Notice of Effectiveness of Exempt Wholesale Generator Status, 52148 [2023-16786]
Download as PDF
52148
Federal Register / Vol. 88, No. 150 / Monday, August 7, 2023 / Notices
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–517–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–517–
000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To file via any other method: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Georgia Clark, Regulatory
Analyst Sr., Discovery Gas Transmission
LLC, 2800 Post Oak Boulevard,
Houston, Texas 77056, or call (346)
388–0663, or via email to
Georgia.clark@williams.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
ddrumheller on DSK120RN23PROD with NOTICES1
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
18:58 Aug 04, 2023
Jkt 259001
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: August 1, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–16777 Filed 8–4–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–131–000]
East Tennessee Natural Gas, LLC;
Notice of Waiver Period for Water
Quality Certification Application
On July 20, 2023, East Tennessee
Natural Gas, LLC submitted to the
Federal Energy Regulatory Commission
(Commission) a copy of its application
for a Clean Water Act section 401(a)(1)
water quality certification filed with the
Tennessee Department of Environment
and Conservation, in conjunction with
the above captioned project. Pursuant to
40 CFR 121.6 and section 157.22(b) of
the Commission’s regulations,1 we
hereby notify the Tennessee Department
of Environment and Conservation of the
following:
Date of Receipt of the Certification
Request: June 26, 2023.
Reasonable Period of Time to Act on
the Certification Request: June 26, 2024.
If the Tennessee Department of
Environment and Conservation fails or
refuses to act on the water quality
certification request by the above waiver
date, then the agency certifying
authority is deemed waived pursuant to
section 401(a)(1) of the Clean Water Act,
33 U.S.C. 1341(a)(1).
Dated: July 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–16709 Filed 8–4–23; 8:45 am]
BILLING CODE 6717–01–P
1 18
PO 00000
CFR 157.22.
Frm 00041
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket Nos.
Anemoi Energy Storage, LLC .....
Ebony Energy Storage, LLC .......
Clearwater Wind II, LLC ..............
Johnson County Power, LLC ......
RW Miller Power, LLC .................
Jack County Power, LLC .............
Boomtown Solar Energy LLC ......
Delta’s Edge Lessee, LLC ...........
Solar Partners XI, LLC ................
Horizon Solar, LLC ......................
Sun Pond, LLC ............................
Oak Lessee, LLC .........................
Fox Squirrel Solar LLC ................
Huck Finn Solar, LLC ..................
Harvest Gold Solar Power, LLC ..
SMT Alamo LLC ..........................
SMT Santa Rosa LLC .................
SMT Bay City LLC .......................
SMT Elsa LLC .............................
SMT Mercedes LLC ....................
SMT Mission LLC ........................
SMT Los Fresnos LLC ................
SMT Rio Grande LLC ..................
SMT Rio Grande II LLC ..............
SMT Harlingen II LLC ..................
Appaloosa Solar I, LLC ...............
Pome BESS LLC .........................
Three Corners Solar, LLC ...........
Three Corners Prime Tenant,
LLC.
BE-Pine 1 LLC .............................
Horus West Virginia I, LLC ..........
Horus Louisiana I, LLC ................
EG23–142–000
EG23–143–000
EG23–144–000
EG23–145–000
EG23–146–000
EG23–147–000
EG23–148–000
EG23–149–000
EG23–150–000
EG23–151–000
EG23–152–000
EG23–153–000
EG23–154–000
EG23–155–000
EG23–156–000
EG23–157–000
EG23–158–000
EG23–159–000
EG23–160–000
EG23–161–000
EG23–162–000
EG23–163–000
EG23–164–000
EG23–165–000
EG23–166–000
EG23–167–000
EG23–168–000
EG23–169–000
EG23–170–000
EG23–171–000
EG23–172–000
EG23–173–000
Take notice that during the month of
July 2023, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a) (2022).
Dated: August 1, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–16786 Filed 8–4–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14775–005]
Marine Renewable Energy
Collaborative of New England; Notice
of Intent To Prepare an Environmental
Assessment
On June 1, 2023, Marine Renewable
Energy Collaborative of New England
filed an application for a hydrokinetic
pilot project license to connect the
existing Bourne Tidal Hydrokinetic Test
Site (project) to the power grid. The
project would be located in the Cape
Cod Canal near the Town of Bourne, in
E:\FR\FM\07AUN1.SGM
07AUN1
Agencies
[Federal Register Volume 88, Number 150 (Monday, August 7, 2023)]
[Notices]
[Page 52148]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-16786]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Anemoi Energy Storage, LLC.............. EG23-142-000
Ebony Energy Storage, LLC............... EG23-143-000
Clearwater Wind II, LLC................. EG23-144-000
Johnson County Power, LLC............... EG23-145-000
RW Miller Power, LLC.................... EG23-146-000
Jack County Power, LLC.................. EG23-147-000
Boomtown Solar Energy LLC............... EG23-148-000
Delta's Edge Lessee, LLC................ EG23-149-000
Solar Partners XI, LLC.................. EG23-150-000
Horizon Solar, LLC...................... EG23-151-000
Sun Pond, LLC........................... EG23-152-000
Oak Lessee, LLC......................... EG23-153-000
Fox Squirrel Solar LLC.................. EG23-154-000
Huck Finn Solar, LLC.................... EG23-155-000
Harvest Gold Solar Power, LLC........... EG23-156-000
SMT Alamo LLC........................... EG23-157-000
SMT Santa Rosa LLC...................... EG23-158-000
SMT Bay City LLC........................ EG23-159-000
SMT Elsa LLC............................ EG23-160-000
SMT Mercedes LLC........................ EG23-161-000
SMT Mission LLC......................... EG23-162-000
SMT Los Fresnos LLC..................... EG23-163-000
SMT Rio Grande LLC...................... EG23-164-000
SMT Rio Grande II LLC................... EG23-165-000
SMT Harlingen II LLC.................... EG23-166-000
Appaloosa Solar I, LLC.................. EG23-167-000
Pome BESS LLC........................... EG23-168-000
Three Corners Solar, LLC................ EG23-169-000
Three Corners Prime Tenant, LLC......... EG23-170-000
BE-Pine 1 LLC........................... EG23-171-000
Horus West Virginia I, LLC.............. EG23-172-000
Horus Louisiana I, LLC.................. EG23-173-000
------------------------------------------------------------------------
Take notice that during the month of July 2023, the status of the
above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR 366.7(a)
(2022).
Dated: August 1, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-16786 Filed 8-4-23; 8:45 am]
BILLING CODE 6717-01-P