Combined Notice of Filings #1, 57446-57448 [2023-18109]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
57446
Federal Register / Vol. 88, No. 162 / Wednesday, August 23, 2023 / Notices
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP23–527–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below. Your motion to
intervene must reference the Project
docket number CP23–527–000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
To file via any other courier: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email at: Randall S. Rich,
Pierce Atwood LLP, 1875 K Street NW,
Suite 700, Washington, DC 20006 or at
rrich@piereatwood.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
All timely, unopposed 9 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).10 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
9 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
10 18 CFR 385.214(c)(1).
VerDate Sep<11>2014
17:27 Aug 22, 2023
Jkt 259001
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.11
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on September 7, 2023.
Dated: August 17, 2023.
Kimberly D. Bose,
Secretary.
information in the record, including
comments filed on the REA notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to license the Bedford
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues
EA.
Comments on EA ......
Target date
January 2024.1
February 2024.
Any questions regarding this notice
may be directed to Andy Bernick at
(202) 502–8660 or andrew.bernick@
ferc.gov.
Dated: August 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–18127 Filed 8–22–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[FR Doc. 2023–18128 Filed 8–22–23; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5596–020]
Town of Bedford, Virginia; Notice of
Intent To Prepare an Environmental
Assessment
On April 30, 2021, the Town of
Bedford, Virginia filed an application
for a new major license for the 5.0megawatt Bedford Hydroelectric Project
(Bedford Project or project; FERC No.
5596). The Bedford Project is located on
the James River, near the Town of
Bedford, in Bedford and Amherst
counties, Virginia.
In accordance with the Commission’s
regulations, on May 31, 2023,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA notice). Based on the
11 18
PO 00000
CFR 385.214(b)(3) and (d).
Frm 00041
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–112–000.
Applicants: Elliott Associates, L.P.,
Elliott International, L.P., The Liverpool
Limited Partnership.
Description: Amendment to August
11, 2023, Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Elliott Associates,
L.P., et al.
Filed Date: 8/15/23.
Accession Number: 20230815–5177.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: EC23–118–000.
Applicants: Yellow Pine Solar, LLC,
Yellow Pine Solar Interconnect, LLC.
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) (2022)
require that EAs be completed within 1 year of the
federal action agency’s decision to prepare an EA.
See National Environmental Policy Act, 42 U.S.C.
4321 et seq., as amended by section 107(g)(1)(B)(iii)
of the Fiscal Responsibility Act of 2023, Public Law
118–5, section 4336a, 137 Stat. 42.
E:\FR\FM\23AUN1.SGM
23AUN1
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 88, No. 162 / Wednesday, August 23, 2023 / Notices
Description: Errata to August 10,
2023, Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Yellow Pine Solar,
LLC, et al.
Filed Date: 8/14/23.
Accession Number: 20230814–5285.
Comment Date: 5 p.m. ET 8/31/23.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–259–000.
Applicants: Wildflower Solar 2 LLC.
Description: Wildflower Solar 2 LLC
submits Notice of Self–Certification of
Exempt Wholesale Generator Status.
Filed Date: 8/17/23.
Accession Number: 20230817–5088.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: EG23–260–000.
Applicants: Wildflower Solar 3 LLC.
Description: Wildflower Solar 3 LLC
submits Notice of Self–Certification of
Exempt Wholesale Generator Status.
Filed Date: 8/17/23.
Accession Number: 20230817–5091.
Comment Date: 5 p.m. ET 9/7/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–92–004.
Applicants: Carroll County Energy
LLC.
Description: Compliance filing:
Informational Filing Regarding Transfer
of Ownership to be effective N/A.
Filed Date: 8/17/23.
Accession Number: 20230817–5066.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23–1372–003.
Applicants: Gaucho Solar LLC.
Description: Compliance filing:
Informational Filing Pursuant to
Schedule 2 of the PJM OATT & Request
for Waiver to be effective N/A.
Filed Date: 8/17/23.
Accession Number: 20230817–5123.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23–2040–001.
