., pressure sensors, dampers, and damper switches). This inspection
shall include observations of the physical appearance of the equipment
(e.g., presence of holes in ductwork or hoods, flow constrictions
caused by dents or excess accumulations of dust in ductwork, and fan
erosion) and building inspections to ensure that the building does not
have any holes or other openings for particulate matter laden air to
escape. Any deficiencies that are determined by the operator to
materially impact the efficacy of the capture system shall be noted and
proper maintenance performed.
(e) The owner or operator may petition the Administrator or
delegated authority to approve any alternative to either the monitoring
requirements specified in paragraph (b) of this section or the monthly
operational status inspections specified in paragraph (d) of this
section if the alternative will provide a continuous record of
operation of each emission capture system.
(f) Except as provided under Sec. 60.273b(d), if emissions during
any phase of the heat cycle are controlled by the use of a DEC system,
the owner or operator shall install, calibrate, and maintain a
monitoring device that allows the pressure in the free space inside the
EAF to be monitored. The pressure shall be recorded as no greater than
15-minute integrated block averages. The monitoring device may be
installed in any appropriate location in the EAF or DEC duct prior to
the introduction of ambient air such that reproducible results will be
obtained. The pressure monitoring device shall have an accuracy of
5 mm of water gauge over its normal operating range and
shall be calibrated according to the manufacturer's instructions.
(g) When the owner or operator of an EAF controlled by a DEC is
required to demonstrate compliance with the standard under Sec.
60.272b(a)(3), and at any other time the Administrator may require
(under section 114 of the Clean Air Act, as amended), the pressure in
the free space inside the furnace shall be determined during the
melting and refining period(s) using the monitoring device required
under paragraph (f) of this section. The owner or operator may petition
the Administrator or delegated authority for reestablishment of the
pressure whenever the owner or operator can demonstrate to the
Administrator's or delegated authority's satisfaction that the EAF
operating conditions upon which the pressures were previously
established are no longer applicable. The pressure range or control
setting during the most recent demonstration of compliance shall be
maintained at all times when the EAF is operating in a melting and
refining period. Continuous operation at pressures higher than the
operational range or control setting may be considered by the
Administrator or delegated authority to be unacceptable operation and
maintenance of the affected facility.
(h) During any performance test required under Sec. 60.8 or Sec.
60.272b(d), and for any report thereof required by Sec. 60.276b(f) of
this subpart, or to determine compliance with Sec. 60.272b(a)(3) of
this subpart, the owner or operator shall monitor the following
information for all heats covered by the test:
(1) Charge weights and materials, and tap weights and materials;
(2) Heat times, including start and stop times, and a log of
process operation, including periods of no operation during testing
and, if a furnace static pressure monitoring device is operated
pursuant to paragraph (f) of this section, the pressure inside an EAF
when DEC systems are used;
(3) Control device operation log;
(4) Continuous opacity monitor (COM) or EPA Method 9 data, or, as
an alternative to EPA Method 9, according to ASTM D7520-16
(incorporated by reference, see Sec. 60.17), with the caveats
described under Shop opacity in Sec. 60.271;
(5) All damper positions, no less frequently than performed in the
latest melt shop opacity compliance test for a full heat, if selected
as a method to demonstrate compliance under paragraph (b) of this
section;
(6) Fan motor amperes at each damper position, if selected as a
method to demonstrate compliance under paragraph (b) of this section;
(7) Volumetric air flow rate through each separately ducted hood,
if selected as a method to demonstrate compliance under paragraph (b)
of this section; and
(8) Static pressure at each separately ducted hood, if selected as
a method to demonstrate compliance under paragraph (b) of this section.
(9) Parameters monitored pursuant to paragraphs (h)(6)-(8) of this
section shall be recorded on a rolling averaging period not to exceed
15 minutes.
Sec. 60.275b Test methods and procedures.
(a) During performance tests required in Sec. Sec. 60.8 and
60.272b(d), the owner or operator shall not add gaseous diluents to the
effluent gas stream after the fabric filter in any pressurized fabric
filter collector, unless the amount of dilution is separately
determined and considered in the determination of emissions.
