Download as PDF lotter on DSK11XQN23PROD with NOTICES1 57446 Federal Register / Vol. 88, No. 162 / Wednesday, August 23, 2023 / Notices www.ferc.gov/resources/guides/how-to/ intervene.asp. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number CP23–527–000 in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below. Your motion to intervene must reference the Project docket number CP23–527–000. To file via USPS: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To file via any other courier: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email at: Randall S. Rich, Pierce Atwood LLP, 1875 K Street NW, Suite 700, Washington, DC 20006 or at rrich@piereatwood.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 9 motions to intervene are automatically granted by operation of Rule 214(c)(1).10 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and 9 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 10 18 CFR 385.214(c)(1). VerDate Sep<11>2014 17:27 Aug 22, 2023 Jkt 259001 provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.11 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on September 7, 2023. Dated: August 17, 2023. Kimberly D. Bose, Secretary. information in the record, including comments filed on the REA notice, staff does not anticipate that licensing the project would constitute a major federal action significantly affecting the quality of the human environment. Therefore, staff intends to prepare an Environmental Assessment (EA) on the application to license the Bedford Project. The EA will be issued and circulated for review by all interested parties. All comments filed on the EA will be analyzed by staff and considered in the Commission’s final licensing decision. The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. Milestone Commission issues EA. Comments on EA ...... Target date January 2024.1 February 2024. Any questions regarding this notice may be directed to Andy Bernick at (202) 502–8660 or andrew.bernick@ ferc.gov. Dated: August 17, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–18127 Filed 8–22–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [FR Doc. 2023–18128 Filed 8–22–23; 8:45 am] BILLING CODE 6717–01–P Federal Energy Regulatory Commission Combined Notice of Filings #1 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5596–020] Town of Bedford, Virginia; Notice of Intent To Prepare an Environmental Assessment On April 30, 2021, the Town of Bedford, Virginia filed an application for a new major license for the 5.0megawatt Bedford Hydroelectric Project (Bedford Project or project; FERC No. 5596). The Bedford Project is located on the James River, near the Town of Bedford, in Bedford and Amherst counties, Virginia. In accordance with the Commission’s regulations, on May 31, 2023, Commission staff issued a notice that the project was ready for environmental analysis (REA notice). Based on the 11 18 PO 00000 CFR 385.214(b)(3) and (d). Frm 00041 Fmt 4703 Sfmt 4703 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–112–000. Applicants: Elliott Associates, L.P., Elliott International, L.P., The Liverpool Limited Partnership. Description: Amendment to August 11, 2023, Joint Application for Authorization Under Section 203 of the Federal Power Act of Elliott Associates, L.P., et al. Filed Date: 8/15/23. Accession Number: 20230815–5177. Comment Date: 5 p.m. ET 9/5/23. Docket Numbers: EC23–118–000. Applicants: Yellow Pine Solar, LLC, Yellow Pine Solar Interconnect, LLC. 1 The Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) (2022) require that EAs be completed within 1 year of the federal action agency’s decision to prepare an EA. See National Environmental Policy Act, 42 U.S.C. 4321 et seq., as amended by section 107(g)(1)(B)(iii) of the Fiscal Responsibility Act of 2023, Public Law 118–5, section 4336a, 137 Stat. 42. E:\FR\FM\23AUN1.SGM 23AUN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 162 / Wednesday, August 23, 2023 / Notices Description: Errata to August 10, 2023, Joint Application for Authorization Under Section 203 of the Federal Power Act of Yellow Pine Solar, LLC, et al. Filed Date: 8/14/23. Accession Number: 20230814–5285. Comment Date: 5 p.m. ET 8/31/23. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–259–000. Applicants: Wildflower Solar 2 LLC. Description: Wildflower Solar 2 LLC submits Notice of Self–Certification of Exempt Wholesale Generator Status. Filed Date: 8/17/23. Accession Number: 20230817–5088. Comment Date: 5 p.m. ET 9/7/23. Docket Numbers: EG23–260–000. Applicants: Wildflower Solar 3 LLC. Description: Wildflower Solar 3 LLC submits Notice of Self–Certification of Exempt Wholesale Generator Status. Filed Date: 8/17/23. Accession Number: 20230817–5091. Comment Date: 5 p.m. ET 9/7/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–92–004. Applicants: Carroll County Energy LLC. Description: Compliance filing: Informational Filing Regarding Transfer of Ownership to be effective N/A. Filed Date: 8/17/23. Accession Number: 20230817–5066. Comment Date: 5 p.m. ET 9/7/23. Docket Numbers: ER23–1372–003. Applicants: Gaucho Solar LLC. Description: Compliance filing: Informational Filing Pursuant to Schedule 2 of the PJM OATT & Request for Waiver to be effective N/A. Filed Date: 8/17/23. Accession Number: 20230817–5123. Comment Date: 5 p.m. ET 9/7/23. Docket Numbers: ER23–2040–001. Applicants: New York Independent System Operator, Inc. Description: Tariff Amendment: NYISO Deficiency Response re: DER and Aggregation Market Rule Changes to be effective 12/31/9998. Filed Date: 8/17/23. Accession Number: 20230817–5079. Comment Date: 5 p.m. ET 9/7/23. Docket Numbers: ER23–2391–001. Applicants: Public Service Company of New Mexico. Description: Tariff Amendment: Supplemental Filing to PNM CAISO Phase 2 Enhancements to be effective 7/ 1/2023. Filed Date: 8/17/23. Accession Number: 20230817–5097. VerDate Sep<11>2014 17:27 Aug 22, 2023 Jkt 259001 Comment Date: 5 p.m. ET 8/28/23. Docket Numbers: ER23–2492–001. Applicants: Gunvor USA LLC. Description: Tariff Amendment: Amendment to 1 to be effective 9/24/ 2023. Filed Date: 8/17/23. Accession Number: 20230817–5110. Comment Date: 5 p.m. ET 9/7/23. Docket Numbers: ER23–2638–000. Applicants: NRG Business Marketing LLC. Description: Baseline eTariff Filing: Notice of Succession and Request for Waiver to be effective 8/16/2023. Filed Date: 8/16/23. Accession Number: 20230816–5142. Comment Date: 5 p.m. ET 9/6/23. Docket Numbers: ER23–2639–000. Applicants: NRG Business Marketing LLC. Description: Compliance filing: Notice of Succession and Request for Waiver to be effective 8/16/2023. Filed Date: 8/16/23. Accession Number: 20230816–5145. Comment Date: 5 p.m. ET 9/6/23. Docket Numbers: ER23–2640–000. Applicants: NorthWestern Corporation. Description: NorthWestern Corporation submits Average System Cost Filing for Sales of Electric Power to the Bonneville Power Administration, FY 2024–2025. Filed Date: 8/11/23. Accession Number: 20230811–5187. Comment Date: 5 p.m. ET 9/1/23. Docket Numbers: ER23–2641–000. Applicants: NRG Power Marketing LLC. Description: Tariff Amendment: Notice of Cancellation and Request for Waiver to be effective 8/1/2023. Filed Date: 8/16/23. Accession Number: 20230816–5147. Comment Date: 5 p.m. ET 9/6/23. Docket Numbers: ER23–2642–000. Applicants: NRG Power Marketing LLC. Description: Tariff Amendment: Notice of Cancellation and Request for Waiver to be effective 8/1/2023. Filed Date: 8/16/23. Accession Number: 20230816–5150. Comment Date: 5 p.m. ET 9/6/23. Docket Numbers: ER23–2643–000. Applicants: Portland General Electric Company. Description: Portland General Electric Company submits Average System Cost Rate Filing for Sales of Electric Power to the Bonneville Power Administration, FY 2024–2025. Filed Date: 8/11/23. Accession Number: 20230811–5188. Comment Date: 5 p.m. ET 9/1/23. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 57447 Docket Numbers: ER23–2644–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Notice of Cancellation of WMPA, Service Agreement No. 5666; Queue No. AF1–033 to be effective 10/16/2023. Filed Date: 8/17/23. Accession Number: 20230817–5026. Comment Date: 5 p.m. ET 9/7/23. Docket Numbers: ER23–2645–000. Applicants: Public Service Company of New Hampshire. Description: § 205(d) Rate Filing: First Amend—Engineering Design Procurement Agreement—NECEC Transmission LLC to be effective 8/18/ 2023. Filed Date: 8/17/23. Accession Number: 20230817–5029. Comment Date: 5 p.m. ET 9/7/23. Docket Numbers: ER23–2646–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Hecate Energy Cedar Springs Solar LGIA Filing to be effective 8/7/2023. Filed Date: 8/17/23. Accession Number: 20230817–5054. Comment Date: 5 p.m. ET 9/7/23. Docket Numbers: ER23–2647–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 7042; Queue No. AE1–245 to be effective 7/18/2023. Filed Date: 8/17/23. Accession Number: 20230817–5100. Comment Date: 5 p.m. ET 9/7/23. Docket Numbers: ER23–2648–000. Applicants: Carroll County Energy LLC. Description: Request for Limited Waiver of Carroll County Energy LLC. Filed Date: 8/17/23. Accession Number: 20230817–5103. Comment Date: 5 p.m. ET 9/7/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing E:\FR\FM\23AUN1.SGM 23AUN1 57448 Federal Register / Vol. 88, No. 162 / Wednesday, August 23, 2023 / Notices requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: August 17, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–18109 Filed 8–22–23; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [CERCLA–02–2023–2003; FRL–11171–01– R2] Proposed CERCLA Cost Recovery Settlement for the Frankfort Asbestos Superfund Site, Village of Frankfort, Herkimer County, New York Environmental Protection Agency. ACTION: Notice; request for public comment. Pasquale Evangelista, Director, Superfund & Emergency Management Division U.S. Environmental Protection Agency Region 2. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (‘‘CERCLA’’), notice is hereby given by the U.S. Environmental Protection Agency (‘‘EPA’’), Region 2, of a proposed cost recovery settlement agreement (‘‘Settlement’’) pursuant to CERCLA, with Crown Container Transfer Station Co., Inc. (‘‘Settling Party’’) for the Frankfort Asbestos Superfund Site (‘‘Site’’), located in the Village of Frankfort, Herkimer County, New York. DATES: Comments must be submitted on or before September 22, 2023. ADDRESSES: Requests for copies of the proposed Settlement and submission of comments must be via electronic mail. Comments should reference the Frankfort Asbestos Superfund Site, Frankfort, Herkimer County, New York, Index No. CERCLA–02–2023–2003. For those unable to communicate via BILLING CODE 6560–50–P AGENCY: SUMMARY: lotter on DSK11XQN23PROD with NOTICES1 electronic mail, please contact the EPA employee identified below. FOR FURTHER INFORMATION CONTACT: Jocelyn Scott, Attorney, Office of Regional Counsel, New York/Caribbean Superfund Branch, U.S. Environmental Protection Agency, 290 Broadway, 17th Floor, New York, NY 10007–1866. Email: scott.jocelyn@epa.gov Telephone: 212–637–3179. SUPPLEMENTARY INFORMATION: The Settling Party will pay $55,000 to the EPA Hazardous Substance Superfund in partial reimbursement of EPA’s past response costs paid in connection with the Site. This payment shall be made within 30 days of the Effective Date of the Settlement. The Settlement includes a covenant by EPA not to sue or to take administrative action against the Settling Party pursuant to section 107(a) of CERCLA, 42 U.S.C. 9607(a), with regard to EPA’s past response costs as provided in the Settlement. For thirty (30) days following the date of publication of this notice, EPA will receive written comments relating to the Settlement. EPA will consider all comments received and may modify or withdraw its consent to the Settlement if comments received disclose facts or considerations that indicate that the proposed Settlement is inappropriate, improper, or inadequate. EPA’s response to any comments received will be available for public inspection at EPA Region 2, 290 Broadway, New York, New York 10007–1866. VerDate Sep<11>2014 17:27 Aug 22, 2023 Jkt 259001 [FR Doc. 2023–18097 Filed 8–22–23; 8:45 am] FEDERAL COMMUNICATIONS COMMISSION [OMB 3060–0967; FR ID 164365] Information Collection Being Reviewed by the Federal Communications Commission Federal Communications Commission. ACTION: Notice and request for comments. AGENCY: As part of its continuing effort to reduce paperwork burdens, and as required by the Paperwork Reduction Act of 1995 (PRA), the Federal Communications Commission (FCC or Commission) invites the general public and other Federal agencies to take this opportunity to comment on the following information collections. SUMMARY: PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 Comments are requested concerning: whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission’s burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. DATES: Written PRA comments should be submitted on or before October 23, 2023. If you anticipate that you will be submitting comments but find it difficult to do so within the period of time allowed by this notice, you should advise the contact listed below as soon as possible. ADDRESSES: Direct all PRA comments to Cathy Williams, FCC, via email to PRA@ fcc.gov and to Cathy.Williams@fcc.gov. FOR FURTHER INFORMATION CONTACT: For additional information about the information collection, contact Cathy Williams at (202) 418–2918. SUPPLEMENTARY INFORMATION: The FCC may not conduct or sponsor a collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the PRA that does not display a valid OMB control number. OMB Control No.: 3060–0967. Title: Section 79.2, Accessibility of Programming Providing Emergency Information, and Emergency Information; Section 79.105, Audio Description and Emergency Information Accessibility Requirements for All Apparatus; Section 79.106, Audio Description and Emergency Information Accessibility Requirements for Recording Devices. Form No.: N/A. Type of Review: Revision of a currently approved collection. Respondents: Individuals or households; Business or other for-profit; Not-for-profit institutions; and State, Local, or Tribal Government. Number of Respondents and Responses: 158 respondents; 261 responses. Estimated Time per Response: 0.5 to 5 hours. Frequency of Response: Annual and on occasion reporting requirements; E:\FR\FM\23AUN1.SGM 23AUN1

