Northern Utilities, Inc. D/B/A Unitil; Notice of Application and Establishing Intervention Deadline, 57444-57446 [2023-18128]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
57444
Federal Register / Vol. 88, No. 162 / Wednesday, August 23, 2023 / Notices
from the state of Florida for any
potential wetland impacts and/or
stormwater drainage modifications.
Lead and Cooperating Agency Status:
The DAF is the lead federal agency for
this EIS action. Both the U.S. Army and
the city of Crestview are participating in
the DAF EIS process as cooperating
agencies.
Scoping and Agency Coordination: To
define the full range of issues to be
evaluated in the EIS effectively, the DAF
will determine the scope of the analysis
by soliciting comments from interested
local, state, and federal elected officials
and agencies, federally recognized
Native American Tribes, as well as
interested members of the public and
others.
Implementation of the Proposed
Action to expand childcare services in
the area north of the ETTC at Eglin AFB,
FL would potentially impact wetlands
and/or floodplains and would therefore
be subject to Executive Order (E.O.)
11990, ‘‘Protection of Wetlands,’’ and
E.O. 11988, ‘‘Floodplain Management.’’
Regulatory agencies with special
expertise in wetlands and floodplains,
such as the U.S. Army Corps of
Engineers, will be contacted and asked
to comment. Consistent with E.O. 11988
and E.O. 11990, this NOI initiates early
public review of the alternatives and
invites public comments and
identification of other potential
alternatives. Implementation of the
Proposed Action also has the potential
to impact historic properties.
Consultation with the appropriate State
Historic Preservation Officer and
federally-recognized Native American
Tribes will occur as part of this process.
The completion of consultations and
any required cultural resources
fieldwork will comply with section 106
of the National Historic Preservation
Act, and this compliance will assist
with the development and selection of
alternatives by assessing ways to avoid,
minimize, or mitigate any adverse
effects to historic properties. The
documents produced during the section
106 process will be included in the
NEPA document, as an appendix.
Concurrent with the publication of this
NOI, public scoping notices will be
announced locally inviting the public to
identify and submit comments on
potential alternatives, information, and
analyses relevant to the Proposed
Action as part of the EIS process.
Tommy W. Lee,
Acting Air Force Federal Register Liaison
Officer.
[FR Doc. 2023–18107 Filed 8–22–23; 8:45 am]
BILLING CODE 5001–10–P
VerDate Sep<11>2014
17:27 Aug 22, 2023
Jkt 259001
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Northern New
Mexico
Office of Environmental
Management, Department of Energy.
ACTION: Notice of open meeting.
AGENCY:
This notice announces an inperson/virtual hybrid meeting of the
Environmental Management SiteSpecific Advisory Board (EM SSAB),
Northern New Mexico. The Federal
Advisory Committee Act requires that
public notice of this meeting be
announced in the Federal Register.
DATES: Wednesday, September 20, 2023;
1:00 p.m. to 5:00 p.m. MDT.
ADDRESSES: This hybrid meeting will be
open to the public in person and via
WebEx. To attend virtually, please
contact the Northern New Mexico
Citizens Advisory Board (NNMCAB)
Executive Director (below) no later than
5:00 p.m. MDT on Friday, September
15, 2023.
Hotel Don Fernando de Taos, 1005
Paseo del Pueblo Sur, Taos, New
Mexico 87571
FOR FURTHER INFORMATION CONTACT:
Menice B. Santistevan, NNMCAB
Executive Director, by Phone: (505)
699–0631 or Email:
menice.santistevan@em.doe.gov.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to provide advice and
recommendations concerning the
following EM site-specific issues: cleanup activities and environmental
restoration; waste and nuclear materials
management and disposition; excess
facilities; future land use and long-term
stewardship. The Board may also be
asked to provide advice and
recommendations on any EM program
components.
Tentative Agenda:
• Presentation on Aggregate Areas at
Los Alamos National Laboratory
• Agency Updates
Public Participation: The in-person/
online virtual hybrid meeting is open to
the public in person or virtually, via
WebEx. Written statements may be filed
with the Board no later than 5:00 p.m.
MDT on Friday, September 15, 2023, or
within seven days after the meeting by
sending them to the NNMCAB
Executive Director at the
aforementioned email address. Written
public comments received prior to the
meeting will be read into the record.
The Deputy Designated Federal Officer
is empowered to conduct the meeting in
a fashion that will facilitate the orderly
SUMMARY:
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
conduct of business. Individuals
wishing to submit public comments
should follow as directed above.
Minutes: Minutes will be available by
emailing or calling Menice Santistevan,
NNMCAB Executive Director, at
menice.santistevan@em.doe.gov or at
(505) 699–0631.
