Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to the Pier 58 Reconstruction Project in Seattle, Washington, 56004-56009 [2023-17682]

Download as PDF 56004 Federal Register / Vol. 88, No. 158 / Thursday, August 17, 2023 / Notices Producer/exporter Jinko Solar Import and Export Co., Ltd.7 ............................... Risen Energy Co., Ltd.8 ........... Non-Examined Companies 9 .... Subsidy rate (percent ad valorem) 10.34 18.95 15.33 Disclosure We intend to disclose the calculations performed for these amended final results in accordance with 19 CFR 351.224(b). Assessment Rates Pursuant to section 751(a)(2)(C) of the Act and 19 CFR 351.212(b)(1), Commerce shall determine, and U.S. Customs and Border Protections (CBP) shall assess, countervailing duties on all appropriate entries of subject merchandise in accordance with the amended final results of this review. Commerce intends to issue assessment instructions to CBP no earlier than 35 days after the date of publication of these amended final results of this review in the Federal Register. However, Risen has filed a summons at the U.S. Court of International Trade challenging the Final Results. Therefore, our assessment instructions will direct CBP not to liquidate relevant entries until the time for parties to file a request for a statutory injunction has expired (i.e., within 90 days of publication of this notice). Cash Deposit Requirements In accordance with section 751(a)(2)(C) of the Act, Commerce also ddrumheller on DSK120RN23PROD with NOTICES1 7 This rate applies to Jinko Solar Import and Export Co., Ltd. and its cross-owned companies: Zhejiang Jinko Solar Co., Ltd.; JinkoSolar Technology (Haining) Co., Ltd.; Jinko Solar Co., Ltd.; Yuhuan Jinko Solar Co., Ltd.; JinkoSolar (Chuzhou) Co., Ltd.; JinkoSolar (Yiwu) Co., Ltd.; JinkoSolar (Shangrao) Co., Ltd.; Xinjiang Jinko Solar Co., Ltd.; JinkoSolar (Sichuan) Co., Ltd.; Jiangxi Jinko Photovoltaic Materials Co., Ltd.; Ruixu Industrial Co., Ltd.; and Jinko Solar (Shanghai) Management Co., Ltd. 8 This rate applies Risen Energy Co., Ltd. and its cross-owned companies: Risen Energy (Luoyang) Co., Ltd.; Risen Energy (Wuhai) Co., Ltd.; Risen Energy (Changzhou) Co., Ltd.; Risen Energy (Ningbo) Co., Ltd.; Risen Energy (Yiwu) Co., Ltd.; Zhejiang Boxin Investment Co., Ltd.; Zhejiang Twinsel Electronic Technology Co., Ltd.; Jiangsu Sveck New Material Co., Ltd.; Changzhou Sveck Photovoltaic New Material Co., Ltd. (including Changzhou Sveck Photovoltaic New Material Co., Ltd. Jintan Danfeng Road Branch); Changzhou Sveck New Material Technology Co., Ltd.; Ninghai Risen Energy Power Development Co., Ltd.; Risen (Ningbo) Electric Power Development Co., Ltd.; Changzhou Jintan Ningsheng Electricity Power Co., Ltd.; and Risen (Changzhou) Import and Export Co., Ltd. 9 See the appendix to this notice for a list of all companies that remain under review but were not selected for individual examination and to which Commerce has assigned the non-examined company rate. VerDate Sep<11>2014 21:36 Aug 16, 2023 Jkt 259001 intends to instruct CBP to collect cash deposits of estimated countervailing duties in the amounts shown for the companies subject to this review, effective July 11, 2023, the date of publication of the Final Results in the Federal Register. For all non-reviewed companies, CBP will continue to collect cash deposits of estimated countervailing duties at the most recent company-specific or all-others rate applicable to the company, as appropriate. These cash deposits, when imposed, shall remain in effect until further notice. Administrative Protective Order This notice serves as a final reminder to parties subject to an administrative protective order (APO) of their responsibility concerning the destruction of proprietary information disclosed under APO in accordance with 19 CFR 351.305(a)(3). Timely written notification of the return or destruction of APO materials or conversion to a judicial protective order is hereby requested. Failure to comply with the regulations and the terms of an APO is a sanctionable violation. Notification to Interested Parties We are issuing and publishing these amended final results of the review in accordance with sections 751(h) and 777(i) of the Act and 19 CFR 351.224(e). Dated: August 11, 2023. Lisa W. Wang, Assistant Secretary for Enforcement and Compliance. Appendix Non-Examined Companies Under Review 1. Anji Dasol Solar Energy Science & Technology Co., Ltd. 2. BYD (Shangluo) Industrial Co., Ltd.; Shanghai BYD Co., Ltd. 3. Chint New Energy Technology (Haining) Co., Ltd. 4. Chint Solar (Zhejiang) Co., Ltd. 5. JA Solar (Xingtai) Co., Ltd. 6. JA Solar Technology Yangzhou Co., Ltd. 7. Jiangsu High Hope Int’l Group 8. Jiangsu Huayou International Logistics 9. LONGi Solar Technology Co., Ltd. 10. Shanghai JA Solar Technology Co., Ltd. 11. Shenzhen Sungold Solar Co., Ltd. 12. Suntech Power Co., Ltd. 13. Toenergy Technology Hangzhou Co., Ltd. 14. Trina Solar (Changzhou) Science and Technology Co., Ltd. 15. Trina Solar Co., Ltd. 16. Wuxi Tianran Photovoltaic Co., Ltd. 17. Yingli Energy (China) Co., Ltd. 18. Changzhou Trina Solar Energy Co., Ltd.; Changzhou Trina Solar Yabang Energy Co., Ltd.; Hubei Trina Solar Energy Co., Ltd.; Turpan Trina Solar Energy Co., Ltd.; Yancheng Trina Solar Energy Technology Co., Ltd.; Changzhou Trina PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 PV Ribbon Materials Co., Ltd. [FR Doc. 2023–17704 Filed 8–16–23; 8:45 am] BILLING CODE 3510–DS–P DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration [RTID 0648–XD237] Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to the Pier 58 Reconstruction Project in Seattle, Washington National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice; issuance of renewal incidental harassment authorization. AGENCY: In accordance with the regulations implementing the Marine Mammal Protection Act (MMPA), as amended, notification is hereby given that NMFS has issued a renewal incidental harassment authorization (IHA) to the City of Seattle, Washington (City) to incidentally harass marine mammals incidental to the Pier 58 Reconstruction Project. DATES: This renewal IHA is effective from August 10, 2023 through July 31, 2024. FOR FURTHER INFORMATION CONTACT: Robert Pauline, Office of Protected Resources, NMFS, (301) 427–8401. SUPPLEMENTARY INFORMATION: SUMMARY: Background The Marine Mammal Protection Act (MMPA) prohibits the ‘‘take’’ of marine mammals, with certain exceptions. Sections 101(a)(5)(A) and (D) of the MMPA (16 U.S.C. 1361 et seq.) direct the Secretary of Commerce (as delegated to NMFS) to allow, upon request, the incidental, but not intentional, taking of small numbers of marine mammals by U.S. citizens who engage in a specified activity (other than commercial fishing) within a specified geographical region if certain findings are made and either regulations are issued or, if the taking is limited to harassment, an incidental harassment authorization is issued. Authorization for incidental takings shall be granted if NMFS finds that the taking will have a negligible impact on the species or stock(s) and will not have an unmitigable adverse impact on the availability of the species or stock(s) for taking for subsistence uses (where relevant). Further, NMFS must prescribe the permissible methods of taking and E:\FR\FM\17AUN1.SGM 17AUN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 88, No. 158 / Thursday, August 17, 2023 / Notices other ‘‘means of effecting the least practicable adverse impact’’ on the affected species or stocks and their habitat, paying particular attention to rookeries, mating grounds, and areas of similar significance, and on the availability of such species or stocks for taking for certain subsistence uses (referred to here as ‘‘mitigation measures’’). Monitoring and reporting of such takings are also required. The meaning of key terms such as ‘‘take,’’ ‘‘harassment,’’ and ‘‘negligible impact’’ can be found in section 3 of the MMPA (16 U.S.C. 1362) and the agency’s regulations at 50 CFR 216.103. NMFS’ regulations implementing the MMPA at 50 CFR 216.107(e) indicate that IHAs may be renewed for additional periods of time not to exceed 1 year for each reauthorization. In the notice of proposed IHA for the initial authorization, NMFS described the circumstances under which we would consider issuing a renewal for this activity, and requested public comment on a potential renewal under those circumstances. Specifically, on a caseby-case basis, NMFS may issue a 1-time 1-year renewal IHA following notice to the public providing an additional 15 days for public comments when (1) up to another year of identical, or nearly identical, activities as described in the Detailed Description of Specified Activities section of the initial IHA issuance notice is planned, or (2) the activities as described in the Description of the Specified Activities and Anticipated Impacts section of the initial IHA issuance notice would not be completed by the time the initial IHA expires and a renewal would allow for completion of the activities beyond that described in the DATES section of the notice of issuance of the initial IHA, provided all of the following conditions are met; 1. A request for renewal is received no later than 60 days prior to the needed renewal IHA effective date (recognizing that the renewal IHA expiration date cannot extend beyond 1 year from expiration of the initial IHA). 