Combined Notice of Filings #1, 56812-56813 [2023-17901]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
56812
Federal Register / Vol. 88, No. 160 / Monday, August 21, 2023 / Notices
Sciences Advisory Committee (FESAC).
The Federal Advisory Committee Act
requires that public notice of these
meetings be announced in the Federal
Register.
DATES: Monday, September 18, 2023;
12:00 p.m. to 5:00 p.m.
ADDRESSES: This meeting is open to the
public. This meeting will be held
virtually via Zoom. Instructions for
Zoom, as well as any updates to meeting
times or meeting agenda, can be found
on the FESAC meeting website at:
https://science.osti.gov/fes/fesac/
Meetings.
FOR FURTHER INFORMATION CONTACT: Dr.
Samuel J. Barish, Designated Federal
Officer, Office of Fusion Energy
Sciences (FES); U.S. Department of
Energy; Office of Science; 1000
Independence Avenue SW; Washington,
DC 20585; Telephone: (301) 903–2917,
Email address: sam.barish@
science.doe.gov.
SUPPLEMENTARY INFORMATION:
Purpose of the Committee: The
purpose of the Committee is to make
recommendations on a continuing basis
to the Director, Office of Science of the
Department of Energy, on the many
complex scientific and technical issues
that arise in the development and
implementation of the fusion energy
sciences program.
Tentative Agenda:
• Report of the FESAC Subcommittee
on International Benchmarking
• Public Comment
• Adjourn
Public Participation: The meeting is
open to the public. If you would like to
file a written statement with the
Committee, you may do so either before
or after the meeting. If you would like
to make an oral statement regarding any
of the items on the agenda, you should
contact Dr. Barish at sam.barish@
science.doe.gov. Reasonable provision
will be made to include the scheduled
oral statements during the Public
Comment time on the agenda. The
Chairperson of the Committee will
conduct the meeting to facilitate the
orderly conduct of business. Public
comment will follow the 10-minute
rule.
Minutes: The minutes of the meeting
will be available for on the Fusion
Energy Sciences Advisory Committee
website: https://science.osti.gov/fes/
fesac/Meetings.
Signed in Washington, DC, on August 15,
2023.
LaTanya Butler,
Deputy Committee Management Officer.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5596–020]
Town of Bedford, Virginia; Notice of
Waiver Period for Water Quality
Certification Application
On July 31, 2023, the Town of
Bedford, Virginia submitted to the
Federal Energy Regulatory Commission
(Commission) a copy of its request for
a Clean Water Act section 401(a)(1)
water quality certification filed with the
Virginia Department of Environmental
Quality (Virginia DEQ), in conjunction
with the above captioned project.
Pursuant to 40 CFR 121.6 and section
5.23(b) of the Commission’s
regulations,1 we hereby notify the
Virginia DEQ of the following:
Date of Receipt of the Certification
Request: July 28, 2023.
Reasonable Period of Time to Act on
the Certification Request: One year (July
28, 2024).
If Virginia DEQ fails or refuses to act
on the water quality certification request
on or before the above date, then the
agency certifying authority is deemed
waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C.
1341(a)(1).
Dated: August 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–17906 Filed 8–18–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–121–000.
Applicants: Elgin Energy Center, LLC,
Rocky Road Power, LLC, Ricochet
Power, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Elgin Energy
Center, LLC, et al.
Filed Date: 8/14/23.
Accession Number: 20230814–5263.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: EC23–122–000.
Applicants: Elgin Energy Center, LLC,
Rocky Road Power, LLC, Middle River
Power VI LLC, Middle River Power VII
LLC.
[FR Doc. 2023–17876 Filed 8–18–23; 8:45 am]
1 18
BILLING CODE 6450–01–P
VerDate Sep<11>2014
18:17 Aug 18, 2023
Jkt 259001
PO 00000
CFR 5.23(b).
Frm 00021
Fmt 4703
Sfmt 4703
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Elgin Energy
Center, LLC.
Filed Date: 8/14/23.
Accession Number: 20230814–5265.
Comment Date: 5 p.m. ET 9/28/23.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–257–000.
Applicants: Hardy Hills Solar Energy
LLC.
Description: Hardy Hills Solar Energy
LLC submits Notice of Self–Certification
of Exempt Wholesale Generator Status.
Filed Date: 8/15/23.
Accession Number: 20230815–5027.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: EG23–258–000.
Applicants: Grover Hill Wind, LLC.
Description: Grover Hill Wind, LLC
submits Notice of Self–Certification of
Exempt Wholesale Generator Status.
Filed Date: 8/15/23.
Accession Number: 20230815–5044.