Signed in Washington, DC, on August 17,
2023.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2023–18115 Filed 8–22–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–527–000]
Northern Utilities, Inc. D/B/A Unitil;
Notice of Application and Establishing
Intervention Deadline
Take notice that on August 7, 2023,
Northern Utilities Inc. D/B/A Unitil
(Northern), Six Liberty Lane West,
Hampton, NH 03842–1720, filed an
application under section 7(f) of the
Natural Gas Act (NGA), and part 157 of
the Commission’s regulations requesting
authorization for its Service Territory
Determination (Project). Northern
respectfully requests that the
Commission grant it a determination of
a service area within which Northern
may: (i) operate a minimal amount of
piping across the New HampshireMassachusetts border in order to
distribute and deliver natural gas to
New Hampshire retail customers, and
(ii) without further Commission
authorization, enlarge or expand its
facilities in its Salem, New Hampshire
service territory. This determination
will allow Northern to transport natural
gas through a distribution line that
receives gas in New Hampshire, crosses
the Massachusetts State line into the
town of Methuen, Massachusetts and
then crosses back to New Hampshire for
distribution to ultimate consumers in
New Hampshire. Northern serves no
consumers in Massachusetts through the
distribution facilities at issue, all as
more fully set forth in the application
which is on file with the Commission
and open for public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
E:\FR\FM\23AUN1.SGM
23AUN1
Federal Register / Vol. 88, No. 162 / Wednesday, August 23, 2023 / Notices
lotter on DSK11XQN23PROD with NOTICES1
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions regarding the proposed
project should be directed to Randall S.
Rich, Pierce Atwood LLP, 1875 K Street
NW, Suite 700, Washington, DC 20006
by phone at 202–530–6424, or by email
at rrich@piereatwood.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify Federal and State
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, you can protest the filing,
and you can file a motion to intervene
in the proceeding. There is no fee or
cost for filing comments or intervening.
The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on
September 7, 2023. How to file protests,
motions to intervene, and comments is
explained below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
17:27 Aug 22, 2023
Jkt 259001
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections, to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be.
Protests
Pursuant to sections 157.10(a)(4) 2 and
385.211 3 of the Commission’s
regulations under the NGA, any person 4
may file a protest to the application.
Protests must comply with the
requirements specified in section
385.2001 5 of the Commission’s
regulations. A protest may also serve as
a motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
To ensure that your comments or
protests are timely and properly
recorded, please submit your comments
on or before September 7, 2023.
There are three methods you can use
to submit your comments or protests to
the Commission. In all instances, please
reference the Project docket number
CP23–527–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments or
protests electronically by using the
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments or protests by mailing them
to the following address below. Your
written comments must reference the
Project docket number (CP23–527–000).
2 18
CFR 157.10(a)(4).
CFR 385.211.
4 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
5 18 CFR 385.2001.
3 18
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
57445
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
To file via any other courier: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,6 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 7 and the regulations under
the NGA 8 by the intervention deadline
for the project, which is September 7,
2023. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
6 18
CFR 385.102(d).
CFR 385.214.
8 18 CFR 157.10.
7 18
E:\FR\FM\23AUN1.SGM
23AUN1
lotter on DSK11XQN23PROD with NOTICES1
57446
Federal Register / Vol. 88, No. 162 / Wednesday, August 23, 2023 / Notices
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP23–527–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below. Your motion to
intervene must reference the Project
docket number CP23–527–000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
To file via any other courier: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email at: Randall S. Rich,
Pierce Atwood LLP, 1875 K Street NW,
Suite 700, Washington, DC 20006 or at
rrich@piereatwood.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
All timely, unopposed 9 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).10 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
9 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
10 18 CFR 385.214(c)(1).
VerDate Sep<11>2014
17:27 Aug 22, 2023
Jkt 259001
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on September 7, 2023.
Dated: August 17, 2023.
Kimberly D. Bose,
Secretary.
information in the record, including
comments filed on the REA notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to license the Bedford
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues
EA.
Comments on EA ......
Target date
January 2024.1
February 2024.
Any questions regarding this notice
may be directed to Andy Bernick at
(202) 502–8660 or andrew.bernick@
ferc.gov.
Dated: August 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18127 Filed 8–22–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[FR Doc. 2023–18128 Filed 8–22–23; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5596–020]
Town of Bedford, Virginia; Notice of
Intent To Prepare an Environmental
Assessment
On April 30, 2021, the Town of
Bedford, Virginia filed an application
for a new major license for the 5.0megawatt Bedford Hydroelectric Project
(Bedford Project or project; FERC No.
5596). The Bedford Project is located on
the James River, near the Town of
Bedford, in Bedford and Amherst
counties, Virginia.
In accordance with the Commission’s
regulations, on May 31, 2023,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA notice). Based on the
11 18
PO 00000
CFR 385.214(b)(3) and (d).
Frm 00041
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–112–000.