Agencies

[Federal Register Volume 88, Number 162 (Wednesday, August 23, 2023)]
[Notices]
[Pages 57446-57448]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18109]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC23-112-000.
    Applicants: Elliott Associates, L.P., Elliott International, L.P., 
The Liverpool Limited Partnership.
    Description: Amendment to August 11, 2023, Joint Application for 
Authorization Under Section 203 of the Federal Power Act of Elliott 
Associates, L.P., et al.
    Filed Date: 8/15/23.
    Accession Number: 20230815-5177.
    Comment Date: 5 p.m. ET 9/5/23.

    Docket Numbers: EC23-118-000.
    Applicants: Yellow Pine Solar, LLC, Yellow Pine Solar Interconnect, 
LLC.

[[Page 57447]]

    Description: Errata to August 10, 2023, Joint Application for 
Authorization Under Section 203 of the Federal Power Act of Yellow Pine 
Solar, LLC, et al.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5285.
    Comment Date: 5 p.m. ET 8/31/23.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG23-259-000.
    Applicants: Wildflower Solar 2 LLC.
    Description: Wildflower Solar 2 LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5088.
    Comment Date: 5 p.m. ET 9/7/23.

    Docket Numbers: EG23-260-000.
    Applicants: Wildflower Solar 3 LLC.
    Description: Wildflower Solar 3 LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5091.
    Comment Date: 5 p.m. ET 9/7/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER18-92-004.
    Applicants: Carroll County Energy LLC.
    Description: Compliance filing: Informational Filing Regarding 
Transfer of Ownership to be effective N/A.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5066.
    Comment Date: 5 p.m. ET 9/7/23.

    Docket Numbers: ER23-1372-003.
    Applicants: Gaucho Solar LLC.
    Description: Compliance filing: Informational Filing Pursuant to 
Schedule 2 of the PJM OATT & Request for Waiver to be effective N/A.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5123.
    Comment Date: 5 p.m. ET 9/7/23.

    Docket Numbers: ER23-2040-001.
    Applicants: New York Independent System Operator, Inc.
    Description: Tariff Amendment: NYISO Deficiency Response re: DER 
and Aggregation Market Rule Changes to be effective 12/31/9998.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5079.
    Comment Date: 5 p.m. ET 9/7/23.

    Docket Numbers: ER23-2391-001.
    Applicants: Public Service Company of New Mexico.
    Description: Tariff Amendment: Supplemental Filing to PNM CAISO 
Phase 2 Enhancements to be effective 7/1/2023.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5097.
    Comment Date: 5 p.m. ET 8/28/23.

