Download as PDF Federal Register / Vol. 88, No. 159 / Friday, August 18, 2023 / Notices public comments will be limited to two (2) minutes per person, with a total public comment period of up to 10 minutes per day. If more speakers register than there is space available on the agenda, PCAST will select speakers on a first-come, first-served basis from those who registered. Those not able to present oral comments may file written comments with the council. Written Comments: Although written comments are accepted continuously, written comments should be submitted to PCAST@ostp.eop.gov no later than 12:00 p.m. Eastern Time on September 1, 2023, so that the comments can be made available to the PCAST members for their consideration prior to this meeting. PCAST operates under the provisions of FACA, all public comments and/or presentations will be treated as public documents and will be made available for public inspection, including being posted on the PCAST website at: www.whitehouse.gov/PCAST/meetings. Minutes: Minutes will be available within 45 days at: www.whitehouse.gov/ PCAST/meetings. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov Dated: August 14, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–17798 Filed 8–17–23; 8:45 am] Signed in Washington, DC, on August 14, 2023. LaTanya Butler, Deputy Committee Management Officer. BILLING CODE 6717–01–P [FR Doc. 2023–17749 Filed 8–17–23; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6450–01–P DEPARTMENT OF ENERGY [Project No. 3509–000] DEPARTMENT OF ENERGY Little Falls Hydroelectric Associates, LP; Notice of Authorization for Continued Project Operation Federal Energy Regulatory Commission 56611 project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 3509 is issued to Little Falls Hydroelectric Associates, LP, for a period effective September 1, 2023, through August 31, 2024, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before August 31, 2024, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Little Falls Hydroelectric Associates, LP, is authorized to continue operation of the Little Falls Hydroelectric Project under the terms and conditions of the prior license until the issuance of a subsequent license for the project or other disposition under the FPA, whichever comes first. Dated: August 14, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–17802 Filed 8–17–23; 8:45 am] BILLING CODE 6717–01–P Combined Notice of Filings lotter on DSK11XQN23PROD with NOTICES1 Take notice that the Commission has received the following Natural Gas and Oil Pipeline Rate and Refund Report filings: Filings in Existing Proceedings Docket Numbers: RP23–377–000. Applicants: WBI Energy Transmission, Inc. Description: Report Filing: 2023 Updated Statements and Schedules to be effective N/A. Filed Date: 8/14/23. Accession Number: 20230814–5029. Comment Date: 5 p.m. ET 8/28/23. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. VerDate Sep<11>2014 18:26 Aug 17, 2023 Jkt 259001 The license for the Little Falls Hydroelectric Project No. 3509 was issued for a period ending August 31, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–110–000. Applicants: 2018 ESA Project Company, LLC, AL Fuel Cell Acquirer, LLC. Description: Supplement to July 18, 2023, Joint Application for Authorization Under Section 203 of the Federal Power Act of 2018 ESA Project Company, LLC, et al. Filed Date: 7/26/23. Accession Number: 20230726–5107. Comment Date: 5 p.m. ET 8/24/23. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–254–000. E:\FR\FM\18AUN1.SGM 18AUN1 lotter on DSK11XQN23PROD with NOTICES1 56612 Federal Register / Vol. 88, No. 159 / Friday, August 18, 2023 / Notices Applicants: Cereal City Solar, LLC. Description: Cereal City Solar, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 8/11/23. Accession Number: 20230811–5154. Comment Date: 5 p.m. ET 9/1/23. Docket Numbers: EG23–255–000. Applicants: AES WR Limited Partnership. Description: AES WR Limited Partnership submits Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 8/14/23. Accession Number: 20230814–5069. Comment Date: 5 p.m. ET 9/5/23. Docket Numbers: EG23–256–000. Applicants: High Banks Wind, LLC. Description: High Banks Wind, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 8/14/23. Accession Number: 20230814–5099. Comment Date: 5 p.m. ET 9/5/23. Take notice that the Commission received the following Complaints and Compliance filings in EL Dockets: Docket Numbers: EL23–91–000. Applicants: Michigan Electric Transmission Company, LLC, et al v. Michigan Public Power Agency. Description: Complaint of Michigan Electric Transmission Company, LLC, et al. v. Michigan Public Power Agency. Filed Date: 8/11/23. Accession Number: 20230811–5173. Comment Date: 5 p.m. ET 8/31/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2033–009; ER17–1972–001; ER15–190–021; ER22– 2042–001; ER12–2337–001; ER12–2338– 001; ER19–2684–002; ER23–256–002; ER23–246–002; ER12–2349–001; ER18– 1343–014; ER16–355–004; ER16–141– 006; ER15–255–005; ER10–2032–010; ER12–2313–007; ER10–1330–009; ER18–2466–002; ER18–2465–002; ER19–2343–003; ER17–2336–007; ER13–2387–010. Applicants: Duke Energy Florida, Inc., Shoreham Solar Commons LLC,2018 ESA Project Company, LLC, Potter Road Powerhouse LLC, Federal Way Powerhouse LLC, North Allegheny Wind, LLC, Laurel Hill Wind Energy, LLC, Duke Energy Kentucky, Inc., Duke Energy Beckjord Storage, LLC, Conetoe II Solar, LLC, Colonial Eagle Solar, LLC, Carolina Solar Power, LLC, Kit Carson Windpower, LLC, Happy Jack Windpower, LLC, Silver Sage Windpower, LLC, Palmer Solar, LLC, Top of the World Wind Energy, LLC, Three Buttes Windpower, LLC, Jackpot VerDate Sep<11>2014 18:26 Aug 17, 2023 