Applicants: New York Independent
System Operator, Inc.
Description: Tariff Amendment:
NYISO Deficiency Response re: DER
and Aggregation Market Rule Changes to
be effective 12/31/9998.
Filed Date: 8/17/23.
Accession Number: 20230817–5079.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23–2391–001.
Applicants: Public Service Company
of New Mexico.
Description: Tariff Amendment:
Supplemental Filing to PNM CAISO
Phase 2 Enhancements to be effective 7/
1/2023.
Filed Date: 8/17/23.
Accession Number: 20230817–5097.
VerDate Sep<11>2014
17:27 Aug 22, 2023
Jkt 259001
Comment Date: 5 p.m. ET 8/28/23.
Docket Numbers: ER23–2492–001.
Applicants: Gunvor USA LLC.
Description: Tariff Amendment:
Amendment to 1 to be effective 9/24/
2023.
Filed Date: 8/17/23.
Accession Number: 20230817–5110.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23–2638–000.
Applicants: NRG Business Marketing
LLC.
Description: Baseline eTariff Filing:
Notice of Succession and Request for
Waiver to be effective 8/16/2023.
Filed Date: 8/16/23.
Accession Number: 20230816–5142.
Comment Date: 5 p.m. ET 9/6/23.
Docket Numbers: ER23–2639–000.
Applicants: NRG Business Marketing
LLC.
Description: Compliance filing: Notice
of Succession and Request for Waiver to
be effective 8/16/2023.
Filed Date: 8/16/23.
Accession Number: 20230816–5145.
Comment Date: 5 p.m. ET 9/6/23.
Docket Numbers: ER23–2640–000.
Applicants: NorthWestern
Corporation.
Description: NorthWestern
Corporation submits Average System
Cost Filing for Sales of Electric Power to
the Bonneville Power Administration,
FY 2024–2025.
Filed Date: 8/11/23.
Accession Number: 20230811–5187.
Comment Date: 5 p.m. ET 9/1/23.
Docket Numbers: ER23–2641–000.
Applicants: NRG Power Marketing
LLC.
Description: Tariff Amendment:
Notice of Cancellation and Request for
Waiver to be effective 8/1/2023.
Filed Date: 8/16/23.
Accession Number: 20230816–5147.
Comment Date: 5 p.m. ET 9/6/23.
Docket Numbers: ER23–2642–000.
Applicants: NRG Power Marketing
LLC.
Description: Tariff Amendment:
Notice of Cancellation and Request for
Waiver to be effective 8/1/2023.
Filed Date: 8/16/23.
Accession Number: 20230816–5150.
Comment Date: 5 p.m. ET 9/6/23.
Docket Numbers: ER23–2643–000.
Applicants: Portland General Electric
Company.
Description: Portland General Electric
Company submits Average System Cost
Rate Filing for Sales of Electric Power to
the Bonneville Power Administration,
FY 2024–2025.
Filed Date: 8/11/23.
Accession Number: 20230811–5188.
Comment Date: 5 p.m. ET 9/1/23.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
57447
Docket Numbers: ER23–2644–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of WMPA,
Service Agreement No. 5666; Queue No.
AF1–033 to be effective 10/16/2023.
Filed Date: 8/17/23.
Accession Number: 20230817–5026.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23–2645–000.
Applicants: Public Service Company
of New Hampshire.
Description: § 205(d) Rate Filing: First
Amend—Engineering Design
Procurement Agreement—NECEC
Transmission LLC to be effective 8/18/
2023.
Filed Date: 8/17/23.
Accession Number: 20230817–5029.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23–2646–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Hecate Energy
Cedar Springs Solar LGIA Filing to be
effective 8/7/2023.
Filed Date: 8/17/23.
Accession Number: 20230817–5054.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23–2647–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
7042; Queue No. AE1–245 to be
effective 7/18/2023.
Filed Date: 8/17/23.
Accession Number: 20230817–5100.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23–2648–000.
Applicants: Carroll County Energy
LLC.
Description: Request for Limited
Waiver of Carroll County Energy LLC.