    Docket Numbers: ER23-2492-001.
    Applicants: Gunvor USA LLC.
    Description: Tariff Amendment: Amendment to 1 to be effective 9/24/
2023.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5110.
    Comment Date: 5 p.m. ET 9/7/23.

    Docket Numbers: ER23-2638-000.
    Applicants: NRG Business Marketing LLC.
    Description: Baseline eTariff Filing: Notice of Succession and 
Request for Waiver to be effective 8/16/2023.
    Filed Date: 8/16/23.
    Accession Number: 20230816-5142.
    Comment Date: 5 p.m. ET 9/6/23.

    Docket Numbers: ER23-2639-000.
    Applicants: NRG Business Marketing LLC.
    Description: Compliance filing: Notice of Succession and Request 
for Waiver to be effective 8/16/2023.
    Filed Date: 8/16/23.
    Accession Number: 20230816-5145.
    Comment Date: 5 p.m. ET 9/6/23.

    Docket Numbers: ER23-2640-000.
    Applicants: NorthWestern Corporation.
    Description: NorthWestern Corporation submits Average System Cost 
Filing for Sales of Electric Power to the Bonneville Power 
Administration, FY 2024-2025.
    Filed Date: 8/11/23.
    Accession Number: 20230811-5187.
    Comment Date: 5 p.m. ET 9/1/23.

    Docket Numbers: ER23-2641-000.
    Applicants: NRG Power Marketing LLC.
    Description: Tariff Amendment: Notice of Cancellation and Request 
for Waiver to be effective 8/1/2023.
    Filed Date: 8/16/23.
    Accession Number: 20230816-5147.
    Comment Date: 5 p.m. ET 9/6/23.

    Docket Numbers: ER23-2642-000.
    Applicants: NRG Power Marketing LLC.
    Description: Tariff Amendment: Notice of Cancellation and Request 
for Waiver to be effective 8/1/2023.
    Filed Date: 8/16/23.
    Accession Number: 20230816-5150.
    Comment Date: 5 p.m. ET 9/6/23.

    Docket Numbers: ER23-2643-000.
    Applicants: Portland General Electric Company.
    Description: Portland General Electric Company submits Average 
System Cost Rate Filing for Sales of Electric Power to the Bonneville 
Power Administration, FY 2024-2025.
    Filed Date: 8/11/23.
    Accession Number: 20230811-5188.
    Comment Date: 5 p.m. ET 9/1/23.

    Docket Numbers: ER23-2644-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Notice of Cancellation of WMPA, 
Service Agreement No. 5666; Queue No. AF1-033 to be effective 10/16/
2023.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5026.
    Comment Date: 5 p.m. ET 9/7/23.

    Docket Numbers: ER23-2645-000.
    Applicants: Public Service Company of New Hampshire.
    Description: Sec.  205(d) Rate Filing: First Amend--Engineering 
Design Procurement Agreement--NECEC Transmission LLC to be effective 8/
18/2023.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5029.
    Comment Date: 5 p.m. ET 9/7/23.

    Docket Numbers: ER23-2646-000.
    Applicants: Alabama Power Company, Georgia Power Company, 
Mississippi Power Company.
    Description: Sec.  205(d) Rate Filing: Alabama Power Company 
submits tariff filing per 35.13(a)(2)(iii: Hecate Energy Cedar Springs 
Solar LGIA Filing to be effective 8/7/2023.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5054.
    Comment Date: 5 p.m. ET 9/7/23.

    Docket Numbers: ER23-2647-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 7042; Queue No. AE1-245 to be effective 7/18/2023.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5100.
    Comment Date: 5 p.m. ET 9/7/23.

    Docket Numbers: ER23-2648-000.
    Applicants: Carroll County Energy LLC.
    Description: Request for Limited Waiver of Carroll County Energy 
LLC.
    Filed Date: 8/17/23.
    Accession Number: 20230817-5103.
    Comment Date: 5 p.m. ET 9/7/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing

[[Page 57448]]

requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: August 17, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.