Comment Date: 5 p.m. ET 9/5/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–99–009.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing: South
Central MCN LLC Amended
Compliance Filing Pursuant to Order
Issued to be effective 4/1/2018.
Filed Date: 8/15/23.
Accession Number: 20230815–5115.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER19–69–001.
Applicants: Rockland Wind Farm
LLC.
Description: Compliance filing:
Rockland Wind Farm LLC Revised MBR
Tariff to be effective 8/16/2023.
Filed Date: 8/15/23.
Accession Number: 20230815–5072.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23–2526–000.
Applicants: GreenStruxure LOR008,
LLC.
Description: Supplement to July 31,
2023, GreenStruxure LOR008, LLC tariff
filing.
Filed Date: 8/9/23.
Accession Number: 20230809–5193.
Comment Date: 5 p.m. ET 8/30/23.
Docket Numbers: ER23–2622–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, Service Agreement No.
6842; Queue No. AF2–134 to be
effective 7/14/2023.
Filed Date: 8/14/23.
Accession Number: 20230814–5180.
E:\FR\FM\21AUN1.SGM
21AUN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 160 / Monday, August 21, 2023 / Notices
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23–2623–000.
Applicants: Puget Sound Energy, Inc.
Description: § 205(d) Rate Filing: 2nd
Amendment to IA and NITS between
PSE and Boeing to be effective 7/31/
2023.
Filed Date: 8/15/23.
Accession Number: 20230815–5002.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23–2624–000.
Applicants: American Electric Power
Service Corporation, Ohio Power
Company, AEP Ohio Transmission
Company, Inc., PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
American Electric Power Service
Corporation submits tariff filing per
35.13(a)(2)(iii: AEP submits two
Facilities Agreements re: ILDSA, SA No.
1336 to be effective 10/16/2023.
Filed Date: 8/15/23.
Accession Number: 20230815–5073.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23–2625–000.
Applicants: NRG Business Marketing
LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Request for
Waiver to be effective 8/1/2023.
Filed Date: 8/15/23.
Accession Number: 20230815–5076.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23–2626–000.
Applicants: NRG Power Marketing
LLC.
Description: Tariff Amendment:
Notice of Cancellation and Request for
Waiver to be effective 8/1/2023.
Filed Date: 8/15/23.
Accession Number: 20230815–5079.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23–2627–000.
Applicants: Northwest Iowa Power
Cooperative.
Description: Annual Informational
Attachment H filing of Northwest Iowa
Power Cooperative.
Filed Date: 8/15/23.
Accession Number: 20230815–5100.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23–2628–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing: DEFBartow Amended and Restated NITSA
SA 145 to be effective 11/1/2023.
Filed Date: 8/15/23.
Accession Number: 20230815–5101.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23–2629–000.
Applicants: High Banks Wind, LLC.
Description: Baseline eTariff Filing:
High Banks Wind, LLC Application for
Market-Based Rate Authorization to be
effective 10/1/2023.
VerDate Sep<11>2014
18:17 Aug 18, 2023
Jkt 259001
Filed Date: 8/15/23.
Accession Number: 20230815–5104.
Comment Date: 5 p.m. ET 9/5/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: August 15, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–17901 Filed 8–18–23; 8:45 am]
BILLING CODE 6717–01–P
56813
Accession Number: 20230815–5000.
Comment Date: 5 p.m. ET 8/28/23.
Docket Numbers: RP23–937–001.
Applicants: Rockies Express Pipeline
LLC.
Description: Tariff Amendment: REX
2023–08–15 RP23–937 Amendment to
be effective 8/1/2023.
Filed Date: 8/15/23.
Accession Number: 20230815–5085.
Comment Date: 5 p.m. ET 8/28/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: August 15, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–17903 Filed 8–18–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Combined Notice of Filings
Federal Energy Regulatory
Commission
Take notice that the Commission has
received the following Natural Gas and
Oil Pipeline Rate and Refund Report
filings:
Filings in Existing Proceedings
Docket Numbers: PR23–63–002.
Applicants: Black Hills/Kansas Gas
Utility Company, LLC.
Description: § 284.123 Rate Filing:
BHKG Amended SOC Filing to be
effective 8/1/2023.
Filed Date: 8/15/23.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
[Project No. 2800–054]
Essex Company, LLC; Notice of Intent
To File License Application, Filing of
Pre-Application Document (Pad),
Commencement of Pre-Filing Process,
and Scoping, Request For Comments
on the Pad and Scoping Document,
and Identification of Issues and
Associated Study Requests
a. Type of Filing: Notice of Intent to
File License Application for a New
E:\FR\FM\21AUN1.SGM
21AUN1
Agencies
[Federal Register Volume 88, Number 160 (Monday, August 21, 2023)]
[Notices]
[Pages 56812-56813]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-17901]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC23-121-000.