2. The request for renewal must include the following: • An explanation that the activities to be conducted under the requested renewal IHA are identical to the activities analyzed under the initial IHA, are a subset of the activities, or include changes so minor (e.g., reduction in pile size) that the changes do not affect the previous analyses, mitigation and monitoring requirements, or take estimates (with the exception of reducing the type or amount of take); and VerDate Sep<11>2014 21:36 Aug 16, 2023 Jkt 259001 • A preliminary monitoring report showing the results of the required monitoring to date and an explanation showing that the monitoring results do not indicate impacts of a scale or nature not previously analyzed or authorized; and 3. Upon review of the request for renewal, the status of the affected species or stocks, and any other pertinent information, NMFS determines that there are no more than minor changes in the activities, the mitigation and monitoring measures will remain the same and appropriate, and the findings in the initial IHA remain valid. An additional public comment period of 15 days (for a total of 45 days), with direct notice by email, phone, or postal service to commenters on the initial IHA, is provided to allow for any additional comments on the proposed renewal. A description of the renewal process may be found on our website at: www.fisheries.noaa.gov/national/ marine-mammal-protection/incidentalharassment-authorization-renewals. 56005 vibratory removal of existing in-water piles and vibratory and impact installation of new piles. The reconstructed pier requires installation of 120 permanent 30-inch steel piles by vibratory hammer and impact proofing. Under the initial IHA, 76 steel piles were successfully installed. The remaining 44 piles, which represent a subset of the originally planned 120 piles, would be installed under the renewal IHA. In addition, installation of 100 24-inch temporary steel template piles by vibratory hammer and impact proofing was analyzed for the initial IHA. The 24-inch piles were to be subsequently removed by vibratory extraction. However, none of the 100 24inch temporary piles were installed during Season 1 and these piles may not be required at all under the renewal IHA. At most, a subset of 33 24-inch temporary piles would be utilized. A total of 31 existing steel H-piles and timber piles were removed under the initial IHA by pulling the piles using vibratory extraction or the clamshell bucket method. The nearly identical activity included under the renewal IHA History of Request is the removal of eight 12-inch creosote On May 20, 2022, NMFS issued an IHA to the City to take marine mammals timber piles (1 day) by vibratory incidental to the Pier 58 Reconstruction hammer and the vibratory installation of eight 16-inch steel piles (2 days) at the Project in Seattle, Washington (87 FR nearby Don Armeni Boat Ramp. All in31985), effective from August 1, 2022 water work with the potential to affect through July 31, 2023. NMFS received marine mammals will occur during the an application for the renewal of that work window allowed by NOAA, U.S. initial IHA on April 3, 2023. As described in the application for renewal Fish and Wildlife Service, U.S. Army Corps of Engineers, and Washington IHA, the activities for which the State Department of Fish and Wildlife. renewal IHA was issued are a subset of For this renewal request, this window is those covered in the initial anticipated to be September 1, 2023, authorization in addition to a small through February 15, 2024. Pile removal amount of nearly identical work that and installation will occur during was not covered under the initial IHA. daylight hours, typically during a work As required, the City also provided a preliminary monitoring report (available shift of 8 hours or fewer. The work would include periods of vibratory at: https://www.fisheries.noaa.gov/ removal of timber piles, vibratory action/incidental-take-authorizationinstallation of steel piles, and impact city-seattle-pier-58-reconstructionproject-seattle-wa) which confirmed that installation of steel piles. Under the initial IHA, take by Level it had implemented the required B harassment was authorized for 11 mitigation and monitoring, and which species/stocks and limited take by Level also showed that no impacts of a scale A harassment was authorized for 3 of or nature not previously analyzed or these species (harbor porpoise authorized occurred as a result of the (Phocoena phocoena), Dall’s porpoise activities conducted. (Phocoenoides dalli), and harbor seal Description of the Specified Activities (Phoca vitulina)). No species were and Anticipated Impacts observed in the estimated Level A harassment zones during Season 1 pile The City is in the process of driving. Observations in the Level B reconstructing Waterfront Park, which harassment zones during pile activity will be renamed Pier 58, along the include 130 harbor seals out of 660 take Elliott Bay shoreline in Seattle, incidents authorized; 92 California sea Washington. The City is repairing lions (Zalophus californianus) out of structural and safety deficiencies and 700 incidents of take that were optimizing public access and authorized; and one Steller sea lion recreational uses of the piers. The Pier (Eumetopias jubatus) out of 140 58 reconstruction project includes PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 E:\FR\FM\17AUN1.SGM 17AUN1 56006 Federal Register / Vol. 88, No. 158 / Thursday, August 17, 2023 / Notices incidents of take that were authorized. No other species were observed in the Level B harassment zones during pile driving activity. The total number of potential takes by Level B harassment for Season 1 were only a small fraction of what were authorized in the IHA: potential harbor seal takes were only 20 percent of the authorized takes, potential California sea lion takes were only 13 percent of the authorized takes, and potential Steller sea lion takes were only 0.7 percent of the authorized takes. Under the original authorization IHA, Season 1 in-water pile activity occurred at Pier 58 across 45 workdays between October 3, 2022, and February 15, 2023. Most workdays consisted of both vibratory and impact hammer installation of 30-inch steel piles; vibratory pile activity occurred on 36 workdays, and impact pile activity occurred on 36 workdays. Of the total 81 piles installed, 5 test piles and 76 production piles were installed via vibratory and impact hammer. It is anticipated that approximately 8 additional days will be required for installation of the remaining 44 30-inch steel piles at Pier 58, and approximately 10 days will be required for impact proofing of the 30-inch steel piles. It is anticipated that only 1 day will be required to remove the eight timber piles at Don Armeni Boat Ramp, and 2 days will be required for the installation of eight 16-inch steel piles. This work could occur over a period of 3 months. ddrumheller on DSK120RN23PROD with NOTICES1 Detailed Description of the Activity A detailed description of the construction activities, including the installation of 30-inch permanent steel piles and 24-inch temporary template steel piles, may be found in the notices of the proposed and final IHAs for the initial authorization (87 FR 12089, March 3, 2022; 87 FR 31985, May 26, 2022). As previously mentioned, these specific activities represent a subset of the activities authorized in the initial IHA that would not be completed prior to its expiration. The location, timing, and nature of the activities, including the types of equipment planned for use, are identical to those described in the previous notice for the initial IHA. Minor changes to the initial scope include the removal of eight 12-inch creosote timber piles by vibratory Estimated Take hammer and the vibratory installation of eight 16-inch steel piles at the boat ramp. Vibratory removal of the 12-inch creosote timber piles, requiring an estimated 2 days, is nearly identical to the vibratory removal of H-piles and timber piles, which required 3 days, under the initial IHA. The installation of eight 16-inch steel piles under the renewal IHA is nearly identical to the installation of 30-inch steel piles under the initial IHA with the only difference being the size of piles (30-inch vs. 16inch) and the duration (36 days vs. 2 days). The renewal IHA would be effective for a period not exceeding 1 year from the date of expiration of the initial IHA, through July 31, 2024. A detailed description of the methods and inputs used to estimate take for the specified activity are found in the Notice of the proposed and/or final IHAs for the initial authorization (87 FR 12089, March 3, 2022; 87 FR 31985, May 26, 2022). Note that the sound source levels (SLs) for the vibratory and impact installation of 30-inch steel piles have been updated based on acoustic measurements from Season 1. The Waterfront Park Reconstruction Project Acoustic Monitoring Report by the Greenbusch Group (2023a) may be found as an attachment to the City’s IHA renewal application. Data revealed that the SL for vibratory installation of steel 30-inch piles was 170 decibels (dB) root mean square (RMS), and the SL for impact installation of 30-inch steel piles was 187 dB RMS with a peak of 201.5 dB. Note that the unweighted value for impact driving of 30-inch steel piles (187 dB) was not listed in the Acoustic Monitoring Report but was provided directly by Greenbusch from the Season 1 monitoring data. These SLs were greater than those utilized for the initial IHA (163 dB RMS for vibratory installation; 180 dB RMS and 193 dB Peak for impact installation). Additionally, the total strikes per day during impact installation of 30-inch steel piles was increased from 1,200 strikes per day in Season 1 (3 piles at 400 strikes per pile) to 4,500 strikes per day (5 piles at 900 strikes per pile) under the IHA renewal. The increase in strikes per pile (from 400 to 900 strikes) is based on data from the Waterfront Park Reconstruction Project Acoustic Monitoring Report (Greenbusch 2023a). The source level used for the vibratory installation of 16-inch steel piles (158 dB RMS) at Don Armeni Boat Ramp was found in Caltrans (2020) while the source level used for the vibratory removal of 12-inch timber piles (145 dB RMS) at the Don Armeni Boat Ramp was taken from the Pier 63 Removal Project Acoustic Monitoring Report (Greenbusch 2023b). Table 1 below shows the distances to the Level A and Level B harassment zones during Season 1 under the initial IHA while Table 2 shows the distances during Season 2 under the IHA renewal. Description of Marine Mammals A description of the marine mammals in the area of the activities including information on abundance, status, distribution, and hearing, may be found in