Jkt 259001 Holdings, LLC, Duke Energy Renewable Services, LLC, Duke Energy Renewable Services, LLC, Duke Energy Ohio, Inc. Description: Supplement to Duke Energy Ohio, Inc, et al. Filed Date: 3/7/23. Accession Number: 20230307–5187. Comment Date: 5 p.m. ET 9/5/23. Docket Numbers: ER22–2357–001. Applicants: ISO New England Inc., Eversource Energy Service Company (as agent), Cross-Sound Cable Company, LLC, New England Power Pool Participants Committee, The United Illuminating Company. Description: Compliance filing: ISO New England Inc. submits tariff filing per 35: ISO–NE.; Further Compliance with Order No. 881—Docket No. ER22– 2357 to be effective 7/12/2025. Filed Date: 8/14/23. Accession Number: 20230814–5092. Comment Date: 5 p.m. ET 9/5/23. Docket Numbers: ER22–2363–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2023– 08–14_Compliance Filing on Order 881 Managing Transmission Line Ratings to be effective 7/11/2025. Filed Date: 8/14/23. Accession Number: 20230814–5122. Comment Date: 5 p.m. ET 9/5/23. Docket Numbers: ER23–2203–001. Applicants: Wildflower Solar, LLC. Description: Tariff Amendment: Amendment to Market-Based Rate Application to be effective 8/21/2023. Filed Date: 8/14/23. Accession Number: 20230814–5108. Comment Date: 5 p.m. ET 9/5/23. Docket Numbers: ER23–2296–001. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Amendment of NSA, SA No. 6989; Queue No. AE1–040 in Docket ER23– 2296–000 to be effective 8/29/2023. Filed Date: 8/11/23. Accession Number: 20230811–5133. Comment Date: 5 p.m. ET 9/1/23. Docket Numbers: ER23–2612–001. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Correction to Revisions to Sch. 12— Appx A and C—July 2023 RTEP to be effective 11/9/2023. Filed Date: 8/14/23. Accession Number: 20230814–5118. Comment Date: 5 p.m. ET 9/5/23. Docket Numbers: ER23–2617–000. Applicants: Orlando Utilities Commission. Description: § 205(d) Rate Filing: Certificate of Concurrence with Duke Energy Florida N–C LGIA to be effective 10/1/2023. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 Filed Date: 8/11/23. Accession Number: 20230811–5132. Comment Date: 5 p.m. ET 9/1/23. Docket Numbers: ER23–2618–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 7033; Queue No. AF2–166 to be effective 7/14/2023. Filed Date: 8/14/23. Accession Number: 20230814–5030. Comment Date: 5 p.m. ET 9/5/23. Docket Numbers: ER23–2619–000. Applicants: BP Energy Holding Company LLC. Description: Tariff Amendment: Notice of Cancellation of Market-Based Rate Tariff and Request for Waiver to be effective 8/15/2023. Filed Date: 8/14/23. Accession Number: 20230814–5040. Comment Date: 5 p.m. ET 9/5/23. Docket Numbers: ER23–2620–000. Applicants: ISO New England Inc. Description: ISO New England Inc. submits Capital Budget Quarterly Filing for Second Quarter of 2023. Filed Date: 8/11/23. Accession Number: 20230811–5186. Comment Date: 5 p.m. ET 9/1/23. Docket Numbers: ER23–2621–000. Applicants: PacifiCorp. Description: Tariff Amendment: Notice of Termination of Cost-Based Load Service Contract to be effective 10/ 14/2023. Filed Date: 8/14/23. Accession Number: 20230814–5091. Comment Date: 5 p.m. ET 9/5/23. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH23–15–000. Applicants: Revity Energy, LLC. Description: Revity Energy LLC submits FERC 65–A Exemption Notification. Filed Date: 8/11/23. Accession Number: 20230811–5182. Comment Date: 5 p.m. ET 9/1/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. E:\FR\FM\18AUN1.SGM 18AUN1 Federal Register / Vol. 88, No. 159 / Friday, August 18, 2023 / Notices eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202)502–6595 or OPP@ ferc.gov. interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact the Federal Energy Regulatory Commission at FercOnlineSupport@ ferc.gov or call toll-free, (886) 208–3676 or TTY (202) 502–8659. Any questions concerning this request should be directed to Michael E. McMahon, Senior Vice President and General Counsel, Gulf South Pipeline Company, LLC, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, or phone (713)-479–3480, or by email Mike.McMahon@bwpipelines.com. Dated: August 14, 2023. Debbie-Anne A. Reese, Deputy Secretary. Public Participation [FR Doc. 2023–17797 Filed 8–17–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–524–000] lotter on DSK11XQN23PROD with NOTICES1 Gulf South Pipeline Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on August 4, 2023, Gulf South Pipeline Company, LLC (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed in the above referenced docket, a prior notice request pursuant to sections 157.205(b) and 157.210 of the Commission’s regulations under the Natural Gas Act (NGA), and Gulf South’s blanket certificate issued in Docket No. CP82– 430–000 for authorization to modify the firm capacity of its Index 99 Loop (Index 99L) line and to operate Index 99L at the new modified capacity. Index 99L is located between San Augustine, Texas and Magasco, Texas. The project will allow Gulf South to increase the certificated firm capacity of Index 99L from 505,000 dekatherms per day (Dth/ d) to 605,000 Dth/d. The estimated cost for the project is $143,100, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all VerDate Sep<11>2014 18:26 Aug 17, 2023 Jkt 259001 There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on October 13, 2023. How to file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is October 13, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is October 13, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) 1 18 2 Persons PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 56613 3 18 CFR 157.205(e). CFR 385.214. 5 18 CFR 157.10. 4 18 E:\FR\FM\18AUN1.SGM 18AUN1