Filed Date: 8/17/23.
Accession Number: 20230817–5103.
Comment Date: 5 p.m. ET 9/7/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
E:\FR\FM\23AUN1.SGM
23AUN1
57448
Federal Register / Vol. 88, No. 162 / Wednesday, August 23, 2023 / Notices
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: August 17, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–18109 Filed 8–22–23; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[CERCLA–02–2023–2003; FRL–11171–01–
R2]
Proposed CERCLA Cost Recovery
Settlement for the Frankfort Asbestos
Superfund Site, Village of Frankfort,
Herkimer County, New York
Environmental Protection
Agency.
ACTION: Notice; request for public
comment.
Pasquale Evangelista,
Director, Superfund & Emergency
Management Division U.S. Environmental
Protection Agency Region 2.
In accordance with the
Comprehensive Environmental
Response, Compensation, and Liability
Act of 1980, as amended (‘‘CERCLA’’),
notice is hereby given by the U.S.
Environmental Protection Agency
(‘‘EPA’’), Region 2, of a proposed cost
recovery settlement agreement
(‘‘Settlement’’) pursuant to CERCLA,
with Crown Container Transfer Station
Co., Inc. (‘‘Settling Party’’) for the
Frankfort Asbestos Superfund Site
(‘‘Site’’), located in the Village of
Frankfort, Herkimer County, New York.
DATES: Comments must be submitted on
or before September 22, 2023.
ADDRESSES: Requests for copies of the
proposed Settlement and submission of
comments must be via electronic mail.
Comments should reference the
Frankfort Asbestos Superfund Site,
Frankfort, Herkimer County, New York,
Index No. CERCLA–02–2023–2003. For
those unable to communicate via
BILLING CODE 6560–50–P
AGENCY:
SUMMARY:
lotter on DSK11XQN23PROD with NOTICES1
electronic mail, please contact the EPA
employee identified below.
FOR FURTHER INFORMATION CONTACT:
Jocelyn Scott, Attorney, Office of
Regional Counsel, New York/Caribbean
Superfund Branch, U.S. Environmental
Protection Agency, 290 Broadway, 17th
Floor, New York, NY 10007–1866.
Email: scott.jocelyn@epa.gov Telephone:
212–637–3179.
SUPPLEMENTARY INFORMATION: The
Settling Party will pay $55,000 to the
EPA Hazardous Substance Superfund in
partial reimbursement of EPA’s past
response costs paid in connection with
the Site. This payment shall be made
within 30 days of the Effective Date of
the Settlement. The Settlement includes
a covenant by EPA not to sue or to take
administrative action against the
Settling Party pursuant to section 107(a)
of CERCLA, 42 U.S.C. 9607(a), with
regard to EPA’s past response costs as
provided in the Settlement. For thirty
(30) days following the date of
publication of this notice, EPA will
receive written comments relating to the
Settlement. EPA will consider all
comments received and may modify or
withdraw its consent to the Settlement
if comments received disclose facts or
considerations that indicate that the
proposed Settlement is inappropriate,
improper, or inadequate. EPA’s
response to any comments received will
be available for public inspection at
EPA Region 2, 290 Broadway, New
York, New York 10007–1866.
VerDate Sep<11>2014
17:27 Aug 22, 2023
Jkt 259001
[FR Doc. 2023–18097 Filed 8–22–23; 8:45 am]
FEDERAL COMMUNICATIONS
COMMISSION
[OMB 3060–0967; FR ID 164365]
Information Collection Being Reviewed
by the Federal Communications
Commission
Federal Communications
Commission.
ACTION: Notice and request for
comments.
AGENCY:
As part of its continuing effort
to reduce paperwork burdens, and as
required by the Paperwork Reduction
Act of 1995 (PRA), the Federal
Communications Commission (FCC or
Commission) invites the general public
and other Federal agencies to take this
opportunity to comment on the
following information collections.