the Notice of the Proposed IHA for the initial authorization (87 FR 12089, March 3, 2022). NMFS has reviewed the monitoring data from the initial IHA, recent draft Stock Assessment Reports, information on relevant Unusual Mortality Events, and other scientific literature, and determined that neither this nor any other new information affects which species or stocks have the potential to be affected or the pertinent information in the Description of the Marine Mammals in the Area of Specified Activities contained in the supporting documents for the initial IHA (87 FR 12089, March 3, 2022). Potential Effects on Marine Mammals and Their Habitat A description of the potential effects of the specified activity on marine mammals and their habitat for the planned activities may be found in the proposed and final IHAs (87 FR 12089, March 3, 2022; 87 FR 31985, May 26, 2022) for the initial authorization. NMFS has reviewed the monitoring data from the initial IHA, recent draft Stock Assessment Reports, information on relevant Unusual Mortality Events, and other scientific literature, and determined that neither this nor any other new information affects our initial analysis of impacts on marine mammals and their habitat. TABLE 1—PIER 58 LEVEL A HARASSMENT AND LEVEL B HARASSMENT ZONES UNDER SEASON 1 AND INITIAL IHA Level A harassment zone (m) Pile size, type, and method LF cetacean Timber and steel H-pile removal ............. VerDate Sep<11>2014 21:36 Aug 16, 2023 Jkt 259001 MF cetacean 6.1 PO 00000 Frm 00011 HF cetacean 0.5 Fmt 4703 Phocids 9.0 Sfmt 4703 3.7 E:\FR\FM\17AUN1.SGM Otariids 0.3 17AUN1 Level B harassment zone (m) 1,359 Number of days 9 56007 Federal Register / Vol. 88, No. 158 / Thursday, August 17, 2023 / Notices TABLE 1—PIER 58 LEVEL A HARASSMENT AND LEVEL B HARASSMENT ZONES UNDER SEASON 1 AND INITIAL IHA— Continued Level A harassment zone (m) Pile size, type, and method LF cetacean 30-inch steel vibratory install, 24-inch steel vibratory install and removal * ..... 30-in steel impact install .......................... MF cetacean 19.3 153.3 1.7 5.5 HF cetacean Phocids 28.6 182.6 Otariids 11.7 82.0 0.8 6.0 Level B harassment zone (m) Number of days 7,357 215 36 * No installation or removal of 24-in steel piles was conducted TABLE 2—PIER 58 LEVEL A HARASSMENT AND LEVEL B HARASSMENT ZONES FROM SEASON 2 UNDER THE IHA RENEWAL Level A harassment zone (m) Pile size, type, and method LF cetacean Timber vibratory removal ......................... 30-inch steel vibratory install, 24-inch steel vibratory install and removal * ..... 30-inch steel impact installation ............... 16-inch steel vibratory installation ........... MF cetacean HF cetacean Phocids Otariids Level B harassment zone (m) Number of days 1.1 0.1 1.6 0.7 0.0 453 1 57.0 550.7 9.0 5.1 19.6 0.8 84.3 655.9 13.3 34.6 294.7 5.4 2.4 21.5 0.4 21,710 616 3,415 8 10 2 ddrumheller on DSK120RN23PROD with NOTICES1 * Use of 24-inch temporary piles may not be necessary under the renewal IHA. At most, a subset of 33 24-inch piles would be utilized. Note that if the 24-inch steel pile installation and removal activities occur, it would be on the same days as vibratory and impact driving of the 30-inch piles, so there are no added extra days for this activity. The Level A and Level B harassment zone sizes for 30-inch steel pile impact and vibratory installation were calculated to be larger for the Season 2 renewal IHA than those used in Season 1 under the initial IHA. This is due to the results from Season 1 acoustic measurements that demonstrated higher SLs for vibratory and impact driving. In addition, increased zone sizes result from an increase in the number of strikes per pile, number of piles per day and total number of strikes per day for impact driving. Additionally, while the behavioral harassment zone for 30-inch vibratory installation has been calculated to extend to just under 22 kilometers (km), the actual maximum ensonified distance is approximately 14 km since the sound field is constrained by the shoreline of Elliott Bay as well as by Bainbridge Island located west of Elliott Bay. The stocks taken (11 total), methods of take (impact and vibratory installation; vibratory removal), and types of take (11 by Level B harassment; 3 by Level A harassment) remain unchanged from the previously issued IHA covering Season 1. The City utilized the same approach for estimating take for Season 2 and the renewal IHA as was used in support of the initial IHA. The results of the preliminary monitoring report were also considered. The 30-inch pile driving work for Pier 58 is anticipated to occur over 18 days within an estimated 2 month time period. The pile removal VerDate Sep<11>2014 21:36 Aug 16, 2023 Jkt 259001 and driving work for Don Armeni is anticipated to occur over 3 days within 1 month of work. Detailed explanations describing how the take numbers were derived from observational data may be found in the notice of final IHA (87 FR 31985, May 26, 2022). Note that even though the Level A and Level B harassment zone sizes are larger in the renewal IHA compared to the initial IHA, as a result of NMFS’ consideration of new sitespecific data, we have concluded that the authorized take numbers remain appropriate and sufficient. As part of the Season 1 monitoring requirements, the City was required to station a protected species observer (PSO) on the Seattle-Bainbridge Ferry whenever vibratory installation was underway. The Ferry runs non-stop throughout the day and the PSO recorded all animal observations, even those outside of the specified harassment zones. The number of observations beyond the Level B harassment zone during Season 1 (7,357 meters (m)) was comparatively small. Only four species were observed beyond the behavioral harassment zone. A brief summary of take assumptions for each species is provided here. For gray whales, minke whales, and northern elephant seals, the City, with NMFS’ concurrence, assumed a single animal would be taken per month by Level B harassment. For long-beaked common dolphin and common bottlenose dolphin, the City assumed, and NMFS concurred, there would be PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 seven takes per month by Level B harassment. For transient killer whales it was assumed that six animals could be taken per month. The Level A harassment zone is larger than the Level B harassment zone for high-frequency cetaceans. For the harbor porpoise, it was assumed that six animals could be taken per day by Level B harassment. That is, they may enter into the larger Level A harassment zone, but are unlikely to remain long enough to accumulate energy at levels that would result in injury. Although the City must implement a shutdown zone of 660 m during this activity, due to the cryptic nature and lower detectability of harbor porpoises at large distances, the City anticipates that up to 6 of the harbor porpoises (2 per month) that enter the Level A harassment zone could enter undetected and remain long enough to experience auditory injury. It was assumed that up to 12 Dall’s porpoises could experience Level B harassment per month. As a high frequency cetacean, the Level A harassment zone is larger than the Level B harassment zone. As with harbor porpoises, the Dall’s porpoise could enter into the Level A harassment zone, but are unlikely to remain long enough to sustain auditory injury. Therefore, the animal would be exposed to Level B harassment. The City must implement a shutdown zone of 660 m during this activity, but anticipates that due to the cryptic nature and lower detectability of harbor porpoises at large distances, up E:\FR\FM\17AUN1.SGM 17AUN1 56008 Federal Register / Vol. 88, No. 158 / Thursday, August 17, 2023 / Notices to 6 of the Dall’s porpoises (2 per month) that enter the Level A harassment zone could remain long enough to experience auditory injury. It was assumed that up to 10 California sea lions and 2 Steller sea lions could be taken by Level B harassment each inwater work day. NMFS concurred with the City’s request for take by Level B harassment of a single northern elephant seal per month. Finally, it was assumed that 10 harbor seals could enter the Level B harassment zone per day and 1 seal may approach closer and enter the 82 m Level A harassment zone before the animal is detected and activities shut down. TABLE 3—AUTHORIZED TAKE OF MARINE MAMMALS BY LEVEL A AND LEVEL B HARASSMENT FROM PIER 58 RENEWAL IHA BY SPECIES AND STOCK AND PERCENT OF TAKE BY STOCK Species Stock Pacific harbor seal .................................... Washington Northern Inland Waters stock. California breeding ................................... U.S. ........................................................... Eastern U.S. ............................................. Washington Inland Waters ....................... California/Oregon/Washington ................. California .................................................. California/Oregon/Washington Offshore .. West Coast Transient ............................... Eastern North Pacific ............................... California/Oregon/Washington Stock ....... Northern elephant seal ............................. California sea lion ..................................... Steller sea lion .......................................... Harbor porpoise ........................................ Dall’s porpoise .......................................... Long-beaked common dolphin ................. Common bottlenose dolphin ..................... Transient killer whale ................................ Gray whale ................................................ Minke whale .............................................. Description of Mitigation, Monitoring and Reporting Measures The mitigation, monitoring, and reporting measures included as requirements in this authorization are nearly identical to those included in the FR Notice announcing the issuance of the initial IHA (87 FR 31985, May 26, 2022), although the size of the shutdown and Level B harassment areas has been revised as appropriate, as shown in Table 4 below. The following identical measures for this renewal include; • Shut down construction operations (including in-water heavy machinery work other than pile driving) if a marine mammal comes within 10 m of construction activity or a vessel involved with construction activity (e.g., barge) to avoid direct physical interaction with marine mammals; • Shut down during active pile driving if marine mammals approach Take by Level A harassment Take by Level B harassment 21 189 11,036 1.90 0 0 0 6 6 0 0 0 0 0 3 210 42 120 30 21 21 18 3 3 187,386 257,606 43,201 11,233 16,498 83,379 3,477 349 26,960 915 <0.01 0.08 0.10 1.12 0.22 0.03 0.60 5.16 0.01 0.33 pile driving activities within hearing group-specific shutdown zones; • Contact the local marine mammal sightings network (Orca Network) hourly to obtain real-time sightings reports of marine mammals in the project area; • Shut down if any species for which take has not been authorized (e.g., Southern Resident killer whales, humpback whales), or a species for which take has been authorized but the authorized take numbers have been met, enters the Level B harassment zones; • Implement impact pile driving soft starts whereby hammer energy is gradually ramped up; • Use of a bubble curtain during all impact pile driving. • Use of NMFS-approved PSOs to monitor the entire Level A and Level B harassment zones; • Submit draft reports on all monitoring within 90 calendar days of Stock abundance Percent of stock the completion of marine mammal monitoring at each pier or 60 days prior to the issuance of any subsequent IHAs for these projects, whichever comes first; • Prepare and submit final reports within 30 days following resolution of comments on the draft report from NMFS; • Submit all PSO datasheets and/or raw sightings data (in a separate file from the final reports referenced above); and • Report injured or dead marine mammals. The shutdown and Level B harassment zones shown in Table 4 have been revised from the Season 1 initial IHA to reflect the updated SLs associated with 30-inch impact and vibratory driving as well as the increase in strikes per day for impact driving described previously. TABLE 4—SHUTDOWN AND LEVEL B HARASSMENT ZONES FOR IHA RENEWAL Minimum shutdown zone (m) ddrumheller on DSK120RN23PROD with NOTICES1 Pile size, type, and method LF Cetacean MF Cetacean HF Cetacean 10 60 555 10 10 10 20 10 10 85 660 15 Timber vibratory removal (Don Armeni) .............................................. 30-inch steel vibratory installation ....................................................... 30-inch steel impact installation ........................................................... 16-inch steel vibratory installation (Don Armeni) ................................. Comments and Responses As noted previously, NMFS published a notice of a proposed IHA (87 FR 12089, March 3, 2022) and solicited VerDate Sep<11>2014 21:36 Aug 16, 2023 Jkt 259001 public comments on both our proposal to issue the initial IHA for the project and on the potential for a renewal IHA, should certain requirements be met. NMFS then published an additional 15- PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 Phocid 10 35 295 10 Otariid 10 10 25 10 Level B harassment zone (m) 453 21,710 616 3,415 day opportunity to comment on the proposed renewal IHA (88 FR 45393; July 17, 2023). No comments were received in response to either public comment period. E:\FR\FM\17AUN1.SGM 17AUN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 88, No. 158 / Thursday, August 17, 2023 / Notices Determinations There is no new information which would change our potential impacts to the specified marine mammal species and stocks. The anticipated effects of the action under the renewal IHA are expected to be the same as those that may have occurred under the initial IHA. The species authorized for take are identical to those that were identified in the initial IHA. The same species that were authorized for limited take by Level A harassment under the initial IHA are authorized for take by Level A harassment under the renewal IHA. The Level A and Level B harassment zones for 30-inch pile installation under the renewal IHA are larger than those contained in the initial IHA. However, the number of animals of each species authorized for take is less than what was authorized under the initial IHA since the number of in-water work days anticipated is less than half of the number of work days that occurred under the initial IHA. Furthermore, PSO monitoring of the renewal IHA’s extended harassment zones demonstrated that most take occurs closer to the in-water driving location. The mitigation and monitoring measures required under the renewal IHA are identical to those prescribed through the initial IHA, with one exception. The shutdown and Level B harassment zones under the renewal IHA are larger than those employed in Season 1. After analyzing the City’s application for the initial IHA, NMFS determined that the action would have a negligible impact on all affected stocks and that the taking of authorized species would be small relative to population size (< six percent of the total abundance for all stocks). NMFS has concluded that there is no new information suggesting that our analysis or findings should change from those reached for the initial IHA. Based on the information and analysis contained here and in the referenced documents, NMFS has determined the following: (1) the required mitigation measures will effect the least practicable impact on marine mammal species or stocks and their habitat; (2) the authorized takes will have a negligible impact on the affected marine mammal species or stocks; (3) the authorized takes represent small numbers of marine mammals relative to the affected stock abundances; (4) The City’s activities will not have an unmitigable adverse impact on taking for subsistence purposes as no relevant subsistence uses of marine mammals are implicated by this action, and; (5) appropriate VerDate Sep<11>2014 21:36 Aug 16, 2023 Jkt 259001 monitoring and reporting requirements are included. National Environmental Policy Act This action is consistent with categories of activities identified in Categorical Exclusion B4 (incidental take authorizations with no anticipated serious injury or mortality) of the Companion Manual for NOAA Administrative Order 216–6A, which do not individually or cumulatively have the potential for significant impacts on the quality of the human environment and for which we have not identified any extraordinary circumstances that would preclude this categorical exclusion. Accordingly, NMFS determined that the issuance of the initial IHA qualified to be categorically excluded from further NEPA review. NMFS has determined that the application of this categorical exclusion remains appropriate for this renewal IHA. Endangered Species Act Section 7(a)(2) of the Endangered Species Act of 1973 (ESA: 16 U.S.C. 1531 et seq.) requires that each Federal agency insure that any action it authorizes, funds, or carries out is not likely to jeopardize the continued existence of any endangered or threatened species or result in the destruction or adverse modification of designated critical habitat. To ensure ESA compliance for the issuance of IHAs, NMFS consults internally whenever we propose to authorize take for endangered or threatened species. No incidental take of ESA-listed species is authorized or expected to result from these activities. Therefore, NMFS has determined that consultation under section 7 of the ESA is not required for this action. Renewal NMFS has issued a renewal IHA to the City of Seattle for the take of marine mammals incidental to construction activities associated with the Pier 58 Reconstruction Project in Seattle, Washington effective from August 10, 2023 through July 31, 2024. Dated: August 14, 2023. Kimberly Damon-Randall, Director, Office of Protected Resources, National Marine Fisheries Service. [FR Doc. 2023–17682 Filed 8–16–23; 8:45 am] BILLING CODE 3510–22–P PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 56009 DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Agency Information Collection Activities; Submission to the Office of Management and Budget (OMB) for Review and Approval; Comment Request; Office of Marine and Aviation Operations: Occupational Health, Safety, and Readiness Forms National Oceanic & Atmospheric Administration (NOAA), Commerce. ACTION: Notice of information collection, request for comment. AGENCY: The Department of Commerce, in accordance with the Paperwork Reduction Act of 1995 (PRA), invites the general public and other Federal agencies to comment on proposed, and continuing information collections, which helps us assess the impact of our information collection requirements and minimize the public’s reporting burden. The purpose of this notice is to allow for 60 days of public comment preceding submission of the collection to OMB. DATES: To ensure consideration, comments regarding this proposed information collection must be received on or before October 16, 2023. ADDRESSES: Interested persons are invited to submit written comments to Adrienne Thomas, NOAA PRA Officer, at NOAA.PRA@noaa.gov. Please reference OMB Control Number 0648– xxxx in the subject line of your comments. Do not submit Confidential Business Information or otherwise sensitive or protected information. FOR FURTHER INFORMATION CONTACT: Requests for additional information or specific questions related to collection activities should be directed to OMAO Policy Program, Attn: Joselyd GarciaKramer, NOAA, 1315 East West Highway, Silver Spring, MD 20910, omao.policy@noaa.gov. SUPPLEMENTARY INFORMATION: SUMMARY: I. Abstract This is a request for a new collection of information. The National Oceanic and Atmospheric Administration’s (NOAA) Office of Marine and Aviation Operations (OMAO) manages and operates NOAA’s fleet of 15 research and survey ships and nine specialized environmental data-collecting aircraft. Comprised of civilians and officers of the NOAA Commissioned Officer Corps, OMAO also manages the NOAA Diving Program, NOAA Small Boat Program, E:\FR\FM\17AUN1.SGM 17AUN1