Agencies

[Federal Register Volume 88, Number 159 (Friday, August 18, 2023)]
[Notices]
[Pages 56611-56613]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-17797]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC23-110-000.
    Applicants: 2018 ESA Project Company, LLC, AL Fuel Cell Acquirer, 
LLC.
    Description: Supplement to July 18, 2023, Joint Application for 
Authorization Under Section 203 of the Federal Power Act of 2018 ESA 
Project Company, LLC, et al.
    Filed Date: 7/26/23.
    Accession Number: 20230726-5107.
    Comment Date: 5 p.m. ET 8/24/23.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG23-254-000.

[[Page 56612]]

    Applicants: Cereal City Solar, LLC.
    Description: Cereal City Solar, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 8/11/23.
    Accession Number: 20230811-5154.
    Comment Date: 5 p.m. ET 9/1/23.

    Docket Numbers: EG23-255-000.
    Applicants: AES WR Limited Partnership.
    Description: AES WR Limited Partnership submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5069.
    Comment Date: 5 p.m. ET 9/5/23.

    Docket Numbers: EG23-256-000.
    Applicants: High Banks Wind, LLC.
    Description: High Banks Wind, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5099.
    Comment Date: 5 p.m. ET 9/5/23.

    Take notice that the Commission received the following Complaints 
and Compliance filings in EL Dockets:

    Docket Numbers: EL23-91-000.
    Applicants: Michigan Electric Transmission Company, LLC, et al v. 
Michigan Public Power Agency.
    Description: Complaint of Michigan Electric Transmission Company, 
LLC, et al. v. Michigan Public Power Agency.
    Filed Date: 8/11/23.
    Accession Number: 20230811-5173.
    Comment Date: 5 p.m. ET 8/31/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2033-009; ER17-1972-001; ER15-190-021; ER22-
2042-001; ER12-2337-001; ER12-2338-001; ER19-2684-002; ER23-256-002; 
ER23-246-002; ER12-2349-001; ER18-1343-014; ER16-355-004; ER16-141-006; 
ER15-255-005; ER10-2032-010; ER12-2313-007; ER10-1330-009; ER18-2466-
002; ER18-2465-002; ER19-2343-003; ER17-2336-007; ER13-2387-010.
    Applicants: Duke Energy Florida, Inc., Shoreham Solar Commons 
LLC,2018 ESA Project Company, LLC, Potter Road Powerhouse LLC, Federal 
Way Powerhouse LLC, North Allegheny Wind, LLC, Laurel Hill Wind Energy, 
LLC, Duke Energy Kentucky, Inc., Duke Energy Beckjord Storage, LLC, 
Conetoe II Solar, LLC, Colonial Eagle Solar, LLC, Carolina Solar Power, 
LLC, Kit Carson Windpower, LLC, Happy Jack Windpower, LLC, Silver Sage 
Windpower, LLC, Palmer Solar, LLC, Top of the World Wind Energy, LLC, 
Three Buttes Windpower, LLC, Jackpot Holdings, LLC, Duke Energy 
Renewable Services, LLC, Duke Energy Renewable Services, LLC, Duke 
Energy Ohio, Inc.
    Description: Supplement to Duke Energy Ohio, Inc, et al.
    Filed Date: 3/7/23.
    Accession Number: 20230307-5187.
    Comment Date: 5 p.m. ET 9/5/23.