Applicants: Elgin Energy Center, LLC, Rocky Road Power, LLC,
Ricochet Power, LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Elgin Energy Center, LLC, et al.
Filed Date: 8/14/23.
Accession Number: 20230814-5263.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: EC23-122-000.
Applicants: Elgin Energy Center, LLC, Rocky Road Power, LLC, Middle
River Power VI LLC, Middle River Power VII LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Elgin Energy Center, LLC.
Filed Date: 8/14/23.
Accession Number: 20230814-5265.
Comment Date: 5 p.m. ET 9/28/23.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG23-257-000.
Applicants: Hardy Hills Solar Energy LLC.
Description: Hardy Hills Solar Energy LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 8/15/23.
Accession Number: 20230815-5027.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: EG23-258-000.
Applicants: Grover Hill Wind, LLC.
Description: Grover Hill Wind, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 8/15/23.
Accession Number: 20230815-5044.
Comment Date: 5 p.m. ET 9/5/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-99-009.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: South Central MCN LLC Amended
Compliance Filing Pursuant to Order Issued to be effective 4/1/2018.
Filed Date: 8/15/23.
Accession Number: 20230815-5115.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER19-69-001.
Applicants: Rockland Wind Farm LLC.
Description: Compliance filing: Rockland Wind Farm LLC Revised MBR
Tariff to be effective 8/16/2023.
Filed Date: 8/15/23.
Accession Number: 20230815-5072.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23-2526-000.
Applicants: GreenStruxure LOR008, LLC.
Description: Supplement to July 31, 2023, GreenStruxure LOR008, LLC
tariff filing.
Filed Date: 8/9/23.
Accession Number: 20230809-5193.
Comment Date: 5 p.m. ET 8/30/23.
Docket Numbers: ER23-2622-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised ISA, Service
Agreement No. 6842; Queue No. AF2-134 to be effective 7/14/2023.
Filed Date: 8/14/23.
Accession Number: 20230814-5180.
[[Page 56813]]
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23-2623-000.
Applicants: Puget Sound Energy, Inc.
Description: Sec. 205(d) Rate Filing: 2nd Amendment to IA and NITS
between PSE and Boeing to be effective 7/31/2023.
Filed Date: 8/15/23.
Accession Number: 20230815-5002.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23-2624-000.
Applicants: American Electric Power Service Corporation, Ohio Power
Company, AEP Ohio Transmission Company, Inc., PJM Interconnection,
L.L.C.
Description: Sec. 205(d) Rate Filing: American Electric Power
Service Corporation submits tariff filing per 35.13(a)(2)(iii: AEP
submits two Facilities Agreements re: ILDSA, SA No. 1336 to be
effective 10/16/2023.
Filed Date: 8/15/23.
Accession Number: 20230815-5073.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23-2625-000.
Applicants: NRG Business Marketing LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Request for Waiver to be effective 8/1/2023.
Filed Date: 8/15/23.
Accession Number: 20230815-5076.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23-2626-000.
Applicants: NRG Power Marketing LLC.
Description: Tariff Amendment: Notice of Cancellation and Request
for Waiver to be effective 8/1/2023.
Filed Date: 8/15/23.
Accession Number: 20230815-5079.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23-2627-000.
Applicants: Northwest Iowa Power Cooperative.
Description: Annual Informational Attachment H filing of Northwest
Iowa Power Cooperative.
Filed Date: 8/15/23.
Accession Number: 20230815-5100.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23-2628-000.
Applicants: Duke Energy Florida, LLC.
Description: Sec. 205(d) Rate Filing: DEF-Bartow Amended and
Restated NITSA SA 145 to be effective 11/1/2023.
Filed Date: 8/15/23.
Accession Number: 20230815-5101.
Comment Date: 5 p.m. ET 9/5/23.
Docket Numbers: ER23-2629-000.
Applicants: High Banks Wind, LLC.
Description: Baseline eTariff Filing: High Banks Wind, LLC
Application for Market-Based Rate Authorization to be effective 10/1/
2023.
Filed Date: 8/15/23.
Accession Number: 20230815-5104.
Comment Date: 5 p.m. ET 9/5/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene, to protest, or to answer a
complaint in any of the above proceedings must file in accordance with
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211,
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the
specified comment date. Protests may be considered, but intervention is
necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: August 15, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-17901 Filed 8-18-23; 8:45 am]
BILLING CODE 6717-01-P