Agencies

[Federal Register Volume 88, Number 158 (Thursday, August 17, 2023)]
[Notices]
[Pages 56004-56009]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-17682]


-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

[RTID 0648-XD237]


Takes of Marine Mammals Incidental to Specified Activities; 
Taking Marine Mammals Incidental to the Pier 58 Reconstruction Project 
in Seattle, Washington

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Notice; issuance of renewal incidental harassment 
authorization.

-----------------------------------------------------------------------

SUMMARY: In accordance with the regulations implementing the Marine 
Mammal Protection Act (MMPA), as amended, notification is hereby given 
that NMFS has issued a renewal incidental harassment authorization 
(IHA) to the City of Seattle, Washington (City) to incidentally harass 
marine mammals incidental to the Pier 58 Reconstruction Project.

DATES: This renewal IHA is effective from August 10, 2023 through July 
31, 2024.

FOR FURTHER INFORMATION CONTACT: Robert Pauline, Office of Protected 
Resources, NMFS, (301) 427-8401.

SUPPLEMENTARY INFORMATION: 

Background

    The Marine Mammal Protection Act (MMPA) prohibits the ``take'' of 
marine mammals, with certain exceptions. Sections 101(a)(5)(A) and (D) 
of the MMPA (16 U.S.C. 1361 et seq.) direct the Secretary of Commerce 
(as delegated to NMFS) to allow, upon request, the incidental, but not 
intentional, taking of small numbers of marine mammals by U.S. citizens 
who engage in a specified activity (other than commercial fishing) 
within a specified geographical region if certain findings are made and 
either regulations are issued or, if the taking is limited to 
harassment, an incidental harassment authorization is issued.
    Authorization for incidental takings shall be granted if NMFS finds 
that the taking will have a negligible impact on the species or 
stock(s) and will not have an unmitigable adverse impact on the 
availability of the species or stock(s) for taking for subsistence uses 
(where relevant). Further, NMFS must prescribe the permissible methods 
of taking and

[[Page 56005]]

other ``means of effecting the least practicable adverse impact'' on 
the affected species or stocks and their habitat, paying particular 
attention to rookeries, mating grounds, and areas of similar 
significance, and on the availability of such species or stocks for 
taking for certain subsistence uses (referred to here as ``mitigation 
measures''). Monitoring and reporting of such takings are also 
required. The meaning of key terms such as ``take,'' ``harassment,'' 
and ``negligible impact'' can be found in section 3 of the MMPA (16 
U.S.C. 1362) and the agency's regulations at 50 CFR 216.103.
    NMFS' regulations implementing the MMPA at 50 CFR 216.107(e) 
indicate that IHAs may be renewed for additional periods of time not to 
exceed 1 year for each reauthorization. In the notice of proposed IHA 
for the initial authorization, NMFS described the circumstances under 
which we would consider issuing a renewal for this activity, and 
requested public comment on a potential renewal under those 
circumstances. Specifically, on a case-by-case basis, NMFS may issue a 
1-time 1-year renewal IHA following notice to the public providing an 
additional 15 days for public comments when (1) up to another year of 
identical, or nearly identical, activities as described in the Detailed 
Description of Specified Activities section of the initial IHA issuance 
notice is planned, or (2) the activities as described in the 
Description of the Specified Activities and Anticipated Impacts section 
of the initial IHA issuance notice would not be completed by the time 
the initial IHA expires and a renewal would allow for completion of the 
activities beyond that described in the DATES section of the notice of 
issuance of the initial IHA, provided all of the following conditions 
are met;
    1. A request for renewal is received no later than 60 days prior to 
the needed renewal IHA effective date (recognizing that the renewal IHA 
expiration date cannot extend beyond 1 year from expiration of the 
initial IHA).
    2. The request for renewal must include the following:
     An explanation that the activities to be conducted under 
the requested renewal IHA are identical to the activities analyzed 
under the initial IHA, are a subset of the activities, or include 
changes so minor (e.g., reduction in pile size) that the changes do not 
affect the previous analyses, mitigation and monitoring requirements, 
or take estimates (with the exception of reducing the type or amount of 
take); and
     A preliminary monitoring report showing the results of the 
required monitoring to date and an explanation showing that the 
monitoring results do not indicate impacts of a scale or nature not 
previously analyzed or authorized; and
    3. Upon review of the request for renewal, the status of the 
affected species or stocks, and any other pertinent information, NMFS 
determines that there are no more than minor changes in the activities, 
the mitigation and monitoring measures will remain the same and 
appropriate, and the findings in the initial IHA remain valid.
    An additional public comment period of 15 days (for a total of 45 
days), with direct notice by email, phone, or postal service to 
commenters on the initial IHA, is provided to allow for any additional 
comments on the proposed renewal. A description of the renewal process 
may be found on our website at: www.fisheries.noaa.gov/national/marine-mammal-protection/incidental-harassment-authorization-renewals.