SUMMARY:
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Comments are requested concerning:
whether the proposed collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information shall have practical utility;
the accuracy of the Commission’s
burden estimate; ways to enhance the
quality, utility, and clarity of the
information collected; ways to minimize
the burden of the collection of
information on the respondents,
including the use of automated
collection techniques or other forms of
information technology; and ways to
further reduce the information
collection burden on small business
concerns with fewer than 25 employees.
DATES: Written PRA comments should
be submitted on or before October 23,
2023. If you anticipate that you will be
submitting comments but find it
difficult to do so within the period of
time allowed by this notice, you should
advise the contact listed below as soon
as possible.
ADDRESSES: Direct all PRA comments to
Cathy Williams, FCC, via email to PRA@
fcc.gov and to Cathy.Williams@fcc.gov.
FOR FURTHER INFORMATION CONTACT: For
additional information about the
information collection, contact Cathy
Williams at (202) 418–2918.
SUPPLEMENTARY INFORMATION: The FCC
may not conduct or sponsor a collection
of information unless it displays a
currently valid Office of Management
and Budget (OMB) control number. No
person shall be subject to any penalty
for failing to comply with a collection
of information subject to the PRA that
does not display a valid OMB control
number.
OMB Control No.: 3060–0967.
Title: Section 79.2, Accessibility of
Programming Providing Emergency
Information, and Emergency
Information; Section 79.105, Audio
Description and Emergency Information
Accessibility Requirements for All
Apparatus; Section 79.106, Audio
Description and Emergency Information
Accessibility Requirements for
Recording Devices.
Form No.: N/A.
Type of Review: Revision of a
currently approved collection.
Respondents: Individuals or
households; Business or other for-profit;
Not-for-profit institutions; and State,
Local, or Tribal Government.
Number of Respondents and
Responses: 158 respondents; 261
responses.
Estimated Time per Response: 0.5 to
5 hours.
Frequency of Response: Annual and
on occasion reporting requirements;
E:\FR\FM\23AUN1.SGM
23AUN1
Agencies
[Federal Register Volume 88, Number 162 (Wednesday, August 23, 2023)]
[Notices]
[Pages 57446-57448]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-18109]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC23-112-000.
Applicants: Elliott Associates, L.P., Elliott International, L.P.,
The Liverpool Limited Partnership.
Description: Amendment to August 11, 2023, Joint Application for
Authorization Under Section 203 of the Federal Power Act of Elliott
Associates, L.P., et al.
Filed Date: 8/15/23.
Accession Number: 20230815-5177.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: EC23-118-000.
Applicants: Yellow Pine Solar, LLC, Yellow Pine Solar Interconnect,
LLC.
[[Page 57447]]
Description: Errata to August 10, 2023, Joint Application for
Authorization Under Section 203 of the Federal Power Act of Yellow Pine
Solar, LLC, et al.
Filed Date: 8/14/23.
Accession Number: 20230814-5285.
Comment Date: 5 p.m. ET 8/31/23.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG23-259-000.
Applicants: Wildflower Solar 2 LLC.
Description: Wildflower Solar 2 LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 8/17/23.
Accession Number: 20230817-5088.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: EG23-260-000.
Applicants: Wildflower Solar 3 LLC.
Description: Wildflower Solar 3 LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 8/17/23.
Accession Number: 20230817-5091.
Comment Date: 5 p.m. ET 9/7/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-92-004.
Applicants: Carroll County Energy LLC.
Description: Compliance filing: Informational Filing Regarding
Transfer of Ownership to be effective N/A.
Filed Date: 8/17/23.
Accession Number: 20230817-5066.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23-1372-003.
Applicants: Gaucho Solar LLC.
Description: Compliance filing: Informational Filing Pursuant to
Schedule 2 of the PJM OATT & Request for Waiver to be effective N/A.
Filed Date: 8/17/23.
Accession Number: 20230817-5123.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23-2040-001.
Applicants: New York Independent System Operator, Inc.
Description: Tariff Amendment: NYISO Deficiency Response re: DER
and Aggregation Market Rule Changes to be effective 12/31/9998.
Filed Date: 8/17/23.
Accession Number: 20230817-5079.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23-2391-001.