Applicants: Elliott Associates, L.P.,
Elliott International, L.P., The Liverpool
Limited Partnership.
Description: Amendment to August
11, 2023, Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Elliott Associates,
L.P., et al.
Filed Date: 8/15/23.
Accession Number: 20230815–5177.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: EC23–118–000.
Applicants: Yellow Pine Solar, LLC,
Yellow Pine Solar Interconnect, LLC.
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) (2022)
require that EAs be completed within 1 year of the
federal action agency’s decision to prepare an EA.
See National Environmental Policy Act, 42 U.S.C.
4321 et seq., as amended by section 107(g)(1)(B)(iii)
of the Fiscal Responsibility Act of 2023, Public Law
118–5, section 4336a, 137 Stat. 42.
E:\FR\FM\23AUN1.SGM
23AUN1
Agencies
[Federal Register Volume 88, Number 162 (Wednesday, August 23, 2023)]
[Notices]
[Pages 57444-57446]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18128]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-527-000]
Northern Utilities, Inc. D/B/A Unitil; Notice of Application and
Establishing Intervention Deadline
Take notice that on August 7, 2023, Northern Utilities Inc. D/B/A
Unitil (Northern), Six Liberty Lane West, Hampton, NH 03842-1720, filed
an application under section 7(f) of the Natural Gas Act (NGA), and
part 157 of the Commission's regulations requesting authorization for
its Service Territory Determination (Project). Northern respectfully
requests that the Commission grant it a determination of a service area
within which Northern may: (i) operate a minimal amount of piping
across the New Hampshire-Massachusetts border in order to distribute
and deliver natural gas to New Hampshire retail customers, and (ii)
without further Commission authorization, enlarge or expand its
facilities in its Salem, New Hampshire service territory. This
determination will allow Northern to transport natural gas through a
distribution line that receives gas in New Hampshire, crosses the
Massachusetts State line into the town of Methuen, Massachusetts and
then crosses back to New Hampshire for distribution to ultimate
consumers in New Hampshire. Northern serves no consumers in
Massachusetts through the distribution facilities at issue, all as more
fully set forth in the application which is on file with the Commission
and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary''
[[Page 57445]]
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. At this time, the
Commission has suspended access to the Commission's Public Reference
Room. For assistance, contact the Federal Energy Regulatory Commission
at [email protected] or call toll-free, (886) 208-3676 or TTY
(202) 502-8659.
Any questions regarding the proposed project should be directed to
Randall S. Rich, Pierce Atwood LLP, 1875 K Street NW, Suite 700,
Washington, DC 20006 by phone at 202-530-6424, or by email at
[email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
Federal and State agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all Federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file comments on the project, you can protest
the filing, and you can file a motion to intervene in the proceeding.
There is no fee or cost for filing comments or intervening. The
deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on
September 7, 2023. How to file protests, motions to intervene, and
comments is explained below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections, to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be.
Protests
Pursuant to sections 157.10(a)(4) \2\ and 385.211 \3\ of the
Commission's regulations under the NGA, any person \4\ may file a
protest to the application. Protests must comply with the requirements
specified in section 385.2001 \5\ of the Commission's regulations. A
protest may also serve as a motion to intervene so long as the
protestor states it also seeks to be an intervenor.
---------------------------------------------------------------------------
\2\ 18 CFR 157.10(a)(4).
\3\ 18 CFR 385.211.
\4\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
\5\ 18 CFR 385.2001.
---------------------------------------------------------------------------
To ensure that your comments or protests are timely and properly
recorded, please submit your comments on or before September 7, 2023.
There are three methods you can use to submit your comments or
protests to the Commission. In all instances, please reference the
Project docket number CP23-527-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments or protests electronically by using
the eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. With eFiling,
you can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making; first select ``General'' and then select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments or protests by
mailing them to the following address below. Your written comments must
reference the Project docket number (CP23-527-000).
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other courier: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\6\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\6\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \7\ and the regulations under the NGA \8\ by the
intervention deadline for the project, which is September 7, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://
[[Page 57446]]
www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\7\ 18 CFR 385.214.
\8\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP23-527-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below. Your
motion to intervene must reference the Project docket number CP23-527-
000.
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other courier: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email at: Randall S. Rich, Pierce Atwood LLP, 1875 K
Street NW, Suite 700, Washington, DC 20006 or at [email protected].
Any subsequent submissions by an intervenor must be served on the
applicant and all other parties to the proceeding. Contact information
for parties can be downloaded from the service list at the eService
link on FERC Online. Service can be via email with a link to the
document.
All timely, unopposed \9\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\10\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\11\ A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\9\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\10\ 18 CFR 385.214(c)(1).
\11\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on September 7, 2023.
Dated: August 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-18128 Filed 8-22-23; 8:45 am]