History of Request

    On May 20, 2022, NMFS issued an IHA to the City to take marine 
mammals incidental to the Pier 58 Reconstruction Project in Seattle, 
Washington (87 FR 31985), effective from August 1, 2022 through July 
31, 2023. NMFS received an application for the renewal of that initial 
IHA on April 3, 2023. As described in the application for renewal IHA, 
the activities for which the renewal IHA was issued are a subset of 
those covered in the initial authorization in addition to a small 
amount of nearly identical work that was not covered under the initial 
IHA. As required, the City also provided a preliminary monitoring 
report (available at: https://www.fisheries.noaa.gov/action/incidental-take-authorization-city-seattle-pier-58-reconstruction-project-seattle-wa) which confirmed that it had implemented the required mitigation and 
monitoring, and which also showed that no impacts of a scale or nature 
not previously analyzed or authorized occurred as a result of the 
activities conducted.

Description of the Specified Activities and Anticipated Impacts

    The City is in the process of reconstructing Waterfront Park, which 
will be renamed Pier 58, along the Elliott Bay shoreline in Seattle, 
Washington. The City is repairing structural and safety deficiencies 
and optimizing public access and recreational uses of the piers. The 
Pier 58 reconstruction project includes vibratory removal of existing 
in-water piles and vibratory and impact installation of new piles. The 
reconstructed pier requires installation of 120 permanent 30-inch steel 
piles by vibratory hammer and impact proofing. Under the initial IHA, 
76 steel piles were successfully installed. The remaining 44 piles, 
which represent a subset of the originally planned 120 piles, would be 
installed under the renewal IHA. In addition, installation of 100 24-
inch temporary steel template piles by vibratory hammer and impact 
proofing was analyzed for the initial IHA. The 24-inch piles were to be 
subsequently removed by vibratory extraction. However, none of the 100 
24-inch temporary piles were installed during Season 1 and these piles 
may not be required at all under the renewal IHA. At most, a subset of 
33 24-inch temporary piles would be utilized. A total of 31 existing 
steel H-piles and timber piles were removed under the initial IHA by 
pulling the piles using vibratory extraction or the clamshell bucket 
method. The nearly identical activity included under the renewal IHA is 
the removal of eight 12-inch creosote timber piles (1 day) by vibratory 
hammer and the vibratory installation of eight 16-inch steel piles (2 
days) at the nearby Don Armeni Boat Ramp. All in-water work with the 
potential to affect marine mammals will occur during the work window 
allowed by NOAA, U.S. Fish and Wildlife Service, U.S. Army Corps of 
Engineers, and Washington State Department of Fish and Wildlife. For 
this renewal request, this window is anticipated to be September 1, 
2023, through February 15, 2024. Pile removal and installation will 
occur during daylight hours, typically during a work shift of 8 hours 
or fewer. The work would include periods of vibratory removal of timber 
piles, vibratory installation of steel piles, and impact installation 
of steel piles.
    Under the initial IHA, take by Level B harassment was authorized 
for 11 species/stocks and limited take by Level A harassment was 
authorized for 3 of these species (harbor porpoise (Phocoena phocoena), 
Dall's porpoise (Phocoenoides dalli), and harbor seal (Phoca 
vitulina)). No species were observed in the estimated Level A 
harassment zones during Season 1 pile driving. Observations in the 
Level B harassment zones during pile activity include 130 harbor seals 
out of 660 take incidents authorized; 92 California sea lions (Zalophus 
californianus) out of 700 incidents of take that were authorized; and 
one Steller sea lion (Eumetopias jubatus) out of 140

[[Page 56006]]

incidents of take that were authorized. No other species were observed 
in the Level B harassment zones during pile driving activity. The total 
number of potential takes by Level B harassment for Season 1 were only 
a small fraction of what were authorized in the IHA: potential harbor 
seal takes were only 20 percent of the authorized takes, potential 
California sea lion takes were only 13 percent of the authorized takes, 
and potential Steller sea lion takes were only 0.7 percent of the 
authorized takes.
    Under the original authorization IHA, Season 1 in-water pile 
activity occurred at Pier 58 across 45 workdays between October 3, 
2022, and February 15, 2023. Most workdays consisted of both vibratory 
and impact hammer installation of 30-inch steel piles; vibratory pile 
activity occurred on 36 workdays, and impact pile activity occurred on 
36 workdays. Of the total 81 piles installed, 5 test piles and 76 
production piles were installed via vibratory and impact hammer.
    It is anticipated that approximately 8 additional days will be 
required for installation of the remaining 44 30-inch steel piles at 
Pier 58, and approximately 10 days will be required for impact proofing 
of the 30-inch steel piles. It is anticipated that only 1 day will be 
required to remove the eight timber piles at Don Armeni Boat Ramp, and 
2 days will be required for the installation of eight 16-inch steel 
piles. This work could occur over a period of 3 months.

Detailed Description of the Activity

    A detailed description of the construction activities, including 
the installation of 30-inch permanent steel piles and 24-inch temporary 
template steel piles, may be found in the notices of the proposed and 
final IHAs for the initial authorization (87 FR 12089, March 3, 2022; 
87 FR 31985, May 26, 2022). As previously mentioned, these specific 
activities represent a subset of the activities authorized in the 
initial IHA that would not be completed prior to its expiration. The 
location, timing, and nature of the activities, including the types of 
equipment planned for use, are identical to those described in the 
previous notice for the initial IHA.
    Minor changes to the initial scope include the removal of eight 12-
inch creosote timber piles by vibratory hammer and the vibratory 
installation of eight 16-inch steel piles at the boat ramp. Vibratory 
removal of the 12-inch creosote timber piles, requiring an estimated 2 
days, is nearly identical to the vibratory removal of H-piles and 
timber piles, which required 3 days, under the initial IHA. The 
installation of eight 16-inch steel piles under the renewal IHA is 
nearly identical to the installation of 30-inch steel piles under the 
initial IHA with the only difference being the size of piles (30-inch 
vs. 16-inch) and the duration (36 days vs. 2 days). The renewal IHA 
would be effective for a period not exceeding 1 year from the date of 
expiration of the initial IHA, through July 31, 2024.

Description of Marine Mammals

    A description of the marine mammals in the area of the activities 
including information on abundance, status, distribution, and hearing, 
may be found in the Notice of the Proposed IHA for the initial 
authorization (87 FR 12089, March 3, 2022). NMFS has reviewed the 
monitoring data from the initial IHA, recent draft Stock Assessment 
Reports, information on relevant Unusual Mortality Events, and other 
scientific literature, and determined that neither this nor any other 
new information affects which species or stocks have the potential to 
be affected or the pertinent information in the Description of the 
Marine Mammals in the Area of Specified Activities contained in the 
supporting documents for the initial IHA (87 FR 12089, March 3, 2022).

Potential Effects on Marine Mammals and Their Habitat

    A description of the potential effects of the specified activity on 
marine mammals and their habitat for the planned activities may be 
found in the proposed and final IHAs (87 FR 12089, March 3, 2022; 87 FR 
31985, May 26, 2022) for the initial authorization. NMFS has reviewed 
the monitoring data from the initial IHA, recent draft Stock Assessment 
Reports, information on relevant Unusual Mortality Events, and other 
scientific literature, and determined that neither this nor any other 
new information affects our initial analysis of impacts on marine 
mammals and their habitat.