(b) When emissions from any EAF(s) or AOD vessel(s) are combined
with emissions from facilities not subject to the provisions of this
subpart but controlled by a common capture system and control device,
the owner or operator shall use any one of the following procedures
during a performance test (see also Sec. 60.276b(e)):
(1) Determine compliance using the combined emissions.
(2) Use a method that is acceptable to the Administrator or
delegated authority and that compensates for the emissions from the
facilities not subject to the provisions of this subpart.
(3) Any combination of the criteria of paragraphs (b)(1) and (2) of
this section.
(c) When emission from any EAF(s) or AOD vessel(s) are combined
with emissions from facilities not subject to the provisions of this
subpart, compliance with Sec. 60.272b(a)(3) will be based on emissions
from only the affected facility(ies). The owner or operator may use
operational knowledge to determine the facilities that are the sources,
in whole or in part, of any emissions observed in demonstrations of
compliance with Sec. 60.272b(a)(3).
(d) In conducting the performance tests required in Sec. Sec. 60.8
and 60.272b(d), the owner or operator shall use as reference methods
and procedures the test methods in appendix A of this part or other
methods and procedures as specified in this section, except as provided
in Sec. 60.8(b).
(e) The owner or operator shall determine compliance with the
particulate matter standards in Sec. 60.272b as follows:
(1) EPA Method 5 (and referenced EPA Methods 1, 2, 3, 3A, 3B, and
4) shall be used for negative-pressure fabric filters and other types
of control devices and EPA Method 5D (and referenced EPA Method 5)
shall be used for positive-pressure fabric filters to determine the
particulate matter concentration and volumetric flow rate of the
effluent gas. The sampling time and sample volume for each run shall be
at least 4 hours and 4.50 dry standard cubic meter (160 dry standard
cubic feet) and, when a single EAF or AOD vessel is sampled, the
sampling time shall include an integral number of heats. The manual
portions only (not the instrumental portion) of the voluntary consensus
standard ANSI/ASME PTC 19.10-1981 (incorporated by reference, see Sec.
60.17) are acceptable alternatives to EPA Methods 3, 3A, and 3B.
[[Page 58492]]
(2) When more than one control device serves the EAF(s) being
tested, the concentration of particulate matter shall be determined
using the following equation:
[GRAPHIC] [TIFF OMITTED] TR25AU23.003
where:
Esf = average emission rate of particulate matter, mg/kg
(lb/ton).
Rsi = emission rate of particulate matter from control
device ``i'', mg/hr (lb/hr).
n = total number of control devices at the facility.
Pi = steel production rate during testing of control
device ``i'', kg/hr (ton/hr).
(3) EPA Method 9 or, as an alternative, ASTM D7520-16 (incorporated
by reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271, and the procedures of Sec. 60.11 shall be
used to determine opacity.
(4) To demonstrate compliance with Sec. 60.272b(a) (1), (2), and
(3), the EPA Method 9 test runs shall be conducted concurrently with
the particulate matter test runs, unless inclement weather interferes.
(f) To comply with Sec. 60.274b(c), (f), (g), and (h), the owner
or operator shall obtain the information required in these paragraphs
during the particulate matter runs.
(g) Any control device subject to the provisions of the subpart
shall be designed and constructed to allow measurement of emissions
using applicable test methods and procedures.
(h) Where emissions from any EAF(s) or AOD vessel(s) are combined
with emissions from facilities not subject to the provisions of this
subpart, determinations of compliance with Sec. 60.272b(a)(1), (2),
and (3) will only be based upon emissions originating from the affected
facility(ies), except if the combined emissions are controlled by a
common capture system and control device, in which case the owner or
operator may use any of the following procedures during an opacity
performance test and during shop opacity observations:
(1) Base compliance on control of the combined emissions; or
(2) Utilize a method acceptable to the Administrator that
compensates for the emissions from the facilities not subject to the
provisions of this subpart.
(3) Any combination of the criteria of paragraphs (h)(1) and (2) of
this section.
(i) Unless the presence of inclement weather makes concurrent
testing infeasible, the owner or operator shall conduct concurrently
the performance tests required under Sec. 60.8 or Sec. 60.272b(d) to
demonstrate compliance with Sec. 60.272b(a)(1), (2), and (3) of this
subpart.