    Docket Numbers: ER22-2357-001.
    Applicants: ISO New England Inc., Eversource Energy Service Company 
(as agent), Cross-Sound Cable Company, LLC, New England Power Pool 
Participants Committee, The United Illuminating Company.
    Description: Compliance filing: ISO New England Inc. submits tariff 
filing per 35: ISO-NE.; Further Compliance with Order No. 881--Docket 
No. ER22-2357 to be effective 7/12/2025.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5092.
    Comment Date: 5 p.m. ET 9/5/23.

    Docket Numbers: ER22-2363-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Compliance filing: 2023-08-14_Compliance Filing on 
Order 881 Managing Transmission Line Ratings to be effective 7/11/2025.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5122.
    Comment Date: 5 p.m. ET 9/5/23.

    Docket Numbers: ER23-2203-001.
    Applicants: Wildflower Solar, LLC.
    Description: Tariff Amendment: Amendment to Market-Based Rate 
Application to be effective 8/21/2023.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5108.
    Comment Date: 5 p.m. ET 9/5/23.

    Docket Numbers: ER23-2296-001.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Amendment of NSA, SA No. 6989; Queue 
No. AE1-040 in Docket ER23-2296-000 to be effective 8/29/2023.
    Filed Date: 8/11/23.
    Accession Number: 20230811-5133.
    Comment Date: 5 p.m. ET 9/1/23.

    Docket Numbers: ER23-2612-001.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Correction to Revisions to Sch. 12--
Appx A and C--July 2023 RTEP to be effective 11/9/2023.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5118.
    Comment Date: 5 p.m. ET 9/5/23.

    Docket Numbers: ER23-2617-000.
    Applicants: Orlando Utilities Commission.
    Description: Sec.  205(d) Rate Filing: Certificate of Concurrence 
with Duke Energy Florida N-C LGIA to be effective 10/1/2023.
    Filed Date: 8/11/23.
    Accession Number: 20230811-5132.
    Comment Date: 5 p.m. ET 9/1/23.

    Docket Numbers: ER23-2618-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 7033; Queue No. AF2-166 to be effective 7/14/2023.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5030.
    Comment Date: 5 p.m. ET 9/5/23.

    Docket Numbers: ER23-2619-000.
    Applicants: BP Energy Holding Company LLC.
    Description: Tariff Amendment: Notice of Cancellation of Market-
Based Rate Tariff and Request for Waiver to be effective 8/15/2023.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5040.
    Comment Date: 5 p.m. ET 9/5/23.

    Docket Numbers: ER23-2620-000.
    Applicants: ISO New England Inc.
    Description: ISO New England Inc. submits Capital Budget Quarterly 
Filing for Second Quarter of 2023.
    Filed Date: 8/11/23.
    Accession Number: 20230811-5186.
    Comment Date: 5 p.m. ET 9/1/23.

    Docket Numbers: ER23-2621-000.
    Applicants: PacifiCorp.
    Description: Tariff Amendment: Notice of Termination of Cost-Based 
Load Service Contract to be effective 10/14/2023.
    Filed Date: 8/14/23.
    Accession Number: 20230814-5091.
    Comment Date: 5 p.m. ET 9/5/23.

    Take notice that the Commission received the following public 
utility holding company filings:

    Docket Numbers: PH23-15-000.
    Applicants: Revity Energy, LLC.
    Description: Revity Energy LLC submits FERC 65-A Exemption 
Notification.
    Filed Date: 8/11/23.
    Accession Number: 20230811-5182.
    Comment Date: 5 p.m. ET 9/1/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date.
    Protests may be considered, but intervention is necessary to become 
a party to the proceeding.

[[Page 56613]]

    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202)502-6595 or [email protected].

    Dated: August 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-17797 Filed 8-17-23; 8:45 am]
BILLING CODE 6717-01-P