Estimated Take

    A detailed description of the methods and inputs used to estimate 
take for the specified activity are found in the Notice of the proposed 
and/or final IHAs for the initial authorization (87 FR 12089, March 3, 
2022; 87 FR 31985, May 26, 2022). Note that the sound source levels 
(SLs) for the vibratory and impact installation of 30-inch steel piles 
have been updated based on acoustic measurements from Season 1. The 
Waterfront Park Reconstruction Project Acoustic Monitoring Report by 
the Greenbusch Group (2023a) may be found as an attachment to the 
City's IHA renewal application. Data revealed that the SL for vibratory 
installation of steel 30-inch piles was 170 decibels (dB) root mean 
square (RMS), and the SL for impact installation of 30-inch steel piles 
was 187 dB RMS with a peak of 201.5 dB. Note that the unweighted value 
for impact driving of 30-inch steel piles (187 dB) was not listed in 
the Acoustic Monitoring Report but was provided directly by Greenbusch 
from the Season 1 monitoring data. These SLs were greater than those 
utilized for the initial IHA (163 dB RMS for vibratory installation; 
180 dB RMS and 193 dB Peak for impact installation). Additionally, the 
total strikes per day during impact installation of 30-inch steel piles 
was increased from 1,200 strikes per day in Season 1 (3 piles at 400 
strikes per pile) to 4,500 strikes per day (5 piles at 900 strikes per 
pile) under the IHA renewal. The increase in strikes per pile (from 400 
to 900 strikes) is based on data from the Waterfront Park 
Reconstruction Project Acoustic Monitoring Report (Greenbusch 2023a).
    The source level used for the vibratory installation of 16-inch 
steel piles (158 dB RMS) at Don Armeni Boat Ramp was found in Caltrans 
(2020) while the source level used for the vibratory removal of 12-inch 
timber piles (145 dB RMS) at the Don Armeni Boat Ramp was taken from 
the Pier 63 Removal Project Acoustic Monitoring Report (Greenbusch 
2023b).
    Table 1 below shows the distances to the Level A and Level B 
harassment zones during Season 1 under the initial IHA while Table 2 
shows the distances during Season 2 under the IHA renewal.

                             Table 1--Pier 58 Level A Harassment and Level B Harassment Zones Under Season 1 and Initial IHA
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                 Level A harassment zone (m)
                                                              -----------------------------------------------------------------   Level B     Number of
                 Pile size, type, and method                        LF           MF           HF                                 harassment      days
                                                                 cetacean     cetacean     cetacean     Phocids      Otariids     zone (m)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Timber and steel H-pile removal..............................          6.1          0.5          9.0          3.7          0.3        1,359            9

[[Page 56007]]

 
30-inch steel vibratory install, 24-inch steel vibratory              19.3          1.7         28.6         11.7          0.8        7,357           36
 install and removal *.......................................
30-in steel impact install...................................        153.3          5.5        182.6         82.0          6.0          215
--------------------------------------------------------------------------------------------------------------------------------------------------------
* No installation or removal of 24-in steel piles was conducted


                          Table 2--Pier 58 Level A Harassment and Level B Harassment Zones From Season 2 Under the IHA Renewal
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                 Level A harassment zone (m)
                                                              -----------------------------------------------------------------   Level B     Number of
                 Pile size, type, and method                        LF           MF           HF                                 harassment      days
                                                                 cetacean     cetacean     cetacean     Phocids      Otariids     zone (m)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Timber vibratory removal.....................................          1.1          0.1          1.6          0.7          0.0          453            1
30-inch steel vibratory install, 24-inch steel vibratory              57.0          5.1         84.3         34.6          2.4       21,710            8
 install and removal *.......................................
30-inch steel impact installation............................        550.7         19.6        655.9        294.7         21.5          616           10
16-inch steel vibratory installation.........................          9.0          0.8         13.3          5.4          0.4        3,415            2
--------------------------------------------------------------------------------------------------------------------------------------------------------
* Use of 24-inch temporary piles may not be necessary under the renewal IHA. At most, a subset of 33 24-inch piles would be utilized. Note that if the
  24-inch steel pile installation and removal activities occur, it would be on the same days as vibratory and impact driving of the 30-inch piles, so
  there are no added extra days for this activity.

    The Level A and Level B harassment zone sizes for 30-inch steel 
pile impact and vibratory installation were calculated to be larger for 
the Season 2 renewal IHA than those used in Season 1 under the initial 
IHA. This is due to the results from Season 1 acoustic measurements 
that demonstrated higher SLs for vibratory and impact driving. In 
addition, increased zone sizes result from an increase in the number of 
strikes per pile, number of piles per day and total number of strikes 
per day for impact driving. Additionally, while the behavioral 
harassment zone for 30-inch vibratory installation has been calculated 
to extend to just under 22 kilometers (km), the actual maximum 
ensonified distance is approximately 14 km since the sound field is 
constrained by the shoreline of Elliott Bay as well as by Bainbridge 
Island located west of Elliott Bay.
    The stocks taken (11 total), methods of take (impact and vibratory 
installation; vibratory removal), and types of take (11 by Level B 
harassment; 3 by Level A harassment) remain unchanged from the 
previously issued IHA covering Season 1. The City utilized the same 
approach for estimating take for Season 2 and the renewal IHA as was 
used in support of the initial IHA. The results of the preliminary 
monitoring report were also considered. The 30-inch pile driving work 
for Pier 58 is anticipated to occur over 18 days within an estimated 2 
month time period. The pile removal and driving work for Don Armeni is 
anticipated to occur over 3 days within 1 month of work.
    Detailed explanations describing how the take numbers were derived 
from observational data may be found in the notice of final IHA (87 FR 
31985, May 26, 2022). Note that even though the Level A and Level B 
harassment zone sizes are larger in the renewal IHA compared to the 
initial IHA, as a result of NMFS' consideration of new site-specific 
data, we have concluded that the authorized take numbers remain 
appropriate and sufficient. As part of the Season 1 monitoring 
requirements, the City was required to station a protected species 
observer (PSO) on the Seattle-Bainbridge Ferry whenever vibratory 
installation was underway. The Ferry runs non-stop throughout the day 
and the PSO recorded all animal observations, even those outside of the 
specified harassment zones. The number of observations beyond the Level 
B harassment zone during Season 1 (7,357 meters (m)) was comparatively 
small. Only four species were observed beyond the behavioral harassment 
zone.
    A brief summary of take assumptions for each species is provided 
here. For gray whales, minke whales, and northern elephant seals, the 
City, with NMFS' concurrence, assumed a single animal would be taken 
per month by Level B harassment. For long-beaked common dolphin and 
common bottlenose dolphin, the City assumed, and NMFS concurred, there 
would be seven takes per month by Level B harassment. For transient 
killer whales it was assumed that six animals could be taken per month. 
The Level A harassment zone is larger than the Level B harassment zone 
for high-frequency cetaceans. For the harbor porpoise, it was assumed 
that six animals could be taken per day by Level B harassment. That is, 
they may enter into the larger Level A harassment zone, but are 
unlikely to remain long enough to accumulate energy at levels that 
would result in injury. Although the City must implement a shutdown 
zone of 660 m during this activity, due to the cryptic nature and lower 
detectability of harbor porpoises at large distances, the City 
anticipates that up to 6 of the harbor porpoises (2 per month) that 
enter the Level A harassment zone could enter undetected and remain 
long enough to experience auditory injury. It was assumed that up to 12 
Dall's porpoises could experience Level B harassment per month. As a 
high frequency cetacean, the Level A harassment zone is larger than the 
Level B harassment zone. As with harbor porpoises, the Dall's porpoise 
could enter into the Level A harassment zone, but are unlikely to 
remain long enough to sustain auditory injury. Therefore, the animal 
would be exposed to Level B harassment. The City must implement a 
shutdown zone of 660 m during this activity, but anticipates that due 
to the cryptic nature and lower detectability of harbor porpoises at 
large distances, up

[[Page 56008]]

to 6 of the Dall's porpoises (2 per month) that enter the Level A 
harassment zone could remain long enough to experience auditory injury. 
It was assumed that up to 10 California sea lions and 2 Steller sea 
lions could be taken by Level B harassment each in-water work day. NMFS 
concurred with the City's request for take by Level B harassment of a 
single northern elephant seal per month. Finally, it was assumed that 
10 harbor seals could enter the Level B harassment zone per day and 1 
seal may approach closer and enter the 82 m Level A harassment zone 
before the animal is detected and activities shut down.