Sec. 60.276b Recordkeeping and reporting requirements.
(a) Records of the measurements required in Sec. 60.274b must be
retained for at least 5 years following the date of the measurement.
(b) Each owner or operator shall submit a written report of
exceedances of the control device opacity to the Administrator or
delegated authority semi-annually. For the purposes of these reports,
exceedances are defined as all 6-minute periods during which the
average opacity of emissions from the control device is 3 percent or
greater or, where the daily shop opacity visible emissions were
measured according to EPA Method 22 and exceeded 0 seconds.
(c) Operation at a furnace static pressure that exceeds the
operational range or control setting under Sec. 60.274b(g), for owners
and operators that elect to install a furnace static pressure
monitoring device under 60.274b(f) or operation ranges or control
settings outside of those established under Sec. 60.274b(c) may be
considered by the Administrator or delegated authority to be
unacceptable operation and maintenance of the affected facility.
Operation at such values shall be reported to the Administrator or
delegated authority semiannually.
(d) The requirements of this section remain in force until and
unless EPA, in delegating enforcement authority to a State under
section 111(c) of the Act, approves reporting requirements or an
alternative means of compliance surveillance adopted by such State. In
that event, affected sources within the State will be relieved of the
obligation to comply with this section, provided that they comply with
the requirements established by the State.
(e) When the owner or operator of an EAF or AOD is required to
demonstrate compliance with the standard under Sec. 60.275b(b)(2) or a
combination of (b)(1) and (b)(2) the owner or operator provide notice
to the Administrator or delegated authority of the procedure(s) that
will be used to determine compliance. Notification of the procedure(s)
to be used must be postmarked at least 30 days prior to the performance
test.
(f) For the purpose of this subpart, the owner or operator shall
conduct the demonstration of compliance with Sec. 60.272b(a) of this
subpart and furnish the Administrator or delegated authority with a
report of the results of the test according to paragraph (i) of this
section. This report shall include the following information:
(1) Facility name and address;
(2) Plant representative;
(3) Make and model of the control device, and continuous opacity
monitoring equipment, if applicable;
(4) Flow diagram of process and emission capture system including
other equipment or process(es) ducted to the same control device;
(5) Rated (design) capacity of process equipment;
(6) Those data required under Sec. 60.274b(h) of this subpart;
(i) List of charge and tap weights and materials;
(ii) Heat times and process log;
(iii) Control device operation log; and
(iv) Continuous opacity monitor or EPA Method 9 data, or, as an
alternative to EPA Method 9, according to ASTM D7520-16 (incorporated
by reference, see Sec. 60.17), with the caveats described under Shop
opacity in Sec. 60.271.
(7) Test dates and test times;
(8) Test company;
(9) Test company representative;
(10) Test observers from any outside agency;
(11) Description of test methodology used, including any deviation
from standard reference methods;
(12) Schematic of sampling location;
(13) Number of sampling points;
(14) Description of sampling equipment;
(15) Listing of sampling equipment calibrations and procedures;
(16) Field and laboratory data sheets;
(17) Description of sample recovery procedures;
(18) Sampling equipment leak check results;
(19) Description of quality assurance procedures;
(20) Description of analytical procedures;
(21) Notation of sample blank corrections; and
(22) Sample emission calculations.
(g) The owner or operator shall maintain records of all shop
opacity observations made in accordance with Sec. 60.273b(d). All shop
opacity observations in excess of the emission limit specified in Sec.
60.272b(a)(3) of this subpart shall indicate a period of excess
emissions and shall be reported to the Administrator or delegated
authority semi-annually, according to Sec. 60.7(c) and submitted
according to paragraph (j) of this section. In addition to the
information required at Sec. 60.7(c), the report shall include the
following information:
(1) The company name and address of the affected facility.
[[Page 58493]]
(2) An identification of each affected facility being included in
the report.
(3) Beginning and ending dates of the reporting period.
(4) A certification by a certifying official of truth, accuracy,
and completeness. This certification shall state that, based on
information and belief formed after reasonable inquiry, the statements
and information in the document are true, accurate, and complete.