Applicants: Public Service Company of New Mexico.
Description: Tariff Amendment: Supplemental Filing to PNM CAISO
Phase 2 Enhancements to be effective 7/1/2023.
Filed Date: 8/17/23.
Accession Number: 20230817-5097.
Comment Date: 5 p.m. ET 8/28/23.
Docket Numbers: ER23-2492-001.
Applicants: Gunvor USA LLC.
Description: Tariff Amendment: Amendment to 1 to be effective 9/24/
2023.
Filed Date: 8/17/23.
Accession Number: 20230817-5110.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23-2638-000.
Applicants: NRG Business Marketing LLC.
Description: Baseline eTariff Filing: Notice of Succession and
Request for Waiver to be effective 8/16/2023.
Filed Date: 8/16/23.
Accession Number: 20230816-5142.
Comment Date: 5 p.m. ET 9/6/23.
Docket Numbers: ER23-2639-000.
Applicants: NRG Business Marketing LLC.
Description: Compliance filing: Notice of Succession and Request
for Waiver to be effective 8/16/2023.
Filed Date: 8/16/23.
Accession Number: 20230816-5145.
Comment Date: 5 p.m. ET 9/6/23.
Docket Numbers: ER23-2640-000.
Applicants: NorthWestern Corporation.
Description: NorthWestern Corporation submits Average System Cost
Filing for Sales of Electric Power to the Bonneville Power
Administration, FY 2024-2025.
Filed Date: 8/11/23.
Accession Number: 20230811-5187.
Comment Date: 5 p.m. ET 9/1/23.
Docket Numbers: ER23-2641-000.
Applicants: NRG Power Marketing LLC.
Description: Tariff Amendment: Notice of Cancellation and Request
for Waiver to be effective 8/1/2023.
Filed Date: 8/16/23.
Accession Number: 20230816-5147.
Comment Date: 5 p.m. ET 9/6/23.
Docket Numbers: ER23-2642-000.
Applicants: NRG Power Marketing LLC.
Description: Tariff Amendment: Notice of Cancellation and Request
for Waiver to be effective 8/1/2023.
Filed Date: 8/16/23.
Accession Number: 20230816-5150.
Comment Date: 5 p.m. ET 9/6/23.
Docket Numbers: ER23-2643-000.
Applicants: Portland General Electric Company.
Description: Portland General Electric Company submits Average
System Cost Rate Filing for Sales of Electric Power to the Bonneville
Power Administration, FY 2024-2025.
Filed Date: 8/11/23.
Accession Number: 20230811-5188.
Comment Date: 5 p.m. ET 9/1/23.
Docket Numbers: ER23-2644-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Notice of Cancellation of WMPA,
Service Agreement No. 5666; Queue No. AF1-033 to be effective 10/16/
2023.
Filed Date: 8/17/23.
Accession Number: 20230817-5026.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23-2645-000.
Applicants: Public Service Company of New Hampshire.
Description: Sec. 205(d) Rate Filing: First Amend--Engineering
Design Procurement Agreement--NECEC Transmission LLC to be effective 8/
18/2023.
Filed Date: 8/17/23.
Accession Number: 20230817-5029.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23-2646-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Hecate Energy Cedar Springs
Solar LGIA Filing to be effective 8/7/2023.
Filed Date: 8/17/23.
Accession Number: 20230817-5054.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23-2647-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, Service
Agreement No. 7042; Queue No. AE1-245 to be effective 7/18/2023.
Filed Date: 8/17/23.
Accession Number: 20230817-5100.
Comment Date: 5 p.m. ET 9/7/23.
Docket Numbers: ER23-2648-000.
Applicants: Carroll County Energy LLC.
Description: Request for Limited Waiver of Carroll County Energy
LLC.
Filed Date: 8/17/23.
Accession Number: 20230817-5103.
Comment Date: 5 p.m. ET 9/7/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
[[Page 57448]]
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: August 17, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-18109 Filed 8-22-23; 8:45 am]
BILLING CODE 6717-01-P