Table 3--Authorized Take of Marine Mammals by Level A and Level B Harassment From Pier 58 Renewal IHA by Species
                                     and Stock and Percent of Take by Stock
----------------------------------------------------------------------------------------------------------------
                                                                Take by      Take by
               Species                         Stock            Level A      Level B       Stock      Percent of
                                                               harassment   harassment   abundance      stock
----------------------------------------------------------------------------------------------------------------
Pacific harbor seal.................  Washington Northern              21          189       11,036         1.90
                                       Inland Waters stock.
Northern elephant seal..............  California breeding...            0            3      187,386        <0.01
California sea lion.................  U.S...................            0          210      257,606         0.08
Steller sea lion....................  Eastern U.S...........            0           42       43,201         0.10
Harbor porpoise.....................  Washington Inland                 6          120       11,233         1.12
                                       Waters.
Dall's porpoise.....................  California/Oregon/                6           30       16,498         0.22
                                       Washington.
Long-beaked common dolphin..........  California............            0           21       83,379         0.03
Common bottlenose dolphin...........  California/Oregon/                0           21        3,477         0.60
                                       Washington Offshore.
Transient killer whale..............  West Coast Transient..            0           18          349         5.16
Gray whale..........................  Eastern North Pacific.            0            3       26,960         0.01
Minke whale.........................  California/Oregon/                0            3          915         0.33
                                       Washington Stock.
----------------------------------------------------------------------------------------------------------------

Description of Mitigation, Monitoring and Reporting Measures

    The mitigation, monitoring, and reporting measures included as 
requirements in this authorization are nearly identical to those 
included in the FR Notice announcing the issuance of the initial IHA 
(87 FR 31985, May 26, 2022), although the size of the shutdown and 
Level B harassment areas has been revised as appropriate, as shown in 
Table 4 below. The following identical measures for this renewal 
include;
     Shut down construction operations (including in-water 
heavy machinery work other than pile driving) if a marine mammal comes 
within 10 m of construction activity or a vessel involved with 
construction activity (e.g., barge) to avoid direct physical 
interaction with marine mammals;
     Shut down during active pile driving if marine mammals 
approach pile driving activities within hearing group-specific shutdown 
zones;
     Contact the local marine mammal sightings network (Orca 
Network) hourly to obtain real-time sightings reports of marine mammals 
in the project area;
     Shut down if any species for which take has not been 
authorized (e.g., Southern Resident killer whales, humpback whales), or 
a species for which take has been authorized but the authorized take 
numbers have been met, enters the Level B harassment zones;
     Implement impact pile driving soft starts whereby hammer 
energy is gradually ramped up;
     Use of a bubble curtain during all impact pile driving.
     Use of NMFS-approved PSOs to monitor the entire Level A 
and Level B harassment zones;
     Submit draft reports on all monitoring within 90 calendar 
days of the completion of marine mammal monitoring at each pier or 60 
days prior to the issuance of any subsequent IHAs for these projects, 
whichever comes first;
     Prepare and submit final reports within 30 days following 
resolution of comments on the draft report from NMFS;
     Submit all PSO datasheets and/or raw sightings data (in a 
separate file from the final reports referenced above); and
     Report injured or dead marine mammals.
    The shutdown and Level B harassment zones shown in Table 4 have 
been revised from the Season 1 initial IHA to reflect the updated SLs 
associated with 30-inch impact and vibratory driving as well as the 
increase in strikes per day for impact driving described previously.

                         Table 4--Shutdown and Level B Harassment Zones for IHA Renewal
----------------------------------------------------------------------------------------------------------------
                                                            Minimum shutdown zone (m)
                                             -------------------------------------------------------   Level B
         Pile size, type, and method              LF         MF         HF                            harassment
                                               Cetacean   Cetacean   Cetacean    Phocid    Otariid     zone (m)
----------------------------------------------------------------------------------------------------------------
Timber vibratory removal (Don Armeni).......         10         10         10         10         10          453
30-inch steel vibratory installation........         60         10         85         35         10       21,710
30-inch steel impact installation...........        555         20        660        295         25          616
16-inch steel vibratory installation (Don            10         10         15         10         10        3,415
 Armeni)....................................
----------------------------------------------------------------------------------------------------------------

Comments and Responses

    As noted previously, NMFS published a notice of a proposed IHA (87 
FR 12089, March 3, 2022) and solicited public comments on both our 
proposal to issue the initial IHA for the project and on the potential 
for a renewal IHA, should certain requirements be met. NMFS then 
published an additional 15-day opportunity to comment on the proposed 
renewal IHA (88 FR 45393; July 17, 2023). No comments were received in 
response to either public comment period.

[[Page 56009]]

Determinations

    There is no new information which would change our potential 
impacts to the specified marine mammal species and stocks. The 
anticipated effects of the action under the renewal IHA are expected to 
be the same as those that may have occurred under the initial IHA. The 
species authorized for take are identical to those that were identified 
in the initial IHA. The same species that were authorized for limited 
take by Level A harassment under the initial IHA are authorized for 
take by Level A harassment under the renewal IHA. The Level A and Level 
B harassment zones for 30-inch pile installation under the renewal IHA 
are larger than those contained in the initial IHA. However, the number 
of animals of each species authorized for take is less than what was 
authorized under the initial IHA since the number of in-water work days 
anticipated is less than half of the number of work days that occurred 
under the initial IHA. Furthermore, PSO monitoring of the renewal IHA's 
extended harassment zones demonstrated that most take occurs closer to 
the in-water driving location. The mitigation and monitoring measures 
required under the renewal IHA are identical to those prescribed 
through the initial IHA, with one exception. The shutdown and Level B 
harassment zones under the renewal IHA are larger than those employed 
in Season 1.
    After analyzing the City's application for the initial IHA, NMFS 
determined that the action would have a negligible impact on all 
affected stocks and that the taking of authorized species would be 
small relative to population size (< six percent of the total abundance 
for all stocks).
    NMFS has concluded that there is no new information suggesting that 
our analysis or findings should change from those reached for the 
initial IHA. Based on the information and analysis contained here and 
in the referenced documents, NMFS has determined the following: (1) the 
required mitigation measures will effect the least practicable impact 
on marine mammal species or stocks and their habitat; (2) the 
authorized takes will have a negligible impact on the affected marine 
mammal species or stocks; (3) the authorized takes represent small 
numbers of marine mammals relative to the affected stock abundances; 
(4) The City's activities will not have an unmitigable adverse impact 
on taking for subsistence purposes as no relevant subsistence uses of 
marine mammals are implicated by this action, and; (5) appropriate 
monitoring and reporting requirements are included.

National Environmental Policy Act

    This action is consistent with categories of activities identified 
in Categorical Exclusion B4 (incidental take authorizations with no 
anticipated serious injury or mortality) of the Companion Manual for 
NOAA Administrative Order 216-6A, which do not individually or 
cumulatively have the potential for significant impacts on the quality 
of the human environment and for which we have not identified any 
extraordinary circumstances that would preclude this categorical 
exclusion. Accordingly, NMFS determined that the issuance of the 
initial IHA qualified to be categorically excluded from further NEPA 
review. NMFS has determined that the application of this categorical 
exclusion remains appropriate for this renewal IHA.

Endangered Species Act

    Section 7(a)(2) of the Endangered Species Act of 1973 (ESA: 16 
U.S.C. 1531 et seq.) requires that each Federal agency insure that any 
action it authorizes, funds, or carries out is not likely to jeopardize 
the continued existence of any endangered or threatened species or 
result in the destruction or adverse modification of designated 
critical habitat. To ensure ESA compliance for the issuance of IHAs, 
NMFS consults internally whenever we propose to authorize take for 
endangered or threatened species.
    No incidental take of ESA-listed species is authorized or expected 
to result from these activities. Therefore, NMFS has determined that 
consultation under section 7 of the ESA is not required for this 
action.

Renewal

    NMFS has issued a renewal IHA to the City of Seattle for the take 
of marine mammals incidental to construction activities associated with 
the Pier 58 Reconstruction Project in Seattle, Washington effective 
from August 10, 2023 through July 31, 2024.

    Dated: August 14, 2023.
Kimberly Damon-Randall,
Director, Office of Protected Resources, National Marine Fisheries 
Service.
[FR Doc. 2023-17682 Filed 8-16-23; 8:45 am]
BILLING CODE 3510-22-P