(h) The owner or operator shall maintain the following records for
each bag leak detection system required under Sec. 60.273b(e):
(1) Records of the bag leak detection system output;
(2) Records of bag leak detection system adjustments, including the
date and time of the adjustment, the initial bag leak detection system
settings, and the final bag leak detection system settings; and
(3) An identification of the date and time of all bag leak
detection system alarms, the time that procedures to determine the
cause of the alarm were initiated, if procedures were initiated within
1 hour of the alarm, the cause of the alarm, an explanation of the
actions taken, the date and time the cause of the alarm was alleviated,
and if the alarm was alleviated within 24 hours of the alarm.
(i) Within 60 days after the date of completing each performance
test or demonstration of compliance required by this subpart, you must
submit the results of the performance test following the procedures
specified in paragraphs (i)(1) through (3) of this section.
(1) Data collected using test methods supported by the EPA's
Electronic Reporting Tool (ERT) as listed on the EPA's ERT website
(https://www.epa.gov/electronic-reporting-air-emissions/electronic-reporting-tool-ert) at the time of the test. Submit the results of the
performance test to the EPA via the Compliance and Emissions Data
Reporting Interface (CEDRI), which can be accessed through the EPA's
Central Data Exchange (CDX) (https://cdx.epa.gov/). The data must be
submitted in a file format generated using the EPA's ERT.
Alternatively, you may submit an electronic file consistent with the
extensible markup language (XML) schema listed on the EPA's ERT
website.
(2) Data collected using test methods that are not supported by the
EPA's ERT as listed on the EPA's ERT website at the time of the test.
The results of the performance test must be included as an attachment
in the ERT or an alternate electronic file consistent with the XML
schema listed on the EPA's ERT website. Submit the ERT generated
package or alternative file to the EPA via CEDRI.
(3) Confidential business information (CBI). Do not use CEDRI to
submit information you claim as CBI. Anything submitted using CEDRI
cannot later be claimed CBI. Although we do not expect persons to
assert a claim of CBI, if you wish to assert a CBI claim for some of
the information submitted under paragraph (i)(1) or (2) of this
section, you must submit a complete file, including information claimed
to be CBI, to the EPA. The file must be generated using the EPA's ERT
or an alternate electronic file consistent with the XML schema listed
on the EPA's ERT website. The preferred method to submit CBI is for it
to be transmitted electronically using email attachments, File Transfer
Protocol (FTP), or other online file sharing services (e.g., Dropbox,
OneDrive, Google Drive). Electronic submissions must be transmitted
directly to the OAQPS CBI Office at the email address [email protected],
and should include clear CBI markings and note the docket ID. If
assistance is needed with submitting large electronic files that exceed
the file size limit for email attachments, and if you do not have your
own file sharing service, please email [email protected] to request a
file transfer link. If sending CBI information through the postal
service, submit the file on a compact disc, flash drive, or other
commonly used electronic storage medium and clearly mark the medium as
CBI. Mail the electronic medium to U.S. EPA/OAQPS/CORE CBI Office,
Attention: Group Leader, Measurement Policy Group, MD C404-02, 4930 Old
Page Rd., Durham, NC 27703. The same file with the CBI omitted must be
submitted to the EPA via the EPA's CDX as described in paragraphs
(i)(1) and (2) of this section. All CBI claims must be asserted at the
time of submission. Furthermore, under CAA section 114(c), emissions
data is not entitled to confidential treatment, and the EPA is required
to make emissions data available to the public. Thus, emissions data
will not be protected as CBI and will be made publicly available.
(j) You must submit a report of excess emissions and monitoring
systems performance report according to Sec. 60.7(c) to the
Administrator semiannually. Submit all reports to the EPA via CEDRI,
which can be accessed through the EPA's CDX (https://cdx.epa.gov/). The
EPA will make all the information submitted through CEDRI available to
the public without further notice to you. Do not use CEDRI to submit
information you claim as CBI. Anything submitted using CEDRI cannot
later be claimed CBI. You must use the appropriate electronic report
template on the CEDRI website (https://www.epa.gov/electronic-reporting-air-emissions/cedri) for this subpart. The date report
templates become available will be listed on the CEDRI website. The
report must be submitted by the deadline specified in this subpart,
regardless of the method in which the report is submitted. Although we
do not expect persons to assert a claim of CBI, if you wish to assert a
CBI claim, follow paragraph (i)(3) of this section except send to the
attention of the Electric Arc Furnace Sector Lead. The same file with
the CBI omitted must be submitted to the EPA via the EPA's CDX as
described earlier in this paragraph (j). All CBI claims must be
asserted at the time of submission. Furthermore, under CAA section
114(c), emissions data is not entitled to confidential treatment, and
the EPA is required to make emissions data available to the public.
Thus, emissions data will not be protected as CBI and will be made
publicly available.
(k) If you are required to electronically submit a report through
CEDRI in the EPA's CDX, you may assert a claim of EPA system outage for
failure to timely comply with that reporting requirement. To assert a
claim of EPA system outage, you must meet the requirements outlined in
paragraphs (k)(1) through (7) of this section.
(1) You must have been or will be precluded from accessing CEDRI
and submitting a required report within the time prescribed due to an
outage of either the EPA's CEDRI or CDX systems.
(2) The outage must have occurred within the period of time
beginning five business days prior to the date that the submission is
due.
(3) The outage may be planned or unplanned.
(4) You must submit notification to the Administrator in writing as
soon as possible following the date you first knew, or through due
diligence should have known, that the event may cause or has caused a
delay in reporting.
(5) You must provide to the Administrator a written description
identifying:
(i) The date(s) and time(s) when CDX or CEDRI was accessed and the
system was unavailable;
(ii) A rationale for attributing the delay in reporting beyond the
regulatory deadline to EPA system outage;
(iii) A description of measures taken or to be taken to minimize
the delay in reporting; and
(iv) The date by which you propose to report, or if you have
already met the
[[Page 58494]]
reporting requirement at the time of the notification, the date you
reported.
(6) The decision to accept the claim of EPA system outage and allow
an extension to the reporting deadline is solely within the discretion
of the Administrator.
(7) In any circumstance, the report must be submitted
electronically as soon as possible after the outage is resolved.
(l) If you are required to electronically submit a report through
CEDRI in the EPA's CDX, you may assert a claim of force majeure for
failure to timely comply with that reporting requirement. To assert a
claim of force majeure, you must meet the requirements outlined in
paragraphs (l)(1) through (5) of this section.
(1) You may submit a claim if a force majeure event is about to
occur, occurs, or has occurred or there are lingering effects from such
an event within the period of time beginning five business days prior
to the date the submission is due. For the purposes of this section, a
force majeure event is defined as an event that will be or has been
caused by circumstances beyond the control of the affected facility,
its contractors, or any entity controlled by the affected facility that
prevents you from complying with the requirement to submit a report
electronically within the time period prescribed. Examples of such
events are acts of nature (e.g., hurricanes, earthquakes, or floods),
acts of war or terrorism, or equipment failure or safety hazard beyond
the control of the affected facility (e.g., large scale power outage).
(2) You must submit notification to the Administrator in writing as
soon as possible following the date you first knew, or through due
diligence should have known, that the event may cause or has caused a
delay in reporting.
(3) You must provide to the Administrator:
(i) A written description of the force majeure event;
(ii) A rationale for attributing the delay in reporting beyond the
regulatory deadline to the force majeure event;
(iii) A description of measures taken or to be taken to minimize
the delay in reporting; and
(iv) The date by which you propose to report, or if you have
already met the reporting requirement at the time of the notification,
the date you reported.
(4) The decision to accept the claim of force majeure and allow an
extension to the reporting deadline is solely within the discretion of
the Administrator.
(5) In any circumstance, the reporting must occur as soon as
possible after the force majeure event occurs.
(m) Any records required to be maintained by this subpart that are
submitted electronically via the EPA's CEDRI may be maintained in
electronic format. This ability to maintain electronic copies does not
affect the requirement for facilities to make records, data, and
reports available upon request to a delegated air agency or the EPA as
part of an on-site compliance evaluation.
[FR Doc. 2023-16747 Filed 8-24-23; 8:45 am]